Nicholas Spencer Firth Gen Contr
- Based in
- Brisbane
- On San Francisco permits
- Jul 2006 to Mar 2025
- Last 24 months
- 1 permit filed
74 permits since 2000: 46 completed, 1 in progress, 17 never finaled, 10 expired or cancelled.
Of the 17 never-finaled permits, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2025 | In progress issued Mar 2025 | 300 Spear St | remodel existing bathroom kind; aka 301 main street; unit b27e (building b, 27th floor)Details
remodel existing bathroom kind; aka 301 main street; unit b27e (building b, 27th floor) | $45,000 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 34 Madrone Av | to obtain final inspection for work approved under pa#201511132592 & pa#201612306312 & 201704063336 all work is completeDetails
to obtain final inspection for work approved under pa#201511132592 & pa#201612306312 & 201704063336 all work is complete | |
| May 30, 2024 | Completed final sign-off Oct 2024 | 34 Madrone Av | to obtain final inspection for work approved under pa#201510079137 & pa#201510260813 & 201606240863 all work is completeDetails
to obtain final inspection for work approved under pa#201510079137 & pa#201510260813 & 201606240863 all work is complete | |
| Oct 30, 2023 | Completed final sign-off Dec 2024 | 338 Spear St | #38f: remodel (2) bathrooms and (1) kitchen in kind. enlarge (1) closet. no structural changes.Details
#38f: remodel (2) bathrooms and (1) kitchen in kind. enlarge (1) closet. no structural changes. | $95,000 |
| Mar 1, 2023 | Completed final sign-off Jun 2024 | 338 Spear St | unit 39b: replace fixtures and fitting in kind in (1) bathroom and (1) kitchen, no structural work required. no removal of wallsDetails
unit 39b: replace fixtures and fitting in kind in (1) bathroom and (1) kitchen, no structural work required. no removal of walls | $85,000 |
| Feb 2, 2023 | Completed final sign-off Jun 2024 | 301 Main St | replace fixtures and fittings in two bathrooms and one kitchen. no framing or structural work required. in kindDetails
replace fixtures and fittings in two bathrooms and one kitchen. no framing or structural work required. in kind | $85,000 |
| Mar 2, 2022 | Completed final sign-off Feb 2023 | 338 Spear St | update master bathroom - replace existing toilet, sink, medicine cabinet, mirror, shower, tub, plumbing fixtures. no wall or layout changesDetails
update master bathroom - replace existing toilet, sink, medicine cabinet, mirror, shower, tub, plumbing fixtures. no wall or layout changes | $45,000 |
| Jun 14, 2021 | Never finaled issued Jun 2021, no final | 301 Main St | unit 35a: replace (e) fixtures and fittings in two bathrooms and one kitchen. no structural work required. no plans in kind.Details
unit 35a: replace (e) fixtures and fittings in two bathrooms and one kitchen. no structural work required. no plans in kind. | $150,000 |
| Dec 15, 2020 | Never finaled issued Dec 2020, no final | 338 Spear St | unit 28d: replace fixtures and fittings in two bathrooms and one kitchen no framing or structural work requiredDetails
unit 28d: replace fixtures and fittings in two bathrooms and one kitchen no framing or structural work required | $100,000 |
| Jul 17, 2020 | Never finaled issued Jul 2020, no final | 50 Palo Alto Av | 2'-6" x 4'-0" test pit to determine depth of existing drilled piers verification of foundation is for separate pa#201704194302.Details
2'-6" x 4'-0" test pit to determine depth of existing drilled piers verification of foundation is for separate pa#201704194302. | $2,000 |
| Jul 17, 2020 | Never finaled issued Jul 2020, no final | 114 Palo Alto Av | 2-6"x4'-0" test pit to determine depth of existing neighbor's drilled piers. neighbor's work @ 50 palo alto ave to be performed under pa 2017-0419-4302Details
2-6"x4'-0" test pit to determine depth of existing neighbor's drilled piers. neighbor's work @ 50 palo alto ave to be performed under pa 2017-0419-4302 | $2,000 |
| Jun 25, 2020 | Completed final sign-off Sep 2021 | 301 Main St | remodel master bathroom (8 ft x 16 ft). no structural alterations.Details
remodel master bathroom (8 ft x 16 ft). no structural alterations. | $70,000 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 338 Spear St | replace kitchen (12 x 6 ft) cabinets and counter tops, replace master bathroom (6 x 16 ft) fixtures and finishes. replacing existing fixtures, cabinets, and finishes. as is, no framing/structure work to be performed.Details
