Inspired Builders Inc.
- Based in
- Santa Clara
- On San Francisco permits
- Dec 2022 to Aug 2026
- Last 24 months
- 25 permits filed
30 permits since 2000: 20 completed, 7 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 125 Sutro Heights Av | kitchen like for like, no structural changes. replace cabinets, sink dishwasher. bathroom remodel like for like, no structural changes. replace toilets (2), sinks (2), replace fan.Details
kitchen like for like, no structural changes. replace cabinets, sink dishwasher. bathroom remodel like for like, no structural changes. replace toilets (2), sinks (2), replace fan. | $60,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 1521 Anza St | kitchen remodel-like for like, no structural changes. replace cabinets, dishwasher, sink, all in same location in the kitchen. upgade mep to code as neededDetails
kitchen remodel-like for like, no structural changes. replace cabinets, dishwasher, sink, all in same location in the kitchen. upgade mep to code as needed | $20,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 125 Sutro Heights Av | revision to bpa# 202608146600 - remodel powder room, like for like, as well.Details
revision to bpa# 202608146600 - remodel powder room, like for like, as well. | $5,000 |
| Jun 16, 2026 | Completed final sign-off Aug 2026 | 2255 Franklin St | window changed to a door. no interior changes. shifting door 6 inches to the right, header enlaregement. no changes to any floor plan or other exterior openings.Details
window changed to a door. no interior changes. shifting door 6 inches to the right, header enlaregement. no changes to any floor plan or other exterior openings. | $6,000 |
| Jun 16, 2026 | Completed final sign-off Aug 2026 | 3566 18th St | adding a powder room. no exterior change, only one sink, one toiler on existing laundry space. mechanical stay as is - no work. total remodel are 32 sq ft.Details
adding a powder room. no exterior change, only one sink, one toiler on existing laundry space. mechanical stay as is - no work. total remodel are 32 sq ft. | $18,000 |
| May 28, 2026 | In progress issued May 2026 | 606 Mississippi St | like for like remodel of (2) existing bathrooms including new electrical, plumbing, and mechanical. installation of new fixtures and finishes, tile work, drywall repairs and paint.Details
like for like remodel of (2) existing bathrooms including new electrical, plumbing, and mechanical. installation of new fixtures and finishes, tile work, drywall repairs and paint. | $42,000 |
| May 15, 2026 | In progress issued Jun 2026 | 606 Mississippi St | revision to pa# 202408209088: provide for raised wood floor from slab on grade at addition.Details
revision to pa# 202408209088: provide for raised wood floor from slab on grade at addition. | $5,000 |
| May 12, 2026 | Completed final sign-off Aug 2026 | 2255 Franklin St | bathroom remodel like for like, tub to shower conversion.Details
bathroom remodel like for like, tub to shower conversion. | $28,000 |
| May 1, 2026 | In progress issued May 2026 | 100 Encline Ct | kitchen and 2x bathroom remodel to include replace gas cooktop for range and update all fixtures and finishes. replace shower for free standing shower and add (n) master bathroom. include (n) subpanelDetails
kitchen and 2x bathroom remodel to include replace gas cooktop for range and update all fixtures and finishes. replace shower for free standing shower and add (n) master bathroom. include (n) subpanel | $70,000 |
| Mar 10, 2026 | Completed final sign-off Aug 2026 | 45 Stonecrest Dr | partial kitchen remodel in kind - remove countertops throughout kitchen, remove (e) appliances and fixtures. install new appliances and fixtures. install new countertops. upgrade outlets to new gfci, at backsplash. all in kind. no change to floor layout. no change to wall layout. no structural workDetails
partial kitchen remodel in kind - remove countertops throughout kitchen, remove (e) appliances and fixtures. install new appliances and fixtures. install new countertops. upgrade outlets to new gfci, at backsplash. all in kind. no change to floor layout. no change to wall layout. no structural work | $15,000 |
| Feb 27, 2026 | Completed final sign-off Jun 2026 | 493 Diamond St | bathroom remodel: tub to shower. replace toilet, sink, vanity , fan. upgrade mep to code. 40sqftDetails
bathroom remodel: tub to shower. replace toilet, sink, vanity , fan. upgrade mep to code. 40sqft | $25,000 |
| Feb 25, 2026 | Completed final sign-off Jun 2026 | 493 Diamond St | project consist of a kitchen and dining room remodel with (n) exterior doors and windows and minor sturctural remodel. no work visible from street.Details
project consist of a kitchen and dining room remodel with (n) exterior doors and windows and minor sturctural remodel. no work visible from street. | $30,000 |
