Kdc Construction
- Based in
- Orange
- On San Francisco permits
- May 2012 to Jan 2026
- Last 24 months
- 1 permit filed
41 permits since 2000: 34 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2026 | Completed final sign-off Mar 2026 | 2165 Polk St | to comply with 202424172- after the fact permit to comply with like for like door replacement. only doors replaced . new doors connected back to (e) powered overhead closers which were not altered/replacedDetails
to comply with 202424172- after the fact permit to comply with like for like door replacement. only doors replaced . new doors connected back to (e) powered overhead closers which were not altered/replaced | $12,100 |
| Jan 22, 2024 | Expired or cancelled cancelled Aug 2025 | 1800 Irving St | major renovation of an (e) starbucks, scope of work is comprised of new non structural partitions, new equipment, new fixtures, new interior furniture and new interior and exterior finishes.Details
major renovation of an (e) starbucks, scope of work is comprised of new non structural partitions, new equipment, new fixtures, new interior furniture and new interior and exterior finishes. | $190,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2023 | 33 Powell St | retrofit of an (e) tenant fit-out of 25 sq ft on ground flr. work includes elec (minor). no exterior scope.Details
retrofit of an (e) tenant fit-out of 25 sq ft on ground flr. work includes elec (minor). no exterior scope. | $5,500 |
| Feb 24, 2022 | Completed final sign-off Jan 2023 | 3801 03rd St | change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelvingDetails
change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelving | $850,000 |
| Oct 3, 2018 | Completed final sign-off Oct 2018 | 442 Geary St | revision pa #201802161618. reconfigure workroom layout. relocate electrical panel. incorporate moisture resistant gypsum board in workroom only. scope of work only in commercial space at ground fl.Details
revision pa #201802161618. reconfigure workroom layout. relocate electrical panel. incorporate moisture resistant gypsum board in workroom only. scope of work only in commercial space at ground fl. | |
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 2500 Mason St | revision to 201711164128 to shear wall modifications to rooms 4424 & 4625. maher n/aDetails
revision to 201711164128 to shear wall modifications to rooms 4424 & 4625. maher n/a | $10,000 |
| Jun 7, 2018 | Completed final sign-off Jan 2019 | 1401 Van Ness Av | g/f -ti - (e) starbucks cafe including arch, plum, ele modifications, new furniture, finishes and artworkDetails
g/f -ti - (e) starbucks cafe including arch, plum, ele modifications, new furniture, finishes and artwork | $380,000 |
| Feb 16, 2018 | Completed final sign-off Oct 2018 | 442 Geary St | on 1st floor - expansion of store/cafe into adjacent landlord space to provide trash area. associated mech, plumbing, elec, finishes upgrades to cafe, compliance upgrades t restroomDetails
on 1st floor - expansion of store/cafe into adjacent landlord space to provide trash area. associated mech, plumbing, elec, finishes upgrades to cafe, compliance upgrades t restroom | $60,000 |
| Feb 9, 2018 | Never finaled filed Feb 2018, never issued | 565 Clay St | exterior finish improvements to existing facade. includes new tile, repaint facade and installation of new break metal ledge. **signage under separate permit**Details
exterior finish improvements to existing facade. includes new tile, repaint facade and installation of new break metal ledge. **signage under separate permit** | $38,536 |
| Feb 7, 2017 | Completed final sign-off Feb 2017 | 2675 Geary Bl | space e-104: revision to pa#201610180528 soffit & lighting. n/a ordinance #155-13Details
space e-104: revision to pa#201610180528 soffit & lighting. n/a ordinance #155-13 | $5,000 |
| Jan 27, 2017 | Never finaled issued Mar 2017, no final | 655 Beach St | remove (e) door & in-fill partition to separate tenant spaces. (n) finishes to match (e)Details
remove (e) door & in-fill partition to separate tenant spaces. (n) finishes to match (e) | $1,175 |
| Dec 22, 2016 | Completed final sign-off Dec 2016 | 2675 Geary Bl | revision to 2016-1018-0528 a detail on how to patch back concrete to (e)Details
