Dan Phipps
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Dan Phipps Architects
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to Dec 2024
197 permits since 2000 (architect on 187 permits, authorized agent-others on 5 permits, engineer on 3 permits, designer on 2 permits): 142 completed, 17 never finaled, 38 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 197.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2024 | Completed final sign-off Jul 2025 | 7 Fallon Pl | Fay Construction & Restoration Inc | removal of unauthorized work and to above 2020-001108enf. no changes proposed at exterior.Details
removal of unauthorized work and to above 2020-001108enf. no changes proposed at exterior. | $3,000 |
| Apr 29, 2024 | Completed final sign-off Aug 2024 | 3409 Jackson St | Mcguinness Mccann Group | add new curb mounted skylight at existing stairDetails
add new curb mounted skylight at existing stair | $7,500 |
| Oct 11, 2023 | Completed final sign-off Aug 2024 | 2710 Divisadero St | The Toboni Group | exploratory demo on all floors - no structural work. work in: basement, laundry, hall, and exterior stair, first floor dining room, second floor study, third floor hall 2. approx. 100 sq. of wall area. repairs to be done under future permits. +/- 100 sq. ft. workDetails
exploratory demo on all floors - no structural work. work in: basement, laundry, hall, and exterior stair, first floor dining room, second floor study, third floor hall 2. approx. 100 sq. of wall area. repairs to be done under future permits. +/- 100 sq. ft. work | $5,000 |
| Jun 28, 2023 | Completed final sign-off Jul 2023 | 2507 Pacific Av | The Toboni Group | add 2'-4" height wood lattice to existing 6' height wood fence (at rear side)Details
add 2'-4" height wood lattice to existing 6' height wood fence (at rear side) | $1,500 |
| Mar 14, 2023 | Expired or cancelled revoked Jun 2023 | 2507 Pacific Av | The Toboni Group | remove existing non-complying fire escape.Details
remove existing non-complying fire escape. | $5,000 |
| Jan 10, 2023 | Completed final sign-off Jan 2023 | 76 Potomac St | revision to permit 200409083560 and per district inspector's request to document "as-built" condition at completion of the original permit. no construction under this permit. as-built documentation only. minor changes to 3rd floor bathroom, laundry and closet areas.Details
revision to permit 200409083560 and per district inspector's request to document "as-built" condition at completion of the original permit. no construction under this permit. as-built documentation only. minor changes to 3rd floor bathroom, laundry and closet areas. | ||
| Dec 13, 2022 | Completed final sign-off Jun 2023 | 2507 Pacific Av | The Toboni Group | relocate existing gate and existinf newel and new open fence at front setbackDetails
relocate existing gate and existinf newel and new open fence at front setback | $4,000 |
| Nov 28, 2022 | Completed final sign-off Aug 2024 | 2710 Divisadero St | The Toboni Group | addition of new elevatorDetails
addition of new elevator | $75,000 |
| Sep 20, 2022 | Completed final sign-off Jul 2023 | 2601 17th Av | Ubr Construction & Roofing Inc | correctin for noitce of 201494501. memoralize existing conditions. to comply w/his/nov 201494501. add 22 sf. legalize work preformed w/o permit: convert (e) social rm to family rm & bedroomDetails
correctin for noitce of 201494501. memoralize existing conditions. to comply w/his/nov 201494501. add 22 sf. legalize work preformed w/o permit: convert (e) social rm to family rm & bedroom | |
| Apr 21, 2022 | Expired or cancelled cancelled Jan 2026 | 2584 Filbert St | remodel master bathroom & powder room. add 125 amp sub panel ant trio lift level(elevator 3 level)Details
remodel master bathroom & powder room. add 125 amp sub panel ant trio lift level(elevator 3 level) | $120,000 | |
| Mar 8, 2022 | Completed final sign-off Feb 2023 | 2847 Gough St | Ramierz Construction | acoustical improvements to existing ceiling. add wall at kitchen. no structural work. all interior.Details
acoustical improvements to existing ceiling. add wall at kitchen. no structural work. all interior. | $15,000 |
| Oct 6, 2021 | Completed final sign-off Jul 2023 | 2736 Bush St | Metzler Brothers General Contractors Inc | in-fill of (e) deck for pantry. remodel kitchen per plan. remodel 2 baths in kind.Details
in-fill of (e) deck for pantry. remodel kitchen per plan. remodel 2 baths in kind. | $12,000 |
