Wai Mar
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Wess Wai Mar
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Sep 2026
157 permits since 2000 (architect on 139 permits, engineer on 13 permits, authorized agent-others on 3 permits, designer on 2 permits): 74 completed, 30 in progress, 25 never finaled, 28 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 157.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 134 Athens St | provide fence, footing, and retaining wall @ rear yard.Details
provide fence, footing, and retaining wall @ rear yard. | $2,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1634 Oakdale Av | Alex He General Construction | compliance to complaint# 202286629. comply to all works with nov# 202185665. 2nd floor: remove illegal unit c (removing doorway) to remerge unit (2022-002593cua).Details
compliance to complaint# 202286629. comply to all works with nov# 202185665. 2nd floor: remove illegal unit c (removing doorway) to remerge unit (2022-002593cua). | $1,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 2782 Folsom St | Amherst Associates Const | revision to pa# 202606253954 unit 1: document as-built light storage loft (non-habitable area).Details
revision to pa# 202606253954 unit 1: document as-built light storage loft (non-habitable area). | |
| Jul 27, 2026 | In progress issued Sep 2026 | 610 Shotwell St | Amherst Associates Const | revision to 202110059833: modification to front facade at level 1: change window to door and window. front facing patio with railing and small utility room to be constructed.Details
revision to 202110059833: modification to front facade at level 1: change window to door and window. front facing patio with railing and small utility room to be constructed. | $5,000 |
| Jun 25, 2026 | Completed final sign-off Sep 2026 | 2782 Folsom St | Amherst Associates Const | unit 1: kitchen - updated plumbing fixtures. bathroom - minor updated plumbing and plumbing fixtures. replace wall heater to comply with item #2 of nov#202419839.Details
unit 1: kitchen - updated plumbing fixtures. bathroom - minor updated plumbing and plumbing fixtures. replace wall heater to comply with item #2 of nov#202419839. | $30,000 |
| May 5, 2026 | In progress issued May 2026 | 3780 22nd St | rear deck renovation. removal of (e) rear sliding patio door and window. replacement of patio door and window with single patio door unit. (no change to interior)Details
rear deck renovation. removal of (e) rear sliding patio door and window. replacement of patio door and window with single patio door unit. (no change to interior) | $5,000 | |
| Apr 3, 2026 | In progress issued Jun 2026 | 747 Rhode Island St | revision to 202306089606 :remove (e) wood stairs on the sideyard and replace it to be use as indoor stairs. 52 s.f. horizontal addition in side yard at 474 ri relocate and reconfigure windows in lower workshop and kitchen, replace (e) french door w/ pivot door. reduce size of shower in basementDetails
revision to 202306089606 :remove (e) wood stairs on the sideyard and replace it to be use as indoor stairs. 52 s.f. horizontal addition in side yard at 474 ri relocate and reconfigure windows in lower workshop and kitchen, replace (e) french door w/ pivot door. reduce size of shower in basement | $1,000 | |
| Mar 25, 2026 | In progress issued Mar 2026 | 610 Shotwell St | Amherst Associates Const | revision to pa# 202001091594: update interior layout. change bath layout. change toilet area. no exterior change. relocate kitchen wall.Details
revision to pa# 202001091594: update interior layout. change bath layout. change toilet area. no exterior change. relocate kitchen wall. | |
| Mar 20, 2026 | In progress issued Mar 2026 | 134 Athens St | Amherst Associates Const | revision to pa 201403211426 ref pa 202211307370 update fire sprinkler system nfpa13r to nfpa 13d update front facade to be fiber cement boardDetails
revision to pa 201403211426 ref pa 202211307370 update fire sprinkler system nfpa13r to nfpa 13d update front facade to be fiber cement board | |
| Mar 17, 2026 | Expired or cancelled withdrawn Jun 2026 | 747 Rhode Island St | revision to 202502079867, relocateion of metel frame on floor joist to accomdate job site need. change beam size of one frameDetails
revision to 202502079867, relocateion of metel frame on floor joist to accomdate job site need. change beam size of one frame | $100 | |
| Mar 13, 2026 | In progress issued Mar 2026 | 5139 Geary Bl | Amherst Associates Const | revision to pa #202206166506. restore to garage and vacant office. document as built underground grease duct.Details
