Vila Construction Co
- Based in
- Richmond
- On San Francisco permits
- Oct 2007 to Dec 2016
- Last 24 months
- 0 permits filed
8 permits since 2000: 4 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2016 | Never finaled issued Dec 2016, no final | 108 Delta St | remove excess dirt on front of lots 108 level front 50' deep and 50' wide (for 2 construction trailers to be set up - future). add 4" of base roack to area.Details
remove excess dirt on front of lots 108 level front 50' deep and 50' wide (for 2 construction trailers to be set up - future). add 4" of base roack to area. | $5,000 |
| Dec 1, 2015 | Completed final sign-off Feb 2016 | 1170 Market St | tenant improvement 1st fl offices. new classrooms at 2nd flDetails
tenant improvement 1st fl offices. new classrooms at 2nd fl | $160,000 |
| Jul 21, 2015 | Never finaled issued Jul 2015, no final | 604 Bush St | revision to 201411262615 foundation changes.Details
revision to 201411262615 foundation changes. | $25,000 |
| Apr 7, 2010 | Never finaled issued Apr 2010, no final | 201 Van Ness Av | architectural barrier removal @davies symphony hall: 1-existing restroom modifications-grove st. lobby; 2-interior(one)ramp modification serving terrace level audience seating; 3-install one new accessible drinking fountainDetails
architectural barrier removal @davies symphony hall: 1-existing restroom modifications-grove st. lobby; 2-interior(one)ramp modification serving terrace level audience seating; 3-install one new accessible drinking fountain | $87,670 |
| Dec 17, 2009 | Completed final sign-off Mar 2010 | 1745 Folsom St | int.renovation of(e) grocery.demo of(e)walls,doors,const of(e) furred full ht &partial ht partitions. addition of (n)sinks,casework,refrigerated storage & (n)finishes,removal of (e)sinks & new sinks @ similar location.(n)stainless steel wain wainscot.no struDetails
int.renovation of(e) grocery.demo of(e)walls,doors,const of(e) furred full ht &partial ht partitions. addition of (n)sinks,casework,refrigerated storage & (n)finishes,removal of (e)sinks & new sinks @ similar location.(n)stainless steel wain wainscot.no stru | $100,000 |
| Jun 16, 2009 | Completed final sign-off Jul 2010 | 1745 Folsom St | renew pa# 2007/12/17/0649 to obtain final inspection. all work has been completed.Details
renew pa# 2007/12/17/0649 to obtain final inspection. all work has been completed. | |
| Feb 28, 2008 | Completed final sign-off Apr 2011 | 1011 Turk St | revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes.Details
revisions to work approved pa# 200709182974-deletion of exterior exit stair (req to comply with 2001 cbc table 10a), addition of required 2nd exit into (e) corridor, permitted under 2007 cbc, section 1015.2.1, except #2, value engineering changes. | |
| Oct 30, 2007 | Never finaled issued Nov 2007, no final | 1011 Turk St | demolition on ground floor: interior walls, remove casework, doors, frames, exterior wall furring below windows, office wall fixtures (whiteboard, tackboards, etc), tv monitors & brackets, carpet & wall base, acoustical ceiling tiles. soft demo.Details
demolition on ground floor: interior walls, remove casework, doors, frames, exterior wall furring below windows, office wall fixtures (whiteboard, tackboards, etc), tv monitors & brackets, carpet & wall base, acoustical ceiling tiles. soft demo. | $75,000 |