| Sep 29, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | Cook Construction | rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall.Details
rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall. | $40,000 |
| Sep 3, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | Cook Construction | kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition.Details
kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition. | $55,000 |
| Jul 20, 2021 | Completed final sign-off Nov 2022 | 456 Noe St | G-Max Construction, O'neill & Neville Construction Inc | remodel kitchen in-kind with new finisehs, appliances and lighting. in bedroom, remove non-load bearing wall and relocate closet.Details
remodel kitchen in-kind with new finisehs, appliances and lighting. in bedroom, remove non-load bearing wall and relocate closet. | $30,000 |
| Jul 15, 2021 | Expired or cancelled cancelled Jan 2026 | 2833 Fillmore St | remove extg wood fence and replace with new 6 foot high painted metal fence with 75% open area at front property line per app#2019019760 enf enforcement.Details
remove extg wood fence and replace with new 6 foot high painted metal fence with 75% open area at front property line per app#2019019760 enf enforcement. | $2,000 | |
| Oct 30, 2020 | Completed final sign-off Dec 2021 | 1914 Webster St | Bbc Construction Inc. | widen (e) garage door.Details
widen (e) garage door. | $17,000 |
| Sep 22, 2020 | Completed final sign-off Aug 2022 | 751 Haight St | Trinity Building Co Llc, Partners Contracting Inc. | revision to pa# 201912230435 to include lowering of basement floor & expand area of existing second unit within existing unconditioned space. misc improvemtns due to site conditions.Details
revision to pa# 201912230435 to include lowering of basement floor & expand area of existing second unit within existing unconditioned space. misc improvemtns due to site conditions. | $155,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jul 2024 | 9 Fallon Pl | per adu ordinance# 162-17, (e) lower floor unit. 1 bedroom & 1 bathroom ** maher: n/a **Details
per adu ordinance# 162-17, (e) lower floor unit. 1 bedroom & 1 bathroom ** maher: n/a ** | $1,000 | |
| Jul 6, 2020 | Never finaled filed Jul 2020, never issued | 736 Bay St | add (n) partially enclosed alcove at first floor under (e) deck.Details
add (n) partially enclosed alcove at first floor under (e) deck. | $15,000 | |
| Dec 23, 2019 | Completed final sign-off May 2022 | 751 Haight St | Trinity Building Co Llc | replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood.Details
replace (e) window with door to (e) deck. remodel kitchen & master bath, add 1 bath on 2nd floor. misc interior work. replace some windows in kind at front. all wood. | $118,000 |
| Nov 8, 2019 | Completed final sign-off Mar 2020 | 2701 Pacific Av | The Toboni Group | change railing at existing roof deckDetails
change railing at existing roof deck | $14,000 |
| Oct 30, 2019 | Completed final sign-off Nov 2019 | 2847 Gough St | The Toboni Group | revision to app#201410108692. change description of scope of work to be 1 story rear addition.Details
revision to app#201410108692. change description of scope of work to be 1 story rear addition. | |
| Oct 3, 2019 | Completed final sign-off May 2021 | 800 Great Hy | D M Builders | revision to 201902253765 to reduce storage room size and modify door to storageDetails
revision to 201902253765 to reduce storage room size and modify door to storage | |
| Jul 18, 2019 | Never finaled issued Aug 2019, no final | 2859 Filbert St | Stroub Construction | rev to pa #201710050488 s1-r1; to include loft storage area at garageDetails
rev to pa #201710050488 s1-r1; to include loft storage area at garage | $5,000 |
| Apr 11, 2019 | Never finaled filed Apr 2019, never issued | 9 Fallon Pl | rear addition at 3rd flr for bathroom extension. ** maher: n/a **Details
rear addition at 3rd flr for bathroom extension. ** maher: n/a ** | $48,000 | |
| Mar 15, 2019 | Completed final sign-off Jan 2020 | 736 Bay St | Carroll Custom Homes, Inc | to comply with planning enforcement case no. 2019-002563enf and dbi nov #201927691. reduce size of rear deck on second floor level and remove deck stairs.Details
to comply with planning enforcement case no. 2019-002563enf and dbi nov #201927691. reduce size of rear deck on second floor level and remove deck stairs. | $8,000 |
| Mar 5, 2019 | Never finaled filed Mar 2019, never issued | 2833 Fillmore St | to erect a type v-b, 2-story, 2-unit residential bldg with one basement.Details