revision to pa #202206166506. restore to garage and vacant office. document as built underground grease duct. | |
| Feb 27, 2026 | In progress filed Feb 2026, not yet issued | 2339 17th Av | add 1 bath & 1 secondary kitchen at the 1st fl. add 1 half bath at 2nd fl.Details
add 1 bath & 1 secondary kitchen at the 1st fl. add 1 half bath at 2nd fl. | $50,000 | |
| Feb 24, 2026 | In progress issued Jul 2026 | 308 Columbus Av | Delvin Garcia Construction-A Partnership | replace (e) wood stair, new fully installed metal staircase (1st fl to basement). build new storage room under staircase. reinforce 1st fl 2"x14 joist below 1st fl kitchen area. redo 1st fl front kitchen tile, subfloor & waterproof. replace store front glass & frame in kind. replace walk in freezer.Details
replace (e) wood stair, new fully installed metal staircase (1st fl to basement). build new storage room under staircase. reinforce 1st fl 2"x14 joist below 1st fl kitchen area. redo 1st fl front kitchen tile, subfloor & waterproof. replace store front glass & frame in kind. replace walk in freezer. | $50,000 |
| Jan 20, 2026 | In progress issued Feb 2026 | 134 Athens St | Amherst Associates Const | revision to pa #2025-0428-5375: add walls & windows below rear deck. enclose area below deck and build a bedroom. ref pa #202211307370 and 201403211426.Details
revision to pa #2025-0428-5375: add walls & windows below rear deck. enclose area below deck and build a bedroom. ref pa #202211307370 and 201403211426. | |
| Dec 15, 2025 | In progress filed Dec 2025, not yet issued | 1121 Key Av | to comply with nov # 202545619, demo illegal as-built storage @ rear yard & front wood retaining wall.Details
to comply with nov # 202545619, demo illegal as-built storage @ rear yard & front wood retaining wall. | $4,000 | |
| Oct 6, 2025 | Completed final sign-off Sep 2026 | 2782 Folsom St | Amherst Associates Const | unit 3: repair kitchen and bathroom in kind. no layout change. partially comply with nov #202537225. repair fire damageDetails
unit 3: repair kitchen and bathroom in kind. no layout change. partially comply with nov #202537225. repair fire damage | $50,000 |
| Oct 6, 2025 | In progress issued Nov 2025 | 2782 Folsom St | Amherst Associates Const | unit 4: repair kitchen and bath inkind. no layout change. comply with no 202537225. repair fire damage. like for like remodelDetails
unit 4: repair kitchen and bath inkind. no layout change. comply with no 202537225. repair fire damage. like for like remodel | $50,000 |
| Sep 23, 2025 | In progress issued Jun 2026 | 660 Bush St | Rei Build Up Construction Corp | repair rear yard retaining wall tie- beam and girt beam in kind less than 50%. no change to design nor layout. comply with nov 202313083Details
repair rear yard retaining wall tie- beam and girt beam in kind less than 50%. no change to design nor layout. comply with nov 202313083 | $6,000 |
| Aug 22, 2025 | Completed final sign-off Dec 2025 | 460 Crestlake Dr | Success Construction ***See Notes*** | revision to 202505015603: side deck (2''-6" above grade) replace in-kind. no fuondation change, no inteiror/framing/structural changes.Details
revision to 202505015603: side deck (2''-6" above grade) replace in-kind. no fuondation change, no inteiror/framing/structural changes. | $1,000 |
| Aug 22, 2025 | Completed final sign-off Dec 2025 | 450 Crestlake Dr | Success Construction ***See Notes*** | revision to 202504224912: removed rear stair & rear deck. minor extension at deck. no interior change, no framing/structural changeDetails
revision to 202504224912: removed rear stair & rear deck. minor extension at deck. no interior change, no framing/structural change | $1,000 |
| May 1, 2025 | Completed final sign-off Dec 2025 | 460 Crestlake Dr | Success Construction ***See Notes*** | rear deck extension and replace decking. no interior change. no framing structural change.Details
rear deck extension and replace decking. no interior change. no framing structural change. | $8,000 |
| Apr 30, 2025 | Completed final sign-off Jan 2026 | 695 Miramar Av | Regional Construction Co | revision to pa #202503242884. alterate existing interior stair case to new up grade plan.Details
revision to pa #202503242884. alterate existing interior stair case to new up grade plan. | $10,000 |
| Apr 24, 2025 | Completed final sign-off Nov 2025 | 1634 Oakdale Av | Alex He General Construction | revision to pa 2022-0719-8815 to maintain r-3 occupancy per ab 005, 2 unit plus (1) adu to remove fire sprinkler & fire alarm requirement per crc r313.2 exception 1; install (n) heat pump for adu; replace sliding door instead of windows @ rear bedroom; remove wall between garage & hallwayDetails
