Abacus Group Builders Inc
- Based in
- Corte Madera
- On San Francisco permits
- Sep 2003 to Apr 2026
- Last 24 months
- 2 permits filed
68 permits since 2000: 50 completed, 2 in progress, 15 never finaled, 1 expired or cancelled.
Of the 15 never-finaled permits, 1 is 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2026 | In progress issued Jun 2026 | 7 Edna St | ref 202508193330: replace foundation at garage, excavate northeast corner of garage to increase ceiling height, remove/replace posts/ beam at center of garag. replace furnace (revise per previous permit) w/heat pump. no work at 2nd/fDetails
ref 202508193330: replace foundation at garage, excavate northeast corner of garage to increase ceiling height, remove/replace posts/ beam at center of garag. replace furnace (revise per previous permit) w/heat pump. no work at 2nd/f | $10,000 |
| Aug 19, 2025 | In progress issued Dec 2025 | 7 Edna St | conditioned space behind @ lower level: (1) new bathroom,family room. re-locate laundry room to lower level. new interior connecting stairs. new furnace. new windows and exterior door. new patio w/steps to grade structural scope per plans.Details
conditioned space behind @ lower level: (1) new bathroom,family room. re-locate laundry room to lower level. new interior connecting stairs. new furnace. new windows and exterior door. new patio w/steps to grade structural scope per plans. | $41,500 |
| Aug 23, 2024 | Completed final sign-off May 2025 | 1017 Green St | voluntary structural improvements including wall plywood & hardwareDetails
voluntary structural improvements including wall plywood & hardware | $5,000 |
| Jun 18, 2024 | Completed final sign-off May 2025 | 1017 Green St | exterior repair including the replacement of windows and new siding on both sides and the rear facade. no changes to front facade other than window sash replacement. total 77 windows w/same size and locations. total 5 doors w/same size and locations.Details
exterior repair including the replacement of windows and new siding on both sides and the rear facade. no changes to front facade other than window sash replacement. total 77 windows w/same size and locations. total 5 doors w/same size and locations. | $468,000 |
| Jun 7, 2024 | Completed final sign-off Feb 2025 | 3736 Jackson St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $50,000 |
| Apr 29, 2024 | Completed final sign-off Feb 2025 | 2899 Vallejo St | revision to 201711274839 s1 & s2 to document as- built conditions including external openings, alteration of internal spiral to square. addition of external spiral stair. proposed trim at facade. no change to special inpsections - see pa 201711274839-s1Details
revision to 201711274839 s1 & s2 to document as- built conditions including external openings, alteration of internal spiral to square. addition of external spiral stair. proposed trim at facade. no change to special inpsections - see pa 201711274839-s1 | |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 1170 Sacramento St | #15d-interior demo remove finishes on floors walls, ceiling fixtures, tile, doors, plaster non bearing walls, appliances. separate remodel permit.Details
#15d-interior demo remove finishes on floors walls, ceiling fixtures, tile, doors, plaster non bearing walls, appliances. separate remodel permit. | $30,000 |
| Jul 23, 2018 | Completed final sign-off Mar 2021 | 74 Midcrest Wy | revision to pa# 2018-0515-9168. additional work include: add deck w/ addition 188s.f. of living space/master bedroom below spiral structure(exterior) & replace windows w/ doors to deck.Details
revision to pa# 2018-0515-9168. additional work include: add deck w/ addition 188s.f. of living space/master bedroom below spiral structure(exterior) & replace windows w/ doors to deck. | $100,000 |
| May 15, 2018 | Completed final sign-off Mar 2021 | 74 Midcrest Wy | remodel kitchen and bath, 2 bedrooms and 2 baths by excavating lower levelDetails
remodel kitchen and bath, 2 bedrooms and 2 baths by excavating lower level | $500,000 |
