Pacific Edge Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Dec 2013 to Jul 2026
- Last 24 months
- 7 permits filed
44 permits since 2000: 39 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Jul 2026 | 1304 Valencia St | structural revision to pa#2022-0420-2645 s1: a replacement of the (e) site condition at the rear garage to include a structural foundationDetails
structural revision to pa#2022-0420-2645 s1: a replacement of the (e) site condition at the rear garage to include a structural foundation | $5,000 |
| Apr 7, 2026 | In progress issued Aug 2026 | 826 Haight St | remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall.Details
remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall. | $38,000 |
| Mar 13, 2026 | In progress issued May 2026 | 1304 Valencia St | structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor.Details
structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor. | $13,201 |
| Feb 12, 2026 | Completed final sign-off May 2026 | 1304 Valencia St | earth shoring permit behind a retaining wall along line 6 (between lines a & b). ref pa #2022-0420-2645/s1Details
earth shoring permit behind a retaining wall along line 6 (between lines a & b). ref pa #2022-0420-2645/s1 | $4,000 |
| Sep 5, 2025 | Completed final sign-off Feb 2026 | 2112 18th St | spiral stair connection for a spiral stair. ref pa #202204202653 (s1)Details
spiral stair connection for a spiral stair. ref pa #202204202653 (s1) | $100 |
| May 13, 2025 | Completed final sign-off May 2025 | 1304 Valencia St | recommencement and completion of work approved under bpa#: 202201186173Details
recommencement and completion of work approved under bpa#: 202201186173 | $75,000 |
| Nov 15, 2024 | Completed final sign-off Apr 2025 | 2424 Polk St | legalization of existing 2' x 20' non-electric channel letter signage on existing marqueeDetails
legalization of existing 2' x 20' non-electric channel letter signage on existing marquee | $1,000 |
| Aug 23, 2024 | Completed final sign-off Apr 2026 | 1345 Masonic Av | remodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glassDetails
remodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glass | $15,000 |
| Apr 24, 2024 | Completed final sign-off May 2024 | 2917 26th Av | to comply with nov #202291832 replace existing side yard walkway. we are removing old concrete digout the necessary dirt and compact. reinforce the walkway with wire mesh, four 3" thick concrete slab. the new walkway should be 50 ft by 19" inchDetails
to comply with nov #202291832 replace existing side yard walkway. we are removing old concrete digout the necessary dirt and compact. reinforce the walkway with wire mesh, four 3" thick concrete slab. the new walkway should be 50 ft by 19" inch | $10,000 |
| Feb 2, 2024 | Completed final sign-off Jul 2024 | 364 17th Av | add approx 173 sf of heated space office to downstaira lelve. revision to 202307212707Details
add approx 173 sf of heated space office to downstaira lelve. revision to 202307212707 | $1,000 |
| Oct 6, 2023 | Completed final sign-off Jul 2024 | 364 17th Av | revision to pa# 202307212707, to add more foundation support & change beams in kitchen.Details
revision to pa# 202307212707, to add more foundation support & change beams in kitchen. | $10,000 |
| Sep 13, 2023 | Completed final sign-off Sep 2025 | 160 Hancock St | a partial remodel to include: window replacement, relocating non-bearing interior partions, new interior finishes, kitchen and (3) bath remodel replace (e) roof deck guard rails, replace a portion of the sidingDetails
a partial remodel to include: window replacement, relocating non-bearing interior partions, new interior finishes, kitchen and (3) bath remodel replace (e) roof deck guard rails, replace a portion of the siding | $250,000 |
| Jul 21, 2023 | Completed final sign-off Jul 2024 | 364 17th Av | kitchen remodel-remove wall, voluntary shearwalls @ garage, remodel existing garage level bathroom from half to full bath. legalize existing office at ground floorDetails
kitchen remodel-remove wall, voluntary shearwalls @ garage, remodel existing garage level bathroom from half to full bath. legalize existing office at ground floor | $60,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 2030 Union St | cannabis dispensiing, demo/relocate internal nonbaring prtitions/doors, upgrade bathroom to ada, install counters w/ada accessiblity, upgrade fire proofing of ceiling, install new ceiling lighting, internal roll down security gates, new exterior lights. signage under separate permit.Details
cannabis dispensiing, demo/relocate internal nonbaring prtitions/doors, upgrade bathroom to ada, install counters w/ada accessiblity, upgrade fire proofing of ceiling, install new ceiling lighting, internal roll down security gates, new exterior lights. signage under separate permit. | $50,000 |
| Dec 20, 2022 | Completed final sign-off Jan 2025 | 1340 Clay St | unit 801 - new countertops; 2 bathroom remodel, retrofit ceiling; can lights in kitchen; replace window seals, painting and tilingDetails
