Andrew Wolfram
- Listed as
- architect, authorized agent-others, designer
- Firm
- Tef Archit/Interior Design
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Jul 2023
27 permits since 2000 (architect on 22 permits, designer on 4 permits, authorized agent-others on 1 permit): 20 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 12, 2023 | Completed final sign-off Jul 2024 | 101 Spear St | Skyline Construction | ste 220: voluntary addition of structural glass guardrails at (e) balconies floors lvls 2,3,4 (e) steel guardrails (c.1988) are non-compliant w/respect to cbc 1015.3 height (42"min) & cbc 1015.4 opening limitations; (n) glass railings shall comply w/these requirements. patch/repair impacted finishesDetails
ste 220: voluntary addition of structural glass guardrails at (e) balconies floors lvls 2,3,4 (e) steel guardrails (c.1988) are non-compliant w/respect to cbc 1015.3 height (42"min) & cbc 1015.4 opening limitations; (n) glass railings shall comply w/these requirements. patch/repair impacted finishes | $465,000 |
| Dec 23, 2022 | Expired or cancelled withdrawn Apr 2023 | 2750 Jackson St | Plant Construction Co, Lp | 1st fl hallway lighting replacement. restroom renovation. voluntary accessibility upgrade. 2nd fl engineering studio & adjacent offices. (n) fixtures, finishes, & equipment. (n) build-in casework & workstations. (n) m.e.p.. minor structural work at (n) opening at concrete wall.Details
1st fl hallway lighting replacement. restroom renovation. voluntary accessibility upgrade. 2nd fl engineering studio & adjacent offices. (n) fixtures, finishes, & equipment. (n) build-in casework & workstations. (n) m.e.p.. minor structural work at (n) opening at concrete wall. | $800,000 |
| Feb 28, 2022 | Completed final sign-off Aug 2022 | 777 Brannan St | C C I Commercial Construction & Improv | revision to arch pa# 202109218876. add smoke detector in elevator shaft. fire alarm under separate permit.Details
revision to arch pa# 202109218876. add smoke detector in elevator shaft. fire alarm under separate permit. | |
| Sep 21, 2021 | Completed final sign-off Aug 2022 | 777 Brannan St | C C I Commercial Construction & Improv | revision of bpa: 201108293506. remove (e) service elevator & installation of new elevator in (e) shaftDetails
revision of bpa: 201108293506. remove (e) service elevator & installation of new elevator in (e) shaft | $350,000 |
| Jun 14, 2021 | Never finaled filed Jun 2021, never issued | 915 Minna St | Landmark Construction Inc. | revision to pa# 2016-0219-0104; expansion of (e) roof deck, exterior of (e) glass wind screenDetails
revision to pa# 2016-0219-0104; expansion of (e) roof deck, exterior of (e) glass wind screen | $2,500 |
| Jun 9, 2020 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | revision to permit # 201809190782. this package revises approved basement elevator machine room, level 1; gender neutral restroom removal, level 1 men's and women's restrooms reconfiguration, and the removal of restrooms on levels 2, 3 and 4. previously approved mechanical scope has been revised.Details
revision to permit # 201809190782. this package revises approved basement elevator machine room, level 1; gender neutral restroom removal, level 1 men's and women's restrooms reconfiguration, and the removal of restrooms on levels 2, 3 and 4. previously approved mechanical scope has been revised. | |
| Jun 27, 2018 | Completed final sign-off Sep 2019 | 3525 17th St | Premier Structures Inc | add units per ord 162-16. constr new interior for adu unit. complete mech,elec,plumb and life safety as req by permit document. this work is performed in conjuction with work permit 2018-01-31-0061. maher n/aDetails
add units per ord 162-16. constr new interior for adu unit. complete mech,elec,plumb and life safety as req by permit document. this work is performed in conjuction with work permit 2018-01-31-0061. maher n/a | |
| Apr 3, 2018 | Completed final sign-off Jun 2018 | 660 03rd St | Novo Construction Inc | removal of non structural partitions on floors 3 & 4. space to remian vacant until all accessible features are restored under separte ti permit.Details
removal of non structural partitions on floors 3 & 4. space to remian vacant until all accessible features are restored under separte ti permit. | $5,000 |
| Jan 31, 2018 | Completed final sign-off Sep 2019 | 3525 17th St | Premier Structures Inc | complete rehab of all areas with modern materials due to fire & water damage. restore historic features. create open flr plan btwn kitchen & lvg rm typical @ 2nd-4th flrs. optimize lvng space @1st flr. structural upgrades including seismic & framing repairs. (n) & upgraded mep.Details