| Nov 27, 2017 | Completed final sign-off Feb 2025 | 2899 Vallejo St | voluntary seismic upgrade to the main residence. renovation of (e) facades, inlcuding (n) windows. (n) elevator. horizontal addition (140sqft), new skylight, and interior remodel.Details
voluntary seismic upgrade to the main residence. renovation of (e) facades, inlcuding (n) windows. (n) elevator. horizontal addition (140sqft), new skylight, and interior remodel. | $500,000 |
| Apr 20, 2017 | Completed final sign-off Aug 2017 | 1017 Green St | retaining wall. repair & reinforcment. voluntary structural improvements as part of rear porch repair "less than 50% repair".Details
retaining wall. repair & reinforcment. voluntary structural improvements as part of rear porch repair "less than 50% repair". | $25,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2016 | 1017 Green St | rear yard fence & retaining wall. ref #201607212942.Details
rear yard fence & retaining wall. ref #201607212942. | $2,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2016 | 1833 Jones St | rear yard fence & retaining wall. ref #201607212948. n/a maher ordinanceDetails
rear yard fence & retaining wall. ref #201607212948. n/a maher ordinance | $2,000 |
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 730 Grand View Av | legalize (e) non-permitted storage room and bathroom on 1st floor of (e) 2 story sfd. maher naDetails
legalize (e) non-permitted storage room and bathroom on 1st floor of (e) 2 story sfd. maher na | $100 |
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 1911 Vallejo St | revision to app#201508285506. structural drawings to reduce length of wf beam, change psl to lvl and update blocking details per field conditions.Details
revision to app#201508285506. structural drawings to reduce length of wf beam, change psl to lvl and update blocking details per field conditions. | |
| Sep 29, 2015 | Completed final sign-off Aug 2016 | 70 Woodacre Dr | revision to app#201401166419: 1) dry rot repair, 2)replace stucco, 3)replace roof and 4) relocate laundry closet. updates structural to meet extg conditions per inspector raymond berrios request.Details
revision to app#201401166419: 1) dry rot repair, 2)replace stucco, 3)replace roof and 4) relocate laundry closet. updates structural to meet extg conditions per inspector raymond berrios request. | $100,000 |
| Aug 28, 2015 | Completed final sign-off Oct 2016 | 1911 Vallejo St | interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition.Details
interior remodel of sfd, including kitchen and master bathroom with one replacement window and 2 replacement doors. no addition. | $69,395 |
| Feb 4, 2015 | Completed final sign-off Nov 2015 | 3221 Washington St | replace exterior entry stair treads and risers, repair leak and install new guard handrail. interior alterations to 1st fl laundry and mech rooms, add window. replace fixtures and finises in existing 1st fl bath, infill window. new light fixtures in 1st fl playroom, laundry rm, and bathDetails
replace exterior entry stair treads and risers, repair leak and install new guard handrail. interior alterations to 1st fl laundry and mech rooms, add window. replace fixtures and finises in existing 1st fl bath, infill window. new light fixtures in 1st fl playroom, laundry rm, and bath | $40,180 |
| Jun 23, 2014 | Completed final sign-off Mar 2015 | 634 30th St | construct new foundation under master bath bay(extg was non existent) leave extg sliding glass door and window in master bedroom(elimate 4-panel sliding glass door from previous submittal). revision to app#201404042428.Details
construct new foundation under master bath bay(extg was non existent) leave extg sliding glass door and window in master bedroom(elimate 4-panel sliding glass door from previous submittal). revision to app#201404042428. | |
| Apr 8, 2014 | Completed final sign-off May 2014 | 572 Moultrie St | to obtain final on bpa#2013-0320-2577.Details
to obtain final on bpa#2013-0320-2577. | |
| Apr 4, 2014 | Completed final sign-off Mar 2015 | 634 30th St | interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition).Details
interior remodel of s.f.r. including kitchen, master bathroom, master closet, interior stair, upper floor bedroom & bath. exterior work to replace portion of exterior siding & replacement of existing windows & doors. (no addition). | $250,000 |
