Monterey Mechanical Co
- Based in
- Oakland
- On San Francisco permits
- Mar 2009 to Mar 2024
- Last 24 months
- 0 permits filed
9 permits since 2000: 4 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2024 | In progress filed Mar 2024, not yet issued | 3500 Great Hy | sfpuc mou proj#j-24-0570: at (e) wastewater facility concrete building 821 - install new standby diesel generator & fuel system.Details
sfpuc mou proj#j-24-0570: at (e) wastewater facility concrete building 821 - install new standby diesel generator & fuel system. | $320,000 |
| Nov 10, 2020 | Completed final sign-off May 2021 | 1570 Bay St | installation of new 8' high steel swing gate for pc&e marina substation.Details
installation of new 8' high steel swing gate for pc&e marina substation. | $65,000 |
| Jun 6, 2013 | Completed final sign-off Jun 2015 | 2445 Golden Gate Av | removal of existing 75 kw standby generator in harney scence center mech room. new 230 kw standby diesel generator at the roof of the harney science center with piping and conduits routed to a new fuel storage tank at gr levelDetails
removal of existing 75 kw standby generator in harney scence center mech room. new 230 kw standby diesel generator at the roof of the harney science center with piping and conduits routed to a new fuel storage tank at gr level | $230,000 |
| Jun 15, 2012 | Completed final sign-off Mar 2013 | 634 Laguna St | kitchen remodel, new elecreical fixtures, lighting, and plumbing. no structural wall modification of 50% of the total rated wattage of permanetly installed lighting in kitchen shall be high efficacy.Details
kitchen remodel, new elecreical fixtures, lighting, and plumbing. no structural wall modification of 50% of the total rated wattage of permanetly installed lighting in kitchen shall be high efficacy. | $3,000 |
| Jan 14, 2011 | Completed final sign-off Jun 2011 | 801 Felton St | 80 kw generator installation plan check revision to permit application #20105142477,201006104237,201006245255. detail changes. added secondary containment fill w/95%, audible alarm, leak sensor.Details
80 kw generator installation plan check revision to permit application #20105142477,201006104237,201006245255. detail changes. added secondary containment fill w/95%, audible alarm, leak sensor. | |
| Jun 24, 2010 | Never finaled issued Jun 2010, no final | 801 Felton St | revision to 201005142477 and 201006104237. detail changes for 80 kw generator installationDetails
revision to 201005142477 and 201006104237. detail changes for 80 kw generator installation | |
| Jun 10, 2010 | Never finaled issued Jun 2010, no final | 801 Felton St | revision to pa# 2010.05.14.2477. tank, venting and generator type changedDetails
revision to pa# 2010.05.14.2477. tank, venting and generator type changed | |
| May 14, 2010 | Never finaled issued May 2010, no final | 801 Felton St | installation of 80 kw genset with leak detectionDetails
installation of 80 kw genset with leak detection | $150,000 |
| Mar 10, 2009 | Never finaled issued May 2009, no final | 801 Felton St | installation of 10,000 gal underground diesel fuel storage tank. install 2 day tanks 150 gal each. install double containment flex hose supply, return, & vent lines underground. install double contained steel lines above gorund. installation of 4 rupture basins.Details
installation of 10,000 gal underground diesel fuel storage tank. install 2 day tanks 150 gal each. install double containment flex hose supply, return, & vent lines underground. install double contained steel lines above gorund. installation of 4 rupture basins. | $250,000 |