revision to pa 2022-0719-8815 to maintain r-3 occupancy per ab 005, 2 unit plus (1) adu to remove fire sprinkler & fire alarm requirement per crc r313.2 exception 1; install (n) heat pump for adu; replace sliding door instead of windows @ rear bedroom; remove wall between garage & hallway | |
| Apr 22, 2025 | Completed final sign-off Dec 2025 | 450 Crestlake Dr | Success Construction ***See Notes*** | rear deck minor extension and replace decking. no interior change, no framing structural changeDetails
rear deck minor extension and replace decking. no interior change, no framing structural change | $8,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 747 Rhode Island St | revision to pa 202306089606: 1)remodel existing 2-unit residence; 2)convert 268 sq.ft of (e) basement to workshop; 3)relocate entry from side entrance to front in lower unit; 4) 121 sq.ft addition on 1st floor; 5)widen entry to upper upper unit; 6)replace/relocate 2nd fl windowDetails
revision to pa 202306089606: 1)remodel existing 2-unit residence; 2)convert 268 sq.ft of (e) basement to workshop; 3)relocate entry from side entrance to front in lower unit; 4) 121 sq.ft addition on 1st floor; 5)widen entry to upper upper unit; 6)replace/relocate 2nd fl window | $10,000 | |
| Feb 20, 2025 | In progress filed Feb 2025, not yet issued | 519 Monterey Bl | Hugo Tejada/Dba Alpha & Omega Renovation | revision per pa #202405242969Details
revision per pa #202405242969 | $1,000 |
| Dec 2, 2024 | Expired or cancelled cancelled Feb 2025 | 2069 Greenwich St | convert existing commercial unit on 1/f and mezz floor to a standard residential unit.Details
convert existing commercial unit on 1/f and mezz floor to a standard residential unit. | $200,000 | |
| Nov 25, 2024 | In progress issued Dec 2024 | 519 Monterey Bl | Hugo Tejada/Dba Alpha & Omega Renovation, Success Construction ***See Notes*** | revision to pa# 202405242969: (n) trellis partially cover 2/f deck mainly to cover the rear deck stairs.Details
revision to pa# 202405242969: (n) trellis partially cover 2/f deck mainly to cover the rear deck stairs. | $5,000 |
| Oct 11, 2024 | Completed final sign-off Nov 2025 | 450 Crestlake Dr | Success Construction ***See Notes*** | revision to pa# 202304185900, replace adu rear sunroom skylight & windows w/ wood framing. no interior layout change.Details
revision to pa# 202304185900, replace adu rear sunroom skylight & windows w/ wood framing. no interior layout change. | $7,000 |
| Aug 30, 2024 | In progress filed Aug 2024, not yet issued | 330 08th Av | erect 2 story type v-b single dwelling detached adu at rear (r-3)Details
erect 2 story type v-b single dwelling detached adu at rear (r-3) | $175,000 | |
| Jun 26, 2024 | Completed final sign-off May 2026 | 5139 Geary Bl | Success Construction ***See Notes*** | revision to pa 202206166506 change kitchen equipment location; change dining area table. rear addition for freezer. remove rear storageDetails
revision to pa 202206166506 change kitchen equipment location; change dining area table. rear addition for freezer. remove rear storage | $1,000 |
| Jun 24, 2024 | In progress filed Jun 2024, not yet issued | 650 Jackson St | change street parking space to dining platformDetails
change street parking space to dining platform | $2,000 | |
| May 30, 2024 | In progress issued Sep 2024 | 5139 Geary Bl | Success Construction ***See Notes*** | 1/f seismic retrofitDetails
1/f seismic retrofit | $30,000 |
| May 16, 2024 | Completed final sign-off Nov 2025 | 450 Crestlake Dr | Success Construction ***See Notes*** | revision to permit # 202304185900: update steel beam location at 2nd floor. revise 1-hr rated detail at 2/f ceiling. no exterior change. no interior layout change.Details
revision to permit # 202304185900: update steel beam location at 2nd floor. revise 1-hr rated detail at 2/f ceiling. no exterior change. no interior layout change. | |
| May 2, 2024 | In progress issued Sep 2024 | 5139 Geary Bl | Success Construction ***See Notes*** | revision to pa 202402266599 change layout 2nd fl and 3rd fl; relocate kitchen from 3rd fl to 2nd fl; remove walls @ 2nd fl; add 2 bathrooms @ 3rd flDetails
revision to pa 202402266599 change layout 2nd fl and 3rd fl; relocate kitchen from 3rd fl to 2nd fl; remove walls @ 2nd fl; add 2 bathrooms @ 3rd fl | $10,000 |
