Permit GraphShortlistSan Francisco building permits since 2000

Serina Calhoun

License
C30744
Look the license up with the state
Listed as
architect, authorized agent-others, engineer, pmt consultant/expediter
Firm
Syncopated Arch
Based in
San Francisco
On San Francisco permits
Apr 2010 to Sep 2026

201 permits since 2000 (architect on 195 permits, authorized agent-others on 4 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 83 completed, 40 in progress, 21 never finaled, 57 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 201.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 21, 2026In progress
filed Sep 2026, not yet issued
719 Alemany Bllegalize ground floor dwelling unit as state adu per ca govt.code section 66323 to abate nov#202533567. provide 1hr separations from (e) second floor unit. remove carport to comply with nov#202533567. no structural alterations proposed.complete inspection for permit8611364; comply with nov#202533567
Details
Permit
202609218436
Status
triage
Filed
Sep 21, 2026
Declared cost
$15,000
Address
719 Alemany Bl

legalize ground floor dwelling unit as state adu per ca govt.code section 66323 to abate nov#202533567. provide 1hr separations from (e) second floor unit. remove carport to comply with nov#202533567. no structural alterations proposed.complete inspection for permit8611364; comply with nov#202533567

Open the permit page

$15,000
Sep 18, 2026In progress
issued Sep 2026
209 Somerset Stin response to nov 202546044, addition to 220 vmoutlet at laundry room, removal of door at ground floor stair. remove mech. hood installed without permits in laundry room
Details
Permit
202609188384
Status
issued
Filed
Sep 18, 2026
Permit issued
Sep 29, 2026
Declared cost
$1,000
Address
209 Somerset St

in response to nov 202546044, addition to 220 vmoutlet at laundry room, removal of door at ground floor stair. remove mech. hood installed without permits in laundry room

Open the permit page

$1,000
Aug 3, 2026In progress
filed Aug 2026, not yet issued
3223 Folsom Stlegalization of (e) dwelling unit at ground floor. reconfigure non-load bearing walls for new studio layout. installation of new 2 hour passageway at ground floor.
Details
Permit
202608035988
Status
filed
Filed
Aug 3, 2026
Declared cost
$200,000
Address
3223 Folsom St

legalization of (e) dwelling unit at ground floor. reconfigure non-load bearing walls for new studio layout. installation of new 2 hour passageway at ground floor.

Open the permit page

$200,000
Jul 30, 2026In progress
filed Jul 2026, not yet issued
704 Broderick Strevision to bpa #202407106213. convert garage space to bedroom; driveway and curb to remain. change rear bedroom to media room. eliminate fire rated on closure at existing utility meters.
Details
Permit
202607305811
Status
filed
Filed
Jul 30, 2026
Declared cost
$20,000
Address
704 Broderick St

revision to bpa #202407106213. convert garage space to bedroom; driveway and curb to remain. change rear bedroom to media room. eliminate fire rated on closure at existing utility meters.

Open the permit page

$20,000
Jun 18, 2026Completed
final sign-off Oct 2026
1415 Indiana StG Legarte Constructionunit 304: legalize expansion of (e) mezzanine and installation of (2) new mini split heaters in response to nov#202649830.
Details
Permit
202606183543
Status
complete
Filed
Jun 18, 2026
Permit issued
Jun 25, 2026
Final sign-off
Oct 2, 2026
Declared cost
$20,000
Address
1415 Indiana St

unit 304: legalize expansion of (e) mezzanine and installation of (2) new mini split heaters in response to nov#202649830.

Open the permit page

$20,000
Jun 11, 2026In progress
issued Jun 2026
227 07th AvBurton Builders Llcinstall minisplit heating system for second floor only.
Details
Permit
202606113035
Status
issued
Filed
Jun 11, 2026
Permit issued
Jun 26, 2026
Declared cost
$5,456
Address
227 07th Av

install minisplit heating system for second floor only.

