Yogesh Chitlangia
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Yogesh Chitlangia Architect
- Based in
- San Carlos
- On San Francisco permits
- Apr 2008 to May 2026
34 permits since 2000 (architect on 26 permits, authorized agent-others on 7 permits, engineer on 1 permit): 21 completed, 3 in progress, 6 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 67 Mirabel Av | Blue Bay Painting Contractor | revision to pa 202407267339 that includes remove the fire rating requirement for rear exterior wall for the proposed adu (adjacent to rear stairs). since non require per the applicable code. no additional change to previously approved permit, which is to remain as approvedDetails
revision to pa 202407267339 that includes remove the fire rating requirement for rear exterior wall for the proposed adu (adjacent to rear stairs). since non require per the applicable code. no additional change to previously approved permit, which is to remain as approved | |
| Mar 27, 2026 | Completed final sign-off Jul 2026 | 600 York St | Andrew Chekene Enterprises/ Dba Ac Enter | work in 1st floor common areas and storage area - drywall & flooring repairs like for like per architectural plans. all interior.Details
work in 1st floor common areas and storage area - drywall & flooring repairs like for like per architectural plans. all interior. | $80,000 |
| Dec 16, 2025 | Completed final sign-off May 2026 | 111 San Pablo Av | Blue Bay Painting Contractor | interior kitchen remodel that includes: remove interior non bearing wall between existing kitchen and sitting room and reconfigure new kitchen layout. replace existing rear door with new to accomodate proposed kitchen counter. no change to existing building footprint, area proposed.Details
interior kitchen remodel that includes: remove interior non bearing wall between existing kitchen and sitting room and reconfigure new kitchen layout. replace existing rear door with new to accomodate proposed kitchen counter. no change to existing building footprint, area proposed. | $20,000 |
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 1360 Jones St | Blue Bay Painting Contractor | railing and guardrail repairs at (e) decks and interior stairs voluntary code upgrades with no structural or layout components to replace non compliant railings/guardrailsDetails
railing and guardrail repairs at (e) decks and interior stairs voluntary code upgrades with no structural or layout components to replace non compliant railings/guardrails | $50,000 |
| Aug 13, 2025 | In progress filed Aug 2025, not yet issued | 555 Fulton St | Advance Construction Technology Inc | addition of 4 safety gates at the exterior of the property for an emergency safety precaution.Details
addition of 4 safety gates at the exterior of the property for an emergency safety precaution. | $12,000 |
| Dec 4, 2024 | In progress issued Mar 2025 | 201 Spear St | B N Builders Inc | 6/fl- replace (2) doors at 2 different locations within the same opening.Details
6/fl- replace (2) doors at 2 different locations within the same opening. | $20,000 |
| Aug 21, 2023 | Expired or cancelled expired Nov 2025 | 67 Mirabel Av | Blue Bay Painting Contractor | revision to pa# 202208160608, replace portions of (e) masonary brick footin/ foundation at lowest level w/ new concrete foundation footing, no change to rest of previously approved scope.Details
revision to pa# 202208160608, replace portions of (e) masonary brick footin/ foundation at lowest level w/ new concrete foundation footing, no change to rest of previously approved scope. | |
| Aug 16, 2022 | Completed final sign-off Nov 2025 | 67 Mirabel Av | Blue Bay Painting Contractor | interior remodel @ (e) 2 dwelling units located @ 1st & 2nd flr that includes: 2nd flr: add (n) bath & (n) bedroom to create a 2bed/2 bath unit. remodel (e) kitchen. 1st flr: reconfigure interior layout to create a 2bed/2bath unit.no changes to (e) 2 levls of basement space.(e) bldg is not sprinklerDetails
interior remodel @ (e) 2 dwelling units located @ 1st & 2nd flr that includes: 2nd flr: add (n) bath & (n) bedroom to create a 2bed/2 bath unit. remodel (e) kitchen. 1st flr: reconfigure interior layout to create a 2bed/2bath unit.no changes to (e) 2 levls of basement space.(e) bldg is not sprinkler | $150,000 |