| Feb 26, 2024 | In progress issued Apr 2024 | 5139 Geary Bl | Success Construction ***See Notes*** | mixed use building with 1 dwelling unit: 2nd/f: bathroom remodel & additional bathroom. 3rd/f new range hood in kitchen, bathroom remodel. remove solid walls & doors enclosing stairs on 3rd.f. replace w/ open railing to maintain open interior connection w/ dw space on 2nd/fDetails
mixed use building with 1 dwelling unit: 2nd/f: bathroom remodel & additional bathroom. 3rd/f new range hood in kitchen, bathroom remodel. remove solid walls & doors enclosing stairs on 3rd.f. replace w/ open railing to maintain open interior connection w/ dw space on 2nd/f | $10,000 |
| Feb 13, 2024 | In progress issued May 2024 | 1750 Sacramento St | Success Construction ***See Notes*** | revision to pa# 2019-0710-5566. revise the title sheet fire notes. remove existing post and install new beam for support: revision to bpa# 202303093361: update unit proposed dwelling unt of combine of bpa# 201907105566 and 202204081878.Details
revision to pa# 2019-0710-5566. revise the title sheet fire notes. remove existing post and install new beam for support: revision to bpa# 202303093361: update unit proposed dwelling unt of combine of bpa# 201907105566 and 202204081878. | $3,000 |
| Jan 10, 2024 | Completed final sign-off Aug 2024 | 1966 Quesada Av | Bay Cities General Construction | 2 story remodel with left side lightwell infill. install rear 1st floor deck; add 1 office, 1 bedroom, 1 media room and 1 bathroom on 1st floorDetails
2 story remodel with left side lightwell infill. install rear 1st floor deck; add 1 office, 1 bedroom, 1 media room and 1 bathroom on 1st floor | $200,000 |
| Dec 22, 2023 | In progress filed Dec 2023, not yet issued | 614 Clement St | ada entry compliance per da17. to comply with the accessible business entrance program. 612 clemente - abe# 202311069019Details
ada entry compliance per da17. to comply with the accessible business entrance program. 612 clemente - abe# 202311069019 | $2,000 | |
| Dec 11, 2023 | Expired or cancelled expired Jul 2025 | 2100 Alemany Bl | Parkson Construction Company | revision to 202309267474. document as built rought framing (post, beam, all (e) framing).Details
revision to 202309267474. document as built rought framing (post, beam, all (e) framing). | $400 |
| Sep 27, 2023 | Never finaled filed Sep 2023, never issued | 3815 Judah St | remodel to ground floor, add new walls, bath and storage, 2/f remove walls between living room and kitchen, remove fireplace.Details
remodel to ground floor, add new walls, bath and storage, 2/f remove walls between living room and kitchen, remove fireplace. | $50,000 | |
| Sep 26, 2023 | Completed final sign-off Jul 2025 | 2100 Alemany Bl | Parkson Construction Company | revision to permit 202305097405. 2/f layout change. document as built shearwall details. relocate one shearwall on 2/f.Details
revision to permit 202305097405. 2/f layout change. document as built shearwall details. relocate one shearwall on 2/f. | $500 |
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 1207 Union St | to comply with accessible business entrance program per ordinance 51-16. alteration of entry & public way (sidewalk improvement). abe# 201911228608.Details
to comply with accessible business entrance program per ordinance 51-16. alteration of entry & public way (sidewalk improvement). abe# 201911228608. | $5,000 | |
| Sep 19, 2023 | Never finaled filed Sep 2023, never issued | 1205 Union St | to comply with accessible business entrance program per ordinance 51-16. alteration of entry & public way (sidewalk improvement) to conform with mandatory disability access improvement program, catagory checklist compliance form 5.1 barrier remediation. abe# 201911228607.Details
to comply with accessible business entrance program per ordinance 51-16. alteration of entry & public way (sidewalk improvement) to conform with mandatory disability access improvement program, catagory checklist compliance form 5.1 barrier remediation. abe# 201911228607. | $5,000 | |
| Sep 8, 2023 | Never finaled issued Oct 2023, no final | 130 Athens St | Amherst Associates Const | retrofit e retaining wall at rear yardDetails
retrofit e retaining wall at rear yard | $15,000 |
| Aug 17, 2023 | Expired or cancelled withdrawn Nov 2023 | 5139 Geary Bl | 2/f: kitchen & bathroom remodel; 3/f: kitchen & bathroom remodelDetails
2/f: kitchen & bathroom remodel; 3/f: kitchen & bathroom remodel | $100,000 | |
| Jul 27, 2023 | In progress issued Nov 2023 | 450 Crestlake Dr | Success Construction ***See Notes*** | revision to pa# 202303033011. remove (e) skylight, (n) skylight proposed under pa#202303033011 will remain. replace rear windows. replace side windows, update as built windows dimension.Details
