Adam Klein
- Listed as
- engineer
- Firm
- Bkg Structural Engineers
- Based in
- Redwood City
- On San Francisco permits
- Sep 2015 to Jul 2026
41 permits since 2000 (engineer on 41 permits): 25 completed, 6 in progress, 5 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Jul 2026 | 2520 Divisadero St | Forma Construction | kitchen and bath remodels of 1st fl. through 3rd fl. removal and infill of service stairs from fls. 1-3 (stair run to basement to remain) removal of dormer at rear facade. replace windows inkind and add (3) (n) windows at side and rear elevations. new electric and plumbing per (n) layout.Details
kitchen and bath remodels of 1st fl. through 3rd fl. removal and infill of service stairs from fls. 1-3 (stair run to basement to remain) removal of dormer at rear facade. replace windows inkind and add (3) (n) windows at side and rear elevations. new electric and plumbing per (n) layout. | $350,700 |
| Jun 8, 2026 | In progress issued Sep 2026 | 3330 Jackson St | Upscale Construction Inc. | major renovation of interior spaces; replacement of existing staircase; expansion of the kitchen on the rear(north facade) to incorporate expansive glass door; all (e) windows, interior and exterior finishes to be replaced.Details
major renovation of interior spaces; replacement of existing staircase; expansion of the kitchen on the rear(north facade) to incorporate expansive glass door; all (e) windows, interior and exterior finishes to be replaced. | $1,600,000 |
| May 13, 2026 | In progress filed May 2026, not yet issued | 2636 Green St | D G M L Construction Inc | revision to pa# 202603187814, remove roof deck scope @ 4/f, replace fire escape inkind, replace all mechanical equipment. bathroom scope changes @ 3/f: remodel (e) primary bath, remodel (e) bath between bedrooms, remove (e) bath @ top of stairs. new bath @ library, remodel half-bath @ 4/f inkind.Details
revision to pa# 202603187814, remove roof deck scope @ 4/f, replace fire escape inkind, replace all mechanical equipment. bathroom scope changes @ 3/f: remodel (e) primary bath, remodel (e) bath between bedrooms, remove (e) bath @ top of stairs. new bath @ library, remodel half-bath @ 4/f inkind. | |
| Aug 26, 2025 | In progress issued Nov 2025 | 710 El Camino Del Mar | Forma Construction | structural work for interior stairs of residence. architectural information was already permitted in pa #202410243675Details
structural work for interior stairs of residence. architectural information was already permitted in pa #202410243675 | $10,000 |
| Nov 19, 2024 | In progress issued Feb 2025 | 710 El Camino Del Mar | Forma Construction | renovation of interior spaces; replacement of the (e) stairs, reconfiguration of some windows on the east facade, and a comprehensive transformation of the rear (north) facade to incorporate new windows, new finishes, and fixtures throughout.Details
renovation of interior spaces; replacement of the (e) stairs, reconfiguration of some windows on the east facade, and a comprehensive transformation of the rear (north) facade to incorporate new windows, new finishes, and fixtures throughout. | $1,500,000 |
| Sep 10, 2024 | Expired or cancelled withdrawn Mar 2025 | 2610 Pacific Av | Colindres & Associates | foundation replacement & seismic upgrade; full interior remodel; exterior window replacement; horizontal extension of rear deckDetails
foundation replacement & seismic upgrade; full interior remodel; exterior window replacement; horizontal extension of rear deck | $1,750,000 |
| Aug 19, 2024 | Expired or cancelled withdrawn Apr 2026 | 2076 14th Av | Kyle Wong Construction | to excavate 3' from backyard doing a osha. cut for shoringDetails
to excavate 3' from backyard doing a osha. cut for shoring | $2,000 |
| Apr 29, 2024 | Completed final sign-off Feb 2025 | 2899 Vallejo St | Abacus Group Builders Inc | revision to 201711274839 s1 & s2 to document as- built conditions including external openings, alteration of internal spiral to square. addition of external spiral stair. proposed trim at facade. no change to special inpsections - see pa 201711274839-s1Details
revision to 201711274839 s1 & s2 to document as- built conditions including external openings, alteration of internal spiral to square. addition of external spiral stair. proposed trim at facade. no change to special inpsections - see pa 201711274839-s1 | |