replace kitchen (12 x 6 ft) cabinets and counter tops, replace master bathroom (6 x 16 ft) fixtures and finishes. replacing existing fixtures, cabinets, and finishes. as is, no framing/structure work to be performed. | $80,000 |
| May 28, 2020 | Completed final sign-off Nov 2020 | 301 Main St | unit 23e: remodel two bathrooms and one kitchen in-kind. replace existing fixtures and fittings with updated finishes.Details
unit 23e: remodel two bathrooms and one kitchen in-kind. replace existing fixtures and fittings with updated finishes. | $80,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2020 | 301 Main St | remove and replace interior fixtures and finishes in 2.5 bathroom and 1 kitchen. no exterior or structural work required. bathrooms total 200 sqft kitchen total 120sqftDetails
remove and replace interior fixtures and finishes in 2.5 bathroom and 1 kitchen. no exterior or structural work required. bathrooms total 200 sqft kitchen total 120sqft | $125,000 |
| Feb 6, 2019 | Completed final sign-off Aug 2019 | 301 Main St | unit 16h: remodel (e) kitchen cabinet andinstall (n) kitchen cabinets.Details
unit 16h: remodel (e) kitchen cabinet andinstall (n) kitchen cabinets. | $25,000 |
| Feb 6, 2019 | Completed final sign-off Sep 2021 | 301 Main St | unit 36b: remove (e) closet and add 1 pocket door.Details
unit 36b: remove (e) closet and add 1 pocket door. | $10,000 |
| Nov 3, 2017 | Completed final sign-off Oct 2018 | 338 Spear St | remove and replace finishes in 3 bathrooms and 1 powder room; n/a maherDetails
remove and replace finishes in 3 bathrooms and 1 powder room; n/a maher | $100,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2019 | 409 Pacheco St | minor kitchen renovation with structural improvements. replacement of all cabinets.Details
minor kitchen renovation with structural improvements. replacement of all cabinets. | $39,000 |
| Jul 20, 2017 | Completed final sign-off Mar 2018 | 301 Main St | replace (e) cabinets in kitchen and two bathrooms, like for like in unit 17b only. all ew lites are led.Details
replace (e) cabinets in kitchen and two bathrooms, like for like in unit 17b only. all ew lites are led. | $40,000 |
| Jun 26, 2017 | Never finaled issued Jul 2017, no final | 338 Spear St | replace e toilet and lav and add new shower enclosure at bath #3Details
replace e toilet and lav and add new shower enclosure at bath #3 | $15,000 |
| Apr 19, 2017 | Never finaled issued Apr 2019, no final | 50 Palo Alto Av | vertical addition. add a 3rd story with a roof deck above to an existing 2 story single family residence. 3rd story will include a bedroom, bathroom, closet and gym. project is a vertical addition.Details
vertical addition. add a 3rd story with a roof deck above to an existing 2 story single family residence. 3rd story will include a bedroom, bathroom, closet and gym. project is a vertical addition. | $190,500 |
| Apr 13, 2017 | Completed final sign-off May 2018 | 2768 Harrison St | new 24" x 48" skylight in entry hall to be installed between e framing. no structural members to be modified. max u.factor 0.55Details
new 24" x 48" skylight in entry hall to be installed between e framing. no structural members to be modified. max u.factor 0.55 | $1,500 |
| Apr 6, 2017 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | revision to app#201511132592 for adding replacement or refurbishment of all extg windows originally shown to remain. adding stucco replacement for all stucco.Details
revision to app#201511132592 for adding replacement or refurbishment of all extg windows originally shown to remain. adding stucco replacement for all stucco. | $80,000 |
| Dec 30, 2016 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | rev to 201511132592 changes to patio, retaining walls, stairs, plant material, drainage and ltg, low feature site wall added, nminor change to retaining wall ht., location to accomodate addl steps & better drainage minor plant rev to lower level laundry/utility room and rep/ltg & main level kitchenDetails