revision to pa# 202303033011. remove (e) skylight, (n) skylight proposed under pa#202303033011 will remain. replace rear windows. replace side windows, update as built windows dimension. | |
| Jul 19, 2023 | Never finaled filed Jul 2023, never issued | 763 05th Av | build a firewall along with the (e) rear stairs.Details
build a firewall along with the (e) rear stairs. | $20,000 | |
| May 9, 2023 | Completed final sign-off Jul 2025 | 2100 Alemany Bl | Parkson Construction Company | rev to pa# 202209061923; revised 2 (e) grade beam to (n) grade beam per as built conditionDetails
rev to pa# 202209061923; revised 2 (e) grade beam to (n) grade beam per as built condition | |
| Apr 18, 2023 | Completed final sign-off Nov 2025 | 450 Crestlake Dr | Success Construction ***See Notes*** | new accessory dwelling, per ordinace #162-16.Details
new accessory dwelling, per ordinace #162-16. | $3,000 |
| Mar 14, 2023 | Completed final sign-off Sep 2023 | 1908 Fillmore St | Gee Construction Co Inc | revision to bpa#202302152070, ref bpa#201708245738, update shearwall layout (commercial)Details
revision to bpa#202302152070, ref bpa#201708245738, update shearwall layout (commercial) | |
| Mar 9, 2023 | Never finaled issued Mar 2023, no final | 1750 Sacramento St | Success Construction ***See Notes*** | revision to pa 2016-0920-8297, update layoutDetails
revision to pa 2016-0920-8297, update layout | |
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 450 Crestlake Dr | Success Construction ***See Notes*** | revision to 202212158420. basement partition wall layout change.Details
revision to 202212158420. basement partition wall layout change. | $5,000 |
| Mar 3, 2023 | Never finaled issued Mar 2023, no final | 450 Crestlake Dr | Success Construction ***See Notes*** | remove e skylight. new skylight. front windows replace in kind. 3 new rear windows. repair window glass. max u factor = 0.3Details
remove e skylight. new skylight. front windows replace in kind. 3 new rear windows. repair window glass. max u factor = 0.3 | $10,000 |
| Dec 28, 2022 | In progress issued Nov 2023 | 2593 23rd Av | Success Construction ***See Notes*** | 1/flr: garage area voluntary paritial structural strengtheningDetails
1/flr: garage area voluntary paritial structural strengthening | $80,000 |
| Dec 28, 2022 | Expired or cancelled cancelled Jan 2026 | 1329 37th Av | alteration and addition to add (1) bathroom at 2nd floor, and add 1 bedroom & (1) bathroom at ground floor. site permit ab-032.Details
alteration and addition to add (1) bathroom at 2nd floor, and add 1 bedroom & (1) bathroom at ground floor. site permit ab-032. | $100,000 | |
| Dec 15, 2022 | Completed final sign-off Nov 2025 | 450 Crestlake Dr | Success Construction ***See Notes*** | 1st floor damage repair interior and changing layoutDetails
1st floor damage repair interior and changing layout | $80,000 |
| Dec 5, 2022 | Completed final sign-off May 2023 | 1707 27th Av | Success Construction ***See Notes*** | add 2 new baths within envelope (1 at g/f and 1 at 2/f), add 1 new bedroom at g/f, convert (e) den to bedroom at 2/f. upgrade utilities.Details
add 2 new baths within envelope (1 at g/f and 1 at 2/f), add 1 new bedroom at g/f, convert (e) den to bedroom at 2/f. upgrade utilities. | $80,000 |
| Nov 30, 2022 | Expired or cancelled expired Mar 2025 | 134 Athens St | Cw Cheng Construction Co | revision to bpa #201403211426-s1. update interior layout. no change to exterior.Details
revision to bpa #201403211426-s1. update interior layout. no change to exterior. | |
| Nov 9, 2022 | Never finaled filed Nov 2022, never issued | 460 Crestlake Dr | Success Construction ***See Notes*** | rear foundation repair. no change to exterior. add piers at the rear to support the building.Details
rear foundation repair. no change to exterior. add piers at the rear to support the building. | $45,000 |
| Jun 21, 2022 | In progress issued Jan 2025 | 19 Cortland Av | Success Construction ***See Notes*** | convert existing storage to one adu unit at the first floor per the state adu program.Details
convert existing storage to one adu unit at the first floor per the state adu program. | $60,000 |
| Apr 27, 2022 | Expired or cancelled withdrawn Mar 2026 | 7 Edgar Av | to erect a 2-story, type 5b, single family residential unit building under sb-9 program.Details
to erect a 2-story, type 5b, single family residential unit building under sb-9 program. | $600,000 | |
