David De Valeria
- Listed as
- architect, lessee
- Firm
- M. Moser Associates
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Oct 2026
59 permits since 2000 (architect on 59 permits, lessee on 1 permit): 45 completed, 8 in progress, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 555 California St | Bcci Construction Company | 51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.Details
51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred. | $1,935,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Details
51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. | $1,935,000 |
| Aug 3, 2026 | In progress issued Sep 2026 | 525 Market St | Bcci Construction Company | anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sfDetails
anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sf | $8,500 |
| Jul 14, 2026 | In progress issued Jul 2026 | 555 California St | Bcci Construction Company | 50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.Details
50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855. | $3,800,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 555 California St | Bcci Construction Company | 50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep.Details
50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep. | $50,000 |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 655 Beach St | W.E. O'neil Construction Co. Of Norcal | 2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant.Details
2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant. | $962,880 |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 160 Spear St | Sc Builders, Inc | 10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage.Details
10th, 11th, 12th, 13th, 15th, and 19th floors. addition of phone booths and structural anchorage. | $80,000 |
| Aug 6, 2025 | Completed final sign-off Oct 2025 | 350 Bush St | Skyline Construction | 18/fl-(n) glass doors at office 1827 and 1847. 19/f-new countertop on break area (1932) and window film.Details
18/fl-(n) glass doors at office 1827 and 1847. 19/f-new countertop on break area (1932) and window film. | $20,000 |
| May 30, 2025 | In progress filed May 2025, not yet issued | 655 Beach St | exterior work only. new porcelain tile deck on pedestals, on top of existing concrete deck.Details
exterior work only. new porcelain tile deck on pedestals, on top of existing concrete deck. | $15,000 | |
| May 29, 2025 | Completed final sign-off Mar 2026 | 650 California St | Bcci Construction Company | 24th & 25th/f: office t.i. renovation total 7912 sf. mep defferred. new patitions & officesDetails
24th & 25th/f: office t.i. renovation total 7912 sf. mep defferred. new patitions & offices | $715,000 |
| May 9, 2025 | Completed final sign-off Oct 2025 | 55 Spear St | Dpr Construction A | for adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007)Details
for adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007) | |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 55 Spear St | Dpr Construction A | for administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st)Details
for administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st) | |
| Jan 24, 2025 | Completed final sign-off Aug 2025 | 160 Spear St | Sc Builders, Inc | 10th flr: t.i. improvement of (e) tenant space. minor demo and construction of (n) non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg.Details
10th flr: t.i. improvement of (e) tenant space. minor demo and construction of (n) non-load bearing walls. millwork, lighting, and furniture. deferred: el, plumb, fire sprinkler, smoke detection and fire alarm system installed to be under separate permit. fully sprinkler bldg. | $612,626 |
| Jan 22, 2025 | Completed final sign-off Oct 2025 | 1 Market St | Dpr Construction A | interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety.Details
interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety. | $150,000 |
| Dec 16, 2024 | Completed final sign-off May 2025 | 1 Market St | Dpr Construction A | 35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetrationDetails
35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetration | $7,000 |
| Oct 30, 2024 | Completed final sign-off Feb 2025 | 160 Spear St | Sc Builders, Inc | 11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture.Details
