Tek Pe
- Listed as
- engineer
- Firm
- Tek Pe Engineers
- Based in
- El Cerrito
- On San Francisco permits
- Aug 2006 to Aug 2021
19 permits since 2000 (engineer on 19 permits): 14 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2021 | Completed final sign-off Sep 2021 | 1870 Sacramento St | Central Convalescent Homes, Inc. | revision to app#201912230408 for replacement post.Details
revision to app#201912230408 for replacement post. | |
| Dec 23, 2019 | Never finaled issued Dec 2020, no final | 1870 Sacramento St | Central Convalescent Homes, Inc. | soft story retrofit per sfebc chapter 4d, other rational design. seismic upgrade with architectural work required to complete the project. comply with nov #201641859. **maher n/a**Details
soft story retrofit per sfebc chapter 4d, other rational design. seismic upgrade with architectural work required to complete the project. comply with nov #201641859. **maher n/a** | $400,000 |
| Nov 25, 2019 | Completed final sign-off Mar 2020 | 1463 Powell St | Saarman Construction,Ltd. | revision to pa# 2018-0913-0110: add strap and blocking to underside of stair landing. soft story retrofit per sfebc chapter 4d, engineering criteria: 2016 cebc appendix a-4Details
revision to pa# 2018-0913-0110: add strap and blocking to underside of stair landing. soft story retrofit per sfebc chapter 4d, engineering criteria: 2016 cebc appendix a-4 | $20,000 |
| Nov 25, 2019 | Completed final sign-off Mar 2020 | 801 Vallejo St | Saarman Construction,Ltd. | revision to pa#2018-0913-0108: shearwall at 2 new locations and new concrete footing. soft story retrofit per sfebc chapter 4d, engineering criteria: 2016 cebc appendix a-4Details
revision to pa#2018-0913-0108: shearwall at 2 new locations and new concrete footing. soft story retrofit per sfebc chapter 4d, engineering criteria: 2016 cebc appendix a-4 | $50,000 |
| Aug 29, 2019 | Completed final sign-off Mar 2020 | 801 Vallejo St | Saarman Construction,Ltd. | ammendenment detail of original dwgs ref 201809130110 and 201809130108. residential.Details
ammendenment detail of original dwgs ref 201809130110 and 201809130108. residential. | $2,000 |
| Aug 23, 2019 | Completed final sign-off Mar 2020 | 1463 Powell St | Saarman Construction,Ltd. | ammendenment detail of original dwgs ref 201809130110 and 201809130108. commericial.Details
ammendenment detail of original dwgs ref 201809130110 and 201809130108. commericial. | $1,000 |
| Sep 13, 2018 | Completed final sign-off Sep 2020 | 1463 Powell St | Saarman Construction,Ltd. | (retail) convert 2 separate retail bathrooms to one shared unisex accessible bathroom at ground floor level. soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 at ground floor and basement level. maher n/a.Details
(retail) convert 2 separate retail bathrooms to one shared unisex accessible bathroom at ground floor level. soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 at ground floor and basement level. maher n/a. | $70,000 |
| Sep 13, 2018 | Completed final sign-off Sep 2020 | 801 Vallejo St | Saarman Construction,Ltd. | (residential) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 at ground floor and basement level. maher n/a.Details
(residential) soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 at ground floor and basement level. maher n/a. | $180,000 |
| Dec 21, 2017 | Expired or cancelled cancelled Jan 2026 | 3321 21st St | lower basement floorDetails
lower basement floor | $100,000 | |
| Dec 29, 2016 | Completed final sign-off Apr 2018 | 235 Buchanan St | Nieto Valle Construction | s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4.Details
s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| Dec 29, 2016 | Completed final sign-off Apr 2018 | 295 Buchanan St | Nieto Valle Construction | s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4.Details
s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| Jul 29, 2015 | Completed final sign-off Jan 2016 | 156 Lombard St | Mc Cutcheon Construction Co. | unit #11 - revision to appl #2015.0617.9159 - for structural wall engineering specs. n/a maher ordinanceDetails
unit #11 - revision to appl #2015.0617.9159 - for structural wall engineering specs. n/a maher ordinance | |
| Jul 21, 2015 | Never finaled issued Jul 2015, no final | 604 Bush St | Vila Construction Co | revision to 201411262615 foundation changes.Details
revision to 201411262615 foundation changes. | $25,000 |
| Dec 9, 2014 | Completed final sign-off May 2016 | 839 Post St | voluntary partial structural strengthening at bottom three floors. n/a ordinance #155-13Details
voluntary partial structural strengthening at bottom three floors. n/a ordinance #155-13 | $500,000 | |
| Oct 29, 2014 | Completed final sign-off Jun 2016 | 827 Peru Av | remodel of existing 2 bedroom & 1 bath, demo of existing 1/f unwarranted bedroom & bath, build out of new 1/f bedroom & bath, new windows, doors, insulation, new electrical service and all new copper piping and wiring throughout.Details
remodel of existing 2 bedroom & 1 bath, demo of existing 1/f unwarranted bedroom & bath, build out of new 1/f bedroom & bath, new windows, doors, insulation, new electrical service and all new copper piping and wiring throughout. | $35,000 | |
| Feb 28, 2013 | Completed final sign-off Apr 2016 | 900 Taylor St | soft story retrofit per ab-094.Details
soft story retrofit per ab-094. | $25,000 | |
| Aug 11, 2009 | Expired or cancelled expired Dec 2010 | 1074 Francisco St | Associate Builders & Co | work only @ unit#1074 & #1078 francisco st.revision to 200505091935: revise/extend rear deck with new post and beams,enlarge window. revise post and beam in seating room and kitchen. additonal detail for wood framing per inspector request. fireplace addition at courtyardDetails
work only @ unit#1074 & #1078 francisco st.revision to 200505091935: revise/extend rear deck with new post and beams,enlarge window. revise post and beam in seating room and kitchen. additonal detail for wood framing per inspector request. fireplace addition at courtyard | $16,800 |
| Apr 3, 2009 | Completed final sign-off May 2010 | 981 Washington St | Sf Bay Builders Inc. | revision to pa# 2006-0202-3694-removal of column @ line #6 on structural plan (s1). addition of steel reinforcement @ beam @ line #6 spanning between line a to e. strengthening & add reinforcement to footings @ line a to e support beam. shotcrete specification for the construction of all exterior waDetails
revision to pa# 2006-0202-3694-removal of column @ line #6 on structural plan (s1). addition of steel reinforcement @ beam @ line #6 spanning between line a to e. strengthening & add reinforcement to footings @ line a to e support beam. shotcrete specification for the construction of all exterior wa | $6,000 |
| Aug 28, 2006 | Never finaled issued Jan 2008, no final | 498 Funston Av | bmt: excavate 2 small unexcavated spaces to have a clear ceiling height of 9'. excavate & remodel sunday school rooms from 7'0 to 9' ceiling ht. add new stairs & provide elevator to this level. 1st fl-provide exterior ramp, elevator, stair, remodel kitchen. 2nd floor: in fill deck area for office.Details
bmt: excavate 2 small unexcavated spaces to have a clear ceiling height of 9'. excavate & remodel sunday school rooms from 7'0 to 9' ceiling ht. add new stairs & provide elevator to this level. 1st fl-provide exterior ramp, elevator, stair, remodel kitchen. 2nd floor: in fill deck area for office. | $1,200,000 |