| Apr 8, 2022 | Never finaled issued Aug 2023, no final | 1750 Sacramento St | Success Construction ***See Notes*** | 1st floor legalize # 104b per city ordinance.Details
1st floor legalize # 104b per city ordinance. | $30,000 |
| Jul 19, 2021 | Never finaled issued Aug 2021, no final | 1831 31st Av | D S Management Inc Dba Metrocon Builders | rev to pa 202104148480 (e) foot @ ground 2, no (e) bm above, shearwall 2cd change to 8.5 ft long perforated sw. sw22 extened length, no hold downs needed. sw 2de changed to perforated. 2d1w changed to 6x8. 2b2w changed to 4x12 take away 2b5w, sw2b & 1b change lenght.Details
rev to pa 202104148480 (e) foot @ ground 2, no (e) bm above, shearwall 2cd change to 8.5 ft long perforated sw. sw22 extened length, no hold downs needed. sw 2de changed to perforated. 2d1w changed to 6x8. 2b2w changed to 4x12 take away 2b5w, sw2b & 1b change lenght. | |
| Jun 1, 2021 | Never finaled issued Aug 2021, no final | 1825 Balboa St | Lee Family Corp | revision to pa 201408042922, 201908290205 to document as built framing. structural update per as built condition. no change to layout and exterior.Details
revision to pa 201408042922, 201908290205 to document as built framing. structural update per as built condition. no change to layout and exterior. | |
| Apr 14, 2021 | Completed final sign-off Jun 2022 | 1831 31st Av | D S Management Inc Dba Metrocon Builders | revision to pa# 201603041263. change all steel bm to wd bm. 3rd fl layout change. 3rd fl shearwall relocation. 2nd fl joist size change, front wall change to stucco.Details
revision to pa# 201603041263. change all steel bm to wd bm. 3rd fl layout change. 3rd fl shearwall relocation. 2nd fl joist size change, front wall change to stucco. | |
| Apr 1, 2021 | Completed final sign-off Dec 2021 | 14 Pleasant St | Yiu's Construction Co | interior remodel. add 1 bath. remodel existing kitchen and bath.Details
interior remodel. add 1 bath. remodel existing kitchen and bath. | $20,000 |
| Dec 23, 2020 | Completed final sign-off Jul 2021 | 308 Crescent Av | revision to pa# 201901099954, 201905069790, 201911268294. to remove first floor bath. add (n) rear deck/stair to rear yard, less than 30" off grade.Details
revision to pa# 201901099954, 201905069790, 201911268294. to remove first floor bath. add (n) rear deck/stair to rear yard, less than 30" off grade. | $1,000 | |
| Dec 1, 2020 | Never finaled filed Dec 2020, never issued | 1358 48th Av | 1 new adu, detached 2-story, no basement, type v-b, 2 bedroom, 2 bathroom, 1 kitchen, adu in rear of (e) lot per ordinance 162-16.Details
1 new adu, detached 2-story, no basement, type v-b, 2 bedroom, 2 bathroom, 1 kitchen, adu in rear of (e) lot per ordinance 162-16. | $160,000 | |
| Nov 6, 2020 | Expired or cancelled withdrawn Oct 2021 | 2482 38th Av | 2/f: add another bathroom with tilet, sink, and shower. remodel/alt kitchen on 2/f at 2482 38th ave.Details
2/f: add another bathroom with tilet, sink, and shower. remodel/alt kitchen on 2/f at 2482 38th ave. | ||
| Feb 27, 2020 | Never finaled filed Feb 2020, never issued | 763 05th Av | to erect a type-5, 4-story single family dwelling with no basement in rear.Details
to erect a type-5, 4-story single family dwelling with no basement in rear. | $500,000 | |
| Feb 12, 2020 | Expired or cancelled withdrawn Apr 2022 | 7 Edgar Av | to erect a 4-story, type 5, single family bldg w/ no basement.Details
to erect a 4-story, type 5, single family bldg w/ no basement. | $600,000 | |
| Feb 7, 2020 | Never finaled filed Feb 2020, never issued | 1358 48th Av | vertical & horizontal additions. 1st fl add 2 bedrooms, 1 bath, hallway to rear yard & a new elevator. 2nd fl add 2 bedrooms, 1 bath & stair to (n) 3rd flr level. (n) 3rd flr add 2 bedrooms, 2 baths, recreation area & wetbar. (n) roof deck.Details
vertical & horizontal additions. 1st fl add 2 bedrooms, 1 bath, hallway to rear yard & a new elevator. 2nd fl add 2 bedrooms, 1 bath & stair to (n) 3rd flr level. (n) 3rd flr add 2 bedrooms, 2 baths, recreation area & wetbar. (n) roof deck. | $50,000 | |
| Jan 9, 2020 | In progress issued Jun 2024 | 610 Shotwell St | Aka Construction Company | legalize unit on 4th floor of building per ordinance 43-14.Details
legalize unit on 4th floor of building per ordinance 43-14. | $20,000 |
| Jan 8, 2020 | Expired or cancelled cancelled Jan 2026 | 125 03rd Av | Kobuksan Construction | revision to pa #201703091149. update plan w/standard smf instead of simpsons smf.Details
revision to pa #201703091149. update plan w/standard smf instead of simpsons smf. | |
