Thomas Ewert
- Listed as
- architect, engineer
- Firm
- Complete Project Solutions
- Based in
- Pleasant Hill
- On San Francisco permits
- Dec 2004 to Jul 2025
14 permits since 2000 (engineer on 11 permits, architect on 3 permits): 6 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2025 | In progress issued Aug 2025 | 73 Erie St | new generator and associated wiring to support the project operation during power outrage. work inches new 100kw standby back up generator.Details
new generator and associated wiring to support the project operation during power outrage. work inches new 100kw standby back up generator. | $50,000 | |
| Jun 9, 2025 | In progress issued Jul 2025 | 73 Erie St | Bcci Construction Company | the scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel fromDetails
the scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel from | $70,000 |
| May 5, 2025 | In progress issued Jun 2025 | 55 Erie St | Bcci Construction Company | revision to pa #2022-1019-4666 & 2025-0129-9327 update of electrical equipment. relocated guard shack. added lota devicesDetails
revision to pa #2022-1019-4666 & 2025-0129-9327 update of electrical equipment. relocated guard shack. added lota devices | |
| May 5, 2025 | In progress issued Jun 2025 | 140 14th St | Bcci Construction Company | revision to permit 202210194657 and 202501299326. temporary light relocation to permanent location. update of electrical equipment locations and electrical yard. re-striping of stalls and drive aisles to provide new u-turn lane, fencing, gate updates. add lota devices.Details
revision to permit 202210194657 and 202501299326. temporary light relocation to permanent location. update of electrical equipment locations and electrical yard. re-striping of stalls and drive aisles to provide new u-turn lane, fencing, gate updates. add lota devices. | |
| May 2, 2024 | In progress issued Nov 2025 | 430 Bush St | Roebbelen Contracting Inc | install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ...Details
install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ... | $400,000 |
| Nov 10, 2022 | In progress issued Nov 2025 | 555 Pine St | Roebbelen Contracting Inc | install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the projectDetails
install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the project | $100,000 |
| Oct 19, 2022 | In progress issued Dec 2023 | 140 14th St | Richlen Construction | install 20 ev chargers for 40 vehicles. convert from vehicle storage lot to fleet charging use.Details
install 20 ev chargers for 40 vehicles. convert from vehicle storage lot to fleet charging use. | $500,000 |
| May 4, 2016 | Completed final sign-off Jan 2017 | 2495 Golden Gate Av | Mai Construction Inc. | replacement of 2 existing 550 gallon lube oil storage tanks with 2 new 550 gallon double wall lube oil storage tanks in existing mechanical equipment pit. maher not reqDetails
replacement of 2 existing 550 gallon lube oil storage tanks with 2 new 550 gallon double wall lube oil storage tanks in existing mechanical equipment pit. maher not req | $20,000 |
| Jun 6, 2013 | Completed final sign-off Jun 2015 | 2445 Golden Gate Av | Monterey Mechanical Co | removal of existing 75 kw standby generator in harney scence center mech room. new 230 kw standby diesel generator at the roof of the harney science center with piping and conduits routed to a new fuel storage tank at gr levelDetails
removal of existing 75 kw standby generator in harney scence center mech room. new 230 kw standby diesel generator at the roof of the harney science center with piping and conduits routed to a new fuel storage tank at gr level | $230,000 |
| Feb 8, 2012 | Completed final sign-off Sep 2012 | 2130 Fulton St | Paragon Mechanical Inc | installation of replacment chiller on roof of harney science center. removal of existing chiller and cooling tower in 1st floor of harney science centerDetails
installation of replacment chiller on roof of harney science center. removal of existing chiller and cooling tower in 1st floor of harney science center | $250,000 |
| Aug 11, 2009 | Completed final sign-off Oct 2009 | 1 South Van Ness Av | Alternative Techs Cooperative Inc | 6th fl - seismic bracing of exiting raised access anchorage and overhead seismic racing of data center equipment and cabinets. installation of overhead cable ladder rack.Details
6th fl - seismic bracing of exiting raised access anchorage and overhead seismic racing of data center equipment and cabinets. installation of overhead cable ladder rack. | $46,500 |
| Sep 23, 2008 | Completed final sign-off Feb 2010 | 1930 Steiner St | voluntary seismic upgrade, accessibility upgrade, minor plumbing, mechanical improvements, restroom upgrade. no facade work.Details
voluntary seismic upgrade, accessibility upgrade, minor plumbing, mechanical improvements, restroom upgrade. no facade work. | $2,500,000 | |
| Mar 7, 2005 | Expired or cancelled expired Jul 2008 | 444 Presidio Av | Park Place Contractors | as built revision to original pa# 2004/06/24/7284 per corrective action from notice of violationDetails
as built revision to original pa# 2004/06/24/7284 per corrective action from notice of violation | $10,000 |
| Dec 28, 2004 | Completed final sign-off Mar 2006 | 2191 Market St | install 3 panel antennas & 2 gps antennas on roof top railing.Details
install 3 panel antennas & 2 gps antennas on roof top railing. | $125,000 |