11th floor: interior t.i. of existing tenent space. minor demolition and construction of new non load bearing walls. millwork, lighting and furniture. | $600,000 |
| Oct 10, 2024 | Completed final sign-off May 2025 | 1 Market St | Dpr Construction A | 35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operationalDetails
35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational | $3,760,780 |
| Sep 17, 2024 | Completed final sign-off Nov 2024 | 160 Spear St | Sc Builders, Inc | 14/fl- structural anchorage for (e) phone booths. deferred submittals :sprinkerls, smoke detection and fire alarm detection under separate permit if neededDetails
14/fl- structural anchorage for (e) phone booths. deferred submittals :sprinkerls, smoke detection and fire alarm detection under separate permit if needed | $12,000 |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | Sc Builders, Inc | 3rd fl tenant improvement construction of non load bearing walls, celings & lightingDetails
3rd fl tenant improvement construction of non load bearing walls, celings & lighting | $454,164 |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 160 Spear St | Sc Builders, Inc | 14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible lockerDetails
14th fl add (agrr) all gender restroom with shower. add a sink to existing wellness room. add bench in shower room, identify accessible locker | $93,408 |
| Aug 7, 2024 | In progress issued Aug 2024 | 445 Bush St | Hitt Contracting Inc. | two new phone booths. life safety system are design build under separate permit. convert exist 2 office to ada access. phone booth ref 2023-0703-1379 r1Details
two new phone booths. life safety system are design build under separate permit. convert exist 2 office to ada access. phone booth ref 2023-0703-1379 r1 | $2,500 |
| Jul 10, 2024 | In progress issued Jul 2024 | 650 California St | Bcci Construction Company | rev 202312132452- 24th flr-to show two way communications devices in elevator lobby per sffd requestDetails
rev 202312132452- 24th flr-to show two way communications devices in elevator lobby per sffd request | |
| Jun 24, 2024 | Completed final sign-off Aug 2024 | 160 Spear St | Sc Builders, Inc | 14th fl - structural anchorage for existing ada phone booths. deferred submittal: sprinkle smoke detection and fire alarm system installtion to be under separate permitsDetails
14th fl - structural anchorage for existing ada phone booths. deferred submittal: sprinkle smoke detection and fire alarm system installtion to be under separate permits | $47,210 |
| May 22, 2024 | Completed final sign-off Nov 2024 | 650 California St | Bcci Construction Company | revision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom.Details
revision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom. | $70,000 |
| May 21, 2024 | Completed final sign-off Nov 2024 | 650 California St | Bcci Construction Company | revision to pa# 202312072109: 25/f - to include modifications to pantry and removal of drinking foundation.Details
revision to pa# 202312072109: 25/f - to include modifications to pantry and removal of drinking foundation. | $55,000 |
| Mar 11, 2024 | Completed final sign-off Feb 2025 | 633 Beach St | Hitt Contracting Inc. | interior t.i. construction of new load bearning walls, ceiling, millwork, lighting and furnitureDetails
interior t.i. construction of new load bearning walls, ceiling, millwork, lighting and furniture | $1,125,000 |
| Feb 29, 2024 | Completed final sign-off May 2024 | 1 Market St | Hitt Contracting Inc. | 35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre toDetails
35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre to | $50,000 |
| Dec 13, 2023 | Completed final sign-off Oct 2024 | 650 California St | Bcci Construction Company | 24th fl - selective demo and construction of non load bearing partitions, new door, frame & glazing, new suspended ceilings, ne light fixtures, new millwork and new finishesDetails
24th fl - selective demo and construction of non load bearing partitions, new door, frame & glazing, new suspended ceilings, ne light fixtures, new millwork and new finishes | $2,000,000 |
| Dec 7, 2023 | Completed final sign-off Oct 2024 | 650 California St | Bcci Construction Company | 25/f. demo and construction of non load bearing partition, new door, frames and glazing, new suspended ceiling, new light fixtures new millwork and new finishes, mep included.Details
