Regional Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Jun 2026
- Last 24 months
- 4 permits filed
65 permits since 2000: 54 completed, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 1571 Sanchez St | bathroom remodel in kind, tub to shower, new shower pan, sink, toilet, tiles on 2/f bathroom. no moving walls, approx 35 sqft.Details
bathroom remodel in kind, tub to shower, new shower pan, sink, toilet, tiles on 2/f bathroom. no moving walls, approx 35 sqft. | $25,000 |
| Jul 22, 2025 | Completed final sign-off Jun 2026 | 2756 35th Av | convert g/f e) family rm space to new bath, relocate g/f e) laundry to g/f e) closet. replace rear windowDetails
convert g/f e) family rm space to new bath, relocate g/f e) laundry to g/f e) closet. replace rear window | $35,000 |
| Apr 30, 2025 | Completed final sign-off Jan 2026 | 695 Miramar Av | revision to pa #202503242884. alterate existing interior stair case to new up grade plan.Details
revision to pa #202503242884. alterate existing interior stair case to new up grade plan. | $10,000 |
| Mar 24, 2025 | Completed final sign-off Jan 2026 | 695 Miramar Av | remodel existing kitchen with new afci/gfci outlets for counter tops, new cabinets, stove top, dishwasher, garbage disposal, recess lighting, sink and faucets in kind.Details
remodel existing kitchen with new afci/gfci outlets for counter tops, new cabinets, stove top, dishwasher, garbage disposal, recess lighting, sink and faucets in kind. | $35,000 |
| Sep 13, 2024 | Completed final sign-off Feb 2025 | 1160 Prague St | remodel (e) full bathroom, replace tub, toilet, shower pan, tile floor & walls. install new exhaust fan through roof. install 4 new recessed lights and gfci receptacle.Details
remodel (e) full bathroom, replace tub, toilet, shower pan, tile floor & walls. install new exhaust fan through roof. install 4 new recessed lights and gfci receptacle. | $18,000 |
| May 31, 2024 | Completed final sign-off Sep 2024 | 882 35th Av | remodel existing 3rd fl bathroom with new soaktub, shower, and vanity. tile floor and shower walls., new exhaust fan to outside, gfi outlet plug, new recess lights (3) plus vanity lihgts.Details
remodel existing 3rd fl bathroom with new soaktub, shower, and vanity. tile floor and shower walls., new exhaust fan to outside, gfi outlet plug, new recess lights (3) plus vanity lihgts. | $12,000 |
| Jun 9, 2023 | Completed final sign-off Jun 2024 | 1160 Prague St | remodel exisiting kkitchen with new cabinets, recess lights new afci/gfc counter outlets, dishwasher, stove, garbage disposal and tile flooringDetails
remodel exisiting kkitchen with new cabinets, recess lights new afci/gfc counter outlets, dishwasher, stove, garbage disposal and tile flooring | $35,000 |
| Jan 11, 2023 | Completed final sign-off Jul 2023 | 1416 Noe St | remodel 1 (e) kitchen: install new cabinets, counters dishwasher, range and hood, recess lites, gfci/afci plugs and tileDetails
remodel 1 (e) kitchen: install new cabinets, counters dishwasher, range and hood, recess lites, gfci/afci plugs and tile | $30,000 |
| Nov 3, 2022 | Completed final sign-off Feb 2023 | 1730 34th Av | remodel 1 (e) kitchen: install new cabinets, countertops, dishwasher rangehood, recess lights, gfci/afci plugs and install vinyl flooring.Details
remodel 1 (e) kitchen: install new cabinets, countertops, dishwasher rangehood, recess lights, gfci/afci plugs and install vinyl flooring. | $35,000 |
| Mar 11, 2022 | Completed final sign-off Feb 2023 | 775 35th Av | remodel one existing kitchen: install new cabinets/counter, tile flooring, new appliances, ref, range/dishwasher, garbage disposal, recess lights.Details
remodel one existing kitchen: install new cabinets/counter, tile flooring, new appliances, ref, range/dishwasher, garbage disposal, recess lights. | $18,000 |
