Tamara Shroll
- Listed as
- architect
- On San Francisco permits
- Apr 2017 to Nov 2018
11 permits since 2000 (architect on 11 permits): 9 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2018 | Completed final sign-off Jan 2020 | 845 Market St | Rylko Builders Inc. | new build out of e tenant space uncluding non structural framing, plumbinb, electrical, mechanical and interior decorative materials and surfacesDetails
new build out of e tenant space uncluding non structural framing, plumbinb, electrical, mechanical and interior decorative materials and surfaces | $800,000 |
| Oct 3, 2018 | Completed final sign-off Oct 2018 | 442 Geary St | Kdc Construction | revision pa #201802161618. reconfigure workroom layout. relocate electrical panel. incorporate moisture resistant gypsum board in workroom only. scope of work only in commercial space at ground fl.Details
revision pa #201802161618. reconfigure workroom layout. relocate electrical panel. incorporate moisture resistant gypsum board in workroom only. scope of work only in commercial space at ground fl. | |
| Sep 28, 2018 | Never finaled issued Oct 2018, no final | 300 California St | Build Group Inc. | mechanical revison to pa#201804045494. n/a for maher.Details
mechanical revison to pa#201804045494. n/a for maher. | |
| May 14, 2018 | Never finaled issued Jun 2018, no final | 300 California St | Build Group Inc. | deferred submittal for health plan check review of retail ti space. ref 201804045494 for approved ti drawingsDetails
deferred submittal for health plan check review of retail ti space. ref 201804045494 for approved ti drawings | |
| May 10, 2018 | Completed final sign-off Dec 2018 | 98 Post St | Eric F Anderson Incorporated | deferred submittal for health plan check. review of retail ti space. ref 201803204126 for approved ti drawings; n/a maherDetails
deferred submittal for health plan check. review of retail ti space. ref 201803204126 for approved ti drawings; n/a maher | |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 689 Townsend St | Ssw Construction Corp | renovation of interior finishes, cabinetry, lighting, equipment and associated mech/elect/ plmg. alarm and sprinklers under sep permit n/a for maher.Details
renovation of interior finishes, cabinetry, lighting, equipment and associated mech/elect/ plmg. alarm and sprinklers under sep permit n/a for maher. | $79,000 |
| Mar 20, 2018 | Completed final sign-off Dec 2018 | 98 Post St | Eric F Anderson Incorporated | ground flr - new build out of (e) tenant space including non structural framining, mep & finishes. no exterior work; maher naDetails
ground flr - new build out of (e) tenant space including non structural framining, mep & finishes. no exterior work; maher na | $1,100,000 |
| Feb 16, 2018 | Completed final sign-off Oct 2018 | 442 Geary St | Kdc Construction | on 1st floor - expansion of store/cafe into adjacent landlord space to provide trash area. associated mech, plumbing, elec, finishes upgrades to cafe, compliance upgrades t restroomDetails
on 1st floor - expansion of store/cafe into adjacent landlord space to provide trash area. associated mech, plumbing, elec, finishes upgrades to cafe, compliance upgrades t restroom | $60,000 |
| Feb 1, 2018 | Completed final sign-off Jun 2018 | 49 Jefferson St | Ssw Construction Corp | intial ti for starbucks including architectural, plumbing, mechanical, electrical and interior furniture, artwork and equipmentDetails
intial ti for starbucks including architectural, plumbing, mechanical, electrical and interior furniture, artwork and equipment | $600,000 |
| Dec 21, 2017 | Completed final sign-off Dec 2018 | 98 Post St | Eric F Anderson Incorporated | prepare (e) tenant space for new tenant, remove portion of over framed main floor and replce with new structural system to accomodate load. new demising wall at east end of tenant space.Details
prepare (e) tenant space for new tenant, remove portion of over framed main floor and replce with new structural system to accomodate load. new demising wall at east end of tenant space. | $300,000 |
| Apr 13, 2017 | Completed final sign-off Dec 2017 | 1231 Market St | Bryant J H Jr. Contracting | new partial height wall; remocate 2 cooling fridge; new work room hand sink; new condiment cart; patch prine and paint walls; soffits and ceilings; retrofit existing signage with new logo (under separate permit)Details
new partial height wall; remocate 2 cooling fridge; new work room hand sink; new condiment cart; patch prine and paint walls; soffits and ceilings; retrofit existing signage with new logo (under separate permit) | $48,000 |