revision to 2016-1018-0528 a detail on how to patch back concrete to (e) | $500 |
| Nov 29, 2016 | Completed final sign-off Feb 2017 | 2675 Geary Bl | unit e104: ab-017, selective removal of drywall finish to (e)demising walls for installation of new plumbing pipework & electrical conduit. remove abandoned hvac equipment located above existing concrete ceilings slab adjacent to unit as outlined on sheet 1-1100-m; maher n/aDetails
unit e104: ab-017, selective removal of drywall finish to (e)demising walls for installation of new plumbing pipework & electrical conduit. remove abandoned hvac equipment located above existing concrete ceilings slab adjacent to unit as outlined on sheet 1-1100-m; maher n/a | $3,000 |
| Nov 14, 2016 | Completed final sign-off Dec 2016 | 3801 03rd St | swap location of existing lavatory and urinal in mens restroomDetails
swap location of existing lavatory and urinal in mens restroom | $3,784 |
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 2675 Geary Bl | space e 104: commercial tenant improvement to existing vacant unit. includes electrical, mechanical, plumbing. fire sprinkler signage separate permit. n/a for maher ordinance no.155-13Details
space e 104: commercial tenant improvement to existing vacant unit. includes electrical, mechanical, plumbing. fire sprinkler signage separate permit. n/a for maher ordinance no.155-13 | $159,960 |
| Aug 4, 2016 | Completed final sign-off Aug 2016 | 3801 03rd St | to verify occupancy load to obtain fire dept, (a) assembly permit only. ref. 2016-0419-5109. administrative permit.Details
to verify occupancy load to obtain fire dept, (a) assembly permit only. ref. 2016-0419-5109. administrative permit. | |
| Apr 19, 2016 | Completed final sign-off Sep 2016 | 3801 03rd St | change from 2 vacant retail to 1 coffee shop. exterior: replace (e) doors,glazing, repaint (e) window mullions. interior remove wall install (n) floor penetration, install (n) specialty equip, plumbing fixtures, casework, (n) wall, floor & ceiling finishes. fire under separate permitDetails
change from 2 vacant retail to 1 coffee shop. exterior: replace (e) doors,glazing, repaint (e) window mullions. interior remove wall install (n) floor penetration, install (n) specialty equip, plumbing fixtures, casework, (n) wall, floor & ceiling finishes. fire under separate permit | $254,000 |
| Jan 5, 2016 | Completed final sign-off Apr 2016 | 3735 Buchanan St | exterior work: remove (e) oudoor furnitures, remove & install (n) rear window/door system, update ramp per ada & install handrails @ (e) exit passageway stairs. interior work: remove & install (n) wall & doors, modify (e) interior ramp, remove (e) & install (n) wall & floor finishes, remove (e) &Details
exterior work: remove (e) oudoor furnitures, remove & install (n) rear window/door system, update ramp per ada & install handrails @ (e) exit passageway stairs. interior work: remove & install (n) wall & doors, modify (e) interior ramp, remove (e) & install (n) wall & floor finishes, remove (e) & | $146,000 |
| Sep 8, 2015 | Never finaled issued Dec 2015, no final | 425 Battery St | new wall at bar area. new floor, ceiling & wall finishes (demo (e)). remove & provide new casework, remove & provide new light fixtures, new hand sink, new keywork at restroom door, new soffit infill over bar area. new fixtures and furnishings; maher n/aDetails
new wall at bar area. new floor, ceiling & wall finishes (demo (e)). remove & provide new casework, remove & provide new light fixtures, new hand sink, new keywork at restroom door, new soffit infill over bar area. new fixtures and furnishings; maher n/a | $67,926 |
| Mar 30, 2015 | Completed final sign-off Mar 2017 | 2300 16th St | work @ unit# 200 only. nexus remodeling, electrical, mechanical. tenant interior improvement. ** maher: compliance with ordinance no# 155-13 not required **Details
work @ unit# 200 only. nexus remodeling, electrical, mechanical. tenant interior improvement. ** maher: compliance with ordinance no# 155-13 not required ** | $450,000 |
| Oct 24, 2014 | Never finaled issued Oct 2014, no final | 3595 California St | as built 201409085699 to show building does not have sprinklersDetails