to erect a type v-b, 2-story, 2-unit residential bldg with one basement. | $679,000 | |
| Mar 5, 2019 | Never finaled filed Mar 2019, never issued | 2833 Fillmore St | to demolish a type v-b, 2-story, (2) unit residence with one basement.Details
to demolish a type v-b, 2-story, (2) unit residence with one basement. | $75,000 | |
| Feb 25, 2019 | Completed final sign-off May 2021 | 800 Great Hy | D M Builders | eliminate existing parking stalls (4) and convert space to an enclosed storage room.Details
eliminate existing parking stalls (4) and convert space to an enclosed storage room. | $12,000 |
| Dec 12, 2018 | Never finaled issued Feb 2020, no final | 2485 Broadway | Plath & Company Inc | addition of new elevator. maher n/a.Details
addition of new elevator. maher n/a. | $59,000 |
| Oct 23, 2018 | Completed final sign-off Jul 2019 | 260 College Av | Muddyorange Fabrication | 1st floor: new fixtures and finishes in powder room, new interior doors, new furnace.Details
1st floor: new fixtures and finishes in powder room, new interior doors, new furnace. | $28,000 |
| Oct 23, 2018 | Expired or cancelled cancelled Jul 2024 | 2584 Filbert St | addition @ 1st flr & basement. addition of conditioned space @ basement to include exercise, wine rm & laundry. remodel of (e) kitchen, (3) powder rms, master bath & closet. new elevator.Details
addition @ 1st flr & basement. addition of conditioned space @ basement to include exercise, wine rm & laundry. remodel of (e) kitchen, (3) powder rms, master bath & closet. new elevator. | $190,000 | |
| Oct 11, 2018 | Completed final sign-off Jun 2020 | 51 Scott St | D3 Construction | add new dwelling unit at lower levelDetails
add new dwelling unit at lower level | $78,000 |
| Jul 3, 2018 | Completed final sign-off Dec 2019 | 76 San Rafael Wy | The Toboni Group | alteration of front facade along san rafael blvd.Details
alteration of front facade along san rafael blvd. | $28,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2019 | 3 Russian Hill Pl | Bbc Construction Inc. | remodel kitchen & (3) bathrooms, no structural work, no wall changes.Details
remodel kitchen & (3) bathrooms, no structural work, no wall changes. | $135,000 |
| Jan 5, 2018 | Never finaled issued Apr 2018, no final | 1116 Pacific Av | Hong Lee Construction Co Inc | enlage and new garage door, new unconditioned storage spaces at 1st fl. interior work at both units to include new powder rm and remodel of bathroom, kitchens, new laundry closet for each of the two units; enclose storage at basement at rear of building.Details
enlage and new garage door, new unconditioned storage spaces at 1st fl. interior work at both units to include new powder rm and remodel of bathroom, kitchens, new laundry closet for each of the two units; enclose storage at basement at rear of building. | $95,000 |
| Oct 5, 2017 | Completed final sign-off Mar 2021 | 2859 Filbert St | Stroub Construction | minor infill additions @ 1st fl, 2nd & 3rd floor.new exterior finishes, windows & doors throughout. remodel kitchen & (5) bathrooms, add (1)new bathroom & misc interior remodeling.Details
minor infill additions @ 1st fl, 2nd & 3rd floor.new exterior finishes, windows & doors throughout. remodel kitchen & (5) bathrooms, add (1)new bathroom & misc interior remodeling. | $328,000 |
| Oct 5, 2017 | Completed final sign-off Oct 2018 | 27 Dorland St | Benjamin Shaw | addition of conditioned space at first floor to include 2 bedrooms, playroom, laundry and a bathroom and (n) interior and exterior stairs. no building expansion.Details
addition of conditioned space at first floor to include 2 bedrooms, playroom, laundry and a bathroom and (n) interior and exterior stairs. no building expansion. | $120,000 |
| Aug 17, 2017 | Completed final sign-off Dec 2019 | 76 San Rafael Wy | The Toboni Group | new rear yard addition, addition of conditioned space at basement. interior remodel to include kitchen and additional (3) baths and (1) powder room.Details
new rear yard addition, addition of conditioned space at basement. interior remodel to include kitchen and additional (3) baths and (1) powder room. | $295,000 |
| Aug 3, 2017 | Completed final sign-off Aug 2017 | 330 Presidio Av | The Toboni Group | revision to pa #201707182105 - replace existing deck & stair (9209092) in-kind as required.Details
revision to pa #201707182105 - replace existing deck & stair (9209092) in-kind as required. | $1,500 |