| Aug 20, 2021 | Completed final sign-off May 2022 | 1627 46th Av | remodel (e) kitchen: replace cabinets, counter, lights, stove, g/d, d/w, floor tile, upgrade plugs.remodel (e) bathroom: new shower,t ilet, sink, new fixtures, new tile ad recessed lights.Details
remodel (e) kitchen: replace cabinets, counter, lights, stove, g/d, d/w, floor tile, upgrade plugs.remodel (e) bathroom: new shower,t ilet, sink, new fixtures, new tile ad recessed lights. | $35,000 |
| Mar 5, 2021 | Completed final sign-off Sep 2021 | 2345 Laguna St | remodel (e) kitchen: install new cabinets, outlets, recess lights, hood, sink and new countertop, d/w & g/d. remodel (e) full & half-bath with new tub, shower, sink, and tile, olus, new faucets. remodel in-kind.Details
remodel (e) kitchen: install new cabinets, outlets, recess lights, hood, sink and new countertop, d/w & g/d. remodel (e) full & half-bath with new tub, shower, sink, and tile, olus, new faucets. remodel in-kind. | $55,000 |
| Oct 2, 2020 | Completed final sign-off Mar 2021 | 1672 Bay St | remodel (e) kitchen, install new kitchen cabinets, counter, stove, garbage disposal, dish washer, sink, faucent, recess light & plugs. remodel (e) bathroom, install shower pan, tub, toilet, tile, exhaust fan, lights, new faucentsDetails
remodel (e) kitchen, install new kitchen cabinets, counter, stove, garbage disposal, dish washer, sink, faucent, recess light & plugs. remodel (e) bathroom, install shower pan, tub, toilet, tile, exhaust fan, lights, new faucents | $25,000 |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 2578 28th Av | replace dry-rot, stucco exterior, cappmt 100sq ft. front house on first floorDetails
replace dry-rot, stucco exterior, cappmt 100sq ft. front house on first floor | $5,000 |
| Mar 25, 2019 | Completed final sign-off Jun 2019 | 245 Bemis St | revision to app#201812249104 floor plan as built.Details
revision to app#201812249104 floor plan as built. | |
| Mar 25, 2019 | Completed final sign-off Jul 2019 | 2 Pizarro Wy | replace kitchen cabinets with same layout. re-install existing aplliances; cooktop, ovens, refrigerator, garbage diposal, dishwasher. install new counter tops and backsplash. approx 200 sq ftDetails
replace kitchen cabinets with same layout. re-install existing aplliances; cooktop, ovens, refrigerator, garbage diposal, dishwasher. install new counter tops and backsplash. approx 200 sq ft | $25,000 |
| Dec 24, 2018 | Completed final sign-off Jun 2019 | 245 Bemis St | remodel (e) kitchen & bathroom, convert (e) storage to new bathDetails
remodel (e) kitchen & bathroom, convert (e) storage to new bath | $40,000 |
| Aug 31, 2018 | Completed final sign-off Jul 2019 | 1658 35th Av | remodel existing kitchen. install new cabinets, lighting, plugs, dishwasher, garbage disposal, counter, stove and refrigerator, flooringDetails
remodel existing kitchen. install new cabinets, lighting, plugs, dishwasher, garbage disposal, counter, stove and refrigerator, flooring | $12,000 |
| Jul 31, 2018 | Completed final sign-off Dec 2018 | 1691 20th Av | remodel (e) kitchen & bathroom. bath: replace shower fixture, pan, toilet, tub, sink, tile and exhaust fan. kitchen: replace kitchen cabinets, sink, garbage disposal, counter top & appliances.Details
remodel (e) kitchen & bathroom. bath: replace shower fixture, pan, toilet, tub, sink, tile and exhaust fan. kitchen: replace kitchen cabinets, sink, garbage disposal, counter top & appliances. | $15,000 |
| Apr 30, 2018 | Completed final sign-off Jun 2018 | 480 Molimo Dr | replace existing 5 windows at front of house in kind. replace existing wood sidin 2nd fl ufactor .32Details
replace existing 5 windows at front of house in kind. replace existing wood sidin 2nd fl ufactor .32 | $8,000 |