| Mar 21, 2024 | Expired or cancelled expired May 2026 | 2640 Jackson St | Clayton Timbrell & Co | replace and expand 2nd floor deck. replace 3rd floor deck. infill at 3rd floor rear facade and expand 4/f balcony. ref# 202304065224Details
replace and expand 2nd floor deck. replace 3rd floor deck. infill at 3rd floor rear facade and expand 4/f balcony. ref# 202304065224 | $20,000 |
| Mar 18, 2024 | In progress issued Apr 2024 | 2636 Green St | Bailey General Contracting Co Inc | structural revision to pa# 202312192746: roof pop-up strengthening due to wood rot and unsafe current conditions viewed during field investigation.Details
structural revision to pa# 202312192746: roof pop-up strengthening due to wood rot and unsafe current conditions viewed during field investigation. | $30,000 |
| Feb 2, 2023 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | revision to bpa#202207088027, adjust position of proposed skylights, provide note to fire rate window, and reframing (e) damaged & substandard framing. allwork previously approved.enlarge footing at grid line 2, replace (e) 2x10 joist at first level in area indicated in plan, replace in-kind framingDetails
revision to bpa#202207088027, adjust position of proposed skylights, provide note to fire rate window, and reframing (e) damaged & substandard framing. allwork previously approved.enlarge footing at grid line 2, replace (e) 2x10 joist at first level in area indicated in plan, replace in-kind framing | |
| Nov 18, 2022 | Completed final sign-off Jun 2024 | 671 04th Av | structural revision to pa 2021-0208-4212 updates to sheets s2.0, s2.1 and s3.0. no other changesDetails
structural revision to pa 2021-0208-4212 updates to sheets s2.0, s2.1 and s3.0. no other changes | ||
| Jul 8, 2022 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration.Details
interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration. | $329,000 |
| Apr 20, 2022 | Completed final sign-off Feb 2026 | 2112 18th St | Pacific Edge Construction Inc | re-build existing rear main level deck. add a roof deck with spiral staircases in the rear yard.Details
re-build existing rear main level deck. add a roof deck with spiral staircases in the rear yard. | $40,000 |
| Apr 12, 2022 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. revise exterior finish at siding. revise interior doors. stair reconfiguration. window heights revised at 3 locations. tesla solar roof on deferred permit submittal.Details
revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. revise exterior finish at siding. revise interior doors. stair reconfiguration. window heights revised at 3 locations. tesla solar roof on deferred permit submittal. | $20,000 |
| Mar 7, 2022 | Completed final sign-off May 2025 | 1558 Grove St | Box Canyon Builders Dba The Englander | ground floor expansion at rear and dormer at stair.Details
ground floor expansion at rear and dormer at stair. | $50,000 |
| Jan 14, 2022 | Never finaled issued Feb 2022, no final | 9 Rio Ct | Realty Builders Inc | replace (e) window @ rear with a sliding door.Details
replace (e) window @ rear with a sliding door. | $6,000 |
| Dec 7, 2021 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Dowbuilt Inc. | structural revisions and deferred mep for 2021-0804-5817 includes flooring reinforcement. addition of steal channels at the stair opening (n) psl headers, updated deck floor framing details, updated interior railing detailDetails
structural revisions and deferred mep for 2021-0804-5817 includes flooring reinforcement. addition of steal channels at the stair opening (n) psl headers, updated deck floor framing details, updated interior railing detail | |
| Aug 4, 2021 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. work includes changes to interior layout, new stairs, new trash enclosure. reconfigure exterior window openings. new skylights. new roofing finishes.Details
revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. work includes changes to interior layout, new stairs, new trash enclosure. reconfigure exterior window openings. new skylights. new roofing finishes. | $50,000 |
| Jul 28, 2021 | Completed final sign-off Apr 2023 | 8 Miguel St | Pacific Edge Construction Inc | interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building.Details
interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building. | $62,000 |
| Apr 9, 2021 | Completed final sign-off May 2024 | 2909 26th Av | Pacific Edge Construction Inc | excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior.Details
excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior. | $197,000 |
| Jan 29, 2021 | Never finaled issued Jul 2021, no final | 60 Hazelwood Av | Caruso Construction Inc. | partially excavate (e) lower level to create new bedroom, bathroom and sitting room. renovate ktichen at upper level. replce interior stairs.Details
partially excavate (e) lower level to create new bedroom, bathroom and sitting room. renovate ktichen at upper level. replce interior stairs. | $140,000 |
| Nov 16, 2020 | Completed final sign-off May 2022 | 2626 Green St | Clayton Timbrell & Co | replace (e) garage footing at 1/f with new footing; replacing approved slab on grade at garage at 1/f and adj slab on grade with new strutural slab. revision to pa2020-0110-1653.Details
replace (e) garage footing at 1/f with new footing; replacing approved slab on grade at garage at 1/f and adj slab on grade with new strutural slab. revision to pa2020-0110-1653. | $8,000 |
| Oct 30, 2020 | Completed final sign-off Jan 2025 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | remove & replace (e) front entry door & (e) sliding glass doors. rebuild (e) stairs at front yard. (n) stone pavers over (e) concrete patio. (n) bb q counter. window infill at front facade. (n) garage door. (n) stone pavers at driveway & entry walkway.Details
remove & replace (e) front entry door & (e) sliding glass doors. rebuild (e) stairs at front yard. (n) stone pavers over (e) concrete patio. (n) bb q counter. window infill at front facade. (n) garage door. (n) stone pavers at driveway & entry walkway. | $30,000 |
| Aug 22, 2020 | Never finaled filed Aug 2020, never issued | 2211 16th Av | Realty Builders Inc | project will consist of a 1st flr extension of approximately 352 sq ft consisting of a (n) bedroom & (n) study room. portion of the garage to be converted into a livable space of approximately 425 sq ft and a (n) balcony at the 2nd flr.Details
project will consist of a 1st flr extension of approximately 352 sq ft consisting of a (n) bedroom & (n) study room. portion of the garage to be converted into a livable space of approximately 425 sq ft and a (n) balcony at the 2nd flr. | $190,000 |
| Feb 6, 2020 | Completed final sign-off May 2022 | 2626 Green St | Clayton Timbrell & Co | (n) drilled pier and wood lagging retaining wall to replace (e) concrete wall along west property line. 2/11/2020 - fence will be at 10 feet in height or less - piers shall not exceed 8 feet in depth. ref. p.a.# 201910225243 & 201910225227.Details
(n) drilled pier and wood lagging retaining wall to replace (e) concrete wall along west property line. 2/11/2020 - fence will be at 10 feet in height or less - piers shall not exceed 8 feet in depth. ref. p.a.# 201910225243 & 201910225227. | $100,000 |
| Nov 22, 2019 | Completed final sign-off May 2021 | 511 Webster St | Hammerhouse Construction | interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be addedDetails
interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be added | $94,000 |
| Sep 30, 2019 | Completed final sign-off Sep 2020 | 1176 Union St | interior kitchen & bath remodel, & addition of new half bath at each unit.Details
interior kitchen & bath remodel, & addition of new half bath at each unit. | $125,000 | |
| Sep 16, 2019 | Completed final sign-off Nov 2020 | 4064 Cesar Chavez St | P 3 Construction & Remodeling Inc | revision to app#201906204058: sheet s2.3-balcony framing at gridline 3/c has been revised. sheet s2.4- framing at gridline 3 has been revised. loading for new 4x10 continueus roof beam is same as for roof joist.Details
revision to app#201906204058: sheet s2.3-balcony framing at gridline 3/c has been revised. sheet s2.4- framing at gridline 3 has been revised. loading for new 4x10 continueus roof beam is same as for roof joist. | $10,000 |
| Jun 20, 2019 | Completed final sign-off Nov 2020 | 4064 Cesar Chavez St | P 3 Construction & Remodeling Inc | revision to pa# 201608296288. various structural revision on sheets s2.1. s2.2, s2.3 and s2.4.Details
