Upkeep Industries Inc
- Based in
- Concord
- On San Francisco permits
- Oct 2019 to Sep 2026
- Last 24 months
- 14 permits filed
20 permits since 2000: 18 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 90 Reuel Ct | building 10: repair (e) dry rot framing at exterior stair at 90 reuel court. patch finishes to match (e). provide new post and beam to replace (e). remove and reattach stair stringer.Details
building 10: repair (e) dry rot framing at exterior stair at 90 reuel court. patch finishes to match (e). provide new post and beam to replace (e). remove and reattach stair stringer. | $45,000 |
| Jan 7, 2026 | Completed final sign-off Feb 2026 | 1 Reuel Ct | weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing.Details
weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing. | $9,150 |
| Jan 7, 2026 | Completed final sign-off Jul 2026 | 50 Cashmere St | weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing.Details
weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing. | $9,150 |
| Nov 21, 2025 | Completed final sign-off Jul 2026 | 65 Reuel Ct | bldg 5-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 3 stair waysDetails
bldg 5-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 3 stair ways | $9,150 |
| Nov 21, 2025 | Completed final sign-off Jul 2026 | 15 Reuel Ct | bldg 6-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 5 stair waysDetails
bldg 6-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 5 stair ways | $11,150 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 5 Cashmere St | weld iron mesh onto (e) metal stair. railing to reduce clear spacing to less than 4 inches. (5) exterior staircases at front.Details
weld iron mesh onto (e) metal stair. railing to reduce clear spacing to less than 4 inches. (5) exterior staircases at front. | $15,453 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 603 Keith St | weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (5 staircase total)Details
weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (5 staircase total) | $15,453 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 55 Cashmere St | weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (4 staircase in total)Details
weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (4 staircase in total) | $15,453 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 10 Cashmere St | weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches. (4) bridge walkways including attached steps - some street visible.Details
weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches. (4) bridge walkways including attached steps - some street visible. | $15,453 |
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 282 Moscow St | revision to 202506209119: build back front stairs according to plans, stair will be built in kind of originalDetails
revision to 202506209119: build back front stairs according to plans, stair will be built in kind of original | $39,000 |
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 282 Moscow St | replace 3 windows with in kind like windows, front of home street facing.Details
replace 3 windows with in kind like windows, front of home street facing. | $17,000 |
| Jun 20, 2025 | Completed final sign-off Dec 2025 | 282 Moscow St | remove all stucco from front of house and restucco. demo old marble stairs and replace with new tiles on stairs.Details
remove all stucco from front of house and restucco. demo old marble stairs and replace with new tiles on stairs. | $76,500 |
| May 12, 2025 | Completed final sign-off Jul 2025 | 23 Dedman Ct | removal of tub and replacing with a shower pan. taking old tile and replacing with marble slads. moving drain over about 9 inches. not layout change and no framing or structural work to be done.Details
removal of tub and replacing with a shower pan. taking old tile and replacing with marble slads. moving drain over about 9 inches. not layout change and no framing or structural work to be done. | $9,500 |
| Jan 16, 2025 | Completed final sign-off Jun 2025 | 40 Reuel Ct | replace the existing deteriorated walkway framing and the infill of vertical elements of the existing steel guardrail. add mesh on railings. replace back decking on unit #2b.Details
replace the existing deteriorated walkway framing and the infill of vertical elements of the existing steel guardrail. add mesh on railings. replace back decking on unit #2b. | $20,000 |
| Jun 12, 2024 | In progress issued Sep 2024 | 60 Surrey St | replace water damaged framing under exterior stairs & replace stair covering, replace water damaged framing for 1/f framing & re-install window flashing, relocate electrical main panel, relocate electrical sub panel inside basement flr, kitchen remodeling, add 2 new skylights in kitchen area.Details
replace water damaged framing under exterior stairs & replace stair covering, replace water damaged framing for 1/f framing & re-install window flashing, relocate electrical main panel, relocate electrical sub panel inside basement flr, kitchen remodeling, add 2 new skylights in kitchen area. | $30,000 |
| Aug 2, 2023 | Completed final sign-off Oct 2023 | 20 Reuel Ct | install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails.Details
install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails. | $20,000 |
| Aug 2, 2023 | Completed final sign-off Nov 2023 | 30 Reuel Ct | install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails.Details
install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails. | $20,000 |
| Feb 23, 2023 | Completed final sign-off Jul 2023 | 62 Surrey St | one kitchen remodel: demo and replace drywall, demo and install new cabinets, change out windows, chnage out electrical outlets, install new pantry doors, reposition and add can lights. non structuralDetails
one kitchen remodel: demo and replace drywall, demo and install new cabinets, change out windows, chnage out electrical outlets, install new pantry doors, reposition and add can lights. non structural | $50,000 |
| Sep 14, 2021 | Completed final sign-off Jul 2022 | 2268 Chestnut St | g/f -minor interior remodel of food service area. no change to occupancy load.Details
g/f -minor interior remodel of food service area. no change to occupancy load. | $8,000 |
| Oct 28, 2019 | Completed final sign-off Jul 2020 | 1998 Polk St | ti minor modification of food service area. replace 4 exterior light fixtures and replace exterior deco tilesDetails
ti minor modification of food service area. replace 4 exterior light fixtures and replace exterior deco tiles | $8,800 |