Argo Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Aug 2026
- Last 24 months
- 3 permits filed
42 permits since 2000: 34 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Sep 2026 | 2601 40th Av | this is a supplemental permit for health dept. review since health review was missed under ba#202403258517.Details
this is a supplemental permit for health dept. review since health review was missed under ba#202403258517. | |
| Nov 7, 2025 | Completed final sign-off Jul 2026 | 2601 40th Av | alteration to (e) roof framing with addition of roof travel restraint anchors.Details
alteration to (e) roof framing with addition of roof travel restraint anchors. | $20,000 |
| Jul 29, 2025 | Completed final sign-off Jul 2026 | 2601 40th Av | revision to pa 202403258517 and comprises alteration of existing concrete footingDetails
revision to pa 202403258517 and comprises alteration of existing concrete footing | |
| Apr 26, 2024 | Completed final sign-off Jul 2026 | 2601 40th Av | renovate (e)sf rec & parks clubhouse.exterior work includes,sewer lateral replacement/modifcation & storm drain,(n) wall paint,concrete pavement & stair replacement,earthwork to provide additional patio area,restroom entrance,roof replacement,exterior doors, lighting,interior signage.Details
renovate (e)sf rec & parks clubhouse.exterior work includes,sewer lateral replacement/modifcation & storm drain,(n) wall paint,concrete pavement & stair replacement,earthwork to provide additional patio area,restroom entrance,roof replacement,exterior doors, lighting,interior signage. | $2,650,000 |
| Jul 21, 2021 | Completed final sign-off Sep 2022 | 1340 Powell St | differed submittl for (n) pull piping installation for (n) roof generator ref pa# 2019-0211-2558.Details
differed submittl for (n) pull piping installation for (n) roof generator ref pa# 2019-0211-2558. | $100,000 |
| Mar 9, 2020 | Never finaled issued Mar 2020, no final | 230 Avila St | recommencement and complete of work approve under pa 201206011662.Details
recommencement and complete of work approve under pa 201206011662. | $25,000 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 230 Avila St | recommencement & completion of work approved under pa# 201206011662Details
recommencement & completion of work approved under pa# 201206011662 | $50,000 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 230 Avila St | recommencement & completion of owrk approved under pa# 201512114790 201702078771 & 201503272029Details
recommencement & completion of owrk approved under pa# 201512114790 201702078771 & 201503272029 | $5,000 |
| Feb 7, 2017 | Never finaled issued Feb 2017, no final | 230 Avila St | to obtain final inspection for work approved under pa # 201512114790, 201503272029. all work is complete. n/a maherDetails
to obtain final inspection for work approved under pa # 201512114790, 201503272029. all work is complete. n/a maher | |
| Jan 31, 2017 | Completed final sign-off Dec 2021 | 1782 21st Av | interior remodel & rear addition to (e) 2 story include new lower floor addition / remodel to convert rear half of (e) garage/storage into habitable room with new kids play room, new office, new family room, new bath, new utility (approx 990 sf). upper floor: remodel (e) interior stair to lower flooDetails
interior remodel & rear addition to (e) 2 story include new lower floor addition / remodel to convert rear half of (e) garage/storage into habitable room with new kids play room, new office, new family room, new bath, new utility (approx 990 sf). upper floor: remodel (e) interior stair to lower floo | $125,000 |
| Dec 11, 2015 | Expired or cancelled expired Jan 2017 | 230 Avila St | revision to pa 2012-0601-1662 - realignment of light court at the right side of the bldg; removal of skylight at the 3rd floor roof deck; reconfiguring roof drainage. (maher n/a)Details