| Feb 16, 2022 | Completed final sign-off Sep 2022 | 1206 34th Av | replace roof awning over (e) entry landing at 2nd fl with (n) flat roof to match existing house roof. no change proposed to rest of the house or floor plan layout.Details
replace roof awning over (e) entry landing at 2nd fl with (n) flat roof to match existing house roof. no change proposed to rest of the house or floor plan layout. | $10,000 | |
| Dec 28, 2021 | Completed final sign-off Dec 2021 | 1782 21st Av | revision to pa# 2017-0131-8285: walls between separate and living area modified, structural plan updated, (n) built in fire place, (n) 20 min fire rated doors, (n) closet, (n) reclocated furanceDetails
revision to pa# 2017-0131-8285: walls between separate and living area modified, structural plan updated, (n) built in fire place, (n) 20 min fire rated doors, (n) closet, (n) reclocated furance | ||
| Jun 15, 2021 | Completed final sign-off Nov 2023 | 288 Union St | Jce Building & Development Inc. | project consists of converting (e) 1st floor area of (e) 4 story multifamily building (3 dwelling units) into an adu (of 607 sq ft, 1 bedroom, 1 bath). work limited to non-structural fixtures only. no changes to existing structural foundation/framing, building footprint or exterior proposed.Details
project consists of converting (e) 1st floor area of (e) 4 story multifamily building (3 dwelling units) into an adu (of 607 sq ft, 1 bedroom, 1 bath). work limited to non-structural fixtures only. no changes to existing structural foundation/framing, building footprint or exterior proposed. | $50,000 |
| Nov 2, 2020 | Completed final sign-off Jul 2022 | 1350 Shotwell St | Blue Bay Painting Contractor | project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as isDetails
project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as is | $110,000 |
| Nov 20, 2019 | Never finaled issued Jan 2020, no final | 1539 Folsom St | Andonian Construction | replace all existing single pane glass windows at front and left side w/ new double pane glass windows (similar configuration, size,& material). accessibility upgrade at existing front entry door to 1st floor. to remove non-complying change in elevation/gradeDetails
replace all existing single pane glass windows at front and left side w/ new double pane glass windows (similar configuration, size,& material). accessibility upgrade at existing front entry door to 1st floor. to remove non-complying change in elevation/grade | $120,000 |
| Feb 15, 2019 | Completed final sign-off Sep 2019 | 1100 Divisadero St | convert portion multipurpose rms within e church structure for child daycare use (max 48 kids).convert multipurpose rm into 2 classrms,convert e office/storage at right corner into new classrm.convert e kitchen area into staff/lunch rm for daycare.create outdr use area for daycare within e sideyard.Details
convert portion multipurpose rms within e church structure for child daycare use (max 48 kids).convert multipurpose rm into 2 classrms,convert e office/storage at right corner into new classrm.convert e kitchen area into staff/lunch rm for daycare.create outdr use area for daycare within e sideyard. | $15,000 | |
| Jan 23, 2019 | Completed final sign-off Jul 2019 | 155 Harriet St | The G B Group Inc. | relocate e exterior recessed door, build infill wall to straighten e curved recessed entry. relocate e intercom key access on side. no structural modifications to e building . no change to layout maher not reqDetails
relocate e exterior recessed door, build infill wall to straighten e curved recessed entry. relocate e intercom key access on side. no structural modifications to e building . no change to layout maher not req | $5,000 |
| Apr 16, 2018 | Never finaled filed Apr 2018, never issued | 550 Larkin St | three (n) adu @ (e) basement storage area on lower fl. that include one 1-bed unit & 2-studio units, (n) laundry rm, (n) access stairs from main 1st fl per ord# 162-16.Details
