Daniel Perez
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Studio Perez
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Aug 2026
53 permits since 2000 (architect on 46 permits, designer on 4 permits, authorized agent-others on 2 permits, engineer on 1 permit): 34 completed, 8 in progress, 6 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 2277 33rd Av | Healthy Building Science Inc | revision to pa #202606042578: demo lower roof & sheating +replaced w/sheathing, cover board+membrane roof. the roof deck will be rebuilt over sleepers parapet walls that act as guardrails on the north+south sides of the deck. metal guardrails added on east+west sides of deck. roof guards+ leadersDetails
revision to pa #202606042578: demo lower roof & sheating +replaced w/sheathing, cover board+membrane roof. the roof deck will be rebuilt over sleepers parapet walls that act as guardrails on the north+south sides of the deck. metal guardrails added on east+west sides of deck. roof guards+ leaders | $223,969 |
| Jun 4, 2026 | In progress issued Jun 2026 | 2277 33rd Av | Healthy Building Science Inc | demolition and reconstruction of (e) roof deck. (e) metal guardrail to be refurbished and re-utilized. add gutter + rain leaders connected to sewer line.Details
demolition and reconstruction of (e) roof deck. (e) metal guardrail to be refurbished and re-utilized. add gutter + rain leaders connected to sewer line. | $25,000 |
| May 21, 2026 | In progress filed May 2026, not yet issued | 401 Duboce Av | volunterily add automatic door opener and actuators to existing west door leaf of entrance doors to improve accessibilityDetails
volunterily add automatic door opener and actuators to existing west door leaf of entrance doors to improve accessibility | $12,000 | |
| Mar 30, 2026 | In progress issued Apr 2026 | 388 Market St | Various Built Construction | change of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per will be removed. some non outlets and switches will be added and (n) sink well be connected to (e)Details
change of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per will be removed. some non outlets and switches will be added and (n) sink well be connected to (e) | $40,000 |
| Dec 5, 2025 | In progress filed Dec 2025, not yet issued | 100 Church St | suite b at south corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility.Details
suite b at south corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility. | $6,000 | |
| Dec 5, 2025 | In progress filed Dec 2025, not yet issued | 100 Church St | suite a at north east corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility.Details
suite a at north east corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility. | $12,000 | |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 2301 Mission St | Urban West Construction Inc | ste 301: tenant improvement of 2nd flr private offcies 212,213 and 214 for soundproofing improvements and accoustical improvements to the 2nd flr conference room 211.Details
ste 301: tenant improvement of 2nd flr private offcies 212,213 and 214 for soundproofing improvements and accoustical improvements to the 2nd flr conference room 211. | $2,000 |
| Apr 21, 2025 | In progress issued Feb 2026 | 400 China Basin St | unit #306: replace (e) bath tub with a shower base, modify shower plumbing fixtures for improved accessibility, patch, repair, and add tile as required to match (e), add shower seat.Details
unit #306: replace (e) bath tub with a shower base, modify shower plumbing fixtures for improved accessibility, patch, repair, and add tile as required to match (e), add shower seat. | $2,500 | |
| Apr 17, 2025 | In progress filed Apr 2025, not yet issued | 400 China Basin St | udummyDetails
udummy | $2,500 | |
| Apr 18, 2024 | Completed final sign-off Sep 2024 | 2301 Mission St | Urban West Construction Inc | tenant improvement 2nd and 3rd fl break rooms. includes new flooring finishes, new base cabinet island at 3fd fl brk rm. elec work will consist of adding outlets /switches, relocate elec panel. add alternatte work to add small office at 3rd fl.Details
tenant improvement 2nd and 3rd fl break rooms. includes new flooring finishes, new base cabinet island at 3fd fl brk rm. elec work will consist of adding outlets /switches, relocate elec panel. add alternatte work to add small office at 3rd fl. | $110,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422Details
owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422 | $170,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240.Details
add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240. | $129,500 |
| Mar 10, 2023 | Completed final sign-off Dec 2023 | 937 Clay St | Amone Corp | rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250Details
rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250 | $40,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2024 | 1003 Powell St | Amone Corp | t.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240Details
t.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240 | $18,000 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 937 Clay St | Amone Corp | scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust,Details
scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust, | $120,000 |
| Apr 14, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalkDetails
to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk | $150,000 |
| Feb 25, 2022 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | r/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windowsDetails
r/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windows | $1,500,000 |
| Feb 22, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | structural work mandatory soft story retrofit using cebc appendix ch a4 and associated accessibility alterations. accessibility improvments include replacement of entry door and side lite at e laundromat. automatic door operators added to the laundromat entrace and at the existing salon door entrancDetails
structural work mandatory soft story retrofit using cebc appendix ch a4 and associated accessibility alterations. accessibility improvments include replacement of entry door and side lite at e laundromat. automatic door operators added to the laundromat entrace and at the existing salon door entranc | $175,000 |
| Dec 29, 2021 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchensDetails
common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchens | $475,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferredDetails
add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred | $400,000 |
| Jul 26, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permitDetails
planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permit | $400,000 |
| Jan 15, 2021 | Never finaled issued Apr 2021, no final | 3115 Kamille Ct | Nibbi Bros Assoc Inc. | 100% affordable housing: replace existing floor & wall finishes, existing plumbing fixtures, and existing light fixture with new in existing building 10 resident services restroom. plumbing fixtures and light fixture to remain in same location.Details
100% affordable housing: replace existing floor & wall finishes, existing plumbing fixtures, and existing light fixture with new in existing building 10 resident services restroom. plumbing fixtures and light fixture to remain in same location. | $30,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2021 | 135 04th St | Bilt Rite Inc | Details
| $120,000 |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 37 Mason St | remove 37, 47, 49, 53 mason st from 0340/001.Details
remove 37, 47, 49, 53 mason st from 0340/001. | ||
| Aug 2, 2019 | Completed final sign-off Aug 2019 | 534 Broadway | Amone Corp | revision to 201803143605. title 24 report revised to remove hers verification qii. there is no new insulation in roof replacementDetails
revision to 201803143605. title 24 report revised to remove hers verification qii. there is no new insulation in roof replacement | |
| Mar 11, 2019 | Never finaled issued Apr 2019, no final | 520 03rd St | Clune Construction Company L P | suite 305. sub-dividing the (e) wired office space into two offices suites. the secondary space will be leased to a sub-tenant. the (e) accessbile restroms and break room will be shared by the two office suites. n/a maherDetails
suite 305. sub-dividing the (e) wired office space into two offices suites. the secondary space will be leased to a sub-tenant. the (e) accessbile restroms and break room will be shared by the two office suites. n/a maher | $150,000 |
| Mar 5, 2019 | Never finaled issued Aug 2019, no final | 1590 Broadway | addition of bedroom & bath to the (e) 1 bedroom property manager's apartment located on the 4th floor of the building. the addition will be over a lower roof area with a high parapet wall.Details
addition of bedroom & bath to the (e) 1 bedroom property manager's apartment located on the 4th floor of the building. the addition will be over a lower roof area with a high parapet wall. | $125,000 | |
| Jan 8, 2019 | Completed final sign-off Dec 2019 | 534 Broadway | Amone Corp | new resilent flooring and paint in 15 units. add 3 sinks in 3 units 214/210/311, replace (e) intercom panel and provide new card reader at front door.Details
new resilent flooring and paint in 15 units. add 3 sinks in 3 units 214/210/311, replace (e) intercom panel and provide new card reader at front door. | $85,000 |
| May 21, 2018 | Completed final sign-off Nov 2019 | 534 Broadway | Amone Corp | replacement of double hung windows in kind and 2 transories. replacement of stucco facades in kind, add plywood sheathing. remove area of dry rot. add roof access ladder per sffd. temporary rear stair repair under pa# 2016-0428-5949. plan shown exiting (temporary) on 2nd & 3rd floors.Details
replacement of double hung windows in kind and 2 transories. replacement of stucco facades in kind, add plywood sheathing. remove area of dry rot. add roof access ladder per sffd. temporary rear stair repair under pa# 2016-0428-5949. plan shown exiting (temporary) on 2nd & 3rd floors. | $350,000 |
| Mar 14, 2018 | Completed final sign-off Aug 2019 | 534 Broadway | Amone Corp | roof replacement with new pvc roof (reroof). replacement of five extg skylights.Details
roof replacement with new pvc roof (reroof). replacement of five extg skylights. | $150,000 |
| Jul 27, 2017 | Completed final sign-off Dec 2017 | 848 Bay St | Devlin/Mcnally Construction | revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded.Details
revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded. | $20,000 |
| Jul 19, 2017 | Completed final sign-off Aug 2017 | 126 Post St | designation one room for permanent body art establishment permit of existing medical spa & sterilization room. revision to permit #201410310430.Details