Open the permit page

$5,456
Jun 2, 2026In progress
filed Jun 2026, not yet issued
30 Jersey Strevision to 202512182095. revision to 4th fl windows with aboo9. sprinkers will be installed in lieu of 45 min windows per 202508294184
Details
Permit
202606022362
Status
filed
Filed
Jun 2, 2026
Address
30 Jersey St

revision to 202512182095. revision to 4th fl windows with aboo9. sprinkers will be installed in lieu of 45 min windows per 202508294184

Open the permit page

May 21, 2026In progress
issued Jun 2026
3443 Balboa StHawk Hill Construction Incg/f commercial: remove non-load bearing walls. new roof at g/f lightwell only. ada upgrades.
Details
Permit
202605211700
Status
issued
Filed
May 21, 2026
Permit issued
Jun 24, 2026
Declared cost
$90,000
Address
3443 Balboa St

g/f commercial: remove non-load bearing walls. new roof at g/f lightwell only. ada upgrades.

Open the permit page

$90,000
May 21, 2026In progress
issued Jun 2026
3439 Balboa StHawk Hill Construction Incresidential: remove juliet balcony at 2/f. replace entry gate at residential entrance.
Details
Permit
202605211701
Status
issued
Filed
May 21, 2026
Permit issued
Jun 24, 2026
Declared cost
$5,000
Address
3439 Balboa St

residential: remove juliet balcony at 2/f. replace entry gate at residential entrance.

Open the permit page

$5,000
May 19, 2026In progress
issued Jul 2026
3401 Balboa StBurton Builders Llcinstall shear wall and (n) bathroom located in garage.
Details
Permit
202605191515
Status
issued
Filed
May 19, 2026
Permit issued
Jul 10, 2026
Declared cost
$30,000
Address
3401 Balboa St

install shear wall and (n) bathroom located in garage.

Open the permit page

$30,000
May 7, 2026In progress
filed May 2026, not yet issued
945 Scott Stlegalization of (e) unpermitted unit 945a at ground floor pursuant to ordinace 43-14, provide one hour rated fire separation between 1st and 2nd floors.
Details
Permit
202603167659
Status
filed
Filed
May 7, 2026
Declared cost
$80,000
Address
945 Scott St

legalization of (e) unpermitted unit 945a at ground floor pursuant to ordinace 43-14, provide one hour rated fire separation between 1st and 2nd floors.

Open the permit page

$80,000
Mar 18, 2026Completed
final sign-off Aug 2026
1201 12th Avrevision to pa# 202411195326. modifying (e) fire escape at rear court yard w/ (n) fire escpe to extend to ground.
Details
Permit
202603187834
Status
complete
Filed
Mar 18, 2026
Permit issued
Apr 1, 2026
Final sign-off
Aug 20, 2026
Declared cost
$10,000
Address
1201 12th Av

revision to pa# 202411195326. modifying (e) fire escape at rear court yard w/ (n) fire escpe to extend to ground.

Open the permit page

$10,000
Mar 9, 2026In progress
issued Sep 2026
175 Margaret AvJian Construction Companyremove unauthorized dwelling unit at garage & basement level constructed by previous tenant without owner knowledge; in response to nov 202299348 & 202298988; reinstate garage;remove plyw'd at int. of garage door; remove cooktop; convert (e) storage room to media room;
Details
Permit
202602186105
Status
issued
Filed
Mar 9, 2026
Permit issued
Sep 8, 2026
Declared cost
$41,200
Address
175 Margaret Av

remove unauthorized dwelling unit at garage & basement level constructed by previous tenant without owner knowledge; in response to nov 202299348 & 202298988; reinstate garage;remove plyw'd at int. of garage door; remove cooktop; convert (e) storage room to media room;

Open the permit page

$41,200
Feb 25, 2026In progress
issued May 2026
30 Jersey StS L M Development Inc.revision 202502180460- install gas fireplace on 4th floor and install garage vent.
Details
Permit
202602256479
Status
issued
Filed
Feb 25, 2026
Permit issued
May 14, 2026
Declared cost
$1,500
Address
30 Jersey St

revision 202502180460- install gas fireplace on 4th floor and install garage vent.