revision to pa 2012-0601-1662 - realignment of light court at the right side of the bldg; removal of skylight at the 3rd floor roof deck; reconfiguring roof drainage. (maher n/a) | |
| Mar 27, 2015 | Expired or cancelled expired Jan 2017 | 230 Avila St | revision to appl #2012.0601.1662 - revise foundation. n/a maher ordinanceDetails
revision to appl #2012.0601.1662 - revise foundation. n/a maher ordinance | |
| May 9, 2014 | Completed final sign-off Aug 2014 | 490 34th Av | to comply with nov# 201460231. complaint # 201460231. light to have motion sensor, two bathrooms, interior finishes & remodeling. work only for unit #103 under this permit. no changes to door or windows. replace fan with convert to ducts.Details
to comply with nov# 201460231. complaint # 201460231. light to have motion sensor, two bathrooms, interior finishes & remodeling. work only for unit #103 under this permit. no changes to door or windows. replace fan with convert to ducts. | $8,000 |
| Oct 15, 2013 | Completed final sign-off Dec 2013 | 405 Filbert St | bathroom remodeling-no structural workDetails
bathroom remodeling-no structural work | $9,000 |
| Sep 12, 2013 | Completed final sign-off Dec 2013 | 405 Filbert St | kitchen and interior finishes remodeling, no structural work, no change of wall, window and doorDetails
kitchen and interior finishes remodeling, no structural work, no change of wall, window and door | $15,000 |
| Aug 5, 2013 | Completed final sign-off Feb 2014 | 470 38th Av | new deck to be added on the second floorDetails
new deck to be added on the second floor | $2,500 |
| Mar 13, 2013 | Completed final sign-off Feb 2014 | 470 38th Av | repl;ace (e) aluminum retrofit windows (not original) with wood windows, 45 total windows. remove all (e) burgular barsDetails
repl;ace (e) aluminum retrofit windows (not original) with wood windows, 45 total windows. remove all (e) burgular bars | $25,000 |
| Jan 17, 2013 | Completed final sign-off Feb 2014 | 470 38th Av | renovated mudroom,office @ 1st flr. modernize ktichen & bathrooms, remove partitions & structl walls & replace/relocated to accommodate the new plan. replace all kitchen cabinets & appliances, replace all alum retrofit windows (not orig) with wood windows. remodel (e) baths & add new bath @ 3rd flr.Details
renovated mudroom,office @ 1st flr. modernize ktichen & bathrooms, remove partitions & structl walls & replace/relocated to accommodate the new plan. replace all kitchen cabinets & appliances, replace all alum retrofit windows (not orig) with wood windows. remodel (e) baths & add new bath @ 3rd flr. | $95,000 |
| Jan 8, 2013 | Completed final sign-off Mar 2013 | 25 Lucerne St | replace extg flooring in kind, replace extg lighting in kind, replace half bath fixtures in kind, remodel ground floor work area, remodel main bathroom, no structural work.Details
replace extg flooring in kind, replace extg lighting in kind, replace half bath fixtures in kind, remodel ground floor work area, remodel main bathroom, no structural work. | $19,500 |
| Aug 8, 2012 | Completed final sign-off Jan 2013 | 1782 21st Av | kitchen and bathroom remodeling. kitchen cabinets, light fixtures, flooring, appliances, (n) drywall, shower pan. tile.Details
kitchen and bathroom remodeling. kitchen cabinets, light fixtures, flooring, appliances, (n) drywall, shower pan. tile. | $25,000 |
| Jun 1, 2012 | Never finaled issued Apr 2014, no final | 230 Avila St | expansion of the (e) 3rd floor toward front & rear yards. horizontal expansion of 1st & 2nd floors toward rear yard. infill lightwell at the 1st floor. complete interior remodelling of the building.Details
expansion of the (e) 3rd floor toward front & rear yards. horizontal expansion of 1st & 2nd floors toward rear yard. infill lightwell at the 1st floor. complete interior remodelling of the building. | $300,000 |
