Permit GraphShortlistSan Francisco building permits since 2000

Nieto Valle Construction

Contractor license
950730
State license record
Based in
Hayward
On San Francisco permits
Mar 2014 to Aug 2025
Last 24 months
1 permit filed

24 permits since 2000: 24 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 20, 2025Completed
final sign-off Nov 2025
248 Cumberland Stinstall a (n) shear wall between line b&d. install a new 4x4 x20' strut along line b w/ 2x block over strut between joists. add a new shear wall between back end of bay window and line #4. supplement beam to post connection along line d in the middle of garage.
Details
Permit
202508203473
Status
complete
Filed
Aug 20, 2025
Permit issued
Aug 20, 2025
Final sign-off
Nov 10, 2025
Declared cost
$22,801
Address
248 Cumberland St

install a (n) shear wall between line b&d. install a new 4x4 x20' strut along line b w/ 2x block over strut between joists. add a new shear wall between back end of bay window and line #4. supplement beam to post connection along line d in the middle of garage.

Open the permit page

$22,801
Nov 30, 2023Completed
final sign-off Oct 2024
195 Portola Drto comply w/ nov #202303480. deconstruction to satisfy & conformance w/ the notice of violation (complaint #202303480) for work conducted without permit. remove all work performed on the exterior at the westside of the house.
Details
Permit
202311301698
Status
complete
Filed
Nov 30, 2023
Permit issued
Dec 12, 2023
Final sign-off
Oct 18, 2024
Declared cost
$11,200
Address
195 Portola Dr

to comply w/ nov #202303480. deconstruction to satisfy & conformance w/ the notice of violation (complaint #202303480) for work conducted without permit. remove all work performed on the exterior at the westside of the house.

Open the permit page

$11,200
Aug 2, 2023Completed
final sign-off Jan 2024
3739 20th Stvoluntary strengthening of a portion of e dwelling and is not intened to bring the structure up to current code requirements for new construction.
Details
Permit
202308023534
Status
complete
Filed
Aug 2, 2023
Permit issued
Aug 2, 2023
Final sign-off
Jan 5, 2024
Declared cost
$25,320
Address
3739 20th St

voluntary strengthening of a portion of e dwelling and is not intened to bring the structure up to current code requirements for new construction.

Open the permit page

$25,320
Oct 17, 2022Completed
final sign-off Jan 2023
199 Burnside Avrevision to 2022-0602-5431. relocate proposed shear wall on line a from the south end to the north end. no change to shear wall length.
Details
Permit
202210174469
Status
complete
Filed
Oct 17, 2022
Permit issued
Oct 17, 2022
Final sign-off
Jan 3, 2023
Address
199 Burnside Av

revision to 2022-0602-5431. relocate proposed shear wall on line a from the south end to the north end. no change to shear wall length.

Open the permit page

Jun 30, 2022Completed
final sign-off Oct 2022
459 Potrero Avvoluntary seismic retrofit as per plan set (a). sill plate anchorage. work does not represent a complete seismic retrofit of the entire bldg.
Details
Permit
202206307507
Status
complete
Filed
Jun 30, 2022
Permit issued
Jun 30, 2022
Final sign-off
Oct 12, 2022
Declared cost
$18,480
Address
459 Potrero Av

voluntary seismic retrofit as per plan set (a). sill plate anchorage. work does not represent a complete seismic retrofit of the entire bldg.

Open the permit page

$18,480
Jun 22, 2022Completed
final sign-off Nov 2022
723 Guerrero Stmodification of (e) overhang supports for voluntary seismic retrofit.
Details
Permit
202206226801
Status
complete
Filed
Jun 22, 2022
Permit issued
Jun 22, 2022
Final sign-off
Nov 15, 2022
Declared cost
$21,411
Address
723 Guerrero St

modification of (e) overhang supports for voluntary seismic retrofit.

