Metcon Ti, Inc
- Based in
- Pleasanton
- On San Francisco permits
- Jul 2017 to Sep 2026
- Last 24 months
- 36 permits filed
51 permits since 2000: 36 completed, 13 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 1680 Eddy St | expansion of 3 electrical rooms to allow new switch gear. extension of concrete pod at exterior of electrical rooms, portion of concrete walkaway to be extended to allow for complaint walkaway clareances.Details
expansion of 3 electrical rooms to allow new switch gear. extension of concrete pod at exterior of electrical rooms, portion of concrete walkaway to be extended to allow for complaint walkaway clareances. | $175,871 |
| Sep 4, 2026 | In progress issued Sep 2026 | 180 Howard St | mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women'sDetails
mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. electrical_ new power & signal devices throughout, new 2025 title 24 compliant lighting/controls. plumbing- replace (e) lavaroty fixtures at (e) locations in women's | $150,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 180 Howard St | mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n)Details
mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n) | $125,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 180 Howard St | 9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531Details
9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531 | |
| Jul 22, 2026 | In progress issued Jul 2026 | 180 Howard St | 2nd floor: anchoring of existing one person furniture phone booths. new signage to designated a recessible phone room and restroom upgrade per form cDetails
2nd floor: anchoring of existing one person furniture phone booths. new signage to designated a recessible phone room and restroom upgrade per form c | $10,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 180 Howard St | 9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531Details
9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531 | $250,000 |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 33 New Montgomery St | 9/f: mep deferred submittal to support approved architecutral permit. ref 202512040978 and 202606012267.Details
9/f: mep deferred submittal to support approved architecutral permit. ref 202512040978 and 202606012267. | $190,000 |
| Jun 4, 2026 | In progress issued Jul 2026 | 33 New Montgomery St | ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finishes and install of new owner golf and racing simulators.Details
ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finishes and install of new owner golf and racing simulators. | $175,000 |
| Jun 4, 2026 | In progress issued Jul 2026 | 33 New Montgomery St | 18th floor, suites 1810 and 1840: market ready improvement for office suite(4,500 sf)combing suites and constructing new walls,lighting, flooring, drinking fountain & stall accessibility.Details
18th floor, suites 1810 and 1840: market ready improvement for office suite(4,500 sf)combing suites and constructing new walls,lighting, flooring, drinking fountain & stall accessibility. | $650,000 |
| Jun 1, 2026 | Completed final sign-off Aug 2026 | 33 New Montgomery St | 9/f: rev 202512040978 to add illuminated exit signage to t.i. electrical deferred under this permit.Details
9/f: rev 202512040978 to add illuminated exit signage to t.i. electrical deferred under this permit. | $55,000 |
| May 19, 2026 | In progress issued May 2026 | 180 Howard St | 9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites, selective demo & construction of non-structural partitions, new finishes lighting fixtures, & millwork. mep & fire/life safety under seprate permitDetails
9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of 2 separate suites, selective demo & construction of non-structural partitions, new finishes lighting fixtures, & millwork. mep & fire/life safety under seprate permit | |
| May 19, 2026 | In progress issued Jun 2026 | 180 Howard St | 12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.Details
12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit. | $750,000 |
| May 15, 2026 | In progress issued Jun 2026 | 180 Howard St | 10/fl- ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit.Details
10/fl- ti and selective soft demo and construction of non structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under another permit. | $750,000 |
| Apr 22, 2026 | In progress issued Jun 2026 | 560 Battery St | combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet...Details
combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet... | $639,000 |
| Mar 10, 2026 | Completed final sign-off Jul 2026 | 180 Howard St | 8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286Details
8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286 | $150,000 |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 180 Howard St | 8th floor tenant improvement, selective demolition and construction of non structural partitions, new finishes, light fixtures, and mill work. mep and fire/life and safety under seperate permit.Details
