Andonian Construction
- Based in
- Millbrae
- On San Francisco permits
- Nov 2004 to Nov 2019
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2019 | Never finaled issued Jan 2020, no final | 1539 Folsom St | replace all existing single pane glass windows at front and left side w/ new double pane glass windows (similar configuration, size,& material). accessibility upgrade at existing front entry door to 1st floor. to remove non-complying change in elevation/gradeDetails
replace all existing single pane glass windows at front and left side w/ new double pane glass windows (similar configuration, size,& material). accessibility upgrade at existing front entry door to 1st floor. to remove non-complying change in elevation/grade | $120,000 |
| Sep 19, 2019 | Never finaled issued Oct 2019, no final | 1539 Folsom St | voluntary roof anchorage and splling column reinforcement. all interior work, no exterior work.Details
voluntary roof anchorage and splling column reinforcement. all interior work, no exterior work. | $45,000 |
| Jun 20, 2017 | Completed final sign-off Oct 2018 | 1463 Palou Av | voluntary reinforcement of attachment @ rear of bldg; voluntary strengthening.Details
voluntary reinforcement of attachment @ rear of bldg; voluntary strengthening. | $10,000 |
| Dec 30, 2016 | Completed final sign-off Jan 2018 | 1169 South Van Ness Av | soft story retrofit per sfbc ch 34b: 2012 iebc appendix a-4Details
soft story retrofit per sfbc ch 34b: 2012 iebc appendix a-4 | $150,000 |
| Oct 1, 2015 | Completed final sign-off Oct 2016 | 1710 19th Av | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory seismic retrofit, 3 moment frames, sheer walls.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. mandatory seismic retrofit, 3 moment frames, sheer walls. | $120,000 |
| Jul 16, 2015 | Completed final sign-off Dec 2024 | 735 Bryant St | construct new 3rd & 4th floors. renovate (e) 1st & 2nd floor. (n) bike racks & stair enclosure on basement. seismic upgrade the entire structure. fully sprinkler nfpa-13 entire structure (under separate permit). ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **Details
construct new 3rd & 4th floors. renovate (e) 1st & 2nd floor. (n) bike racks & stair enclosure on basement. seismic upgrade the entire structure. fully sprinkler nfpa-13 entire structure (under separate permit). ** maher: disturbance of at least 50 cu.yd. of soil. route to dph ** | $200,000 |
| Apr 22, 2015 | Completed final sign-off Sep 2017 | 1354 27th Av | legalize 1st floor unit per zoning permitted. renovation: 1st floor - entrance door & kitchen relocation. 2nd floor: fill lightwell, add full bath. rebuild rear stair.Details
legalize 1st floor unit per zoning permitted. renovation: 1st floor - entrance door & kitchen relocation. 2nd floor: fill lightwell, add full bath. rebuild rear stair. | $35,000 |
| Apr 1, 2015 | Completed final sign-off Apr 2015 | 90 Midcrest Wy | dryrot repair under exisitng roof including re-roof of 50% of flat roof & partial sheathing.Details
dryrot repair under exisitng roof including re-roof of 50% of flat roof & partial sheathing. | $12,500 |
| Jul 11, 2014 | Never finaled issued Jan 2015, no final | 40 Rausch St | convert existing basement storage of main building at the front of lot into new residential unit. no additional change to existing upper floors, residential units, or residential units at rear buildingDetails
convert existing basement storage of main building at the front of lot into new residential unit. no additional change to existing upper floors, residential units, or residential units at rear building | $110,000 |
| Apr 7, 2014 | Completed final sign-off Apr 2014 | 1250 26th Av | remove existing terrazzo stairs and replace with new granite. front of house 100% of risers and treads only. no structural work.Details
remove existing terrazzo stairs and replace with new granite. front of house 100% of risers and treads only. no structural work. | $7,500 |
| Nov 29, 2011 | Completed final sign-off Dec 2011 | 140 Duboce Av | roof deck repair take out about 50 sf 1x8 lath on the roof deck with 3/4 plywood. 8 penny nails.Details
roof deck repair take out about 50 sf 1x8 lath on the roof deck with 3/4 plywood. 8 penny nails. | $1,000 |
| Nov 29, 2011 | Completed final sign-off Dec 2011 | 140 Duboce Av | reroofingDetails
reroofing | $18,000 |
| May 5, 2011 | Completed final sign-off Jan 2012 | 1354 27th Av | add n2 bedrooms and one full bathroom and a family room at ground floorDetails
add n2 bedrooms and one full bathroom and a family room at ground floor | $20,000 |
| Jun 7, 2006 | Completed final sign-off Apr 2008 | 2383 15th Av | horizontal expansion at rear of residence at lower & main level. replace (e) front windows with bay window. remodel (e) kitchen with new cabinets, countertops & appliances & new bathroomDetails
horizontal expansion at rear of residence at lower & main level. replace (e) front windows with bay window. remodel (e) kitchen with new cabinets, countertops & appliances & new bathroom | $175,000 |
| Nov 15, 2004 | Completed final sign-off Dec 2004 | 1344 Jackson St | remove & replacecabs on the walls, new tiles in the bathrm. replacement of toilet, tub vanity in batDetails
remove & replacecabs on the walls, new tiles in the bathrm. replacement of toilet, tub vanity in bat | $7,500 |
| Nov 5, 2004 | Completed final sign-off Nov 2004 | 300 Connecticut St | reroofingDetails
reroofing | $12,500 |