| Jan 16, 2014 | Completed final sign-off Aug 2016 | 70 Woodacre Dr | interior remodel & addition of 154.5 sq ft to the 2nd fl level, including kitchen on 1st level. replacement of 17 (e) windows & enclosure of front yard with a stucco garden wall & metal gate.Details
interior remodel & addition of 154.5 sq ft to the 2nd fl level, including kitchen on 1st level. replacement of 17 (e) windows & enclosure of front yard with a stucco garden wall & metal gate. | $52,500 |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 32 States St | to obtain final inspection on pa 201205079883Details
to obtain final inspection on pa 201205079883 | |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 32 States St | to obtain final inspection on pa 201201232679; all work complete.Details
to obtain final inspection on pa 201201232679; all work complete. | |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 32 States St | to obtain final inspeciton on pa # 2010122069881. all work completeDetails
to obtain final inspeciton on pa # 2010122069881. all work complete | |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 32 States St | to obtain final inspeciton on pa # 201007207031. all work completeDetails
to obtain final inspeciton on pa # 201007207031. all work complete | |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 32 States St | to obtain final inspeciton on pa # 201006104240. all work completeDetails
to obtain final inspeciton on pa # 201006104240. all work complete | |
| Nov 21, 2013 | Completed final sign-off Jan 2014 | 3221 Washington St | repair/replace rotted deck, joists at upper & lower rear decks as needed, less than 50% of total, repair/repl bed deck boards as needed 50% less than total decking), repl old 36" wood guard rail on lower deck with new feeney inc, design rail system using glass infill panel system, min height 42",Details
repair/replace rotted deck, joists at upper & lower rear decks as needed, less than 50% of total, repair/repl bed deck boards as needed 50% less than total decking), repl old 36" wood guard rail on lower deck with new feeney inc, design rail system using glass infill panel system, min height 42", | $10,000 |
| Nov 8, 2013 | Completed final sign-off Jul 2014 | 572 Moultrie St | revision to pa# 2013-0320-2577-deck to become larger in east/west direction. stair to extend west by owe tread. 1 new post at front stairDetails
revision to pa# 2013-0320-2577-deck to become larger in east/west direction. stair to extend west by owe tread. 1 new post at front stair | $500 |
| May 23, 2013 | Completed final sign-off May 2013 | 2525 Webster St | to complete work and obtain final inspection for work approved under pa#201202284980Details
to complete work and obtain final inspection for work approved under pa#201202284980 | |
| Mar 26, 2013 | Never finaled issued Mar 2013, no final | 32 States St | street spaceDetails
street space | |
| Mar 26, 2013 | Never finaled issued Mar 2013, no final | 2525 Webster St | street spaceDetails
street space | |
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 572 Moultrie St | 1)demolish the 32 sq ft floor area to the north of the kitchen, 2) replace the back deck and stair with a new stair and slightly larger deck. 3)remove the siding and stucco stone from and restore stucco finish. rebuild front stair and landing in wood. 4)replace windows and add skylights.Details
1)demolish the 32 sq ft floor area to the north of the kitchen, 2) replace the back deck and stair with a new stair and slightly larger deck. 3)remove the siding and stucco stone from and restore stucco finish. rebuild front stair and landing in wood. 4)replace windows and add skylights. | $50,000 |
| Jan 7, 2013 | Completed final sign-off May 2013 | 1200 California St | repl flooring at kitchen & master bedrm, reface kitchen cabinets, repl appliances, repl counters, vanity, repl bath door, vanity @bath & master bath,remove vanity @dressing, repl master closet doors & organizers,install motorized shades, install recessed lighting throughout,repl radiator cover,Details