designation one room for permanent body art establishment permit of existing medical spa & sterilization room. revision to permit #201410310430. | ||
| Jan 13, 2017 | Completed final sign-off Nov 2021 | 1370 California St | Ncr Construction Inc | capital improvement project of non-residential support spaces to 1370 california. offices maintenance storage; laundry will be upgraded. a community room & two accessible restrooms will be added. existing steps in corridor will be replaced with a ramp. selected doors & windows replaced. lighting,Details
capital improvement project of non-residential support spaces to 1370 california. offices maintenance storage; laundry will be upgraded. a community room & two accessible restrooms will be added. existing steps in corridor will be replaced with a ramp. selected doors & windows replaced. lighting, | $125,000 |
| Oct 12, 2016 | Completed final sign-off Feb 2019 | 579 Haight St | Avalon Construction Co | to comply with nov 200671108 items 1-23 & nov 201404391 - interior remodel of unit 579 haight, 3rd & 4th floors. kitchen & 2 baths will be remodeled with new cainets, fixtures and finishes. laundry closet will be added at 4th floor. 2 windows will be added at 4th floor bedrm. lighting will be upgradDetails
to comply with nov 200671108 items 1-23 & nov 201404391 - interior remodel of unit 579 haight, 3rd & 4th floors. kitchen & 2 baths will be remodeled with new cainets, fixtures and finishes. laundry closet will be added at 4th floor. 2 windows will be added at 4th floor bedrm. lighting will be upgrad | $100,000 |
| Jun 27, 2016 | Completed final sign-off Mar 2019 | 575 Haight St | Avalon Construction Co | this is an administrative permit to confirm 575-579 haight street contains a total of two dwelling units & one commercial space per certificate of occupancy dated october 16, 1978.Details
this is an administrative permit to confirm 575-579 haight street contains a total of two dwelling units & one commercial space per certificate of occupancy dated october 16, 1978. | |
| Jun 27, 2016 | Expired or cancelled expired Mar 2019 | 583 Haight St | Avalon Construction Co | this is an administrative permit to confirm 583-87 haight street contains a total of two dwelling units and one commercial space per certificate of occupancy dated october 17, 1978.Details
this is an administrative permit to confirm 583-87 haight street contains a total of two dwelling units and one commercial space per certificate of occupancy dated october 17, 1978. | |
| May 25, 2016 | Expired or cancelled expired Mar 2019 | 583 Haight St | Avalon Construction Co | to comply w/nov #200671966. repair and partial replacement of rear egress stair. work will be less than 50%. add handrails, risers, post bases, strl and dry rot repair. no. of dwelling units clarification under 2016-0627-0920. contact bldg inspector for pre-construction mtg.Details
to comply w/nov #200671966. repair and partial replacement of rear egress stair. work will be less than 50%. add handrails, risers, post bases, strl and dry rot repair. no. of dwelling units clarification under 2016-0627-0920. contact bldg inspector for pre-construction mtg. | $25,000 |
| Apr 28, 2016 | Expired or cancelled expired Jul 2019 | 534 Broadway | Amone Corp | to comply with nov 201552841 replacement of (e) rear exit stair with new pre-fabricated metal stair. replacement of 8 wood windows inkind. replacement of 6 security window guards. addition of roll up door and waste removal system.Details
to comply with nov 201552841 replacement of (e) rear exit stair with new pre-fabricated metal stair. replacement of 8 wood windows inkind. replacement of 6 security window guards. addition of roll up door and waste removal system. | $50,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 1328 Mission St | Baytown Construction | unit #6: the (e) building is 6 residential units on 2nd & 3rd flr & office space on 4th & 5th flrs. unit 6 remodel work includes adding closets @2nd flr,& loft lvl,upgrade lighting @ (e)dining/kitchen & new walk-in closet.Details
unit #6: the (e) building is 6 residential units on 2nd & 3rd flr & office space on 4th & 5th flrs. unit 6 remodel work includes adding closets @2nd flr,& loft lvl,upgrade lighting @ (e)dining/kitchen & new walk-in closet. | $8,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2017 | 1328 Mission St | Baytown Construction | unit #4: the (e)bldg is 6 residential units on 2nd &3rd flr, office spaces on 4th & 5th flr. unit 4 work includes remodel of the (e)kitchen, remodel the (e)bath to add a shower, add closets @ the 2nd flr & loft level, upgrade lighting @ dining/kitchen & new walk-in closet.Details
unit #4: the (e)bldg is 6 residential units on 2nd &3rd flr, office spaces on 4th & 5th flr. unit 4 work includes remodel of the (e)kitchen, remodel the (e)bath to add a shower, add closets @ the 2nd flr & loft level, upgrade lighting @ dining/kitchen & new walk-in closet. | $35,000 |
| Mar 16, 2016 | Expired or cancelled withdrawn Mar 2016 | 1328 Mission St | t.i./remodel of 1328 mission st, units 4 and 6: kitchen remodel in unit #4. in units 4&6,shower added at lower level,lighting upgrade at dining; walk-in closets, adding closets.Details