25/f. demo and construction of non load bearing partition, new door, frames and glazing, new suspended ceiling, new light fixtures new millwork and new finishes, mep included. | $1,500,000 |
| Jul 3, 2023 | Completed final sign-off Feb 2024 | 445 Bush St | Hitt Contracting Inc. | 5/f: interior commercial ti of existing tenant space, includes non-structural demolition of existing ti and build-out of new including non-structural partitions, doors, and sidelites, suspended ceilings, casework and finishes. mep & life safety systems are design-build under separate permit.Details
5/f: interior commercial ti of existing tenant space, includes non-structural demolition of existing ti and build-out of new including non-structural partitions, doors, and sidelites, suspended ceilings, casework and finishes. mep & life safety systems are design-build under separate permit. | $330,330 |
| May 30, 2023 | Completed final sign-off Oct 2023 | 4 Embarcadero Center | M C S Construction Services | ste 710 - interior commercial ti of existing tenant space. includes non-structural demolition of existing ti and build out of new including non-structural partitions, doors and sidelites, suspended ceiling, casework, and finishes. mep and life safety systems are design-build under a separate permiDetails
ste 710 - interior commercial ti of existing tenant space. includes non-structural demolition of existing ti and build out of new including non-structural partitions, doors and sidelites, suspended ceiling, casework, and finishes. mep and life safety systems are design-build under a separate permi | $495,000 |
| May 30, 2023 | Completed final sign-off Oct 2023 | 4 Embarcadero Center | M C S Construction Services | 13th fl, ste 1300: non-structural demolition of existing interior commercial tenant improvement. fire sprinkler under separate permit.(202305177924)Details
13th fl, ste 1300: non-structural demolition of existing interior commercial tenant improvement. fire sprinkler under separate permit.(202305177924) | $125,000 |
| May 11, 2023 | Completed final sign-off Feb 2024 | 3 Embarcadero Center | Gci, Inc | ste 1480: interior commercial t.i. of (e) space. non-structural demo of (e) t.i. and build-out of new including non-structural partitions, doors, & sidelites, suspended ceilings, casework, & finishes. mep & life safety systems are design-build under separate permit.Details
ste 1480: interior commercial t.i. of (e) space. non-structural demo of (e) t.i. and build-out of new including non-structural partitions, doors, & sidelites, suspended ceilings, casework, & finishes. mep & life safety systems are design-build under separate permit. | $450,562 |
| May 11, 2023 | Completed final sign-off Feb 2024 | 2 Embarcadero Center | Gci, Inc | ste 2200, 22nd fl - interior ccommercial ti of (e) tenant space includes non-structural demo of (e) ti and build out of new including non-structural partitions, doors and sidelites, suspended ceilings, casework and finishes. mep and life safety systems are design build under a separate permitDetails
ste 2200, 22nd fl - interior ccommercial ti of (e) tenant space includes non-structural demo of (e) ti and build out of new including non-structural partitions, doors and sidelites, suspended ceilings, casework and finishes. mep and life safety systems are design build under a separate permit | $948,383 |
| May 4, 2023 | Completed final sign-off Dec 2023 | 1 Embarcadero Center | Gci, Inc | interior commercial ti of (e) tenant space, includes non structural demo of (e) ti and build out of new including non structural partitions, doors and sidelites, suspened ceilings, casework, and finishes mep and life safety systems are design -build under separate permitDetails
interior commercial ti of (e) tenant space, includes non structural demo of (e) ti and build out of new including non structural partitions, doors and sidelites, suspened ceilings, casework, and finishes mep and life safety systems are design -build under separate permit | $575,693 |
| Mar 1, 2023 | Completed final sign-off Nov 2023 | 160 Spear St | Sc Builders, Inc | 12/f: tenant imrpovement of existing space, minor demo and construction of new non-load bearing walls, ceilings, lighting & furniture.Details
12/f: tenant imrpovement of existing space, minor demo and construction of new non-load bearing walls, ceilings, lighting & furniture. | $350,000 |