repl flooring at kitchen & master bedrm, reface kitchen cabinets, repl appliances, repl counters, vanity, repl bath door, vanity @bath & master bath,remove vanity @dressing, repl master closet doors & organizers,install motorized shades, install recessed lighting throughout,repl radiator cover, | $40,000 |
| Nov 26, 2012 | Completed final sign-off Apr 2013 | 1017 Green St | modify garage floor plan, add water closet window,add wind screen. revision to app#201209189965 and 200906251269.Details
modify garage floor plan, add water closet window,add wind screen. revision to app#201209189965 and 200906251269. | $5,000 |
| Sep 18, 2012 | Completed final sign-off Apr 2013 | 1017 Green St | revision to 200906251269. framing to conform to field conditionsDetails
revision to 200906251269. framing to conform to field conditions | $5,000 |
| Aug 7, 2012 | Completed final sign-off Aug 2012 | 2525 Webster St | to obtain final inspection for work approved under app#2010-07-08-6203. all work is complete.Details
to obtain final inspection for work approved under app#2010-07-08-6203. all work is complete. | |
| Aug 7, 2012 | Completed final sign-off Aug 2012 | 2525 Webster St | to obtain final inspection for work approved under app#2010-01-22-5149. all work is complete.Details
to obtain final inspection for work approved under app#2010-01-22-5149. all work is complete. | |
| Aug 7, 2012 | Completed final sign-off Aug 2012 | 2525 Webster St | to obtain final inspection for work approved under app#2010-0826-9592. all work is complete.Details
to obtain final inspection for work approved under app#2010-0826-9592. all work is complete. | |
| May 8, 2012 | Completed final sign-off May 2012 | 1806 Great Hy | to obtain final inspection for work approved under pa#200609111956 all work is complete.Details
to obtain final inspection for work approved under pa#200609111956 all work is complete. | |
| May 8, 2012 | Completed final sign-off May 2012 | 1806 Great Hy | to obtain final inspection for work approved under pa#200701242504 all work is complete.Details
to obtain final inspection for work approved under pa#200701242504 all work is complete. | |
| May 8, 2012 | Completed final sign-off May 2012 | 1806 Great Hy | to obtain final inspection for work approved under pa#200702013129 all work is complete.Details
to obtain final inspection for work approved under pa#200702013129 all work is complete. | |
| May 8, 2012 | Completed final sign-off May 2012 | 1806 Great Hy | to obtain final inspection for work approved under pa#200411229802. all work is complete.Details
to obtain final inspection for work approved under pa#200411229802. all work is complete. | |
| May 7, 2012 | Never finaled issued May 2012, no final | 32 States St | construct basement in crawl spae created by previously permitted patios, 2012-01-23-2679. new basement will have wine cellar and storage room with 3 new windows, partially below grade with light well. construct new interior stair from 1st fl to basementDetails
construct basement in crawl spae created by previously permitted patios, 2012-01-23-2679. new basement will have wine cellar and storage room with 3 new windows, partially below grade with light well. construct new interior stair from 1st fl to basement | $20,000 |
| Mar 15, 2012 | Completed final sign-off May 2013 | 2525 Webster St | construct trellis at deck with gas heaters. reference application #201202284980Details
construct trellis at deck with gas heaters. reference application #201202284980 | $10,000 |
| Feb 28, 2012 | Expired or cancelled expired May 2013 | 2525 Webster St | revision to pa #2010.07.08.6203 - demolish stair from deck to rear yard. enlarge deck & reconfigure stairs from deck to rear yard. remove 2- kitchen windows & replace with one full width bi-folding window system.Details
revision to pa #2010.07.08.6203 - demolish stair from deck to rear yard. enlarge deck & reconfigure stairs from deck to rear yard. remove 2- kitchen windows & replace with one full width bi-folding window system. | $30,000 |
| Feb 28, 2012 | Completed final sign-off May 2013 | 2525 Webster St | to complete work & obtain final inspection for work approved under pa #2010.07.08.6203.Details