| Feb 13, 2026 | Completed final sign-off Apr 2026 | 1515 Anza St | to obtain final inspection for work approved under pa#202411255657Details
to obtain final inspection for work approved under pa#202411255657 | |
| Feb 13, 2026 | Completed final sign-off Apr 2026 | 1517 Anza St | to obtain final inspection for work approved under pa#202411255667Details
to obtain final inspection for work approved under pa#202411255667 | |
| Feb 13, 2026 | Completed final sign-off Jun 2026 | 34 Collins St | unit# 201. add drain / water & power supply for washer / dryer stackable.Details
unit# 201. add drain / water & power supply for washer / dryer stackable. | $2,000 |
| Jan 21, 2026 | Completed final sign-off Jun 2026 | 34 Collins St | unit 201: remodel 2 bathrooms like for like, new toilet, sink, vanity.Details
unit 201: remodel 2 bathrooms like for like, new toilet, sink, vanity. | $24,000 |
| Aug 22, 2025 | Completed final sign-off Nov 2025 | 318 Vicksburg St | kitchen remodel like for like. 97 sq ft.Details
kitchen remodel like for like. 97 sq ft. | $30,000 |
| May 8, 2025 | In progress issued Feb 2026 | 606 Mississippi St | 1st floor modify existing building - rear addition to add new kitchen and living area. approx 342 sq ft 2nd floor - also demolition of a (e) walk in closet area and interior modifications.Details
1st floor modify existing building - rear addition to add new kitchen and living area. approx 342 sq ft 2nd floor - also demolition of a (e) walk in closet area and interior modifications. | $168,800 |
| Mar 21, 2025 | Completed final sign-off Mar 2025 | 592 Wildwood Wy | revision to permit 202412207219. kitchen remodel has been removed from scope of work.Details
revision to permit 202412207219. kitchen remodel has been removed from scope of work. | |
| Mar 6, 2025 | Completed final sign-off Mar 2025 | 2446 47th Av | replacement of ~330sf of sheetrock on the garage walls. no structural changes.Details
replacement of ~330sf of sheetrock on the garage walls. no structural changes. | $15,000 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 2458 44th Av | kitchen like for like & 1 bathroom like for like convert tub to showerDetails
kitchen like for like & 1 bathroom like for like convert tub to shower | $45,000 |
| Jan 16, 2025 | Completed final sign-off Apr 2025 | 701 Minna St | unit #22: 1 bathroom remodel like for like convert tub to shower.Details
unit #22: 1 bathroom remodel like for like convert tub to shower. | $20,000 |
| Dec 20, 2024 | Completed final sign-off Mar 2025 | 592 Wildwood Wy | laundry room: add new cabinets & sink to (e). kitchen remodel in kind -rip & replace like for like. install ev charger in garageDetails
laundry room: add new cabinets & sink to (e). kitchen remodel in kind -rip & replace like for like. install ev charger in garage | $40,000 |
| Nov 25, 2024 | Expired or cancelled expired Apr 2026 | 1515 Anza St | add a media room and bathroom on the 1st floorDetails
add a media room and bathroom on the 1st floor | $50,000 |
| Nov 25, 2024 | Expired or cancelled expired Apr 2026 | 1517 Anza St | add a media and a bathroom on 1st floor.Details
add a media and a bathroom on 1st floor. | $50,000 |
| Apr 2, 2024 | Completed final sign-off Sep 2024 | 65 Lomita Av | remodel of e single family dwelling to reconfigure kitchen and master bedroom closet. removal of bearing wall in kitchen. removal of e hall bath. convert lower storage room into a new bedroom and bathDetails
remodel of e single family dwelling to reconfigure kitchen and master bedroom closet. removal of bearing wall in kitchen. removal of e hall bath. convert lower storage room into a new bedroom and bath | $80,000 |
| Oct 5, 2023 | Completed final sign-off Dec 2023 | 432 Collingwood St | unit a: 1 kitchen remodel like for like. install subpanel. install 21 recessed lights throughout the house.Details
unit a: 1 kitchen remodel like for like. install subpanel. install 21 recessed lights throughout the house. | $40,000 |
| Jul 13, 2023 | Completed final sign-off Jul 2024 | 660 Myra Wy | replacement of 2360sf of stucco in-kind throughout the house, replace 60" window to new patio door, demo window and transform for new dbl awning.Details
replacement of 2360sf of stucco in-kind throughout the house, replace 60" window to new patio door, demo window and transform for new dbl awning. | $61,000 |
| May 16, 2023 | Completed final sign-off Jul 2023 | 2323 Funston Av | (1) bathroom remodel like for likeDetails
(1) bathroom remodel like for like | $30,000 |
| Dec 20, 2022 | Expired or cancelled cancelled Jan 2023 | 357 Bocana St | remodel (e) bathroom in kind. replace fixtures (tub, toilet, vanity, tile, fan, light fixture). no structural work, no floor or wall layout change.Details
remodel (e) bathroom in kind. replace fixtures (tub, toilet, vanity, tile, fan, light fixture). no structural work, no floor or wall layout change. | $15,000 |