| Dec 27, 2019 | Completed final sign-off Apr 2025 | 1400 35th Av | Hbm Construction Inc | change of use from 2unit r3 to 3unit r-2 occupancy (not an adu)conversion of 1st fl commercial space to standard residential unit. expand (e) 1st fl unit area to include adjacent storage as bedroom, and bathroom. 1st fl voluntary structural strengtheining - front wall add shearwall.Details
change of use from 2unit r3 to 3unit r-2 occupancy (not an adu)conversion of 1st fl commercial space to standard residential unit. expand (e) 1st fl unit area to include adjacent storage as bedroom, and bathroom. 1st fl voluntary structural strengtheining - front wall add shearwall. | $40,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2020 | 1486 26th Av | J L M Construction Inc. | 1/f: add 2 bedrooms, 1 family area, 2 bathrooms, add laundry and sink, 2/f: remodel (e) kitchen & 2 bathrooms and living room. new roof deck on 1st floor lightwell infill and new roofdeck at highest level. infill under room on posts at rear. no work at front.Details
1/f: add 2 bedrooms, 1 family area, 2 bathrooms, add laundry and sink, 2/f: remodel (e) kitchen & 2 bathrooms and living room. new roof deck on 1st floor lightwell infill and new roofdeck at highest level. infill under room on posts at rear. no work at front. | $40,000 |
| Dec 17, 2019 | Expired or cancelled cancelled Aug 2026 | 1 Edgar Av | emergency structural framing repair due to partial collapse. 2nd fl reconfiguration to include 4 bedrooms, 4 baths. eliminate dining rm. windows, sliding door. note: building also is located on lots, 31, 32, 33, and 34, being number 106, 108, 110, and 116 harold ave.Details
emergency structural framing repair due to partial collapse. 2nd fl reconfiguration to include 4 bedrooms, 4 baths. eliminate dining rm. windows, sliding door. note: building also is located on lots, 31, 32, 33, and 34, being number 106, 108, 110, and 116 harold ave. | $88,000 | |
| Dec 17, 2019 | Never finaled filed Dec 2019, never issued | 723 25th Av | per unit legalization ordinance 43-14, 1st floor legalize existing illegal unit, kitchen, bathroom, convert (e) social room to bedroom and living area, relocate the bathroom, new front landscape/permeable area.Details
per unit legalization ordinance 43-14, 1st floor legalize existing illegal unit, kitchen, bathroom, convert (e) social room to bedroom and living area, relocate the bathroom, new front landscape/permeable area. | $20,000 | |
| Dec 2, 2019 | Never finaled filed Dec 2019, never issued | 7700 Geary Bl | add one accessory dwelling unit (studio) at ground floor per ordinance 162-16.Details
add one accessory dwelling unit (studio) at ground floor per ordinance 162-16. | $20,000 | |
| Nov 21, 2019 | Never finaled filed Nov 2019, never issued | 933 Clement St | remodel (e) 2-story commercial bldg. vertical addition two story mixed used bldg. 1st fl commercial restaurant & 1 (n) unit, 2nd fl (3) (n) condo units, 3rd fl (3) (n) condo units. 4th fl (2) (n) condo units.Details
remodel (e) 2-story commercial bldg. vertical addition two story mixed used bldg. 1st fl commercial restaurant & 1 (n) unit, 2nd fl (3) (n) condo units, 3rd fl (3) (n) condo units. 4th fl (2) (n) condo units. | $3,000,000 | |
| Nov 19, 2019 | Completed final sign-off Jun 2022 | 1527 Ulloa St | Sky Town Construction | legalize (e) unit @ 1st floor per ordinance 95-17: to comply with nov 201931411.Details
legalize (e) unit @ 1st floor per ordinance 95-17: to comply with nov 201931411. | $20,000 |
| Nov 8, 2019 | Completed final sign-off Dec 2022 | 1878 24th Av | Sun Wu Liu Dba Golden Wu Construction In | 1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14.Details
1st floor legalize existing illeal unit, convert (e) garage to bedroom add a kitchen, bath. per ordinance 43-14. | $50,000 |
| Nov 8, 2019 | Completed final sign-off Jul 2021 | 1347 Jackson St | S And L Tec Construction Co Inc | unit 204 and unit 304 2nd fl & 3rd fl: maintenance and renovation work. replace cracked lath plaster finish with gypsum board finish. instrall bath insulation. replace kitchen and bath finishes. casework countertops and fixtures. fire alarm/sprinkler under sep permit.Details
unit 204 and unit 304 2nd fl & 3rd fl: maintenance and renovation work. replace cracked lath plaster finish with gypsum board finish. instrall bath insulation. replace kitchen and bath finishes. casework countertops and fixtures. fire alarm/sprinkler under sep permit. | $65,798 |
| Aug 22, 2019 | Completed final sign-off Sep 2021 | 618 Andover St | Franko Construction Co | revision to 201904057298 & comply with complaint 201975811, 1/f & 2/f rear (e) structure rebuild in kind (up to grid line b) due to deterationDetails