8th floor tenant improvement, selective demolition and construction of non structural partitions, new finishes, light fixtures, and mill work. mep and fire/life and safety under seperate permit. | $750,000 |
| Dec 5, 2025 | Completed final sign-off Apr 2026 | 2000 Fillmore St | install (n) non load bearing walls. (e) restrooms and plumbing fixtures to remain. install (n) lighting fixtures, ti improvmenets for (e) retail space no change of use.Details
install (n) non load bearing walls. (e) restrooms and plumbing fixtures to remain. install (n) lighting fixtures, ti improvmenets for (e) retail space no change of use. | $30,000 |
| Dec 4, 2025 | In progress issued Jan 2026 | 180 Howard St | 9/f: tenant improvement to include new partitions, offices, and conference rooms. mep deferred.Details
9/f: tenant improvement to include new partitions, offices, and conference rooms. mep deferred. | $750,000 |
| Dec 4, 2025 | Completed final sign-off Aug 2026 | 33 New Montgomery St | 9th/f t.i. new partitions, offices, conference rooms, and 14 new phone booths. mep deferredDetails
9th/f t.i. new partitions, offices, conference rooms, and 14 new phone booths. mep deferred | $750,000 |
| Dec 3, 2025 | Completed final sign-off Feb 2026 | 180 Howard St | 7/f: deferred mep for ti# 202509044560. replace (e) plumbing fixtures at break froom 7506, according to cpc 2022 and energy code 2022. replace low pressure ductwork for ste 750. install (5) new terminal units. new power and signal devices throughout the space. new 2022 title 24 compliant lighting &Details
7/f: deferred mep for ti# 202509044560. replace (e) plumbing fixtures at break froom 7506, according to cpc 2022 and energy code 2022. replace low pressure ductwork for ste 750. install (5) new terminal units. new power and signal devices throughout the space. new 2022 title 24 compliant lighting & | $30,000 |
| Dec 1, 2025 | Completed final sign-off Jan 2026 | 1 Lombard St | deferred plumbing: replace (e) drinking fountain at 1st fl and (e) drinking fountain at mezz level. replace (e) restroom fixtures at mezz including undermount (4) lavs, (3) urinals, (5) water closets. provide (h) & (c) water & drain line insulation kit, provide clean out at drain line.Details
deferred plumbing: replace (e) drinking fountain at 1st fl and (e) drinking fountain at mezz level. replace (e) restroom fixtures at mezz including undermount (4) lavs, (3) urinals, (5) water closets. provide (h) & (c) water & drain line insulation kit, provide clean out at drain line. | $30,000 |
| Oct 24, 2025 | Completed final sign-off Feb 2026 | 180 Howard St | 7th floor: revision to permit #202509044560; minor revisions to ceilings, light fixtures, millwork, and finishes.Details
7th floor: revision to permit #202509044560; minor revisions to ceilings, light fixtures, millwork, and finishes. | |
| Sep 30, 2025 | Completed final sign-off Dec 2025 | 180 Howard St | suite 700: installation and seismic anchoring of 4 phone booths.Details
suite 700: installation and seismic anchoring of 4 phone booths. | $8,000 |
| Sep 19, 2025 | Completed final sign-off Jan 2026 | 1 Lombard St | deferred mep for pa# 202407085966: mechanical- demo (e) ductwork, registers, and fan coils where shown. relocate (e) registers to new location, install (n) registers/t-stats. comfort balance. electrical-upgrade/replace lighting throughout half of the 1/f. title-24 compliant. plumbing-provide and...Details
deferred mep for pa# 202407085966: mechanical- demo (e) ductwork, registers, and fan coils where shown. relocate (e) registers to new location, install (n) registers/t-stats. comfort balance. electrical-upgrade/replace lighting throughout half of the 1/f. title-24 compliant. plumbing-provide and... | $40,000 |
| Sep 15, 2025 | Completed final sign-off Jan 2026 | 180 Howard St | lobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with asse 1070, (n) water heater, drinking fountain with bottle filter and water boxes. mep deferredDetails
lobby floor/electrical (n) title lighting controls and (n) power signal devices throughout space. plumbing install (n) ada complaint water closet, shower and fixtures, water tempering complaint with asse 1070, (n) water heater, drinking fountain with bottle filter and water boxes. mep deferred | $75,000 |
| Sep 12, 2025 | Completed final sign-off Nov 2025 | 180 Howard St | deferred mep for pa# 202505025705: mech-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the space, new 2022 title-24 compliant lighting and controls. plumbing-installDetails
deferred mep for pa# 202505025705: mech-replace low pressure ductwork for ste 700, install 2 new terminal units. all plumbing is replacing (e) fxitures at (e) location. electrical- new power and signal devices throughout the space, new 2022 title-24 compliant lighting and controls. plumbing-install | $385,000 |
| Sep 4, 2025 | Completed final sign-off Feb 2026 | 180 Howard St | 7th fl, ste 750 interior ti; construction of non-structural partitions, new finishes, lighting fixtures and millwork. mep and fire/life safety under separate permitDetails