as built 201409085699 to show building does not have sprinklers | |
| Sep 8, 2014 | Completed final sign-off Jan 2015 | 3595 California St | change of occupancy b to a-2- remodel of (e) starbucks cafe- electrical, mechanical arch & interior to be performed, rework of existing back bar, new furnitures, new seating area, addition of women restroom, new lights. signage under separate permit.Details
change of occupancy b to a-2- remodel of (e) starbucks cafe- electrical, mechanical arch & interior to be performed, rework of existing back bar, new furnitures, new seating area, addition of women restroom, new lights. signage under separate permit. | $350,000 |
| Jul 8, 2014 | Completed final sign-off Aug 2014 | 1501 Fillmore St | existing starbucks space, no change to use group or occupancy. renovation includes new furniture, fixtures, and equipment. upgrade lighting, no exterior work.Details
existing starbucks space, no change to use group or occupancy. renovation includes new furniture, fixtures, and equipment. upgrade lighting, no exterior work. | $175,000 |
| Jun 4, 2014 | Completed final sign-off Jul 2014 | 685 Beach St | amendment to 201404244104. response to inspectors corection notice of 5/21/14. work new mineral wool w/ in framing of 2 raised platforms. new ada complying handrail at ramp. new railing at window along beach st. ada sign at primary door. clarification of a occupancy. new ada waiting area.Details
amendment to 201404244104. response to inspectors corection notice of 5/21/14. work new mineral wool w/ in framing of 2 raised platforms. new ada complying handrail at ramp. new railing at window along beach st. ada sign at primary door. clarification of a occupancy. new ada waiting area. | $7,500 |
| Apr 24, 2014 | Completed final sign-off Jul 2014 | 685 Beach St | intallation of decorative steel portal in an extg tenant space. n/a for the maher ordinance #155-13Details
intallation of decorative steel portal in an extg tenant space. n/a for the maher ordinance #155-13 | $25,000 |
| Apr 24, 2014 | Completed final sign-off Jul 2014 | 685 Beach St | revision to app#201401246968 changes are revised bathrooms, backbar caswork, mop sink, finishes and other minor modification. n/a maher ordinance #155-13Details
revision to app#201401246968 changes are revised bathrooms, backbar caswork, mop sink, finishes and other minor modification. n/a maher ordinance #155-13 | $10,000 |
| Feb 18, 2014 | Completed final sign-off Jul 2014 | 685 Beach St | replacement of e revolving entrance door with new double doors. work includes new lighting in exterior vestibule. occupant load for an a occupancy. no other work. ordiance no. 155-13 not required.Details
replacement of e revolving entrance door with new double doors. work includes new lighting in exterior vestibule. occupant load for an a occupancy. no other work. ordiance no. 155-13 not required. | $10,000 |
| Jan 24, 2014 | Completed final sign-off Jul 2014 | 685 Beach St | t.i. for extg starbucks cafe. work includes new fixtures finishes, ceilings, partitions, mep, equipment. no exterior work. fire protection under seperate permit.Details
t.i. for extg starbucks cafe. work includes new fixtures finishes, ceilings, partitions, mep, equipment. no exterior work. fire protection under seperate permit. | $125,000 |
| Nov 22, 2013 | Never finaled issued Feb 2014, no final | 675 Portola Dr | remodel of (e) cafe.Details
remodel of (e) cafe. | $100,000 |
| Aug 29, 2013 | Completed final sign-off Aug 2013 | 2165 Polk St | revision to pa#201306058723, revise restroom walls including shear walls.Details
revision to pa#201306058723, revise restroom walls including shear walls. | $2,000 |
| Aug 23, 2013 | Completed final sign-off Aug 2013 | 2165 Polk St | to obtain final inspection for work approved under pa 200801152562. all work is completeDetails
to obtain final inspection for work approved under pa 200801152562. all work is complete | |
| Aug 14, 2013 | Completed final sign-off Oct 2013 | 2222 Fillmore St | interior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment.Details