three (n) adu @ (e) basement storage area on lower fl. that include one 1-bed unit & 2-studio units, (n) laundry rm, (n) access stairs from main 1st fl per ord# 162-16. | $300,000 | |
| Aug 7, 2017 | Completed final sign-off Dec 2019 | 895 37th Av | (n)adu per ord #162-16. convert portion of(e)ground fl garage/storage area into(n)accessory dwelling unit; replace(e)rear yard access door w/ (n)6' wide sliding door; relocate(e)water hters/furnace upper fl; relocate laundry sink &(n)stacked washer/dryer; no change to(e)unit, bldg footprint or extrDetails
(n)adu per ord #162-16. convert portion of(e)ground fl garage/storage area into(n)accessory dwelling unit; replace(e)rear yard access door w/ (n)6' wide sliding door; relocate(e)water hters/furnace upper fl; relocate laundry sink &(n)stacked washer/dryer; no change to(e)unit, bldg footprint or extr | $45,000 | |
| Apr 13, 2017 | Completed final sign-off Oct 2022 | 166 Park St | K 2 Builders Inc | horizontal add.rear addition/remodel/convert(e) lower floor storage(e)2 story bldg into new res'l dwg incl:remove rear portion of(e)bldg at lower floor&upper floor,(n)rear addition at lower & upper floor; create(n)1 car garage at lower fl,rescope(e)driveway access to the(n)garage create(n)2 bedrms..Details
horizontal add.rear addition/remodel/convert(e) lower floor storage(e)2 story bldg into new res'l dwg incl:remove rear portion of(e)bldg at lower floor&upper floor,(n)rear addition at lower & upper floor; create(n)1 car garage at lower fl,rescope(e)driveway access to the(n)garage create(n)2 bedrms.. | $100,000 |
| Jan 31, 2017 | Completed final sign-off Dec 2021 | 1782 21st Av | Sean Michael Mchugh Construction, Argo Construction Inc | interior remodel & rear addition to (e) 2 story include new lower floor addition / remodel to convert rear half of (e) garage/storage into habitable room with new kids play room, new office, new family room, new bath, new utility (approx 990 sf). upper floor: remodel (e) interior stair to lower flooDetails
interior remodel & rear addition to (e) 2 story include new lower floor addition / remodel to convert rear half of (e) garage/storage into habitable room with new kids play room, new office, new family room, new bath, new utility (approx 990 sf). upper floor: remodel (e) interior stair to lower floo | $125,000 |
| Jan 4, 2017 | Completed final sign-off May 2019 | 86 Aloha Av | to comply w/ nov #201652411. replace 5 windows @ front of house. add sheetrock & tile @ garageDetails
to comply w/ nov #201652411. replace 5 windows @ front of house. add sheetrock & tile @ garage | $5,000 | |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 6124 Fulton St | (e) exterior rear stair dry rot repair in kind including replace (e) damaged footing. no change to (e) bld exterior or footprint layout proposedDetails
(e) exterior rear stair dry rot repair in kind including replace (e) damaged footing. no change to (e) bld exterior or footprint layout proposed | $15,000 | |
| Nov 2, 2015 | Never finaled issued Nov 2015, no final | 901 Cole St | occupancy load modification to include existing open mezzanine. no work. no other changes proposed.Details
occupancy load modification to include existing open mezzanine. no work. no other changes proposed. | ||
| May 15, 2015 | Expired or cancelled withdrawn Aug 2017 | 895 37th Av | rooms down addition. (349 sq ft) at extg garage/storage area at 1st floor. including create 2 rooms and 1/2 bath towards rear, relocate extg water heaters, replace and relocate extg furnaces towards front at garage, relocate extg laudnry sink and washer/dryer, replace extg rear door and 1 window.Details
rooms down addition. (349 sq ft) at extg garage/storage area at 1st floor. including create 2 rooms and 1/2 bath towards rear, relocate extg water heaters, replace and relocate extg furnaces towards front at garage, relocate extg laudnry sink and washer/dryer, replace extg rear door and 1 window. | $60,000 | |
| Jul 11, 2014 | Never finaled issued Jan 2015, no final | 40 Rausch St | Andonian Construction | convert existing basement storage of main building at the front of lot into new residential unit. no additional change to existing upper floors, residential units, or residential units at rear buildingDetails