| Jul 27, 2017 | Completed final sign-off Dec 2017 | 2371 Broadway | Right Angle Construction | in-kind replacement of (e) exterior entry steps and landing. repair dryrot and provide waterproofing as required.Details
in-kind replacement of (e) exterior entry steps and landing. repair dryrot and provide waterproofing as required. | $15,000 |
| Apr 7, 2017 | Completed final sign-off May 2017 | 43 Homestead St | Kevin Sullivan Construction Inc. | change address on pa@201610039425 from 45 homestead to 43 homestead.Details
change address on pa@201610039425 from 45 homestead to 43 homestead. | |
| Mar 22, 2017 | Expired or cancelled expired Oct 2019 | 35 San Fernando Wy | Kevin Sullivan Construction Inc., Grand Industries Inc | kitchen remodel, office relocated, remove bath. add outdoor bbq and fire pit. (2) side , 1 east new windows. one new door on east and one new door on north facade.Details
kitchen remodel, office relocated, remove bath. add outdoor bbq and fire pit. (2) side , 1 east new windows. one new door on east and one new door on north facade. | $68,000 |
| Mar 2, 2017 | Completed final sign-off Nov 2018 | 350 15th Av | The Toboni Group, Bloch Construction Inc | horizontal addition. add a rear yard addition to include an alcove at 1st floor and a master suite at 2nd floor.Details
horizontal addition. add a rear yard addition to include an alcove at 1st floor and a master suite at 2nd floor. | $88,000 |
| Nov 15, 2016 | Never finaled issued Dec 2016, no final | 68 Presidio Av | restore building to previously approved plans (201303011348) per planning request. replace stair entry gaurd rail with vertically oriented railing, addition of belt course at 1st story and install 3/4 solid wood garage door. all materials to match historical finishes.Details
restore building to previously approved plans (201303011348) per planning request. replace stair entry gaurd rail with vertically oriented railing, addition of belt course at 1st story and install 3/4 solid wood garage door. all materials to match historical finishes. | $14,200 | |
| Nov 4, 2016 | Completed final sign-off Nov 2018 | 736 Bay St | Carroll Custom Homes, Inc | remove (e) spiral interior staircase, add new staircase, relocate bedroom #2, enlarge bedroom #3, eliminate bedroom #4 maher naDetails
remove (e) spiral interior staircase, add new staircase, relocate bedroom #2, enlarge bedroom #3, eliminate bedroom #4 maher na | $15,000 |
| Oct 28, 2016 | Never finaled issued Apr 2017, no final | 2763 Filbert St | H Construction Co | revision to 201305287983 reconfigure 2nd egress stair to enclose area of (e) exterior stair with new interior stairs from garage to 3rd flr. new bath and laundry room at garage levelDetails
revision to 201305287983 reconfigure 2nd egress stair to enclose area of (e) exterior stair with new interior stairs from garage to 3rd flr. new bath and laundry room at garage level | $48,000 |
| Oct 3, 2016 | Completed final sign-off May 2017 | 45 Homestead St | Kevin Sullivan Construction Inc. | remodel lower floor adding new bathroom, replace (e) stair from 1st to lower floor. new exterior door to yard in (e) window openingDetails
remodel lower floor adding new bathroom, replace (e) stair from 1st to lower floor. new exterior door to yard in (e) window opening | $98,000 |
| Aug 31, 2016 | Completed final sign-off May 2017 | 2528 Union St | The Toboni Group | new 10' maximum height fence in rear yardDetails
new 10' maximum height fence in rear yard | $5,500 |
| Jul 20, 2016 | Completed final sign-off Sep 2017 | 3038 Fillmore St | rear bldg - revision to pa 2016-0414-4829 and 2016-0623-0748, replace (e) dry rot wall framing as required. maher naDetails
rear bldg - revision to pa 2016-0414-4829 and 2016-0623-0748, replace (e) dry rot wall framing as required. maher na | $5,000 | |
| Jun 30, 2016 | Completed final sign-off May 2017 | 2528 Union St | Cullinane Plastering, The Toboni Group | revision to 201401226857. reconfigure exercise, media, spa area to family rm and storage area in basement. remove column at dining rm at 1st fl. addition of retaining walls at rear and front property lineDetails
revision to 201401226857. reconfigure exercise, media, spa area to family rm and storage area in basement. remove column at dining rm at 1st fl. addition of retaining walls at rear and front property line | $5,000 |
| Jun 23, 2016 | Completed final sign-off Jun 2017 | 999 Green St | Bjlgc Inc | unit 3004 - remodel 2 bedrooms, 2 baths and kitchen. existing exterior glazed wall to remain, refurbish (e) frames and galss as requiredDetails