unit 801 - new countertops; 2 bathroom remodel, retrofit ceiling; can lights in kitchen; replace window seals, painting and tiling | $90,000 |
| Sep 16, 2022 | Completed final sign-off Sep 2022 | 16 Fountain St | to obtain final inspection for work approved under pa# 2013-1217-4331 & 2017-0511-6409. all work is complete.Details
to obtain final inspection for work approved under pa# 2013-1217-4331 & 2017-0511-6409. all work is complete. | |
| Jul 26, 2022 | Completed final sign-off Nov 2024 | 1583 18th Av | interior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall.Details
interior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall. | $130,000 |
| Jul 15, 2022 | Completed final sign-off Apr 2025 | 2424 Polk St | deferred mechanical polans for pa202109037791.Details
deferred mechanical polans for pa202109037791. | $30,000 |
| Jun 9, 2022 | Completed final sign-off Apr 2025 | 2424 Polk St | revision to bpa#2021-0903-7791. to add an ada ramp to the retail store and ada power door with ada door opener actuators.Details
revision to bpa#2021-0903-7791. to add an ada ramp to the retail store and ada power door with ada door opener actuators. | $6,000 |
| Apr 20, 2022 | In progress issued Jan 2024 | 1304 Valencia St | remodel existing ground level and second level. add a rear addition. demolish existing attic level storage and attic. create a new residential unit atop the existing second level.Details
remodel existing ground level and second level. add a rear addition. demolish existing attic level storage and attic. create a new residential unit atop the existing second level. | $600,000 |
| Apr 20, 2022 | Completed final sign-off Feb 2026 | 2112 18th St | re-build existing rear main level deck. add a roof deck with spiral staircases in the rear yard.Details
re-build existing rear main level deck. add a roof deck with spiral staircases in the rear yard. | $40,000 |
| Nov 3, 2021 | Completed final sign-off Feb 2022 | 1432 Guerrero St | bathroom in kind remodelDetails
bathroom in kind remodel | $20,000 |
| Sep 3, 2021 | Completed final sign-off Apr 2025 | 2424 Polk St | change of use authorized per #2020-011603cua & tenant improvements- bring bathroom & 2nd front entrance to ada compliance, add partitions for retail, offices, storage & smoking areas. install reflectv ceiling & exterior lighting. replace glazing on 2nd front exit dr w/ metallic security door.Details
change of use authorized per #2020-011603cua & tenant improvements- bring bathroom & 2nd front entrance to ada compliance, add partitions for retail, offices, storage & smoking areas. install reflectv ceiling & exterior lighting. replace glazing on 2nd front exit dr w/ metallic security door. | $100,000 |
| Jul 28, 2021 | Completed final sign-off Apr 2023 | 8 Miguel St | interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building.Details
interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building. | $62,000 |
| Jun 7, 2021 | Completed final sign-off Oct 2023 | 127 12th Av | revision to pa #202009234814 - remove 1 non-structural, non-bearing wall from the scope of work. refer to sheets s2.2, s2.3, and a2.0Details
revision to pa #202009234814 - remove 1 non-structural, non-bearing wall from the scope of work. refer to sheets s2.2, s2.3, and a2.0 | |
| Apr 9, 2021 | Completed final sign-off May 2024 | 2909 26th Av | excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior.Details
excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior. | $197,000 |
| Jan 28, 2021 | Completed final sign-off Apr 2021 | 2441 Mission St | adminstrative permit only. to establish smoking lounge at mezzanine per conditional use authorization (cua) #2020-001294, nsr for the project has been included in permit package as wells as revised occupant load calculation for mezz & ground fl.ref pa# 201903296722. all work complete.Details
adminstrative permit only. to establish smoking lounge at mezzanine per conditional use authorization (cua) #2020-001294, nsr for the project has been included in permit package as wells as revised occupant load calculation for mezz & ground fl.ref pa# 201903296722. all work complete. | |
| Sep 23, 2020 | Completed final sign-off Oct 2023 | 125 12th Av | interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit.Details
interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit. | $188,400 |
| Sep 23, 2020 | Completed final sign-off Oct 2023 | 127 12th Av | 3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit.Details
3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit. | $158,400 |
| Dec 18, 2019 | Completed final sign-off Oct 2020 | 2441 Mission St | administrative only. revision to app#201903296722:code constructed vaping and smoking lounge will not be utilized for these purposes, which are prohibited by item #6 of the notice of special restrictions of the planning commission motion no. 19776Details
administrative only. revision to app#201903296722:code constructed vaping and smoking lounge will not be utilized for these purposes, which are prohibited by item #6 of the notice of special restrictions of the planning commission motion no. 19776 | |