rev to 201511132592 changes to patio, retaining walls, stairs, plant material, drainage and ltg, low feature site wall added, nminor change to retaining wall ht., location to accomodate addl steps & better drainage minor plant rev to lower level laundry/utility room and rep/ltg & main level kitchen | |
| Oct 24, 2016 | Completed final sign-off Mar 2018 | 338 Spear St | relocation of door to (e) walk-in closet (no exterior structural work).Details
relocation of door to (e) walk-in closet (no exterior structural work). | $4,000 |
| Oct 24, 2016 | Completed final sign-off Mar 2018 | 301 Main St | unit #36b only: removal of approx 5lf of non bearing interior wall. (no exterior structural work).Details
unit #36b only: removal of approx 5lf of non bearing interior wall. (no exterior structural work). | $5,000 |
| Aug 29, 2016 | Completed final sign-off Oct 2017 | 266 27th Av | revision to app#201605046541. restore fence and gate with new vertical stained wood slats. restore railings with horizontal stained wood boards, paint extg vertical wood siding paint extg beams.Details
revision to app#201605046541. restore fence and gate with new vertical stained wood slats. restore railings with horizontal stained wood boards, paint extg vertical wood siding paint extg beams. | $5,000 |
| Jun 24, 2016 | Never finaled issued Jul 2016, no final | 30 Madrone Av | soil grouting aloing approx 67' of south property lineDetails
soil grouting aloing approx 67' of south property line | $8,000 |
| Jun 24, 2016 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | soil grouting & shoring along of north property lineDetails
soil grouting & shoring along of north property line | $8,000 |
| May 4, 2016 | Completed final sign-off Oct 2017 | 266 27th Av | interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking.Details
interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking. | $60,000 |
| Mar 21, 2016 | Completed final sign-off Feb 2017 | 4721 17th St | renovation of a single family residence, (n)garage door @ basement fl, (n) powder rm @ 1st fl, (n) aluminum frame windows & doors @ front of building - all floors.Details
renovation of a single family residence, (n)garage door @ basement fl, (n) powder rm @ 1st fl, (n) aluminum frame windows & doors @ front of building - all floors. | $45,000 |
| Jan 20, 2016 | Completed final sign-off Aug 2020 | 643 33rd Av | remove existing deck, rebuild new wood deck at back of single family residence. 1 exterior door to be remove and 1 window to be reconfigured to include doorDetails
remove existing deck, rebuild new wood deck at back of single family residence. 1 exterior door to be remove and 1 window to be reconfigured to include door | $5,000 |
| Jan 5, 2016 | Completed final sign-off Jan 2017 | 301 Main St | bathroom remodelDetails
bathroom remodel | $12,000 |
| Jan 5, 2016 | Completed final sign-off Jan 2017 | 301 Main St | bathroom remodelDetails
bathroom remodel | $12,000 |
| Nov 13, 2015 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | interior remodel consisting of kitchen remodel on main level and guest room, bathroom, and laundry on the lower level. work includes foundation replacement and at grade exterior patio.Details
interior remodel consisting of kitchen remodel on main level and guest room, bathroom, and laundry on the lower level. work includes foundation replacement and at grade exterior patio. | $150,000 |
| Nov 5, 2015 | Completed final sign-off Feb 2016 | 375 04th Av | foundation to be repaired by demolishing extg crack and installing new foundation. repair attached walls and floors as needed.Details
foundation to be repaired by demolishing extg crack and installing new foundation. repair attached walls and floors as needed. | $30,000 |
| Oct 26, 2015 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | exploratory removal of drywall & finishes in bsmt & 1st fl. no structural members to be removed. bsmt ceiling plaster to be removed. 300 sq ft of gnb 2nd fl walls to be removed only.Details
exploratory removal of drywall & finishes in bsmt & 1st fl. no structural members to be removed. bsmt ceiling plaster to be removed. 300 sq ft of gnb 2nd fl walls to be removed only. | $1,500 |
| Oct 7, 2015 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | interior remodel of 2 upper floor bathrooms.Details