| Aug 28, 2017 | Completed final sign-off Dec 2017 | 60 Hazelwood Av | remodel (e) bathroom, install new shower, toilet, sink, tile floor, wall. same location, no walls/doors or windows moved/relocated.Details
remodel (e) bathroom, install new shower, toilet, sink, tile floor, wall. same location, no walls/doors or windows moved/relocated. | $8,500 |
| May 26, 2017 | Completed final sign-off Aug 2017 | 61 Vienna St | remodel (e) kitchen, install new cabinets, counter , new appliances, recess lighting & tile flooring, also upgrade electrical plugsDetails
remodel (e) kitchen, install new cabinets, counter , new appliances, recess lighting & tile flooring, also upgrade electrical plugs | $12,000 |
| Apr 21, 2017 | Completed final sign-off Feb 2018 | 631 17th Av | replace dilapidated rear wood stair and deck with "in-kind" at rear yardDetails
replace dilapidated rear wood stair and deck with "in-kind" at rear yard | $10,000 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 466 02nd Av | replace rusted flashing at front facade, repair rotted siding and trim underneath, less than 50% repair.Details
replace rusted flashing at front facade, repair rotted siding and trim underneath, less than 50% repair. | $1,500 |
| Mar 1, 2016 | Completed final sign-off Jan 2017 | 272 Granada Av | replace existing concrete entrance steps at front of property to provide barrier free accessible driveway ramp. provide also new curb cut.Details
replace existing concrete entrance steps at front of property to provide barrier free accessible driveway ramp. provide also new curb cut. | $10,000 |
| Dec 1, 2015 | Completed final sign-off Feb 2016 | 1693 20th Av | remodel existing ktichen & bathrom - kitchen: upgrade electrical works, new cabinets, apliances, sink, dishwasher, stove, garbage disposal. bathroom: new tile work, tub, sink, & new shower.Details
remodel existing ktichen & bathrom - kitchen: upgrade electrical works, new cabinets, apliances, sink, dishwasher, stove, garbage disposal. bathroom: new tile work, tub, sink, & new shower. | $20,000 |
| Mar 30, 2015 | Completed final sign-off May 2016 | 1160 Prague St | legalize (e) unauthorized unit per sf ordinance#43-14. add insulation, verify electrical gfi, alter furnace to dual zone, replace gyp, board to type "x".Details
legalize (e) unauthorized unit per sf ordinance#43-14. add insulation, verify electrical gfi, alter furnace to dual zone, replace gyp, board to type "x". | $13,000 |
| Mar 12, 2015 | Completed final sign-off Jul 2015 | 148 Westwood Dr | kitchen remodel - replace all cabinets & countertop, plumbing fixtures, upgrade electrical circuits w/gfi, replace w/new exhaust vent hood.Details
kitchen remodel - replace all cabinets & countertop, plumbing fixtures, upgrade electrical circuits w/gfi, replace w/new exhaust vent hood. | $9,300 |
| Jul 7, 2014 | Completed final sign-off Dec 2014 | 1890 31st Av | remodel (e) bath & kitchen on upper level, no change in wall & opening, layout: install new tile, shower pan, tub, toilet & sink, install new kitchen cabinets, granite top, all appliance & upgrade elec works. bathrm lighting high efficacy or controlled by manual on sensor,kit 50% lighting wattageDetails
remodel (e) bath & kitchen on upper level, no change in wall & opening, layout: install new tile, shower pan, tub, toilet & sink, install new kitchen cabinets, granite top, all appliance & upgrade elec works. bathrm lighting high efficacy or controlled by manual on sensor,kit 50% lighting wattage | $15,000 |
| Jun 2, 2014 | Completed final sign-off May 2015 | 2918 20th Av | repair exterior stucco due to dry rot at south side of the house (50 sq.ft.)Details
repair exterior stucco due to dry rot at south side of the house (50 sq.ft.) | $2,500 |
| Jul 19, 2013 | Completed final sign-off Dec 2013 | 136 Westwood Dr | alteration to convert existing study to new master bath.Details