t.i./remodel of 1328 mission st, units 4 and 6: kitchen remodel in unit #4. in units 4&6,shower added at lower level,lighting upgrade at dining; walk-in closets, adding closets. | $55,000 | |
| Feb 9, 2016 | Completed final sign-off Dec 2017 | 848 Bay St | Northcoast Remodeling & Construction, Devlin/Mcnally Construction | extending elevator to roof. existing roof deck will be brought into current code complianceDetails
extending elevator to roof. existing roof deck will be brought into current code compliance | $100,000 |
| Nov 23, 2015 | Never finaled issued Nov 2015, no final | 1 Daniel Burnham Ct | Conscious Construction | suite 368c - revision to pa #201506098498: revise sheets a0.2, a0.3, a2.1 title 24 report & reflected ceiling plan. n/a maher ordinanceDetails
suite 368c - revision to pa #201506098498: revise sheets a0.2, a0.3, a2.1 title 24 report & reflected ceiling plan. n/a maher ordinance | |
| Oct 30, 2015 | Completed final sign-off Apr 2019 | 200 12th St | Cornerstone Dba Ag Construction | nov 20140761 resolution. legalize unpermitted kitchen, legalize added shower. remove selected added partitions to restore unit as nuch as feasible to its previous permitted condition. n/a for maher ordinance 155-13.Details
nov 20140761 resolution. legalize unpermitted kitchen, legalize added shower. remove selected added partitions to restore unit as nuch as feasible to its previous permitted condition. n/a for maher ordinance 155-13. | $50,000 |
| Sep 22, 2015 | Expired or cancelled cancelled Nov 2016 | 1061 Market St | |||
| Dec 24, 2014 | Completed final sign-off May 2015 | 585 Geary St | Flying Colors | floors 2 - 6: replacement of 45 windows at geary st, painting of front exterior facade & selective painting of interior. replace (e) windows with wood double hung windows in existing openings.Details
floors 2 - 6: replacement of 45 windows at geary st, painting of front exterior facade & selective painting of interior. replace (e) windows with wood double hung windows in existing openings. | $55,000 |
| Oct 31, 2014 | Completed final sign-off Apr 2016 | 126 Post St | R W Simone Company | 2nd floor t.i. - adding partitions to create consultation rooms, treatment, office breakroom, existing bathrooms will have fixtures & finishes updated.new led lighting will replace existing lighting. mep work will be design build.Details
2nd floor t.i. - adding partitions to create consultation rooms, treatment, office breakroom, existing bathrooms will have fixtures & finishes updated.new led lighting will replace existing lighting. mep work will be design build. | $350,000 |
| Oct 17, 2013 | Completed final sign-off May 2014 | 49 Julian Av | Zivko Corporation Inc Dba Metal Building | removal of (e) roof & skylights, gutters; to be replaced with new metal roof, skylights, and gutter. (e) exhaust fans to be salvaged & reinstalled with roof curb and sound attenuator duct. replacement of roof in-kind. no change of use. maher ordinance # 155-13 n/aDetails
removal of (e) roof & skylights, gutters; to be replaced with new metal roof, skylights, and gutter. (e) exhaust fans to be salvaged & reinstalled with roof curb and sound attenuator duct. replacement of roof in-kind. no change of use. maher ordinance # 155-13 n/a | $40,000 |
| May 16, 2013 | Completed final sign-off Jul 2013 | 1050 South Van Ness Av | Avalon Construction Co | revision to appl #2012.09.06.9122 - revision permit for unreasonable hardship request approval.Details
revision to appl #2012.09.06.9122 - revision permit for unreasonable hardship request approval. | |
| Sep 25, 2012 | Completed final sign-off Sep 2012 | 1050 South Van Ness Av | Avalon Construction Co | revision to pa# 201112050049. install a fire rated door in front of the furnace. install 1 hr rated partition.Details
revision to pa# 201112050049. install a fire rated door in front of the furnace. install 1 hr rated partition. | $500 |
| Dec 5, 2011 | Never finaled issued Jun 2012, no final | 1050 South Van Ness Av | Avalon Construction Co | tenant improvement for new pre school classroom to include accessible restroom, isolation room, break room, abatement of ceiling. elec, plumbing design build. upgrade courtyard area play yard to include accessible upgrades, additon of state platform, stairs, and guardrailsDetails
tenant improvement for new pre school classroom to include accessible restroom, isolation room, break room, abatement of ceiling. elec, plumbing design build. upgrade courtyard area play yard to include accessible upgrades, additon of state platform, stairs, and guardrails | $86,000 |
| May 27, 2011 | Completed final sign-off Oct 2011 | 4751 25th St | addition of new wood deck to (e) wood deck @ rear of house.Details
addition of new wood deck to (e) wood deck @ rear of house. | $8,000 | |
| Sep 21, 2007 | Completed final sign-off Aug 2008 | 819 Cayuga Av | Bay Area General Const | add one family room, one bedroom, bathroom, laundry room and storage at lower level within the existing footprint of house.modify lower level rear elevation for new windows & doors. modify garage door for pivoting operation. new skylight over (e) patio.Details
add one family room, one bedroom, bathroom, laundry room and storage at lower level within the existing footprint of house.modify lower level rear elevation for new windows & doors. modify garage door for pivoting operation. new skylight over (e) patio. | $75,000 |