| Aug 19, 2011 | Completed final sign-off Sep 2011 | 1469 Kearny St | change out existing, single-hung aluminum windows on top floor to double-hung paintable fiberglass windows visible from the public right of way within existing openings. (10) total windows being replaced. same size. max u-factor is 0.40.Details
change out existing, single-hung aluminum windows on top floor to double-hung paintable fiberglass windows visible from the public right of way within existing openings. (10) total windows being replaced. same size. max u-factor is 0.40. | $10,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 1469 Kearny St | removal of (e) interior wall & addition of new wood beam & columns. new kitchen & closet cabinets. 2 new windows facing back of property, 1 in an (e) opening to be widened. replacement of (e) door facing back of propertyDetails
removal of (e) interior wall & addition of new wood beam & columns. new kitchen & closet cabinets. 2 new windows facing back of property, 1 in an (e) opening to be widened. replacement of (e) door facing back of property | $18,000 |
| Apr 11, 2011 | Completed final sign-off Apr 2011 | 2147 29th Av | new deck and fence intallation at rear yard.less than 36" from any gradesDetails
new deck and fence intallation at rear yard.less than 36" from any grades | $8,000 |
| Nov 23, 2010 | Completed final sign-off Apr 2011 | 260 Topaz Wy | drywall replacement in entire house. refrane upper bedrooms closets and bathroom, lower kitchen wall. install soffits to cover all pipes in garage. per inspection request notice of violation # 201079586Details
drywall replacement in entire house. refrane upper bedrooms closets and bathroom, lower kitchen wall. install soffits to cover all pipes in garage. per inspection request notice of violation # 201079586 | $3,000 |
| Oct 6, 2010 | Completed final sign-off Apr 2011 | 260 Topaz Wy | second floor: kitchen & 1/2 bathroom remodeling. third floor: 2-each bathrooms remodeling. no moving or adding walls. kitchen: at least 50% high efficency (h.e.) by wattage- lighting. bathroom: he or occupancy sensor.Details
second floor: kitchen & 1/2 bathroom remodeling. third floor: 2-each bathrooms remodeling. no moving or adding walls. kitchen: at least 50% high efficency (h.e.) by wattage- lighting. bathroom: he or occupancy sensor. | $45,000 |
| Jul 27, 2009 | Completed final sign-off Aug 2009 | 1664 Fulton St | garage door frame and door repair, to comply with nov 200905961.Details
garage door frame and door repair, to comply with nov 200905961. | $3,000 |
| Oct 23, 2008 | Completed final sign-off Dec 2008 | 5 Powhattan Av | revision to 200803056364: changes to structural details. top plate and connection at new roof to the e structureDetails
revision to 200803056364: changes to structural details. top plate and connection at new roof to the e structure | |
| Sep 25, 2008 | Completed final sign-off Mar 2010 | 1243 38th Av | ground floor remodel: add family room, bedroom, full bath, and sunroom under existing sunroom at 2nd floor. new rear door.Details
ground floor remodel: add family room, bedroom, full bath, and sunroom under existing sunroom at 2nd floor. new rear door. | $30,000 |
| Apr 1, 2008 | Completed final sign-off Nov 2008 | 1243 38th Av | kitchen & bathroom remodeling, add new master bathroom, convert restroom on main level into closet.Details
kitchen & bathroom remodeling, add new master bathroom, convert restroom on main level into closet. | $30,000 |
| Mar 5, 2008 | Completed final sign-off Dec 2008 | 5 Powhattan Av | partially raising the roof at the facade to create headroom.Details
partially raising the roof at the facade to create headroom. | $7,000 |
| Jan 28, 2008 | Completed final sign-off Aug 2008 | 380 Byxbee St | revision to appl #200702234756-s: remove skylight in existing dining area; remove new window in existing kitchen, change new exterior walls cover material from stucco to hardy plank siding; remove bathroom in exercise room replace as closet.Details