revision to pa# 201608296288. various structural revision on sheets s2.1. s2.2, s2.3 and s2.4. | $10,000 |
| Dec 27, 2018 | Completed final sign-off May 2020 | 1471 South Van Ness Av | J Brown Construction | unit b. interior remodel. remodel kitchen. 3rd flr - relocate bath, remodel bedroom. 2nd flr - convert 1 bath to laundry, add powder roomDetails
unit b. interior remodel. remodel kitchen. 3rd flr - relocate bath, remodel bedroom. 2nd flr - convert 1 bath to laundry, add powder room | $200,000 |
| Jul 11, 2018 | Completed final sign-off May 2020 | 4952 17th St | Aa Construction Group Inc | interior renovation at ground flr and 2nd flr (2 units). including: bedroom, bathroom and kitchen remodel at lower unit and kitchen, bathroom abd 1/2 powder room remodel at upper unit. no exterior workDetails
interior renovation at ground flr and 2nd flr (2 units). including: bedroom, bathroom and kitchen remodel at lower unit and kitchen, bathroom abd 1/2 powder room remodel at upper unit. no exterior work | $180,000 |
| Jun 8, 2018 | Completed final sign-off Sep 2018 | 2151 Filbert St | Yiu's Construction Co | all work is in unit #2153 filbert street: remodel kitchen & remove (e) wall, remodel (e) bathroom, and add (n) bathroom. new footings at ground level. replace exterior french doors in kind. n/a maherDetails
all work is in unit #2153 filbert street: remodel kitchen & remove (e) wall, remodel (e) bathroom, and add (n) bathroom. new footings at ground level. replace exterior french doors in kind. n/a maher | $55,000 |
| Mar 29, 2018 | Completed final sign-off Nov 2018 | 640 02nd Av | J Brown Construction | revision to pa #201711073290. revised foundation details, stair framing, 3rd floor ceiling framing.Details
revision to pa #201711073290. revised foundation details, stair framing, 3rd floor ceiling framing. | $10,000 |
| Feb 23, 2018 | Completed final sign-off Jan 2019 | 2276 Fulton St | Centoni Restoration & Development | interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egressDetails
interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egress | $125,000 |
| Nov 7, 2017 | Completed final sign-off Nov 2018 | 640 02nd Av | J Brown Construction | remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear.Details
remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear. | $150,000 |
| Sep 13, 2017 | Expired or cancelled expired Feb 2024 | 100 Palo Alto Av | Forma Construction, Dowbuilt Inc. | revision to #201604296200. relocate 1 hr wall at garage - reconfigure layout of 2nd fl. demo diagram- minor changes to structural as noted foundation, 1st fl framing - 2nd fl lower roof.Details
revision to #201604296200. relocate 1 hr wall at garage - reconfigure layout of 2nd fl. demo diagram- minor changes to structural as noted foundation, 1st fl framing - 2nd fl lower roof. | |
| Apr 14, 2017 | Expired or cancelled withdrawn Aug 2017 | 176 Nevada St | addition of (n) accessory room w/new bath within bldg enverlop at ground floor. interior renovation of existing kitchen & stairway from garage to kitchen. replacement of existing skylight & windows in kithcen.Details
addition of (n) accessory room w/new bath within bldg enverlop at ground floor. interior renovation of existing kitchen & stairway from garage to kitchen. replacement of existing skylight & windows in kithcen. | $150,000 | |
| Oct 24, 2016 | Never finaled issued Oct 2016, no final | 236 Ashbury St | Dugarry Construction Inc | partial foundation repair. revision to 2016-0912-7371.Details
partial foundation repair. revision to 2016-0912-7371. | $50,000 |
| May 4, 2016 | Completed final sign-off Oct 2017 | 266 27th Av | Nicholas Spencer Firth Gen Contr | interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking.Details
interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking. | $60,000 |
| Sep 15, 2015 | Never finaled issued Sep 2015, no final | 910 Clayton St | Fontana Construction, Inc. | (n) open guardrail & decking @ 1/f roof, (n) property line window @ kitchen; replace (e) window @ bedroom w/(n) door, remove exterior stair @ bedroom. ref. to pa# 201411212193 & 201410280097Details
(n) open guardrail & decking @ 1/f roof, (n) property line window @ kitchen; replace (e) window @ bedroom w/(n) door, remove exterior stair @ bedroom. ref. to pa# 201411212193 & 201410280097 | $1,000 |