Open the permit page

$21,411
Jun 2, 2022Completed
final sign-off Jan 2023
199 Burnside Avvoluntary engineered seismic retrofit to comply with the brace and bolt program.this permit is for work to be performed in general confromance w/ california existing building code(cebc), appendix ch.a3(sfbc ab-108)
Details
Permit
202206025431
Status
complete
Filed
Jun 2, 2022
Permit issued
Jun 2, 2022
Final sign-off
Jan 3, 2023
Declared cost
$94,124
Address
199 Burnside Av

voluntary engineered seismic retrofit to comply with the brace and bolt program.this permit is for work to be performed in general confromance w/ california existing building code(cebc), appendix ch.a3(sfbc ab-108)

Open the permit page

$94,124
Oct 27, 2021Completed
final sign-off Jul 2022
254 Page Ststructural work only. voluntary strengthening in the crawlspace. adding ply shear walls with foundation and new posts with concrete pad footings.
Details
Permit
202110271251
Status
complete
Filed
Oct 27, 2021
Permit issued
Nov 12, 2021
Final sign-off
Jul 15, 2022
Declared cost
$70,000
Address
254 Page St

structural work only. voluntary strengthening in the crawlspace. adding ply shear walls with foundation and new posts with concrete pad footings.

Open the permit page

$70,000
Mar 10, 2021Completed
final sign-off Sep 2021
1239 22nd Avvoluntary strengthening of 1st floor.
Details
Permit
202103106259
Status
complete
Filed
Mar 10, 2021
Permit issued
Apr 16, 2021
Final sign-off
Sep 28, 2021
Declared cost
$103,750
Address
1239 22nd Av

voluntary strengthening of 1st floor.

Open the permit page

$103,750
Aug 30, 2019Completed
final sign-off Aug 2020
1948 Washington Stseismic retrofit at the 1st story as triggered by the mandatory soft story ord. designed per 2016 cebc appx a4 (sfebc chapter 4d)
Details
Permit
201908300300
Status
complete
Filed
Aug 30, 2019
Permit issued
Sep 10, 2019
Final sign-off
Aug 4, 2020
Declared cost
$70,000
Address
1948 Washington St

seismic retrofit at the 1st story as triggered by the mandatory soft story ord. designed per 2016 cebc appx a4 (sfebc chapter 4d)

Open the permit page

$70,000
Sep 18, 2018Completed
final sign-off May 2019
2 Castro Strevision to 201712196846 details 8 & 5 on s5.1 - rebar and holddowns on concrete grade beam. detail 11 on s8.1 - studs welded into (e) i beam column m,aher na
Details
Permit
201809180691
Status
complete
Filed
Sep 18, 2018
Permit issued
Sep 19, 2018
Final sign-off
May 15, 2019
Address
2 Castro St

revision to 201712196846 details 8 & 5 on s5.1 - rebar and holddowns on concrete grade beam. detail 11 on s8.1 - studs welded into (e) i beam column m,aher na

Open the permit page

Sep 6, 2018Completed
final sign-off May 2019
2 Castro Strevision to pa 2017-1219-6846, detail 9s8.1 shear clips only. detail 10s8.1 framing field condition different from original detail. cmst straps reduce to 3 locations
Details
Permit
201809069310
Status
complete
Filed
Sep 6, 2018
Permit issued
Sep 6, 2018
Final sign-off
May 15, 2019
Address
2 Castro St

revision to pa 2017-1219-6846, detail 9s8.1 shear clips only. detail 10s8.1 framing field condition different from original detail. cmst straps reduce to 3 locations

Open the permit page

Jun 1, 2018Completed
final sign-off Sep 2018
830 Broderick Strevision to 201709158484. new shearwalls, footers, stem walls. maher na
Details
Permit
201806010707
Status
complete
Filed
Jun 1, 2018
Permit issued
Jun 4, 2018
Final sign-off
Sep 21, 2018
Declared cost
$50,000
Address
830 Broderick St

revision to 201709158484. new shearwalls, footers, stem walls. maher na

Open the permit page

$50,000
Dec 19, 2017Completed
final sign-off Jul 2019
2 Castro Stto comply with nov 201719241 seismic retrofit. 2016 cebc appendix a-4
Details
Permit
201712196846
Status
complete
Filed
Dec 19, 2017
Permit issued
Apr 2, 2018
Final sign-off
Jul 1, 2019
Declared cost
$40,000
Address
2 Castro St

to comply with nov 201719241 seismic retrofit. 2016 cebc appendix a-4

Open the permit page

$40,000
Sep 15, 2017Completed
final sign-off Sep 2018
830 Broderick Stsoft story seismic retrofit based on 2016 ibc appendix 4a. no exterior work. ** maher: n/a **
Details
Permit
201709158484
Status
complete
Filed
Sep 15, 2017
Permit issued
Jan 22, 2018
Final sign-off
Sep 21, 2018
Declared cost
$60,000
Address
830 Broderick St

soft story seismic retrofit based on 2016 ibc appendix 4a. no exterior work. ** maher: n/a **