unit 3004 - remodel 2 bedrooms, 2 baths and kitchen. existing exterior glazed wall to remain, refurbish (e) frames and galss as required | $290,100 |
| Jun 23, 2016 | Completed final sign-off Sep 2017 | 3038 Fillmore St | modify plan per field conditions, revision to pa 2016-0414-4829Details
modify plan per field conditions, revision to pa 2016-0414-4829 | $5,000 | |
| May 24, 2016 | Completed final sign-off Mar 2018 | 225 Valdez Av | Benjamin Shaw | new interior addition at lower level to include family room, bedrooms, laundry and bathroom. revise location of bedroom #2 entry door at entry levelDetails
new interior addition at lower level to include family room, bedrooms, laundry and bathroom. revise location of bedroom #2 entry door at entry level | $170,000 |
| May 23, 2016 | Completed final sign-off May 2017 | 132 Presidio Av | The Toboni Group | revision to pa #201405095341: changes due to site conditions. replcaement of windows & new windows.Details
revision to pa #201405095341: changes due to site conditions. replcaement of windows & new windows. | $10,000 |
| Apr 13, 2016 | Completed final sign-off Dec 2016 | 346 15th Av | The Toboni Group | underpinning work related to pa 2014 1230 4716Details
underpinning work related to pa 2014 1230 4716 | $12,000 |
| Apr 4, 2016 | Expired or cancelled expired Jun 2019 | 3829 Clay St | Arcon Construction Corp | new dormers at top floor. n/a ordinance #155-13. revision to pa2015-0220-8839. min 3'-0" from property line, setback 10'-0" from front facade 8'-0" x 7'-0"Details
new dormers at top floor. n/a ordinance #155-13. revision to pa2015-0220-8839. min 3'-0" from property line, setback 10'-0" from front facade 8'-0" x 7'-0" | $25,000 |
| Mar 18, 2016 | Completed final sign-off Dec 2016 | 2951 Pine St | The Toboni Group | exploratory removal of finishes on all floors. all interior work, no structural.Details
exploratory removal of finishes on all floors. all interior work, no structural. | $12,000 |
| Jan 22, 2016 | Completed final sign-off Dec 2016 | 35 San Fernando Wy | Kevin Sullivan Construction Inc. | addition of conditions space at (e) basement to include 1 bathroom and new open railing at (e) stair and media room/bar/hallwayDetails
addition of conditions space at (e) basement to include 1 bathroom and new open railing at (e) stair and media room/bar/hallway | $65,000 |
| Nov 19, 2015 | Completed final sign-off Jan 2016 | 2255 Octavia St | Stroub Construction | renew to pa #201401317553 & #201103182358 for final inspection.Details
renew to pa #201401317553 & #201103182358 for final inspection. | |
| Aug 24, 2015 | Never finaled issued Sep 2015, no final | 35 San Fernando Wy | Kevin Sullivan Construction Inc. | replace existing wood window with new wood french door at living room.Details
replace existing wood window with new wood french door at living room. | $5,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2019 | 2239 Webster St | Rico's General Construction | restore base of 2nd floor bay window, lower (e) sloped driveway & install new garage door, replace (e) front stair railing, remove a portion of bldg at rear of property, and interior remodel of existing 2 units, maher n/aDetails
restore base of 2nd floor bay window, lower (e) sloped driveway & install new garage door, replace (e) front stair railing, remove a portion of bldg at rear of property, and interior remodel of existing 2 units, maher n/a | $280,000 |
| Aug 6, 2015 | Completed final sign-off Feb 2016 | 3140 Clay St | The Toboni Group | kitchen remodel, bathroom remodel, new lighting & other. cosmetic work. no changes to layout, walls or openings. no structural work.Details
kitchen remodel, bathroom remodel, new lighting & other. cosmetic work. no changes to layout, walls or openings. no structural work. | $150,000 |
| May 26, 2015 | Never finaled issued May 2015, no final | 2500 Steiner St | The Toboni Group | change out plumbing fixtures, add lights, remove arch, upgrade cabinets refinish hardwood floors & painting.Details
change out plumbing fixtures, add lights, remove arch, upgrade cabinets refinish hardwood floors & painting. | $28,000 |
| May 6, 2015 | Completed final sign-off Dec 2015 | 35 San Fernando Wy | Kevin Sullivan Construction Inc. | addition of fireplace at master bedroom, remodel master bath, relocate laundry and add bathroom at second floor.Details
addition of fireplace at master bedroom, remodel master bath, relocate laundry and add bathroom at second floor. | $76,000 |