| Apr 19, 2022 | Completed final sign-off Dec 2022 | 575 Market St | Source Planning And Construction Inc | ste 1800 18th flr: t.i. demo & buildout of non-load bearing partitions. modification to (e) ceiling grid & tile. (n) light fixtures. (n) & salvaged office doors & frames. (n) millwork & finishes. structural work provided for operable partitions. mep, fire safety to be deferred.Details
ste 1800 18th flr: t.i. demo & buildout of non-load bearing partitions. modification to (e) ceiling grid & tile. (n) light fixtures. (n) & salvaged office doors & frames. (n) millwork & finishes. structural work provided for operable partitions. mep, fire safety to be deferred. | $875,000 |
| Feb 14, 2022 | Completed final sign-off Jul 2022 | 55 02nd St | Principal Builders Inc. | 4/f: deferred mep associated with ti permit 202201045364.Details
4/f: deferred mep associated with ti permit 202201045364. | |
| Jan 12, 2022 | Never finaled issued Jan 2022, no final | 650 California St | submittal to memorialize the correct occupant load of breakroom for sffd assembly permit. ref permit 201911056459.Details
submittal to memorialize the correct occupant load of breakroom for sffd assembly permit. ref permit 201911056459. | ||
| Jan 4, 2022 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | 4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipmentDetails
4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipment | $2,366,525 |
| Jul 29, 2021 | Completed final sign-off Jul 2022 | 55 02nd St | Principal Builders Inc. | demo of only e non structural partitons, associated power and telecome outlets, plumbing and finishes per ab-017 per ab-017Details
demo of only e non structural partitons, associated power and telecome outlets, plumbing and finishes per ab-017 per ab-017 | $16,000 |
| Jul 23, 2021 | Never finaled issued Aug 2021, no final | 140 New Montgomery St | Team Commercial Construction Inc. | interior ti of 15th fl demo of non bearing walls, finishes, ceilings. construction to include new partition finsihes, lighting, and 1 unisex restroom. mep deferredDetails
interior ti of 15th fl demo of non bearing walls, finishes, ceilings. construction to include new partition finsihes, lighting, and 1 unisex restroom. mep deferred | $700,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 655 Beach St | M Moser Associates Llc | replacement of (2) double entry glass doors with addition of automatic door operator and panic bar for the museum of the eye.Details
replacement of (2) double entry glass doors with addition of automatic door operator and panic bar for the museum of the eye. | $43,500 |
| Feb 26, 2021 | Completed final sign-off Dec 2021 | 1 Market St | Dpr Construction | 34th floor (#3400): interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maherDetails
34th floor (#3400): interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maher | $180,000 |
| Feb 26, 2021 | Completed final sign-off Dec 2021 | 1 Market St | Dpr Construction | 33rd floor: interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maherDetails
33rd floor: interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maher | $195,000 |
| Dec 22, 2020 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | 5th fl: t.i. work includes non-structural interior demolition + new partitions, creation of a servery, cafe, i.t. help desk, restrooms, mother's room + associated finishes fixtures. m.e.p. deferred.Details
5th fl: t.i. work includes non-structural interior demolition + new partitions, creation of a servery, cafe, i.t. help desk, restrooms, mother's room + associated finishes fixtures. m.e.p. deferred. | $800,000 |
| Oct 10, 2020 | Completed final sign-off Sep 2021 | 575 Market St | Bcci Construction Company | suite 3000:ti work includes interior non-structural demo, new partitions, doors, sidelites, casework, finishes, & light fixtures. maher n/aDetails
suite 3000:ti work includes interior non-structural demo, new partitions, doors, sidelites, casework, finishes, & light fixtures. maher n/a | $900,000 |
| Sep 18, 2020 | Completed final sign-off Mar 2021 | 2 Embarcadero Center | Gci, Inc | 2nd fl: renovation of existing restroom & elevator lobby, restroom, include replacing existing light & plumbing fixtures, new finishes. elevator lobby includes new finishes. no work on elevators. deferred mep.Details