complete rehab of all areas with modern materials due to fire & water damage. restore historic features. create open flr plan btwn kitchen & lvg rm typical @ 2nd-4th flrs. optimize lvng space @1st flr. structural upgrades including seismic & framing repairs. (n) & upgraded mep. | $3,275,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 851 Beach St | Dome Construction Corp | addition of 1 private office on mezzanine level to an (e) office area. ref pa 2017-0119-7486Details
addition of 1 private office on mezzanine level to an (e) office area. ref pa 2017-0119-7486 | $28,000 |
| Apr 5, 2017 | Completed final sign-off Jul 2018 | 1800 Mission St | Yerba Buena Builders Inc | 1/f- revisioon to pa#201607142293, relocate gender inclusive restroom in different area of the project on level 1 (same floor). n/a ordinance #155-13Details
1/f- revisioon to pa#201607142293, relocate gender inclusive restroom in different area of the project on level 1 (same floor). n/a ordinance #155-13 | |
| Mar 15, 2017 | Never finaled filed Mar 2017, never issued | 1800 Mission St | replacement of existing non-historic loading dock coiling door on julian street with new perforated coiling door, new air intake & exhaust vents on roof.Details
replacement of existing non-historic loading dock coiling door on julian street with new perforated coiling door, new air intake & exhaust vents on roof. | $12,000 | |
| Feb 23, 2017 | Completed final sign-off Feb 2020 | 950 Natoma St | Landmark Construction Inc. | to erect 4 stories, no basement, type va, 6 units multi-family residential building. (r-s) struct/arch/mep/alarm/sprinkler/standpipe/errcs on addenda. ** maher: n/a **Details
to erect 4 stories, no basement, type va, 6 units multi-family residential building. (r-s) struct/arch/mep/alarm/sprinkler/standpipe/errcs on addenda. ** maher: n/a ** | $200,000 |
| Jan 19, 2017 | Completed final sign-off Jul 2017 | 851 Beach St | Dome Construction Corp | level 1 & mezz: t.i. of powerhouse bldg. scope in build-out of (n) business office in former restaurant space. no exterior work. mep & fire protection under separate perit. maher n/a.Details
level 1 & mezz: t.i. of powerhouse bldg. scope in build-out of (n) business office in former restaurant space. no exterior work. mep & fire protection under separate perit. maher n/a. | $1,500,000 |
| Jan 13, 2017 | Completed final sign-off Jun 2017 | 851 Beach St | Dome Construction Corp | modification to 3(e) exterior doors along beach st. n/a for maher ordinance.Details
modification to 3(e) exterior doors along beach st. n/a for maher ordinance. | $12,000 |
| Oct 28, 2016 | Completed final sign-off Nov 2017 | 1800 Mission St | Yerba Buena Builders Inc | administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to aid in developing reinforcement solution. n/a for maher ordinance.Details
administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to aid in developing reinforcement solution. n/a for maher ordinance. | $84,000 |
| Oct 27, 2016 | Never finaled issued Oct 2017, no final | 1138 Sutter St | Palmera Construction Co | change of use & change of occupancy from office to commercial bakery & limited service restaurant. partial remodel of the tenant space on ground level of an existing five-story building. this project creates a new limited restaurant and new commercial bakery. n/a for maher ordinance no.155-13Details
change of use & change of occupancy from office to commercial bakery & limited service restaurant. partial remodel of the tenant space on ground level of an existing five-story building. this project creates a new limited restaurant and new commercial bakery. n/a for maher ordinance no.155-13 | $150,000 |
| Sep 23, 2016 | Completed final sign-off Jun 2017 | 851 Beach St | Swinerton Builders | exterior work only. demo of (e) mech penthouse, (e) rooftop mech units. modification to bitumen roofing membrane & powerhouse roof including new roof penetrations. replacement of (e) seismic joint. removal of brick infill & installation of new aluminum windows maher naDetails
exterior work only. demo of (e) mech penthouse, (e) rooftop mech units. modification to bitumen roofing membrane & powerhouse roof including new roof penetrations. replacement of (e) seismic joint. removal of brick infill & installation of new aluminum windows maher na | $10,000 |
| Aug 3, 2016 | Completed final sign-off Dec 2016 | 1800 Mission St | tenant improvement including addition of (3) new vestibules within a-4/drill court space to improve acoustical performance, no chane in exiting width as proposed; maher n/aDetails