| Apr 27, 2015 | Expired or cancelled expired Feb 2026 | 190 Dorantes Av | Seamus Collins Construction, Inc. | rear addition at 1st & 2nd floors. interior remodel to include kitchen remodel, master bathroom, master closet and misc including dining & family rooms. ** maher: n/a **Details
rear addition at 1st & 2nd floors. interior remodel to include kitchen remodel, master bathroom, master closet and misc including dining & family rooms. ** maher: n/a ** | $98,000 |
| Mar 9, 2015 | Expired or cancelled cancelled Nov 2016 | 566 Kansas St | The Toboni Group | remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building.Details
remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building. | $235,000 |
| Mar 9, 2015 | Completed final sign-off Mar 2015 | 2342 Washington St | The Toboni Group | revision to app#201208157477. add bbq sink and undercounter refrigeration at top floor roof terrace and a fire pit.Details
revision to app#201208157477. add bbq sink and undercounter refrigeration at top floor roof terrace and a fire pit. | $15,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2016 | 2951 Pine St | The Toboni Group | new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door.Details
new 3rd floor addition. new rear addition & deck at 2nd floor. interior remodel to include kitchen, additional bath & misc. replace (e) garage door. | $480,000 |
| Feb 20, 2015 | Completed final sign-off Jun 2019 | 3829 Clay St | Arcon Construction Corp, Colindres & Associates | horizontal addition at rear. new dormers, new elevator and interior remodel work. add 3 & 1/2 new bathrooms & kitchen remodel.Details
horizontal addition at rear. new dormers, new elevator and interior remodel work. add 3 & 1/2 new bathrooms & kitchen remodel. | $700,000 |
| Jan 29, 2015 | Completed final sign-off Jun 2015 | 1209 Green St | Stroub Construction | unit 1: new fixtures & finishes in 2 (e) bathrooms, new electrical lighting; no doors/windows/walls under this scope comply with cbc 2013-co and smoke alarm requirements.Details
unit 1: new fixtures & finishes in 2 (e) bathrooms, new electrical lighting; no doors/windows/walls under this scope comply with cbc 2013-co and smoke alarm requirements. | $25,000 |
| Jan 5, 2015 | Completed final sign-off Apr 2015 | 2200 Sacramento St | The Toboni Group | #205 - remodel kitchen & 1 & 1/2 bathrooms plus misc work. no structural or exterior work. no work to windows or doors. n/a maher ordinanceDetails
#205 - remodel kitchen & 1 & 1/2 bathrooms plus misc work. no structural or exterior work. no work to windows or doors. n/a maher ordinance | $48,000 |
| Dec 30, 2014 | Completed final sign-off Oct 2016 | 3524 Jackson St | Stroub Construction | rev.to #201303222850 & 201307192235:reconfigure front stair, add outdoor bbq. lower fl add bath, relocate laundry, add storage, add utility sink @ garage. 1st fl minor int wall changes. 2nd fl add bath, reconfigure closets & 1 bath. upper fl add fireplace, add 2 windows @ ma. bedrm. struct changesDetails
rev.to #201303222850 & 201307192235:reconfigure front stair, add outdoor bbq. lower fl add bath, relocate laundry, add storage, add utility sink @ garage. 1st fl minor int wall changes. 2nd fl add bath, reconfigure closets & 1 bath. upper fl add fireplace, add 2 windows @ ma. bedrm. struct changes | $40,000 |
| Dec 30, 2014 | Completed final sign-off Dec 2016 | 350 15th Av | The Toboni Group | add (1) bedroom unit & garage @ basement level & family room @ rear of building on 1st level. unit includes (1) kitchen & (1) bath.Details
add (1) bedroom unit & garage @ basement level & family room @ rear of building on 1st level. unit includes (1) kitchen & (1) bath. | $98,000 |
| Oct 15, 2014 | Completed final sign-off May 2015 | 3385 Jackson St | The Toboni Group | reduce solid parapet wall and add open rail. add fire pit.revise direct vent fire place spec at family room. revision to appl. 2013.1210.3784 and 2014.0131.7536.Details
reduce solid parapet wall and add open rail. add fire pit.revise direct vent fire place spec at family room. revision to appl. 2013.1210.3784 and 2014.0131.7536. | $15,000 |
| Sep 23, 2014 | Never finaled issued Oct 2014, no final | 1132 Green St | Qse Construction | revision to appl #2013.0927.8015 - play layout change on 2nd floor onlyDetails
revision to appl #2013.0927.8015 - play layout change on 2nd floor only | |