revision to appl #200702234756-s: remove skylight in existing dining area; remove new window in existing kitchen, change new exterior walls cover material from stucco to hardy plank siding; remove bathroom in exercise room replace as closet. | |
| Jun 13, 2007 | Completed final sign-off Jul 2007 | 1494 27th Av | 1 kitchen and 1 bathroom remodeling. replace (6) existing windows/same size, same location. all facing street .67 u factor min. no structural lights being replaced.Details
1 kitchen and 1 bathroom remodeling. replace (6) existing windows/same size, same location. all facing street .67 u factor min. no structural lights being replaced. | $17,000 |
| Jun 13, 2007 | Completed final sign-off Jul 2007 | 1494 27th Av | to compy with 3r report 3r-4816.Details
to compy with 3r report 3r-4816. | $6,000 |
| May 15, 2007 | Completed final sign-off Jun 2007 | 1415 Van Ness Av | install (n) t-bar light & ceiling mounted light fixtures. extend (e) duck work to accomodate t-bar installation. add to appl#200705080648, install (n) electrical wall outlets.Details
install (n) t-bar light & ceiling mounted light fixtures. extend (e) duck work to accomodate t-bar installation. add to appl#200705080648, install (n) electrical wall outlets. | $30,000 |
| May 8, 2007 | Completed final sign-off Jun 2007 | 1415 Van Ness Av | tenant improvement for mattress dicounters store. t-bar ceiling. accessible comply per permits: 8400340, 9908846, 9910684, 9322814. mech under seperate permitDetails
tenant improvement for mattress dicounters store. t-bar ceiling. accessible comply per permits: 8400340, 9908846, 9910684, 9322814. mech under seperate permit | $50,000 |
| Apr 26, 2007 | Completed final sign-off Aug 2007 | 1734 25th Av | to comply with complaint #200794433. legalize lower floor rooms & enclose area @ rear 12'x14'.Details
to comply with complaint #200794433. legalize lower floor rooms & enclose area @ rear 12'x14'. | $26,000 |
| Apr 12, 2007 | Completed final sign-off Nov 2007 | 9 De Soto St | revision to pa# 2005/10/14/5613. replace (e) rotened wall studs. install new wall stud. replace (e) exterior stucco 100% (all) replace in kind. install new exterior 1/2 plywood 100% all. install new stucco exterior 100% all. replace in kind.Details
revision to pa# 2005/10/14/5613. replace (e) rotened wall studs. install new wall stud. replace (e) exterior stucco 100% (all) replace in kind. install new exterior 1/2 plywood 100% all. install new stucco exterior 100% all. replace in kind. | $10,000 |
| Feb 23, 2007 | Completed final sign-off Aug 2008 | 380 Byxbee St | two story addition at rear side of the building. exterior finishes. repair and replacement.Details
two story addition at rear side of the building. exterior finishes. repair and replacement. | $50,000 |
| Mar 30, 2006 | Completed final sign-off Jun 2007 | 461 02nd St | kitchen remodel- non structural work. at least 50% of the total kitchen lighting waltage must be of fluorescent lights.Details
kitchen remodel- non structural work. at least 50% of the total kitchen lighting waltage must be of fluorescent lights. | $10,000 |
| Oct 14, 2005 | Completed final sign-off Nov 2007 | 9 De Soto St | remodeling @ basement including ()n) guest room (n) fam room (n) bath and (n) office remdoel @ 1st floor (kitchen stair to basement and 2/f addition of deck on 1/f @ rear addition on 1/f @ front addition of 2/fDetails
remodeling @ basement including ()n) guest room (n) fam room (n) bath and (n) office remdoel @ 1st floor (kitchen stair to basement and 2/f addition of deck on 1/f @ rear addition on 1/f @ front addition of 2/f | $60,000 |
| May 5, 2005 | Completed final sign-off Jun 2005 | 1200 Gough St | replace cabinets, countertops, tile flooring, sink add lighting replace tub, sink, toilet, & floorinDetails
replace cabinets, countertops, tile flooring, sink add lighting replace tub, sink, toilet, & floorin | $7,000 |