alteration to convert existing study to new master bath. | $10,000 |
| Jun 12, 2013 | Completed final sign-off Jul 2013 | 695 Miramar Av | replace 11 (e) wooden frame windows with double pane vinyl. comply with egress windows not visible to street.Details
replace 11 (e) wooden frame windows with double pane vinyl. comply with egress windows not visible to street. | $5,000 |
| Aug 20, 2012 | Completed final sign-off Mar 2013 | 690 Miramar Av | gr floor remodel. add new 2 bedroom, office, 2 bathrooms at garage level, build new staircase from second level to groundlevel. remove all (e) lath & plaster in 2nd floor and install new lighting & outlets.Details
gr floor remodel. add new 2 bedroom, office, 2 bathrooms at garage level, build new staircase from second level to groundlevel. remove all (e) lath & plaster in 2nd floor and install new lighting & outlets. | $60,000 |
| Jun 11, 2012 | Never finaled issued Jun 2012, no final | 690 Miramar Av | remodel bathroom&kitchen on 2/fl. install new tub,toilet,vanity&shower stall &new tiles w/ new plumbing fixtures in exist bathroom. replace new counter tops, dishwasher, stove&sink in exist kitchen w/ tile flooring.installnew garage door w/ opener.Details
remodel bathroom&kitchen on 2/fl. install new tub,toilet,vanity&shower stall &new tiles w/ new plumbing fixtures in exist bathroom. replace new counter tops, dishwasher, stove&sink in exist kitchen w/ tile flooring.installnew garage door w/ opener. | $15,000 |
| Nov 1, 2011 | Completed final sign-off Jul 2012 | 1347 Jackson St | unit #404-remodel apt w/energy upgrades includes repl kitchen cabinets, convert shower th 2nd bathroom, repl plumbing fixtures w/low water usage unbits. add batt insulation to ceiling, exterior walls, common walls. repl windows w/dual glazed, repl heating system w/h.e gas unit. repl lightingDetails
unit #404-remodel apt w/energy upgrades includes repl kitchen cabinets, convert shower th 2nd bathroom, repl plumbing fixtures w/low water usage unbits. add batt insulation to ceiling, exterior walls, common walls. repl windows w/dual glazed, repl heating system w/h.e gas unit. repl lighting | $38,000 |
| Jun 10, 2011 | Never finaled issued Jun 2011, no final | 701 16th Av | demo existing dry rot wood stair in lightwell and replace with similar wood stairDetails
demo existing dry rot wood stair in lightwell and replace with similar wood stair | $3,000 |
| May 6, 2011 | Completed final sign-off Apr 2012 | 2500 47th Av | add new bath and bedroom at garage level. relocate laundry and central furnaceDetails
add new bath and bedroom at garage level. relocate laundry and central furnace | $15,000 |
| Aug 18, 2010 | Completed final sign-off Apr 2011 | 1167 Guerrero St | alter basement storage space to home office/den. add bathroom, replace concrete floor w/same, replace wood ladder stair w/new spiral stair and landingDetails
alter basement storage space to home office/den. add bathroom, replace concrete floor w/same, replace wood ladder stair w/new spiral stair and landing | $35,000 |
| May 19, 2010 | Completed final sign-off Jul 2010 | 218 29th St | revision to permit #200905128255 & 200907031958. revise m. bath layout, relocate laundry, provide maintenance access stair to roof deck, add railing to (e) rear stair.Details
revision to permit #200905128255 & 200907031958. revise m. bath layout, relocate laundry, provide maintenance access stair to roof deck, add railing to (e) rear stair. | $3,000 |
| Mar 26, 2010 | Completed final sign-off Jun 2010 | 611 12th Av | replace existing foundation (perimeter).Details
replace existing foundation (perimeter). | $15,000 |
| Jul 3, 2009 | Never finaled issued Jul 2009, no final | 218 29th St | partial replacement of foundation (rear of building) revision to 200905128255. revise radiant floor heating to force air furnace.Details