to complete work & obtain final inspection for work approved under pa #2010.07.08.6203. | $9,000 |
| Jan 23, 2012 | Never finaled issued Jan 2012, no final | 32 States St | add new landscape terraces and stairs, grading with existing spoiles on site to reduce height of terracesDetails
add new landscape terraces and stairs, grading with existing spoiles on site to reduce height of terraces | $30,000 |
| Jul 21, 2011 | Completed final sign-off Aug 2012 | 2525 Webster St | demo of existing stucco planters and stone on stairs. re-build new planter walls, stairs, handrails, and pavingDetails
demo of existing stucco planters and stone on stairs. re-build new planter walls, stairs, handrails, and paving | $25,000 |
| Dec 20, 2010 | Never finaled issued Feb 2011, no final | 32 States St | revision to pa# 2010.07.20.7031. 1st fl: playrm& gamerm becomce bedrooms w/ (n)dr to extr. 1st floor bathrm & laundry config. changes, add new landscape terraces & steps and rear entry.all changes shown as delta 2, dated 2/1/11 on arch and 1/31/11 on structural.Details
revision to pa# 2010.07.20.7031. 1st fl: playrm& gamerm becomce bedrooms w/ (n)dr to extr. 1st floor bathrm & laundry config. changes, add new landscape terraces & steps and rear entry.all changes shown as delta 2, dated 2/1/11 on arch and 1/31/11 on structural. | $32,500 |
| Aug 26, 2010 | Completed final sign-off Aug 2012 | 2525 Webster St | revision to pa#2010.07.08.6203 - includes engineering for elliptical stair which was excluded from previous permit application. also includes change to skylights - which was approved by jeffry ma in pre-application meeting (see letter on a1.1)Details
revision to pa#2010.07.08.6203 - includes engineering for elliptical stair which was excluded from previous permit application. also includes change to skylights - which was approved by jeffry ma in pre-application meeting (see letter on a1.1) | $35,000 |
| Jul 20, 2010 | Never finaled issued Jul 2010, no final | 32 States St | revision to 201006104240. lateral additon of 1st floor underneath 2nd floor elements. 1st sloor work includes new playroowm, game room, new laundry and new bath.Details
revision to 201006104240. lateral additon of 1st floor underneath 2nd floor elements. 1st sloor work includes new playroowm, game room, new laundry and new bath. | $100,000 |
| Jul 8, 2010 | Completed final sign-off Aug 2012 | 2525 Webster St | revision to pa# 2010.01.22.5149. infill of light well on top 2 fl. raise a portion of the flat roof over stairwell, lndry, lightwell. remove (e) stairs; (n) elliptical stair stringers under separate permit. new elev thru all 4 floors. new powder rm and closets on 2nd fl. (n)laundry on 4th fl.Details
revision to pa# 2010.01.22.5149. infill of light well on top 2 fl. raise a portion of the flat roof over stairwell, lndry, lightwell. remove (e) stairs; (n) elliptical stair stringers under separate permit. new elev thru all 4 floors. new powder rm and closets on 2nd fl. (n)laundry on 4th fl. | $90,000 |
| Jun 10, 2010 | Never finaled issued Jun 2010, no final | 32 States St | remodel to (e) 2-story single fam. res. all work in on 2nd. flr. interior remodel of mst. bathrm. powder rm. & kit. w/ built-in cabs. in mst. bedrm. study & dining rm. exterior work includes (n) windows & exterior doors @ 2nd. flr. (n) shingles installed o/(e) sinding; (n) skylights & re-roofing.Details
remodel to (e) 2-story single fam. res. all work in on 2nd. flr. interior remodel of mst. bathrm. powder rm. & kit. w/ built-in cabs. in mst. bedrm. study & dining rm. exterior work includes (n) windows & exterior doors @ 2nd. flr. (n) shingles installed o/(e) sinding; (n) skylights & re-roofing. | $200,000 |
| Jan 22, 2010 | Completed final sign-off Aug 2012 | 2525 Webster St | new kitchen remodel bathrooms, new laundry room, enclose courtyard, replace window. remodel in all 4-floors.Details
new kitchen remodel bathrooms, new laundry room, enclose courtyard, replace window. remodel in all 4-floors. | $380,000 |