interior remodel of 2 upper floor bathrooms. | $40,000 |
| Oct 1, 2015 | Never finaled issued Oct 2015, no final | 4238 21st St | replacing existing wood burning fireplace with new gas fireplace at the same location, no new wall and no existing wall relocation.Details
replacing existing wood burning fireplace with new gas fireplace at the same location, no new wall and no existing wall relocation. | $600 |
| Jul 30, 2015 | Completed final sign-off Oct 2015 | 643 33rd Av | interior alterations to an (e) s.f.d. including new master bathroom. no exterior work. all work at thrid floor.Details
interior alterations to an (e) s.f.d. including new master bathroom. no exterior work. all work at thrid floor. | $8,000 |
| Apr 16, 2015 | Completed final sign-off Feb 2017 | 4721 17th St | renovate single family residence. laundry rm expansion @ rear of bldg, basement level. kitchen & dining rm expansion @ rear. (n) powder rm @ front of bldg, 1st fl reconfigure of 2nd fl planDetails
renovate single family residence. laundry rm expansion @ rear of bldg, basement level. kitchen & dining rm expansion @ rear. (n) powder rm @ front of bldg, 1st fl reconfigure of 2nd fl plan | $165,000 |
| Mar 31, 2015 | Completed final sign-off Feb 2017 | 4721 17th St | revision to appl #2014.0929.7526 - revise concrete mix.Details
revision to appl #2014.0929.7526 - revise concrete mix. | |
| Feb 26, 2015 | Completed final sign-off Oct 2015 | 338 Spear St | unit #24c: remove tile, tub, toilet and vanity and all fixtures. re-tile room and build out shower in area where tub was plmg moved, new plmg fixutres, new vanity and toilet. new mirror, lighting, fan and electrical, gfi in vanity too. n/a for maher.Details
unit #24c: remove tile, tub, toilet and vanity and all fixtures. re-tile room and build out shower in area where tub was plmg moved, new plmg fixutres, new vanity and toilet. new mirror, lighting, fan and electrical, gfi in vanity too. n/a for maher. | $21,000 |
| Feb 4, 2015 | Completed final sign-off Feb 2017 | 4725 17th St | underpin east foundation.Details
underpin east foundation. | $5,000 |
| Jan 20, 2015 | Completed final sign-off Feb 2017 | 4721 17th St | shoring permit for appl. #2014.0929.7526.Details
shoring permit for appl. #2014.0929.7526. | $10,000 |
| Nov 25, 2014 | Completed final sign-off Aug 2015 | 1835 Leavenworth St | unit # 1:replace kitchen cabinets. cosmetic.Details
unit # 1:replace kitchen cabinets. cosmetic. | $20,000 |
| Sep 29, 2014 | Completed final sign-off Feb 2017 | 4721 17th St | renovatin of single family residence. convert portion of basement to conditioned space. remodel 1st fl entry, living rm, dining rom, kitchen. complete stair replacement and new exterior terrace at rear of building. reconfiguration of 2nd fl layout to accommodate new bath and master bath. renovationDetails
renovatin of single family residence. convert portion of basement to conditioned space. remodel 1st fl entry, living rm, dining rom, kitchen. complete stair replacement and new exterior terrace at rear of building. reconfiguration of 2nd fl layout to accommodate new bath and master bath. renovation | $200,000 |
| Aug 28, 2014 | Completed final sign-off Feb 2015 | 200 Brannan St | #441: replace existing cabinetry, appliances, counter top, and backsplash.Details
#441: replace existing cabinetry, appliances, counter top, and backsplash. | $92,000 |
| Aug 20, 2014 | Never finaled issued Sep 2014, no final | 394 Guerrero St | 3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain.Details
3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain. | $90,000 |
| Mar 21, 2014 | Completed final sign-off Feb 2015 | 1 Sunview Dr | remove interior partition non-load wall, move entry. kitchen (non load). renovate kitchen, replace kitchen window not facing street in kind. remove and install kitchen cabinets, counter top. all plmg & elec. under seperate permit. lighing install high efficacy. window u-factor 0.40 max.Details
remove interior partition non-load wall, move entry. kitchen (non load). renovate kitchen, replace kitchen window not facing street in kind. remove and install kitchen cabinets, counter top. all plmg & elec. under seperate permit. lighing install high efficacy. window u-factor 0.40 max. | $30,000 |
