Bo Zhang
- Listed as
- architect, engineer
- Firm
- Ladc Engineering Inc
- Based in
- San Jose
- On San Francisco permits
- Feb 2021 to Aug 2026
25 permits since 2000 (engineer on 23 permits, architect on 2 permits): 15 completed, 8 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Sep 2026 | 401 Marietta Dr | Kyj Construction Inc | 1) remodel (e) kitchen, (e) bathroom, (e) bedroom. 2) convert (e) pantry into additional cooking area, adding (n) w.i.c. in (e) bedroom #4. 3) convert (e) storage partial crawl space into (n) bathroom, replace (e) deck guardrail.Details
1) remodel (e) kitchen, (e) bathroom, (e) bedroom. 2) convert (e) pantry into additional cooking area, adding (n) w.i.c. in (e) bedroom #4. 3) convert (e) storage partial crawl space into (n) bathroom, replace (e) deck guardrail. | $60,000 |
| May 15, 2026 | In progress issued Jun 2026 | 606 Mississippi St | Inspired Builders Inc. | revision to pa# 202408209088: provide for raised wood floor from slab on grade at addition.Details
revision to pa# 202408209088: provide for raised wood floor from slab on grade at addition. | $5,000 |
| Mar 20, 2026 | Completed final sign-off Sep 2026 | 3024 California St | Mission Home Remodeling Inc | 3/f: remove wall b/t kitchen and dining. remove fireplace. remodel kitchen and 2 bathrooms. r/r closet doors. remove low guard walls and provide new full height wood slats guardrail walls. new hvac system. 2/f: remove fireplace. new hvac system. g/f: upgrade main panel to 200amp.Details
3/f: remove wall b/t kitchen and dining. remove fireplace. remodel kitchen and 2 bathrooms. r/r closet doors. remove low guard walls and provide new full height wood slats guardrail walls. new hvac system. 2/f: remove fireplace. new hvac system. g/f: upgrade main panel to 200amp. | $120,000 |
| Nov 24, 2025 | Completed final sign-off Jun 2026 | 163 Galewood Cr | Mission Home Remodeling Inc | revision to permit 202506209121. 1/f: remove (e) living room. create new media room. remove (e) storage and bathroom. create new bathroom. 2/f: remove (e) rooms and storage. create new office, new closet and new pantry. 3/f: remove (e) room. create new w.i.c. remodel (e) bath. provide new skylights.Details
revision to permit 202506209121. 1/f: remove (e) living room. create new media room. remove (e) storage and bathroom. create new bathroom. 2/f: remove (e) rooms and storage. create new office, new closet and new pantry. 3/f: remove (e) room. create new w.i.c. remodel (e) bath. provide new skylights. | $80,000 |
| Aug 8, 2025 | Completed final sign-off Jun 2026 | 1527 Sanchez St | Edri Construction Inc *See Notes* | replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location.Details
replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location. | $60,000 |
| Feb 22, 2025 | In progress issued Feb 2026 | 441 Madrid St | replacement of beam and posts on g/f. legalize conditioned space. repair slab and relocate g/f bathroom ext staircase replacement. wdws and ext sheathing replacement of rear elevation. (n) g/f lighting, power, hvac and plumbing. new 1hr wall at replaced ext staircase.Details
replacement of beam and posts on g/f. legalize conditioned space. repair slab and relocate g/f bathroom ext staircase replacement. wdws and ext sheathing replacement of rear elevation. (n) g/f lighting, power, hvac and plumbing. new 1hr wall at replaced ext staircase. | $100,000 | |
| Oct 1, 2024 | Completed final sign-off Aug 2026 | 1740 Sanchez St | We Do Construction Inc. | 1/f: remove e) garage, create new reconfifing garage, bedroom, bathroom & stair. 2nd/f: convert (e) living rm to 1 bedroom, family rm to 1 bedroom. remove (e) dining room and create (n) bathroom and dining room. remodel (e) kitchen. remove (e) bathroom to create new kids area. remove (e) dining roomDetails
1/f: remove e) garage, create new reconfifing garage, bedroom, bathroom & stair. 2nd/f: convert (e) living rm to 1 bedroom, family rm to 1 bedroom. remove (e) dining room and create (n) bathroom and dining room. remodel (e) kitchen. remove (e) bathroom to create new kids area. remove (e) dining room | $250,000 |
| Jul 23, 2024 | Completed final sign-off Sep 2024 | 117 Marview Wy | We Do Construction Inc. | revision to pa# 2024-0522-2711; only structural page's s-1, s-2, s-d-2Details