7th fl, ste 750 interior ti; construction of non-structural partitions, new finishes, lighting fixtures and millwork. mep and fire/life safety under separate permit | $750,000 |
| Aug 20, 2025 | Completed final sign-off Jan 2026 | 180 Howard St | 1/f: revision to permit 202501148318.. revise the description of scope of work stating that there is no modification to fire alarm or sprinklerDetails
1/f: revision to permit 202501148318.. revise the description of scope of work stating that there is no modification to fire alarm or sprinkler | |
| May 21, 2025 | Completed final sign-off Mar 2026 | 2750 19th St | ti improvement ref pa #2024-0829-9734 lvl 1: add (n) office 123-126 & 129. mech rm 127 & it/storage 128. (n) partitions, lighting, power, signal & hvac. provide concrete threshold ext to max 8.33% (1:12) slope at bryant st entrance. mezzanine: add (n) partitions to enclosed it/storage rm 128.Details
ti improvement ref pa #2024-0829-9734 lvl 1: add (n) office 123-126 & 129. mech rm 127 & it/storage 128. (n) partitions, lighting, power, signal & hvac. provide concrete threshold ext to max 8.33% (1:12) slope at bryant st entrance. mezzanine: add (n) partitions to enclosed it/storage rm 128. | $100,000 |
| May 2, 2025 | Completed final sign-off Nov 2025 | 180 Howard St | 7/f: interior tenant improvement. selective demolition and construction of non-structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under separate permit.Details
7/f: interior tenant improvement. selective demolition and construction of non-structural partitions, new finishes, light fixtures, and millwork. mep and fire/life safety under separate permit. | $750,000 |
| Mar 6, 2025 | Completed final sign-off Jun 2025 | 33 New Montgomery St | 11/f: interior imrpovement to (e) office suite, including demo of (e) walls and ceiling and construction of (n) non load bearing walls, floor finishes, lighting, power, and ceilings.Details
11/f: interior imrpovement to (e) office suite, including demo of (e) walls and ceiling and construction of (n) non load bearing walls, floor finishes, lighting, power, and ceilings. | $250,000 |
| Feb 6, 2025 | Completed final sign-off Jan 2026 | 180 Howard St | exterior non-structural building entry mofification,scope includes new finishes & lighting at walkway ceiling,new signage under deferred permit.modifications to fire sprinkler under deferred permit.this scope of work does not change exisiting bldg occupancy,existing or accessible access.Details
exterior non-structural building entry mofification,scope includes new finishes & lighting at walkway ceiling,new signage under deferred permit.modifications to fire sprinkler under deferred permit.this scope of work does not change exisiting bldg occupancy,existing or accessible access. | $100,000 |
| Jan 29, 2025 | Completed final sign-off Feb 2026 | 1887 Union St | deferred mechanicial and electrical for pa# 202411195258. no plumbing deferred submittal, fixtures and removal and replaced. t.i within an existing vacant suite on the g/f of a mixed use bldg to incorporate new personal supplies for personal health retailer.Details
deferred mechanicial and electrical for pa# 202411195258. no plumbing deferred submittal, fixtures and removal and replaced. t.i within an existing vacant suite on the g/f of a mixed use bldg to incorporate new personal supplies for personal health retailer. | $120,000 |
| Jan 23, 2025 | Completed final sign-off Mar 2026 | 2750 19th St | deferred mep for pa # 2024-0829-9734 (ref pa #2017-1215-665 s & 2020-0715-0223) level 01- add (n) plumbing to restrooms, janitor's closet & breakroom, new hvac equipment for space conditioning & ventilation. add lighting & power for new ti space. mezzanine- add lighting & power for (n) ti spaceDetails
deferred mep for pa # 2024-0829-9734 (ref pa #2017-1215-665 s & 2020-0715-0223) level 01- add (n) plumbing to restrooms, janitor's closet & breakroom, new hvac equipment for space conditioning & ventilation. add lighting & power for new ti space. mezzanine- add lighting & power for (n) ti space | $750,000 |
| Nov 19, 2024 | Completed final sign-off Feb 2026 | 1887 Union St | tenant improvement of existing vacant suite in an exisintg mixted use builing. scope is interior only. minimal demo of existing non-load bearing partitions. new non-bearing partitions and doors. restroom accessibility upgrade. new floor finishes and wall painting. mep deferred.Details
tenant improvement of existing vacant suite in an exisintg mixted use builing. scope is interior only. minimal demo of existing non-load bearing partitions. new non-bearing partitions and doors. restroom accessibility upgrade. new floor finishes and wall painting. mep deferred. | $120,000 |
| Oct 24, 2024 | Completed final sign-off Jan 2026 | 180 Howard St | ground fl: interior ti. selective demo & construction of non-structural partitions. new ceilings, lighting, millwork & finishes. mep & life safety deferred submittalDetails
ground fl: interior ti. selective demo & construction of non-structural partitions. new ceilings, lighting, millwork & finishes. mep & life safety deferred submittal | $500,000 |