interior t.i. to existing coffee shop. new floor, casework, lighting, ceiling & mechanical system. reconfigure backbar & restroom. minor improvements to existing workroom, relocation & installation of equipment. | $226,000 |
| Jun 5, 2013 | Completed final sign-off Aug 2013 | 2165 Polk St | minor improvements to cafe, front bar and back bar of existing starbucks with minor repairs and repainting to existing walls and ceiling finishes. install new floor, update furniture an casework. relocate bar equipment, update floor sinks. exterior work to include new paint, recover existing awning,Details
minor improvements to cafe, front bar and back bar of existing starbucks with minor repairs and repainting to existing walls and ceiling finishes. install new floor, update furniture an casework. relocate bar equipment, update floor sinks. exterior work to include new paint, recover existing awning, | $111,000 |
| Mar 12, 2013 | Completed final sign-off Jul 2013 | 5455 Geary Bl | minor cosmetic improvement - consisting of re-facing of cabinets, millwork and flooring. minor electrical improvement consisting of replacing specific light fixtures and new power outlets.Details
minor cosmetic improvement - consisting of re-facing of cabinets, millwork and flooring. minor electrical improvement consisting of replacing specific light fixtures and new power outlets. | $80,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 1560 Van Ness Av | interior non structural t.i to (e) coffee shop. work to include relocation of (e) equipment, new casework, new finishes, new floor sinks, flooring, furniture & relocation of (e) lightingDetails
interior non structural t.i to (e) coffee shop. work to include relocation of (e) equipment, new casework, new finishes, new floor sinks, flooring, furniture & relocation of (e) lighting | $193,500 |
| Jan 8, 2013 | Expired or cancelled cancelled Apr 2013 | 2018 Market St | interior tenant improvement of existing starbucks coffee shop. new wall finishes and paint. new cabinets and casework. no changes to mech, electrical and plumbingDetails
interior tenant improvement of existing starbucks coffee shop. new wall finishes and paint. new cabinets and casework. no changes to mech, electrical and plumbing | $87,669 |
| Oct 2, 2012 | Completed final sign-off Dec 2012 | 1799 Fulton St | interior and exterior non structural tenant improvement to existing coffee shop. interior work to include new paritions, finishes, and equipment. exterior work to include replace and add planters and seating.Details
interior and exterior non structural tenant improvement to existing coffee shop. interior work to include new paritions, finishes, and equipment. exterior work to include replace and add planters and seating. | $204,000 |
| Aug 6, 2012 | Completed final sign-off Oct 2012 | 2201 Fillmore St | interior tenant improvement to existing coffee shop. work on the ground floor and basement. new floor, wall, ceiling finishes and mep.Details
interior tenant improvement to existing coffee shop. work on the ground floor and basement. new floor, wall, ceiling finishes and mep. | $125,000 |
| Jul 20, 2012 | Completed final sign-off Oct 2012 | 2201 Fillmore St | exterior removal & replacement of windows exterior door with new storefronts, & new awnings. removal of existing & construction of new interior stair. ti & mep under separate permit.Details
exterior removal & replacement of windows exterior door with new storefronts, & new awnings. removal of existing & construction of new interior stair. ti & mep under separate permit. | $85,000 |
| Jul 16, 2012 | Completed final sign-off Oct 2012 | 2201 Fillmore St | interior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation.Details
interior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation. | $14,500 |
| May 15, 2012 | Completed final sign-off Oct 2012 | 100 West Portal Av | 1st/2nd floors-remove (e) & provide new lighting fixtures, plumbing fixtures, accessories & finishes. hallway, alcove, toilet rooms, provide new toilet rooms & shower roomsDetails
1st/2nd floors-remove (e) & provide new lighting fixtures, plumbing fixtures, accessories & finishes. hallway, alcove, toilet rooms, provide new toilet rooms & shower rooms | $111,000 |