| Aug 12, 2019 | Completed final sign-off Mar 2021 | 2112 18th St | 231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths.Details
231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths. | $225,000 |
| Mar 29, 2019 | Completed final sign-off Oct 2020 | 2441 Mission St | revision to 201808318963 new smolking rm at mezz level, modify 2nd exit, modify exterior elevation & entry doors, new filtration system/lounge ventilation at mezzDetails
revision to 201808318963 new smolking rm at mezz level, modify 2nd exit, modify exterior elevation & entry doors, new filtration system/lounge ventilation at mezz | $40,000 |
| Jan 29, 2019 | Never finaled issued Feb 2019, no final | 2827 Laguna St | interior modification to provide dining room in existing 3 unit structure. provdie structural and electrical revisions as required.Details
interior modification to provide dining room in existing 3 unit structure. provdie structural and electrical revisions as required. | $95,000 |
| Sep 6, 2018 | Completed final sign-off Mar 2019 | 826 Haight St | improvements to attic for light storage and access to furnace. no exterior work no work on the roofDetails
improvements to attic for light storage and access to furnace. no exterior work no work on the roof | $25,000 |
| Aug 31, 2018 | Completed final sign-off Oct 2020 | 2441 Mission St | revision to pa 2016-0304-1291 modify as approved plans. removal of partition walls to integrate vacant area on the south side of the 1st floor & the vacant mezzanine with the mcd on north side. mcd area expands 1635 sf to 4400 sf. modify (e) storefront & toiletsDetails
revision to pa 2016-0304-1291 modify as approved plans. removal of partition walls to integrate vacant area on the south side of the 1st floor & the vacant mezzanine with the mcd on north side. mcd area expands 1635 sf to 4400 sf. modify (e) storefront & toilets | $20,000 |
| May 2, 2018 | Completed final sign-off Dec 2018 | 88 Museum Wy | replace siding in kind. approximately 700 square feet vertical redwood tongue and groove.Details
replace siding in kind. approximately 700 square feet vertical redwood tongue and groove. | $30,000 |
| Mar 19, 2018 | Completed final sign-off Aug 2023 | 2441 Mission St | administrative change of use only - from institutional mcd to retail recreational cannabis. previous pa# 201006164621. no construction.Details
administrative change of use only - from institutional mcd to retail recreational cannabis. previous pa# 201006164621. no construction. | |
| Mar 16, 2018 | Completed final sign-off Aug 2018 | 84 Levant St | revision to 201612205379 change in roof framing from doubled 2"x10" to doubled 2" x 8" joists to support added load of roof deck and extensionDetails
revision to 201612205379 change in roof framing from doubled 2"x10" to doubled 2" x 8" joists to support added load of roof deck and extension | $30,000 |
| Jul 11, 2017 | Completed final sign-off Nov 2017 | 151 Nevada St | demo 160sf of garage wall, frame 6x6 wood post 32sqft, stucco apply new stucco coating to 160sf garge, paint new stucco gate repairDetails
demo 160sf of garage wall, frame 6x6 wood post 32sqft, stucco apply new stucco coating to 160sf garge, paint new stucco gate repair | $8,350 |
| Apr 18, 2017 | Completed final sign-off Jan 2020 | 158 Dolores St | a (2) story rear addition with deck at grade. interior remodeling.Details
a (2) story rear addition with deck at grade. interior remodeling. | $265,000 |
| Dec 20, 2016 | Completed final sign-off Aug 2018 | 84 Levant St | a 205 sq ft 4th story addition & 333 sq ft roof deck within existing building foot print.Details
a 205 sq ft 4th story addition & 333 sq ft roof deck within existing building foot print. | $80,000 |
| Apr 15, 2016 | Completed final sign-off Dec 2016 | 614 Teresita Bl | remodel kitchen & replace 2 windows & 1 patio door inkind at interior courtyard with (n) vinyl window. no work visible from street, neighouring properites or public right of way. u factor not > .32Details
remodel kitchen & replace 2 windows & 1 patio door inkind at interior courtyard with (n) vinyl window. no work visible from street, neighouring properites or public right of way. u factor not > .32 | $20,000 |
| Mar 4, 2016 | Completed final sign-off Oct 2020 | 2441 Mission St | removal partition wall to intergrate vacant area on outh side of 1st fl & vacant mezzanine with mcd on the north side. dispensary area expand fr 1635sf to 4400 sf.replace 2 sets store front doors with 1 entry doorset.Details
removal partition wall to intergrate vacant area on outh side of 1st fl & vacant mezzanine with mcd on the north side. dispensary area expand fr 1635sf to 4400 sf.replace 2 sets store front doors with 1 entry doorset. | $15,000 |
| Dec 27, 2013 | Completed final sign-off Jul 2015 | 991 Innes Av | remodel, fill in covered patio space, add to front of (e) addition within building envelope, add kitchen pop out.Details
remodel, fill in covered patio space, add to front of (e) addition within building envelope, add kitchen pop out. | $210,000 |