Open the permit page

$60,000
Sep 15, 2017Completed
final sign-off Feb 2022
557 Capp Stseismic upgrade in accordance per sfebc chapter 4-d. 2016 cebc appendix a-4.
Details
Permit
201709158450
Status
complete
Filed
Sep 15, 2017
Permit issued
Feb 24, 2021
Final sign-off
Feb 23, 2022
Declared cost
$150,000
Address
557 Capp St

seismic upgrade in accordance per sfebc chapter 4-d. 2016 cebc appendix a-4.

Open the permit page

$150,000
May 10, 2017Completed
final sign-off Sep 2017
1920 Jefferson Strevision to 201601157276 double the thickness of one shear wall to accomodate utilities
Details
Permit
201705106211
Status
complete
Filed
May 10, 2017
Permit issued
Jun 19, 2017
Final sign-off
Sep 29, 2017
Address
1920 Jefferson St

revision to 201601157276 double the thickness of one shear wall to accomodate utilities

Open the permit page

Dec 29, 2016Completed
final sign-off Apr 2018
295 Buchanan Sts.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4.
Details
Permit
201612296191
Status
complete
Filed
Dec 29, 2016
Permit issued
Nov 3, 2017
Final sign-off
Apr 10, 2018
Declared cost
$34,800
Address
295 Buchanan St

s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4.

Open the permit page

$34,800
Dec 29, 2016Completed
final sign-off Apr 2018
235 Buchanan Sts.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4.
Details
Permit
201612296194
Status
complete
Filed
Dec 29, 2016
Permit issued
Nov 3, 2017
Final sign-off
Apr 10, 2018
Declared cost
$34,800
Address
235 Buchanan St

s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4.

Open the permit page

$34,800
Jul 22, 2016Completed
final sign-off Feb 2017
1213 York Stimplement voluntary engineered seismic retrofit to comply with the brace & bolt program
Details
Permit
201607223053
Status
complete
Filed
Jul 22, 2016
Permit issued
Jul 22, 2016
Final sign-off
Feb 7, 2017
Declared cost
$31,125
Address
1213 York St

implement voluntary engineered seismic retrofit to comply with the brace & bolt program

Open the permit page

$31,125
Feb 22, 2016Completed
final sign-off Aug 2016
1694 36th Avvoluntary strengthening at front of house. install a steel column and concrete grade beam in the garage slab floor as per engineering plans.
Details
Permit
201602220130
Status
complete
Filed
Feb 22, 2016
Permit issued
Feb 22, 2016
Final sign-off
Aug 22, 2016
Declared cost
$21,000
Address
1694 36th Av

voluntary strengthening at front of house. install a steel column and concrete grade beam in the garage slab floor as per engineering plans.

Open the permit page

$21,000
Oct 22, 2015Completed
final sign-off Jul 2016
648 Waller Stsoft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthening of crawl space cripple walls, add new shear walls at crawl space.
Details
Permit
201510220502
Status
complete
Filed
Oct 22, 2015
Permit issued
Jan 20, 2016
Final sign-off
Jul 12, 2016
Declared cost
$50,000
Address
648 Waller St

soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthening of crawl space cripple walls, add new shear walls at crawl space.

Open the permit page

$50,000
Oct 9, 2015Completed
final sign-off Nov 2015
4404 17th Strepair of failed concrete slab on grade. work is confined to the east half of the garage, within the (e) perimeter footing
Details
Permit
201510099312
Status
complete
Filed
Oct 9, 2015
Permit issued
Oct 9, 2015
Final sign-off
Nov 18, 2015
Declared cost
$10,250
Address
4404 17th St

repair of failed concrete slab on grade. work is confined to the east half of the garage, within the (e) perimeter footing

Open the permit page

$10,250
Mar 10, 2014Completed
final sign-off Aug 2014
4935 17th Stcompliance with sfbc chapter 34c mandatory soft story seismic retrofit.
Details
Permit
201403100272
Status
complete
Filed
Mar 10, 2014
Permit issued
Apr 11, 2014
Final sign-off
Aug 21, 2014
Declared cost
$5,000
Address
4935 17th St

compliance with sfbc chapter 34c mandatory soft story seismic retrofit.

Open the permit page

$5,000