convert existing basement storage of main building at the front of lot into new residential unit. no additional change to existing upper floors, residential units, or residential units at rear building | $110,000 |
| Nov 20, 2012 | Completed final sign-off Mar 2013 | 3448 Mission St | Rafael Miranda Dba R M Constr. | basement & 1st floor-tenant improvement for new dental clinic in (e) ground floor commercial vacant space. adding compessor on basement levelDetails
basement & 1st floor-tenant improvement for new dental clinic in (e) ground floor commercial vacant space. adding compessor on basement level | $40,000 |
| Sep 10, 2012 | Completed final sign-off Oct 2013 | 133 06th St | Bonilla Construction | tenant improvement for new juice bar @ front corner of (e) building. take out only. no seating proposed.Details
tenant improvement for new juice bar @ front corner of (e) building. take out only. no seating proposed. | $10,000 |
| Apr 6, 2012 | Completed final sign-off Jan 2013 | 1018 Mission St | Clear Channel Outdoor | to obtain final inspection for work approved under pa #2010.02.04.5942. all work has been completed for general adventise sign.Details
to obtain final inspection for work approved under pa #2010.02.04.5942. all work has been completed for general adventise sign. | |
| Dec 20, 2011 | Completed final sign-off Aug 2012 | 1001 Harrison St | Clear Channel Outdoor | clear channel outdoor inc, the owner of general advertising sign located at 1001 harrison street will remove this sign voluntarily. sign is 25'x 65' east facing freestanding sign. cco sign number 1613.Details
clear channel outdoor inc, the owner of general advertising sign located at 1001 harrison street will remove this sign voluntarily. sign is 25'x 65' east facing freestanding sign. cco sign number 1613. | $1,000 |
| Dec 20, 2011 | Completed final sign-off Aug 2012 | 1001 Harrison St | clear channel outdoor inc, the owner of general advertising sign located at 1001 harrison street will remove this sign voluntarily. sign is 14'x 48' east facing freestanding sign. cco sign number 1054.Details
clear channel outdoor inc, the owner of general advertising sign located at 1001 harrison street will remove this sign voluntarily. sign is 14'x 48' east facing freestanding sign. cco sign number 1054. | $1,000 | |
| Dec 20, 2011 | Completed final sign-off Aug 2012 | 1001 Harrison St | clear channel outdoor inc, the owner of general advertising sign located at 1001 harrison street will remove this sign voluntarily. sign is 12'x25' east facing freestanding sign. cco sign number 1261.Details
clear channel outdoor inc, the owner of general advertising sign located at 1001 harrison street will remove this sign voluntarily. sign is 12'x25' east facing freestanding sign. cco sign number 1261. | $1,000 | |
| Sep 9, 2008 | Expired or cancelled cancelled Oct 2015 | 285 Ocean Av | erect commercial offices, 4 residential units, garage mix use building.Details
erect commercial offices, 4 residential units, garage mix use building. | $925,000 | |
| Sep 9, 2008 | Expired or cancelled cancelled May 2017 | 285 Ocean Av | demolish 1 story commercial office buildingDetails
demolish 1 story commercial office building | $1,000 | |
| Apr 14, 2008 | Never finaled issued Apr 2008, no final | 3026 San Bruno Av | underpinning of adjoining building foundation at 3026 san bruno avenue for proposed new building at 3020-3022 san bruno avenue approved under pa# 2003-0121-5578-s1/r4Details
underpinning of adjoining building foundation at 3026 san bruno avenue for proposed new building at 3020-3022 san bruno avenue approved under pa# 2003-0121-5578-s1/r4 | $12,000 | |
| Apr 11, 2008 | Never finaled issued Sep 2008, no final | 744 Urbano Dr | revision to application 200605262636 to shown correct location of existing garage and to show that the two exterior risers and landing adjacent to the rear patio door have been removed from the scope of work.Details
revision to application 200605262636 to shown correct location of existing garage and to show that the two exterior risers and landing adjacent to the rear patio door have been removed from the scope of work. |