| Aug 29, 2024 | Completed final sign-off Mar 2026 | 2750 19th St | t.i. improvements to the (e)bldg. ref#: approved and issued 201712156685 (iii-a, 6 stories, 1 basement) & pa#: 202007150223 (change const type iii-a to i-a) - level 01: add (n) restrooms, janitor & storage closets, conference room, office & break ara (n) partitions, lighting, power and signal & hvacDetails
t.i. improvements to the (e)bldg. ref#: approved and issued 201712156685 (iii-a, 6 stories, 1 basement) & pa#: 202007150223 (change const type iii-a to i-a) - level 01: add (n) restrooms, janitor & storage closets, conference room, office & break ara (n) partitions, lighting, power and signal & hvac | $350,000 |
| Jul 8, 2024 | Completed final sign-off Jan 2026 | 1 Lombard St | 1/f & mezz. -new floor finishes, light fixtures, ceiling finishes, conduits, switches, wiring, outlets, typ. in selected areas. restroom accessibility upgrade. interior non load bearing partitions. tenant improvement, no exterior work. no changes to e building structure.Details
1/f & mezz. -new floor finishes, light fixtures, ceiling finishes, conduits, switches, wiring, outlets, typ. in selected areas. restroom accessibility upgrade. interior non load bearing partitions. tenant improvement, no exterior work. no changes to e building structure. | $250,000 |
| Jun 25, 2024 | Expired or cancelled cancelled Jun 2025 | 1 Lombard St | revision to pa#202310178850. mezanine no longer to be removed. no structural work. no exterior work.Details
revision to pa#202310178850. mezanine no longer to be removed. no structural work. no exterior work. | |
| Apr 18, 2024 | Completed final sign-off Nov 2024 | 180 Howard St | interior ti selective demo and construction of non structural partitions, new finishes, light fixtures and millwork. mep and fire life safety under separate permitDetails
interior ti selective demo and construction of non structural partitions, new finishes, light fixtures and millwork. mep and fire life safety under separate permit | $750,000 |
| Mar 15, 2022 | Completed final sign-off Nov 2022 | 323 Octavia St | space is a vacant shell, all new construction. building out a fitness studio. adding hvac (10 tons), electrical (new service), plumbing, life safety (fire alarms and sprinkler relocations), new flooring, new door entry system. plumbing includes 1 new shower room, 1 new restroom with urinal.Details
space is a vacant shell, all new construction. building out a fitness studio. adding hvac (10 tons), electrical (new service), plumbing, life safety (fire alarms and sprinkler relocations), new flooring, new door entry system. plumbing includes 1 new shower room, 1 new restroom with urinal. | $500,000 |
| Mar 15, 2022 | Never finaled issued Apr 2022, no final | 323 Octavia St | building out a fitness studio with new exterior signage.Details
building out a fitness studio with new exterior signage. | $15,000 |
| Dec 22, 2021 | Completed final sign-off Mar 2022 | 1551 Tennessee St | voluntarily convert existing office to accessible unisex restroomDetails
voluntarily convert existing office to accessible unisex restroom | $56,000 |
| May 3, 2018 | Completed final sign-off Oct 2019 | 6301 03rd St | revision to floor layout 201707061129 for dental offieDetails
revision to floor layout 201707061129 for dental offie | |
| Apr 13, 2018 | Completed final sign-off Oct 2019 | 6301 03rd St | revision to app#201712015287 for mechanical and electrical plans.Details
revision to app#201712015287 for mechanical and electrical plans. | |
| Apr 13, 2018 | Completed final sign-off Oct 2019 | 6301 03rd St | revision to app#201802221989 for plumbing plans. change of pipes locations and sink locationDetails
revision to app#201802221989 for plumbing plans. change of pipes locations and sink location | |
| Apr 10, 2018 | Completed final sign-off Oct 2018 | 6301 03rd St | revision to app#201707061129. replacement of exterior windows in kind, keeping in line with the historic charactor of the bldg. no infill of any windows of any sortDetails
revision to app#201707061129. replacement of exterior windows in kind, keeping in line with the historic charactor of the bldg. no infill of any windows of any sort | |
| Feb 22, 2018 | Completed final sign-off Oct 2019 | 6301 03rd St | provide piping for operating rooms 1,2,3,4,6 and lab sinks - plan checkDetails
provide piping for operating rooms 1,2,3,4,6 and lab sinks - plan check | |
| Dec 1, 2017 | Completed final sign-off Feb 2020 | 6301 03rd St | hvac, electrical, plumbing, paint, flooring, grid work. ref ti pa #201707061129.Details
hvac, electrical, plumbing, paint, flooring, grid work. ref ti pa #201707061129. | $560,000 |
| Aug 31, 2017 | Completed final sign-off Oct 2019 | 6301 03rd St | facade improvement work to include (n) exterior paint.Details
facade improvement work to include (n) exterior paint. | $2,000 |
| Jul 6, 2017 | Completed final sign-off Feb 2020 | 6301 03rd St | interior renovation of e 2 story medical office bldg to bring it up to code and modernize it. space is 5700 sfDetails
interior renovation of e 2 story medical office bldg to bring it up to code and modernize it. space is 5700 sf | $750,000 |