| Apr 3, 2009 | Never finaled issued Apr 2009, no final | 117 Lower Tr | alternations to lower level foyer, master bedroom & kitchen.Details
alternations to lower level foyer, master bedroom & kitchen. | $4,200 |
| Jul 1, 2008 | Completed final sign-off Feb 2009 | 1017 Green St | replace concrete in garage, sidewalk & driveway. install wall plywood sheating & anchor bolts,replace failed window sashes in kind, garden gate,repalce garage door, new water supply lines, main sewer line to house trap. electrical panels, & outlets, garage door in kind with wood.Details
replace concrete in garage, sidewalk & driveway. install wall plywood sheating & anchor bolts,replace failed window sashes in kind, garden gate,repalce garage door, new water supply lines, main sewer line to house trap. electrical panels, & outlets, garage door in kind with wood. | $75,000 |
| Jan 28, 2008 | Never finaled issued Jan 2008, no final | 1806 Great Hy | renew pa# 2004/11/22/9802 for final inspection only.Details
renew pa# 2004/11/22/9802 for final inspection only. | |
| Nov 14, 2007 | Completed final sign-off Sep 2008 | 560 Haight St | interior remodel in unit #103,remove and replace mezzanine carpet,stairs, hand/guardrail, water closet vanity and lavatory. no alteration to existing layout.Details
interior remodel in unit #103,remove and replace mezzanine carpet,stairs, hand/guardrail, water closet vanity and lavatory. no alteration to existing layout. | $25,000 |
| Jan 24, 2007 | Never finaled issued Jan 2007, no final | 1806 Great Hy | revision 4 to approved app 200411229802, additonal foundation details to clarify foundation construction as shown on 2-6.7, 2-6.8Details
revision 4 to approved app 200411229802, additonal foundation details to clarify foundation construction as shown on 2-6.7, 2-6.8 | $100 |
| Nov 8, 2006 | Completed final sign-off Oct 2007 | 3221 Washington St | replacing extg kchn countertops and cabinets/new funiture/electrical see lighting plan/no structural workDetails
replacing extg kchn countertops and cabinets/new funiture/electrical see lighting plan/no structural work | $75,000 |
| Sep 11, 2006 | Never finaled issued Sep 2006, no final | 1806 Great Hy | revision to approved existing / demolition ground floor & 2nd floor plans sheets 1-1.0, a-1.1 of building. due to dry rot & pre existing old fire damage uncovered during the demolition.Details
revision to approved existing / demolition ground floor & 2nd floor plans sheets 1-1.0, a-1.1 of building. due to dry rot & pre existing old fire damage uncovered during the demolition. | |
| Nov 22, 2004 | Never finaled issued Jun 2006, no final | 1806 Great Hy | vertical and horizontal room addition and remodeling of (e) single family dwelling.Details
vertical and horizontal room addition and remodeling of (e) single family dwelling. | $100,000 |
| Jul 27, 2004 | Completed final sign-off Sep 2004 | 1406 Diamond St | new retaining wall in rear yard to replace failed terrace retaining walls.Details
new retaining wall in rear yard to replace failed terrace retaining walls. | $20,000 |
| Apr 13, 2004 | Completed final sign-off Sep 2004 | 1406 Diamond St | rev#200310309063 to show upgrade roof structure,new sunken tob, additional blocking and new title-24Details
rev#200310309063 to show upgrade roof structure,new sunken tob, additional blocking and new title-24 | |
| Mar 9, 2004 | Completed final sign-off Jun 2005 | 737 Duncan St | rev.appl#200310207900 change door location on g/f bedroom #2 foundation,framing & shear wall changeDetails
rev.appl#200310207900 change door location on g/f bedroom #2 foundation,framing & shear wall change | |
| Oct 30, 2003 | Completed final sign-off Sep 2004 | 1406 Diamond St | new drywall, interior partitions,windows,plumbing,elect.heating (new kitchen/bath) in (e)2-story resDetails
new drywall, interior partitions,windows,plumbing,elect.heating (new kitchen/bath) in (e)2-story res | $63,500 |
| Sep 17, 2003 | Completed final sign-off Jun 2005 | 737 Duncan St | (n) groundfloor fill-in under (e) permitted room, (see a1.2 for diagram, exempt from 311 noticing)Details
(n) groundfloor fill-in under (e) permitted room, (see a1.2 for diagram, exempt from 311 noticing) | $65,000 |