| Aug 12, 2014 | Expired or cancelled expired Jun 2018 | 611 Marina Bl | The Toboni Group | revision to 201312134202 to revise 2 window sizes at kitchen and 1 window at master bath. primary facade window enlarge. new window to be wood with stucco to match existing. 3/f & master bathrooms modified. bathroom, toilet moved, shower decreased & vanities moved. bath tub size increased, shower &Details
revision to 201312134202 to revise 2 window sizes at kitchen and 1 window at master bath. primary facade window enlarge. new window to be wood with stucco to match existing. 3/f & master bathrooms modified. bathroom, toilet moved, shower decreased & vanities moved. bath tub size increased, shower & | |
| Jun 27, 2014 | Completed final sign-off Nov 2016 | 2255 Octavia St | Stroub Construction | kitchen and sitting room remodel with new windows and doors to rear yard. maher not requiredDetails
kitchen and sitting room remodel with new windows and doors to rear yard. maher not required | $68,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 45 Homestead St | Stroub Construction | 2/f: replace kitchen cabinets & finishes, no change to wall & opening layouts. kitchen lighting will have 50% min. wattache high efficacyDetails
2/f: replace kitchen cabinets & finishes, no change to wall & opening layouts. kitchen lighting will have 50% min. wattache high efficacy | $28,000 |
| Apr 24, 2014 | Expired or cancelled withdrawn Jul 2017 | 2761 Scott St | Stroub Construction | remodel & addition @ 3rd & 4th floors. enlarge (e) bedroom, exercise room & office / study. add storage / closet at bedroom.Details
remodel & addition @ 3rd & 4th floors. enlarge (e) bedroom, exercise room & office / study. add storage / closet at bedroom. | $80,000 |
| Mar 17, 2014 | Expired or cancelled withdrawn Apr 2014 | 68 Presidio Av | The Toboni Group | revision to pa#201303011348 & 201311222683 - reduce 1 hr. parapet from 10' long to 6' at roof deck level.Details
revision to pa#201303011348 & 201311222683 - reduce 1 hr. parapet from 10' long to 6' at roof deck level. | |
| Jan 31, 2014 | Completed final sign-off Jan 2016 | 2255 Octavia St | Buestad Construction Inc | new stacked washer and dryer at 2nd floor.n/a for the maher ordinance #155-13Details
new stacked washer and dryer at 2nd floor.n/a for the maher ordinance #155-13 | $2,000 |
| Jan 22, 2014 | Completed final sign-off May 2017 | 2528 Union St | The Toboni Group | to erect 3 stories, basement, single family residence.Details
to erect 3 stories, basement, single family residence. | $960,000 |
| Jan 22, 2014 | Completed final sign-off May 2017 | 2528 Union St | The Toboni Group | to demolish 3 stories, single family residence.Details
to demolish 3 stories, single family residence. | $45,000 |
| Dec 10, 2013 | Completed final sign-off May 2015 | 3385 Jackson St | The Toboni Group | remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement.Details
remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement. | $250,000 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 2763 Filbert St | Hardman-Riedell Const. | revision to app#201305287983 to confirm top floor (3rd) is to be a habitable/occupied space & that sprinklers are not required by cbc 903.2.8.2 exception. also that the original bldg should be listed as 2 stories of occupancy and one story of basement. new work to be 3 stories of occupancyDetails
revision to app#201305287983 to confirm top floor (3rd) is to be a habitable/occupied space & that sprinklers are not required by cbc 903.2.8.2 exception. also that the original bldg should be listed as 2 stories of occupancy and one story of basement. new work to be 3 stories of occupancy | |
| Dec 3, 2013 | Completed final sign-off Oct 2016 | 3524 Jackson St | Stroub Construction | revision to appl #2013.0322.2850- lower floor foundation additoin for future proposed work, north of grid line a.Details
revision to appl #2013.0322.2850- lower floor foundation additoin for future proposed work, north of grid line a. | $20,000 |
| Jul 29, 2013 | Completed final sign-off Jun 2014 | 2255 Octavia St | Buestad Construction Inc | master suite remodel includng master bath with new window, powder room remodel. new wood windows and door to terrace, new fire place surround at living room and other misc. improvements.Details
master suite remodel includng master bath with new window, powder room remodel. new wood windows and door to terrace, new fire place surround at living room and other misc. improvements. | $75,000 |
| Jul 19, 2013 | Completed final sign-off Oct 2016 | 3524 Jackson St | Stroub Construction | revision to app #201303222850, new addition to (e) garage with terrace above, new gas fireplace and chimney at living room, relocate (e) solarium and skylights, reduce kitchen, new addition to terrace #1 foot printDetails