| Jan 17, 2014 | Never finaled issued Jan 2014, no final | 2614 Sutter St | install 68 ft. length of permeation grout at right (east side) property line (depth varies 2 ft. to 8 ft.)Details
install 68 ft. length of permeation grout at right (east side) property line (depth varies 2 ft. to 8 ft.) | $12,000 |
| Jan 17, 2014 | Never finaled issued Jan 2014, no final | 2610 Sutter St | install 68 ft length of permeation grout at left (west side) property line. (depth varies 2 ft. to 8 ft.)Details
install 68 ft length of permeation grout at left (west side) property line. (depth varies 2 ft. to 8 ft.) | $12,000 |
| Dec 9, 2013 | Never finaled issued Dec 2013, no final | 2612 Sutter St | shoring of existing gutted residence to replace basement walls. see 201212055483 for other work. shoring work per plan, only other excavation & underpinning & shoring are under seperate permit.Details
shoring of existing gutted residence to replace basement walls. see 201212055483 for other work. shoring work per plan, only other excavation & underpinning & shoring are under seperate permit. | $10,000 |
| May 2, 2013 | Completed final sign-off Jan 2015 | 301 Main St | unti #36b:interior alterations to an extg dwelling unit. no exterior or structural work. all fire resistne assemblies to remain. sprinkler under seperate permit.Details
unti #36b:interior alterations to an extg dwelling unit. no exterior or structural work. all fire resistne assemblies to remain. sprinkler under seperate permit. | $125,000 |
| Feb 25, 2013 | Completed final sign-off Apr 2014 | 266 27th Av | int remodel including new master bedrm suite, new upstairs bathrm, remodel (e) upstairs bathrm, remodel int stairs, new downstairs bathrm, laundry room, remodel of downstairs family room with bar & study. no exterior work other than new sliding glass door.Details
int remodel including new master bedrm suite, new upstairs bathrm, remodel (e) upstairs bathrm, remodel int stairs, new downstairs bathrm, laundry room, remodel of downstairs family room with bar & study. no exterior work other than new sliding glass door. | $95,000 |
| Oct 26, 2012 | Never finaled issued Oct 2012, no final | 1654 Beach St | remodel kitchen, replace cabinets and countertops, lighting shall comply with t-24Details
remodel kitchen, replace cabinets and countertops, lighting shall comply with t-24 | $25,000 |
| Oct 22, 2012 | Expired or cancelled expired Oct 2014 | 333 Main St | interior alerations to existing condominium on the 3rd fl of an eight story building. no exterior work. remove interior partition ad 2 closets. new closet, bookcase, soffit and new light fixturesDetails
interior alerations to existing condominium on the 3rd fl of an eight story building. no exterior work. remove interior partition ad 2 closets. new closet, bookcase, soffit and new light fixtures | $10,000 |
| Aug 20, 2012 | Never finaled issued Aug 2012, no final | 4145 26th St | installation of plywood panel on the lower floorDetails
installation of plywood panel on the lower floor | $15,000 |
| Apr 19, 2012 | Never finaled issued Apr 2012, no final | 338 Spear St | to complete work and obtain final inspection for work approved under pa # 201003168341.Details
to complete work and obtain final inspection for work approved under pa # 201003168341. | $25,000 |
| Feb 28, 2012 | Never finaled issued Aug 2012, no final | 50 Palo Alto Av | demolish existing deck, construct new enlarged deck.Details
demolish existing deck, construct new enlarged deck. | $30,000 |
| Sep 15, 2011 | Never finaled issued Oct 2011, no final | 338 Spear St | unit #35d-bathroom remodel (2), 1 bathroom to become ada complaint, floor remodel for new showerDetails
unit #35d-bathroom remodel (2), 1 bathroom to become ada complaint, floor remodel for new shower | $6,000 |
| Jun 29, 2011 | Completed final sign-off Mar 2012 | 711 46th Av | interior remodel of kitchen and bath. also included are posts and beams to support where walls are removed and 3 existing windows replacedDetails
interior remodel of kitchen and bath. also included are posts and beams to support where walls are removed and 3 existing windows replaced | $22,000 |