revision to 201904057298 & comply with complaint 201975811, 1/f & 2/f rear (e) structure rebuild in kind (up to grid line b) due to deteration | $10,000 |
| Jul 22, 2019 | Completed final sign-off Nov 2019 | 441 Green St | Alex He General Construction | rebuild rear yard stairsDetails
rebuild rear yard stairs | $4,000 |
| Jul 17, 2019 | Never finaled filed Jul 2019, never issued | 1630 Sutter St | 1st flr add new one adu unit per ord# 162-16.Details
1st flr add new one adu unit per ord# 162-16. | $50,000 | |
| Jul 17, 2019 | Completed final sign-off Nov 2021 | 863 Clayton St | Sgdm Llc | add 1 adu at first floor per ordinance# 162-16. 2 bdrooms, 1 living room, 1 kitchen & 1 bath.Details
add 1 adu at first floor per ordinance# 162-16. 2 bdrooms, 1 living room, 1 kitchen & 1 bath. | $50,000 |
| Jul 10, 2019 | Completed final sign-off Dec 2022 | 2482 38th Av | Th Construction & Remodel Inc | 1st flr adu. unit# 1 adu convert (e) garage to 2 bedrooms, 1 bath & kitchen and remove stair, per ord# 162-16. no work to be performed on the second floor under this permit.Details
1st flr adu. unit# 1 adu convert (e) garage to 2 bedrooms, 1 bath & kitchen and remove stair, per ord# 162-16. no work to be performed on the second floor under this permit. | $9,000 |
| Jul 10, 2019 | In progress issued Dec 2023 | 1750 Sacramento St | Success Construction ***See Notes*** | first floor add (2) adu per ordinance 162-16. **maher n/a** and legalize two additional units on the first floor.Details
first floor add (2) adu per ordinance 162-16. **maher n/a** and legalize two additional units on the first floor. | $120,000 |
| May 6, 2019 | Completed final sign-off Sep 2019 | 1316 Noriega St | C T Construction & Plumb | add counter, new kitchen fixtures, add ada bath including new walls per plans.Details
add counter, new kitchen fixtures, add ada bath including new walls per plans. | $30,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 261 27th Av | Synerforce Construction | as-built documentation for pa 201709056853.Details
as-built documentation for pa 201709056853. | |
| Apr 11, 2019 | Never finaled issued Sep 2019, no final | 1701 Polk St | Synerforce Construction | revision to pa 201612165180. update ada entrances.Details
revision to pa 201612165180. update ada entrances. | |
| Mar 27, 2019 | Expired or cancelled withdrawn Oct 2021 | 2482 38th Av | to comply nov 201929264. illegal unit convert storage to a media room and legalize existing kitchen @ 1st flr per ord. 43-14.Details
to comply nov 201929264. illegal unit convert storage to a media room and legalize existing kitchen @ 1st flr per ord. 43-14. | $9,000 | |
| Feb 15, 2019 | Completed final sign-off Aug 2019 | 723 25th Av | Family Construction Co | revision to app#201805219642. reconfigure remodel bath plumbing fixture location. repair rear deck waterproofing less than 50%.Details
revision to app#201805219642. reconfigure remodel bath plumbing fixture location. repair rear deck waterproofing less than 50%. | |
| Dec 21, 2018 | Completed final sign-off Feb 2020 | 2578 38th Av | 1st fl- add 2 bedrooms, 2 baths, remove 1 interior stair, relocate 2nd stair, 2nd fl- kitchen remodel, add 1 bath, walk in closet, add rear deck, remove fire placeDetails
1st fl- add 2 bedrooms, 2 baths, remove 1 interior stair, relocate 2nd stair, 2nd fl- kitchen remodel, add 1 bath, walk in closet, add rear deck, remove fire place | $120,000 | |
| Dec 14, 2018 | Completed final sign-off Dec 2019 | 7700 Geary Bl | revision to app#201609208299 for steel frame and shearwall layout.Details
revision to app#201609208299 for steel frame and shearwall layout. | ||
| Oct 18, 2018 | Completed final sign-off Feb 2019 | 2562 San Bruno Av | Bay C T Construction Inc. | add 1 bath to 2nd fl, add 2 baths to 3rd fl.Details
add 1 bath to 2nd fl, add 2 baths to 3rd fl. | $30,000 |
| Sep 11, 2018 | Expired or cancelled cancelled Mar 2025 | 218 Amber Dr | Alex He General Construction | (2) stories side addition, (1) story rear addition w/ roof deck. replace vertical wood siding on front fence to match existing. less than 50% repair.Details
(2) stories side addition, (1) story rear addition w/ roof deck. replace vertical wood siding on front fence to match existing. less than 50% repair. | $300,000 |
| Sep 10, 2018 | Completed final sign-off Mar 2019 | 2623 San Bruno Av | Ken Leung Construction Inc | 1st floor restaurant relocate wetbar, remove 1 restroomDetails
1st floor restaurant relocate wetbar, remove 1 restroom | $30,000 |