tenant improvement including addition of (3) new vestibules within a-4/drill court space to improve acoustical performance, no chane in exiting width as proposed; maher n/a | $18,000 | |
| Jul 14, 2016 | Completed final sign-off Jul 2018 | 1800 Mission St | tenant improvement consisting of new gender neutral restroom on ground floor (above code minimum required fixtures), new storage room & small accessory lounge space. scope of work is all on ground floor. maher naDetails
tenant improvement consisting of new gender neutral restroom on ground floor (above code minimum required fixtures), new storage room & small accessory lounge space. scope of work is all on ground floor. maher na | $285,000 | |
| May 26, 2016 | Expired or cancelled withdrawn Aug 2016 | 64 06th St | demo of (e) walls; construction of new cafe counter; reno of (e) toilet to ada compliant toilet, reopening of infilled windows and doors, new lighting, plumb and mech; (n) doors actuatores at entry door, inside and outside. consturct new glazed window at facade. replace store front windows & frames.Details
demo of (e) walls; construction of new cafe counter; reno of (e) toilet to ada compliant toilet, reopening of infilled windows and doors, new lighting, plumb and mech; (n) doors actuatores at entry door, inside and outside. consturct new glazed window at facade. replace store front windows & frames. | $40,000 | |
| May 20, 2016 | Completed final sign-off Mar 2017 | 170 09th St | C C I Commercial Construction & Improv | 1st, 2nd, 3rd floors: ti accessible restrooms @ each floor. passenger elevator cab finish alt. main entry alt. to provide accessible entry alt. to int stairs to provide improved accessibility m/e/p included. maher naDetails
1st, 2nd, 3rd floors: ti accessible restrooms @ each floor. passenger elevator cab finish alt. main entry alt. to provide accessible entry alt. to int stairs to provide improved accessibility m/e/p included. maher na | $1,000,000 |
| Mar 11, 2016 | Completed final sign-off Oct 2016 | 851 Beach St | Swinerton Builders | renovation of (e) vacant restaurant at powerhouse bldg. work includes partial replacement of (e)steel framing & concrete deck. (n)accessible stair & guardrail system. no exterior work. no change to historic bldg fabric. space to remain vacant per ab-017. compliance with maher ordin. 155-15 not req.Details
renovation of (e) vacant restaurant at powerhouse bldg. work includes partial replacement of (e)steel framing & concrete deck. (n)accessible stair & guardrail system. no exterior work. no change to historic bldg fabric. space to remain vacant per ab-017. compliance with maher ordin. 155-15 not req. | $300,000 |
| Feb 19, 2016 | Completed final sign-off Jan 2020 | 915 Minna St | Landmark Construction Inc. | to erect 4 stories, 1 basement, type iii-a, 49 units residential apartment building.(r-2) ** maher: disturbance of at least 50 cu. yd. of soil. addendum to be routed to dph **.Details
to erect 4 stories, 1 basement, type iii-a, 49 units residential apartment building.(r-2) ** maher: disturbance of at least 50 cu. yd. of soil. addendum to be routed to dph **. | $11,000,000 |
| Dec 23, 2015 | Completed final sign-off Nov 2017 | 64 06th St | Cookline Construction Inc | conversion of ground floor tenant space from barber shop to limited restaurant. demolition of interior walls, construction of (n) partitions, cafe counter, plumbing electrical & mech. reduce size of storage room in basement ** maher: n/a **Details
conversion of ground floor tenant space from barber shop to limited restaurant. demolition of interior walls, construction of (n) partitions, cafe counter, plumbing electrical & mech. reduce size of storage room in basement ** maher: n/a ** | $90,000 |
| Jun 27, 2014 | Never finaled issued Apr 2015, no final | 1360 Bush St | change of use: level 1 retail suites 1360 bush to large institutional office use. demolition of interior partitions and mezzanine. construction of new interior partitions all work first floor only, suite 1360 and 1380Details
change of use: level 1 retail suites 1360 bush to large institutional office use. demolition of interior partitions and mezzanine. construction of new interior partitions all work first floor only, suite 1360 and 1380 | $47,000 | |
| Sep 9, 2005 | Expired or cancelled expired Feb 2009 | 1355 Market St | 9th street wing basement renovations - demo and removal of portion of bldg or structure sliding steel track (mounted) to be removed existingDetails
9th street wing basement renovations - demo and removal of portion of bldg or structure sliding steel track (mounted) to be removed existing | $11,000 |