| May 20, 2011 | Expired or cancelled expired Jul 2014 | 2489 16th Av | remodel of exiting kitchen and creation of new master bath and closet. dry rot repair and waterproofing as req. replace existing windows in kind. install plywood panels & anchor bolts on lowest level.Details
remodel of exiting kitchen and creation of new master bath and closet. dry rot repair and waterproofing as req. replace existing windows in kind. install plywood panels & anchor bolts on lowest level. | $50,000 |
| Oct 14, 2010 | Completed final sign-off May 2011 | 210 Francisco St | unit #210 - renovation kitchen, install 2 new prop line windows on 3rd floor and one new prop line window on 4th floor of unit 210. enclose extg 3rd fl00r exterior deck.Details
unit #210 - renovation kitchen, install 2 new prop line windows on 3rd floor and one new prop line window on 4th floor of unit 210. enclose extg 3rd fl00r exterior deck. | $24,750 |
| Sep 9, 2010 | Completed final sign-off Apr 2011 | 2768 Harrison St | interior remodel of extg 2nd story flat to include a remodel of the kitchen and bathroom in their extg locations.new work to include expansion of interior wall openings, replacement and relocation of some plmg fixtures, appliances, lighting, finishes, and cabinetry.Details
interior remodel of extg 2nd story flat to include a remodel of the kitchen and bathroom in their extg locations.new work to include expansion of interior wall openings, replacement and relocation of some plmg fixtures, appliances, lighting, finishes, and cabinetry. | $45,000 |
| May 13, 2010 | Completed final sign-off Oct 2010 | 495 Pacheco St | demo existing wood burning fire place, wall between kitc and dining rm, and btn dining rm wall and living rm. install new gas fire place with stone veneerDetails
demo existing wood burning fire place, wall between kitc and dining rm, and btn dining rm wall and living rm. install new gas fire place with stone veneer | $20,000 |
| Apr 5, 2010 | Completed final sign-off May 2011 | 208 Francisco St | install new entry dr at grade and enclose common stair hall. 2nd fl: renovate (e) bath & add bathrm#2. relocate kitchen and enclose (e)deck. upper fl: renovate (e) bathrm. remove (e)n stair to roof and replace w/ new one. enclose portion of (e) ext. deck, replace (e) gas fireplace.Details
install new entry dr at grade and enclose common stair hall. 2nd fl: renovate (e) bath & add bathrm#2. relocate kitchen and enclose (e)deck. upper fl: renovate (e) bathrm. remove (e)n stair to roof and replace w/ new one. enclose portion of (e) ext. deck, replace (e) gas fireplace. | $85,000 |
| Mar 18, 2010 | Completed final sign-off Jul 2010 | 1916 Vallejo St | replace kitchen cabinets one unit, repair replace dry rot in windows in kind ; counter tops in 2 unitsDetails
replace kitchen cabinets one unit, repair replace dry rot in windows in kind ; counter tops in 2 units | $20,000 |
| Dec 8, 2009 | Completed final sign-off Jun 2010 | 1776 Sacramento St | demo & install new kitchen cabinets. demo & install (n) tile in 2-bathrooms. 4-recessed lights in living room. 3-pendant lights in kitchen.Details
demo & install new kitchen cabinets. demo & install (n) tile in 2-bathrooms. 4-recessed lights in living room. 3-pendant lights in kitchen. | $15,000 |
| Aug 31, 2009 | Completed final sign-off Sep 2009 | 50 Palo Alto Av | to obtain final inspection for work approved under pa #200803268014. all work is complete.Details
to obtain final inspection for work approved under pa #200803268014. all work is complete. | |
| Oct 31, 2008 | Expired or cancelled expired Jul 2010 | 1030 Clayton St | currently there are no cabinets in kitchen. we are adding cabinets.Details
currently there are no cabinets in kitchen. we are adding cabinets. | $18,200 |
| Mar 26, 2008 | Expired or cancelled expired Sep 2009 | 50 Palo Alto Av | interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail.Details
interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail. | $250,000 |
| Jul 10, 2006 | Completed final sign-off Dec 2006 | 20 Keystone Wy | replace as existing front stairs due to dry rot. replace in kind on existing footing. visible from street.Details
replace as existing front stairs due to dry rot. replace in kind on existing footing. visible from street. | $10,000 |