partial replacement of foundation (rear of building) revision to 200905128255. revise radiant floor heating to force air furnace. | $20,000 |
| May 12, 2009 | Completed final sign-off Jul 2010 | 218 29th St | master suite in garage/ground floor. retrofit heating to radiant heat floors. full bath & laundry & circular staircase to connect second floor with ground floor.Details
master suite in garage/ground floor. retrofit heating to radiant heat floors. full bath & laundry & circular staircase to connect second floor with ground floor. | $50,000 |
| Jan 28, 2008 | Completed final sign-off Apr 2008 | 535 Steiner St | work @ unit# 535 (middle floor unit) only. remodel (e) kitchen-new cabinets, counter, sink, faucet and flooring. new lighting, counter outlets.Details
work @ unit# 535 (middle floor unit) only. remodel (e) kitchen-new cabinets, counter, sink, faucet and flooring. new lighting, counter outlets. | $9,000 |
| Jan 10, 2008 | Never finaled issued Jan 2008, no final | 669 19th Av | remodel kitchen, replace existing kitchen cabinets, new counter, sink, faucet, tile floor. no structural work. 50% of lighting to be fluorescent.Details
remodel kitchen, replace existing kitchen cabinets, new counter, sink, faucet, tile floor. no structural work. 50% of lighting to be fluorescent. | $8,000 |
| Nov 13, 2007 | Completed final sign-off May 2008 | 34 Caine Av | stair replacement, (dry rot termites) to conforming stairway. add bathroom to ground floor, laundry room. remodel kitchen w/ new cabinets lighting & flooring, on 2nd floor.Details
stair replacement, (dry rot termites) to conforming stairway. add bathroom to ground floor, laundry room. remodel kitchen w/ new cabinets lighting & flooring, on 2nd floor. | $25,000 |
| Sep 4, 2007 | Completed final sign-off Dec 2007 | 23 Molimo Dr | remodel (e) kitchen only. install new kitchen cabiners. replace sink/faucet, counter, dishwasher. tile floor new lighting to be fluorescent. no structural changes.Details
remodel (e) kitchen only. install new kitchen cabiners. replace sink/faucet, counter, dishwasher. tile floor new lighting to be fluorescent. no structural changes. | $8,000 |
| Jul 26, 2007 | Completed final sign-off Oct 2007 | 1340 18th Av | remodel kitchen, add 3 new electrical circuits & 1 sub panel. no structural work 50% lighting to be fruorescent.Details
remodel kitchen, add 3 new electrical circuits & 1 sub panel. no structural work 50% lighting to be fruorescent. | $15,000 |
| Feb 26, 2007 | Completed final sign-off Jul 2007 | 1469 Waller St | work to be done @ # 1469 only. remodel (e) kitchen / laundry. replace / install new cabinets / granite counter. install new lighting & counter outlets.Details
work to be done @ # 1469 only. remodel (e) kitchen / laundry. replace / install new cabinets / granite counter. install new lighting & counter outlets. | $8,500 |
| Jul 31, 2006 | Expired or cancelled expired Jul 2007 | 640 Teresita Bl | remodel (e) top floor bathroom. install new tub sink, toilet, tile and faucets flourescent lighting.Details
remodel (e) top floor bathroom. install new tub sink, toilet, tile and faucets flourescent lighting. | $7,000 |
| Jun 5, 2006 | Completed final sign-off Aug 2006 | 1859 29th Av | remodel (e) top bathroom, replace tub, sink, toilet and install new tiles for walls and floor. no structural work.Details
remodel (e) top bathroom, replace tub, sink, toilet and install new tiles for walls and floor. no structural work. | $7,000 |
| May 31, 2006 | Completed final sign-off Jun 2006 | 731 Cayuga Av | revise plan for ground level remodel at ground level, relocate bathroom to 2nd bedroom. enlarge 1st bedroom. rev. to pa#2004/08/09/1039Details
revise plan for ground level remodel at ground level, relocate bathroom to 2nd bedroom. enlarge 1st bedroom. rev. to pa#2004/08/09/1039 | |