revision to app #201303222850, new addition to (e) garage with terrace above, new gas fireplace and chimney at living room, relocate (e) solarium and skylights, reduce kitchen, new addition to terrace #1 foot print | $35,000 |
| Jul 10, 2013 | Never finaled issued Jul 2013, no final | 3409 Jackson St | remodel 2 bathrooms, reconfigure closets, add sink.Details
remodel 2 bathrooms, reconfigure closets, add sink. | $48,000 | |
| Jul 5, 2013 | Completed final sign-off Jul 2015 | 2516 Gough St | Hardman-Riedell Const. | remodel 2 and 1/2 bathrms, kitchen, master closet, misc interior partitions, replacement of (e) windows in kind with new wood dble glazed windows, enclose north wall below exterior stair & landing per planDetails
remodel 2 and 1/2 bathrms, kitchen, master closet, misc interior partitions, replacement of (e) windows in kind with new wood dble glazed windows, enclose north wall below exterior stair & landing per plan | $95,000 |
| Jun 11, 2013 | Completed final sign-off Jun 2013 | 2615 Union St | Stroub Construction | admin correction to memorialize this is a 2 unit building & the permits #2012-0403-7485, 2010-1210-5815, 2012-1030-3166, 2012-0731-6194. should all refer both units 2615 union street & 2617 union streetDetails
admin correction to memorialize this is a 2 unit building & the permits #2012-0403-7485, 2010-1210-5815, 2012-1030-3166, 2012-0731-6194. should all refer both units 2615 union street & 2617 union street | |
| May 28, 2013 | Never finaled issued Jul 2013, no final | 2763 Filbert St | Hardman-Riedell Const. | addition of 2 internal stairs & adding conditioned space at the 3rd floor attic, add 2 skylights (not visible from street).Details
addition of 2 internal stairs & adding conditioned space at the 3rd floor attic, add 2 skylights (not visible from street). | $40,000 |
| Mar 22, 2013 | Completed final sign-off Mar 2014 | 68 Presidio Av | The Toboni Group | consolidation of all work previously appvd on pa# 2011/10/14/6891, pa# 2012/01/18/2486, pa# 2012/03/23/6788, pa# 2012/11/20/4610. replace in kind (e) wdw, single glazed wdws w/ new dbl glazed wood wdws. reconfigure (e) wdws, enlarge (e) wdws, replace (e) front stair in kind w/ stone stair, newDetails
consolidation of all work previously appvd on pa# 2011/10/14/6891, pa# 2012/01/18/2486, pa# 2012/03/23/6788, pa# 2012/11/20/4610. replace in kind (e) wdw, single glazed wdws w/ new dbl glazed wood wdws. reconfigure (e) wdws, enlarge (e) wdws, replace (e) front stair in kind w/ stone stair, new | $300,000 |
| Feb 8, 2013 | Completed final sign-off Jan 2014 | 1940 Broadway | Stroub Construction | remodel kitchen & 2.5 baths, remove 1 bath, replace existing single glazed wood window sashes with new double - glazed wood window sashes in kind configurations. reconfigure misc, non-load bearing walls and provide misc interior improvement. no structwork. all new doors 2b 20 min. except pocket drDetails
remodel kitchen & 2.5 baths, remove 1 bath, replace existing single glazed wood window sashes with new double - glazed wood window sashes in kind configurations. reconfigure misc, non-load bearing walls and provide misc interior improvement. no structwork. all new doors 2b 20 min. except pocket dr | $200,000 |
| Nov 20, 2012 | Completed final sign-off Mar 2014 | 68 Presidio Av | The Toboni Group | revision to 201201182486. remove existing walls at 2nd fl and new roofingDetails
revision to 201201182486. remove existing walls at 2nd fl and new roofing | $3,000 |
| Oct 11, 2012 | Expired or cancelled revoked Mar 2013 | 68 Presidio Av | The Toboni Group | revision to 201201182486. expand existing roof terrace. new window at top floor family room #2. replace existing single glazed window windows with new wood double glazed windows. repair stucco with integral colored stuccoDetails
revision to 201201182486. expand existing roof terrace. new window at top floor family room #2. replace existing single glazed window windows with new wood double glazed windows. repair stucco with integral colored stucco | $78,000 |
| Sep 10, 2012 | Completed final sign-off Nov 2013 | 2601 Broadway | relocate front doorDetails
relocate front door | $18,000 | |
| Aug 15, 2012 | Completed final sign-off Mar 2015 | 2342 Washington St | The Toboni Group | to erect 4 stories, 1 basement, single family building.Details
to erect 4 stories, 1 basement, single family building. | $960,000 |