Bilt Rite Inc
- Based in
- Newark
- On San Francisco permits
- Mar 2020 to Aug 2026
- Last 24 months
- 5 permits filed
16 permits since 2000: 13 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Aug 2026 | 2230 Union St | revision to bpa: 2026.0504.0586 - revise da checklist per field conditions. for power door operator.Details
revision to bpa: 2026.0504.0586 - revise da checklist per field conditions. for power door operator. | |
| Aug 4, 2026 | In progress issued Aug 2026 | 2230 Union St | mechanical, plumbing and electrical drawings associated with approved t.i. building permit #202605040586Details
mechanical, plumbing and electrical drawings associated with approved t.i. building permit #202605040586 | $50,000 |
| May 4, 2026 | In progress issued Jul 2026 | 2230 Union St | t.i.& change of use from (e)vacant retail space to(n)indoor playground(entertainment use) & cafe.scope of work to include modication fo(e)storefront for(n)cafe & associated equipment(n)ada restroom,(n)finishes and lighting throughout.mech,elec & plumbing deferred.no changes to(e)square footage.Details
t.i.& change of use from (e)vacant retail space to(n)indoor playground(entertainment use) & cafe.scope of work to include modication fo(e)storefront for(n)cafe & associated equipment(n)ada restroom,(n)finishes and lighting throughout.mech,elec & plumbing deferred.no changes to(e)square footage. | $380,000 |
| Feb 6, 2025 | Completed final sign-off Mar 2026 | 2430 Scott St | revision to pa #202309227222. provide revised structural framing plans for new window and door at existing lightwell.Details
revision to pa #202309227222. provide revised structural framing plans for new window and door at existing lightwell. | |
| Oct 23, 2024 | Completed final sign-off Mar 2026 | 2430 Scott St | (n) horizontal addition in (e) penthouse , (n) addiotion shall inlcude (n) bathroom and (n) laundry roomDetails
(n) horizontal addition in (e) penthouse , (n) addiotion shall inlcude (n) bathroom and (n) laundry room | $50,000 |
| Jan 19, 2024 | Completed final sign-off May 2024 | 165 Ofarrell St | decommission existing fire escape in link to previous approved t.i. # 201511203222. fire escape landings to be open. interior signage to be added at each fire escape access point. "this is not an exit."Details
decommission existing fire escape in link to previous approved t.i. # 201511203222. fire escape landings to be open. interior signage to be added at each fire escape access point. "this is not an exit." | $23,500 |
| Sep 22, 2023 | Completed final sign-off Mar 2026 | 2430 Scott St | g/f: expand (e) bonus rm into (e) garage. remodel (e) bathroom. 1st/f: relocate (e) entry door to enclose (e) porch, remodel (e) kitchen. new bathroom. 2nd/f: remodel (e) bathroom 2, e bedroom 2, bathroom 3, & master bathroomDetails
g/f: expand (e) bonus rm into (e) garage. remodel (e) bathroom. 1st/f: relocate (e) entry door to enclose (e) porch, remodel (e) kitchen. new bathroom. 2nd/f: remodel (e) bathroom 2, e bedroom 2, bathroom 3, & master bathroom | $80,000 |
| Jun 6, 2023 | Completed final sign-off Oct 2023 | 1500 07th St | rev to pa202209192729 for tenant impovement. (e) service panel to remain unchanged at 200amp 240/120v, 3phase, delta, 4-wire.Details
rev to pa202209192729 for tenant impovement. (e) service panel to remain unchanged at 200amp 240/120v, 3phase, delta, 4-wire. | |
| Sep 19, 2022 | Completed final sign-off Oct 2023 | 1500 07th St | title 24 compliance. replacement of light fixtures, outlets, switches, panel upgrade. ref #202105049716.Details
title 24 compliance. replacement of light fixtures, outlets, switches, panel upgrade. ref #202105049716. | $50,000 |
| Sep 19, 2022 | Completed final sign-off Oct 2023 | 1500 07th St | installation of new heat pump hvac system ref pa 202105049716Details
installation of new heat pump hvac system ref pa 202105049716 | $20,000 |
| Apr 5, 2022 | Completed final sign-off Oct 2023 | 1500 07th St | exterior changes only. removal of (e) metal siding at ground fl street facing elevation & replace with new stucco. remove (e) rollup garage door & replace with (n) rollup garage door. ref change of use pa# 202105049716.Details
exterior changes only. removal of (e) metal siding at ground fl street facing elevation & replace with new stucco. remove (e) rollup garage door & replace with (n) rollup garage door. ref change of use pa# 202105049716. | $18,800 |
| Aug 26, 2021 | Completed final sign-off May 2022 | 1703 Greenwich St | units 1703/1705/1707/1709: interior remodel to (e) units: remodel (e) ktichen & bathroom sand add new recessed lights. replace 8 hallway and bathroom windows not visible from street.Details
units 1703/1705/1707/1709: interior remodel to (e) units: remodel (e) ktichen & bathroom sand add new recessed lights. replace 8 hallway and bathroom windows not visible from street. | $190,000 |
| Jun 4, 2021 | Completed final sign-off Oct 2024 | 104 Lunado Wy | interior renovation & vertical addition into (e) 1 story residential building with lower garage level. bedrooms, kitchen & dining @ ground floor. vertical addition to new 2nd floor.Details
interior renovation & vertical addition into (e) 1 story residential building with lower garage level. bedrooms, kitchen & dining @ ground floor. vertical addition to new 2nd floor. | $550,000 |
| May 4, 2021 | Completed final sign-off Oct 2023 | 1500 07th St | change of use - ti for 1st fl. demo of (e) non-compliant interior stair, non-bearing partitions, & restrooms. new construction of partirions, finishes, interior stairs, accessible restrooms, & accessible ramps. reconstruct sidewalk to comply with notice of repair #1196550.Details
change of use - ti for 1st fl. demo of (e) non-compliant interior stair, non-bearing partitions, & restrooms. new construction of partirions, finishes, interior stairs, accessible restrooms, & accessible ramps. reconstruct sidewalk to comply with notice of repair #1196550. | $170,500 |
| Sep 5, 2020 | Completed final sign-off Jan 2023 | 1350 04th St | suite #f: interior ti for a small cafe (serving soft serve) in an (e) vacant ground floor commercial tenant space work to include (n) interior partitions, (n) acessible restroom, (n) casework, (n) kitchen & related equipment, (n) finishes, and (n) lighting.Details
suite #f: interior ti for a small cafe (serving soft serve) in an (e) vacant ground floor commercial tenant space work to include (n) interior partitions, (n) acessible restroom, (n) casework, (n) kitchen & related equipment, (n) finishes, and (n) lighting. | $180,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2021 | 135 04th St | Details
| $120,000 |