| May 2, 2006 | Completed final sign-off Nov 2006 | 72 Mangels Av | remodel kitchen, add new skylights,(24x30 all double 2x around) soho 24 ul listed remove old non struc wall, replace ex fireplace w gas, replace 2 alum windows w/vinyl clad wood casement.Details
remodel kitchen, add new skylights,(24x30 all double 2x around) soho 24 ul listed remove old non struc wall, replace ex fireplace w gas, replace 2 alum windows w/vinyl clad wood casement. | $10,000 |
| Nov 1, 2005 | Expired or cancelled expired Dec 2007 | 731 Cayuga Av | reviwion to permit #200408091039. add in details for underpinning foundation.Details
reviwion to permit #200408091039. add in details for underpinning foundation. | |
| Aug 25, 2005 | Expired or cancelled expired May 2006 | 1833 Alabama St | to renew pa#2004/03/23/9427Details
to renew pa#2004/03/23/9427 | $4,000 |
| Jun 27, 2005 | Expired or cancelled expired Mar 2008 | 763 38th Av | remodel (e) kitchen and bath, replace cabinets, counters, florings, recess lighting, faucetsDetails
remodel (e) kitchen and bath, replace cabinets, counters, florings, recess lighting, faucets | $25,000 |
| Aug 9, 2004 | Expired or cancelled expired Dec 2007 | 731 Cayuga Av | horizontal addition- two story rear addition with family room above and master suite belowDetails
horizontal addition- two story rear addition with family room above and master suite below | $80,000 |
| May 17, 2004 | Completed final sign-off Jul 2004 | 1867 29th Av | remodel (e) bath-replace tub, plumbing fixtures, sink toilet, tile and install new lighting. (no strDetails
remodel (e) bath-replace tub, plumbing fixtures, sink toilet, tile and install new lighting. (no str | $6,500 |
| Mar 19, 2003 | Expired or cancelled expired Nov 2006 | 688 South Van Ness Av | remodel existing bath & kitchen.bath area replace tub,faucet,sink,toilet & install new outlets &Details
remodel existing bath & kitchen.bath area replace tub,faucet,sink,toilet & install new outlets & | $12,000 |
| Jan 2, 2003 | Completed final sign-off Mar 2003 | 201 Eureka St | remodel existing kitchen & bath: kitchen, replace all cabinets. install recessio lighting, outlets,Details
remodel existing kitchen & bath: kitchen, replace all cabinets. install recessio lighting, outlets, | $12,000 |
| Aug 14, 2002 | Completed final sign-off Oct 2002 | 1634 Ortega St | remodel bathrm,repl faucets,tube,shower pan vanity & tile works,repl one toiletDetails
remodel bathrm,repl faucets,tube,shower pan vanity & tile works,repl one toilet | $4,000 |
| May 30, 2002 | Completed final sign-off Aug 2002 | 648 Teresita Bl | remodel (e) kitchen, install new cabinet, tiles, floor, new sink, faucet & recess lt.Details
remodel (e) kitchen, install new cabinet, tiles, floor, new sink, faucet & recess lt. | $10,000 |
| Nov 19, 2001 | Completed final sign-off Mar 2002 | 535 Steiner St | remodel bathrm w/(n) fl tile, toilet, pedestal, sink, shower/new faucets, tile walls in shower, inxDetails
remodel bathrm w/(n) fl tile, toilet, pedestal, sink, shower/new faucets, tile walls in shower, inx | $7,000 |
| Aug 30, 2001 | Completed final sign-off Oct 2001 | 3997 17th St | remodel kitchen and bath repair water pipes dry rot near bathtubDetails
remodel kitchen and bath repair water pipes dry rot near bathtub | $15,000 |
| Jan 22, 2001 | Completed final sign-off Apr 2001 | 2039 15th Av | remodel bath install new tile, tub, faucet, toilet & sink. no structural work.Details
remodel bath install new tile, tub, faucet, toilet & sink. no structural work. | $5,000 |
| Oct 30, 2000 | Completed final sign-off Dec 2000 | 1859 29th Av | kitchen remodeling, new cabinets, linoleum flooring replace 1 window, appliances, counter topsDetails
kitchen remodeling, new cabinets, linoleum flooring replace 1 window, appliances, counter tops | $6,000 |