revision to pa# 2024-0522-2711; only structural page's s-1, s-2, s-d-2 | |
| Jun 27, 2024 | Completed final sign-off Oct 2026 | 2167 North Point St | We Do Construction Inc. | 1st fl: (n) family room, bedroom, closet, bathroom & stairs to 2nd fl., laundry room and storage. (n) mudroom, remove (e) outdoor stairs. relocate upgrade main panel. 2nd fl: remodel kitchen & bathroom, infill (e) covered deck. (n) alum clad windows at front.Details
1st fl: (n) family room, bedroom, closet, bathroom & stairs to 2nd fl., laundry room and storage. (n) mudroom, remove (e) outdoor stairs. relocate upgrade main panel. 2nd fl: remodel kitchen & bathroom, infill (e) covered deck. (n) alum clad windows at front. | $70,000 |
| Jun 25, 2024 | Completed final sign-off Oct 2024 | 1121 Montgomery St | Huey Const Mngmt Co Inc - Dba M H Const. | foundation on south side - remove & replace per drawings. west wall 15" rise foundation 8" above grade. interior onlyDetails
foundation on south side - remove & replace per drawings. west wall 15" rise foundation 8" above grade. interior only | $70,000 |
| Jun 12, 2024 | In progress issued Sep 2024 | 60 Surrey St | Barcci Builders Inc, Upkeep Industries Inc | replace water damaged framing under exterior stairs & replace stair covering, replace water damaged framing for 1/f framing & re-install window flashing, relocate electrical main panel, relocate electrical sub panel inside basement flr, kitchen remodeling, add 2 new skylights in kitchen area.Details
replace water damaged framing under exterior stairs & replace stair covering, replace water damaged framing for 1/f framing & re-install window flashing, relocate electrical main panel, relocate electrical sub panel inside basement flr, kitchen remodeling, add 2 new skylights in kitchen area. | $30,000 |
| Jun 7, 2024 | Completed final sign-off Aug 2024 | 2725 23rd St | Edri Construction Inc *See Notes* | remove and replace (in-kind) front stairs and landing in kind at (e) front entry due to dry rot. handrails and side walls below to remain tile floorDetails
remove and replace (in-kind) front stairs and landing in kind at (e) front entry due to dry rot. handrails and side walls below to remain tile floor | $15,000 |
| May 22, 2024 | Completed final sign-off Sep 2024 | 117 Marview Wy | We Do Construction Inc. | kitchen remodel per plans & foundation workDetails
kitchen remodel per plans & foundation work | $50,000 |
| Apr 29, 2024 | In progress issued Feb 2025 | 2566 42nd Av | We Do Construction Inc. | 1/f: remodel (e) bathroom, remodel (e) exterior stairs provide new, create new addition for new sitting room/ recreation room; 2/f: remove and replace (e) balcony railings as indicated,Details
1/f: remodel (e) bathroom, remodel (e) exterior stairs provide new, create new addition for new sitting room/ recreation room; 2/f: remove and replace (e) balcony railings as indicated, | $65,000 |
| Feb 23, 2024 | In progress issued Mar 2024 | 38 Belcher St | Mission Home Remodeling Inc | remove some portion of existing ceiling; provide new stairs and under stairs storage; remove some portion of existing roof create new roof hatch and roof deckDetails
remove some portion of existing ceiling; provide new stairs and under stairs storage; remove some portion of existing roof create new roof hatch and roof deck | $100,000 |
| Nov 28, 2023 | In progress filed Nov 2023, not yet issued | 200 Cordova St | Mission Home Remodeling Inc | second floor - remove (e) kitchen, nook area and laundry. create (n) kitchen & (n) half bath & closet. remove (e) deck. create (n) addition to extend (e) dining room. provide (n) deck.Details
second floor - remove (e) kitchen, nook area and laundry. create (n) kitchen & (n) half bath & closet. remove (e) deck. create (n) addition to extend (e) dining room. provide (n) deck. | $180,000 |
| Oct 20, 2023 | Completed final sign-off Nov 2025 | 1722 25th Av | Grey Line General Engineering Inc | this project is residential interior remodeling to existing two story house. proposed to convert garage space to family day-care less than 14 children (r-3 occupancy) on the first floor.Details
this project is residential interior remodeling to existing two story house. proposed to convert garage space to family day-care less than 14 children (r-3 occupancy) on the first floor. | $230,000 |