2nd fl: renovation of existing restroom & elevator lobby, restroom, include replacing existing light & plumbing fixtures, new finishes. elevator lobby includes new finishes. no work on elevators. deferred mep. | $600,000 |
| Sep 10, 2020 | Completed final sign-off May 2021 | 650 California St | Bcci Construction Company | revision to pa #2019-1126-8224. combined rooms 3330, 3334-3340 into open office 3329, other misc. mep changes.Details
revision to pa #2019-1126-8224. combined rooms 3330, 3334-3340 into open office 3329, other misc. mep changes. | |
| Jul 9, 2020 | Completed final sign-off Nov 2020 | 50 California St | Principal Builders Inc. | 33rd floor only. construction includes new partitions, finishes, lighting, and equipment.Details
33rd floor only. construction includes new partitions, finishes, lighting, and equipment. | $2,000,000 |
| Dec 23, 2019 | Never finaled issued Feb 2020, no final | 100 01st St | Novo Construction Inc | partial floor ti on the 12th fl - to include new partitions, ceiling, lighting, finishes. mep included.Details
partial floor ti on the 12th fl - to include new partitions, ceiling, lighting, finishes. mep included. | $1,755,675 |
| Dec 23, 2019 | Never finaled issued Feb 2020, no final | 139 Townsend St | Dpr Construction | suite 150 mezz. interior ti. improvement, new partion, finishes, lighting & equipment n/a maherDetails
suite 150 mezz. interior ti. improvement, new partion, finishes, lighting & equipment n/a maher | $428,000 |
| Dec 23, 2019 | Completed final sign-off Sep 2020 | 100 01st St | Novo Construction Inc | full floor tenant improvement on the 17th fl to oinclude new partitions, ceiling, lighting, finishes. new caferteria w no prep mep incDetails
full floor tenant improvement on the 17th fl to oinclude new partitions, ceiling, lighting, finishes. new caferteria w no prep mep inc | $1,755,675 |
| Dec 23, 2019 | Never finaled issued Jan 2020, no final | 100 01st St | Novo Construction Inc | full fl ti on 16th fl to include partitions, ceiling, lighting and finishes. new mothers room, new cafeteria w/no prep. mep included.Details
full fl ti on 16th fl to include partitions, ceiling, lighting and finishes. new mothers room, new cafeteria w/no prep. mep included. | $1,755,675 |
| Mar 7, 2019 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | revision to app#201902263813 to convert partrial break room area to coffee bar with full service and storage area to kitchen prep. & title 24 mep to construct mechanical, electrical and plmg system on 10th floor. n/a for maherDetails
revision to app#201902263813 to convert partrial break room area to coffee bar with full service and storage area to kitchen prep. & title 24 mep to construct mechanical, electrical and plmg system on 10th floor. n/a for maher | $720,995 |
| Feb 26, 2019 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | ti on 10th fl - to construct new partitions, doors, finishes, glazing, millwork, and ceilings. mep, fire alarms, and sprinklers on separate permits. determine occupancy load for assembly area. maher n/a.Details
ti on 10th fl - to construct new partitions, doors, finishes, glazing, millwork, and ceilings. mep, fire alarms, and sprinklers on separate permits. determine occupancy load for assembly area. maher n/a. | $1,240,191 |
| Dec 8, 2017 | Expired or cancelled cancelled Mar 2021 | 115 Sansome St | Gci, Inc | 2nd fl - tenant improvement, partitions, finishes, lighting & equipment, restrooms, conference room, open office, pantry, print room, reception areaDetails
2nd fl - tenant improvement, partitions, finishes, lighting & equipment, restrooms, conference room, open office, pantry, print room, reception area | $300,000 |
| Sep 15, 2014 | Completed final sign-off Jun 2015 | 940 Howard St | Turner Construction Co | basement, 1st & 2nd floors - t.i. with mechanical, electrical & plumbing included (remain as is). n/a maher ordinanceDetails
basement, 1st & 2nd floors - t.i. with mechanical, electrical & plumbing included (remain as is). n/a maher ordinance | $2,800,000 |
| Nov 5, 2013 | Completed final sign-off Feb 2014 | 114 Sansome St | Rudolph Commercial Interiors Inc, Rci | 8th floor, suite 800 - tenant improvement: includes architectural, mechanical and electrical. f/a sprinklers on sep permits. jjcDetails
8th floor, suite 800 - tenant improvement: includes architectural, mechanical and electrical. f/a sprinklers on sep permits. jjc | $215,000 |