| Sep 11, 2023 | In progress issued Nov 2023 | 1033 Green St | Mission Home Remodeling Inc, Boaz Mor Design & Construction, Barton Builders | basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear sidingDetails
basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear siding | $200,000 |
| Jun 21, 2023 | Completed final sign-off Feb 2025 | 1725 10th Av | Mission Home Remodeling Inc | gr fl remove (e) garage,furnace stairs.(n) garage,stairs,vestibule, storage, office, & closet. 2/f remove back laundry struct & rebuild same size. add kitchen. (n) bath & hallway. (n) water heater, furnace, skylight.3/f new deck over new kitchen. remove windows and replace tempered door.Details
gr fl remove (e) garage,furnace stairs.(n) garage,stairs,vestibule, storage, office, & closet. 2/f remove back laundry struct & rebuild same size. add kitchen. (n) bath & hallway. (n) water heater, furnace, skylight.3/f new deck over new kitchen. remove windows and replace tempered door. | $150,000 |
| Apr 20, 2023 | Completed final sign-off Mar 2026 | 3345 Divisadero St | Mission Home Remodeling Inc | rev to pa# 202301260820,1st flr-provide new door, 2nd flr-remove extg kitchen & breakfast nook, create new kitchen & laundry rm w/secondary egress, remove extg bathroom & closet, creaet new bathroom, remove extg bathroom & wic, add new bathroom & closet, replace extg fireplace w/ electric fireplaceDetails
rev to pa# 202301260820,1st flr-provide new door, 2nd flr-remove extg kitchen & breakfast nook, create new kitchen & laundry rm w/secondary egress, remove extg bathroom & closet, creaet new bathroom, remove extg bathroom & wic, add new bathroom & closet, replace extg fireplace w/ electric fireplace | $40,000 |
| Apr 4, 2023 | Completed final sign-off Aug 2023 | 50 Benton Av | Barcci Builders Inc | kitchen remodel and remove portion of wall between kitchen and playroom. remove door and portion of wall betwee playroom and dining room to make wider openingDetails
kitchen remodel and remove portion of wall between kitchen and playroom. remove door and portion of wall betwee playroom and dining room to make wider opening | $50,000 |
| Nov 18, 2022 | Never finaled filed Nov 2022, never issued | 1036 Innes Av | convert existing the attached single-car garage to adu.Details
convert existing the attached single-car garage to adu. | $15,000 | |
| Jun 21, 2022 | Never finaled filed Jun 2022, never issued | 161 Miramar Av | re-plan layout & additional area @ western & east side of (e) 1st floor & additional exterior stair. horizontal addition at second floor. new roof plan. provide plumbing & electrical for new equipment. update electrical meter from 100a to 200a. provide new hvac. new lighing.Details
re-plan layout & additional area @ western & east side of (e) 1st floor & additional exterior stair. horizontal addition at second floor. new roof plan. provide plumbing & electrical for new equipment. update electrical meter from 100a to 200a. provide new hvac. new lighing. | $20,000 | |
| Mar 29, 2022 | Completed final sign-off Jul 2023 | 2 Vasquez Av | Studio 101 General Building Contractor | int remodel: 2nd flr remodel (e) kitchen, relocate stairs to 1st floor, remove (e) window on north side. 1st floor remodel (e) bedrooms, baths, add family room.Details
int remodel: 2nd flr remodel (e) kitchen, relocate stairs to 1st floor, remove (e) window on north side. 1st floor remodel (e) bedrooms, baths, add family room. | $190,000 |
| Feb 16, 2021 | Completed final sign-off Dec 2023 | 192 Marview Wy | D & L Construction And Consulting Servic | 1/f: convert (e) 733sf garage to 1 new bedroom, 1 bath, 1 half bath, 1 living room. replace (e) interior stairs. 2/f: reduce (e) bathroom by rebuilding a non-bearing partition. refurnish 2 (e) baths, 1 (e) kitchen. new 100sf rear yard shed to further part from main house. replace windows w/alum cladDetails
1/f: convert (e) 733sf garage to 1 new bedroom, 1 bath, 1 half bath, 1 living room. replace (e) interior stairs. 2/f: reduce (e) bathroom by rebuilding a non-bearing partition. refurnish 2 (e) baths, 1 (e) kitchen. new 100sf rear yard shed to further part from main house. replace windows w/alum clad | $200,000 |