Open the permit page

$1,500
Jan 29, 2026In progress
filed Jan 2026, not yet issued
260 Chattanooga Stlegalization of (e) ground fl unit @ rear of builg per ordinance 43-14. for a building total of (3) residential units.remove connecting interior stair;infill fl framing assembly to separate ground.entire ground fl to be sprinklered per information sheet fs-05 & eg-05.
Details
Permit
202508153159
Status
approved
Filed
Jan 29, 2026
Declared cost
$65,000
Address
260 Chattanooga St

legalization of (e) ground fl unit @ rear of builg per ordinance 43-14. for a building total of (3) residential units.remove connecting interior stair;infill fl framing assembly to separate ground.entire ground fl to be sprinklered per information sheet fs-05 & eg-05.

Open the permit page

$65,000
Jan 23, 2026In progress
filed Jan 2026, not yet issued
424 Wilde Avlegalize unauthorized dwelling unit at ground floor pursuant to building code section 106a.3.1.3 & planning code 207.3. in association with nov# 202532925. reconfigure (e) stair from primary unit to garage.
Details
Permit
202512111577
Status
approved
Filed
Jan 23, 2026
Declared cost
$70,000
Address
424 Wilde Av

legalize unauthorized dwelling unit at ground floor pursuant to building code section 106a.3.1.3 & planning code 207.3. in association with nov# 202532925. reconfigure (e) stair from primary unit to garage.

Open the permit page

$70,000
Jan 21, 2026In progress
filed Jan 2026, not yet issued
1906 Folsom Stconvert g/f vacant storage to 3 new adu per ord#162-16. replace wood framed stair at rear yard in kind. coordinate work w/ soft story #202501305531. infill light wells at g/f & rear expansion at g/f.
Details
Permit
202511250455
Status
filed
Filed
Jan 21, 2026
Declared cost
$150,000
Address
1906 Folsom St

convert g/f vacant storage to 3 new adu per ord#162-16. replace wood framed stair at rear yard in kind. coordinate work w/ soft story #202501305531. infill light wells at g/f & rear expansion at g/f.

Open the permit page

$150,000
Jan 14, 2026In progress
issued Jan 2026
30 Jersey StS L M Development Inc.revision to pa #202502180460; new plumbing fixture count total; additional bar sinks, ice makers, and hosebibs.
Details
Permit
202601143808
Status
issued
Filed
Jan 14, 2026
Permit issued
Jan 28, 2026
Declared cost
$3,200
Address
30 Jersey St

revision to pa #202502180460; new plumbing fixture count total; additional bar sinks, ice makers, and hosebibs.

Open the permit page

$3,200
Dec 22, 2025In progress
issued May 2026
227 07th AvBurton Builders Llcrevision to permit 202404129912. installation of 1 "as-of-right" unit on ground floor. legalize stairs between 2nd and 3rd floor. install new ext. stair from grade to 2nd floor at rear yard. reconfigure recessed entry and garage door.
Details
Permit
202512222427
Status
issued
Filed
Dec 22, 2025
Permit issued
May 8, 2026
Address
227 07th Av

revision to permit 202404129912. installation of 1 "as-of-right" unit on ground floor. legalize stairs between 2nd and 3rd floor. install new ext. stair from grade to 2nd floor at rear yard. reconfigure recessed entry and garage door.

Open the permit page

Dec 18, 2025In progress
issued Jan 2026
30 Jersey StS L M Development Inc.revision 202502180460 to install garage door facing street with intergrated pass through door to approved adu and revise 4th floor windows
Details
Permit
202512182095
Status
issued
Filed
Dec 18, 2025
Permit issued
Jan 7, 2026
Declared cost
$7,500
Address
30 Jersey St

revision 202502180460 to install garage door facing street with intergrated pass through door to approved adu and revise 4th floor windows

Open the permit page

$7,500
Nov 12, 2025In progress
issued Dec 2025
30 Jersey StS L M Development Inc.revision to pa# 202502180460, radiant flrs @ ground flr, ducted mini-split heat pump system at 2nd, 3rd, and 4th flr. mini-split condensors located at roof. title 24 revision.
Details
Permit
202511129443
Status
issued
Filed
Nov 12, 2025
Permit issued
Dec 4, 2025
Declared cost
$1,000
Address
30 Jersey St

revision to pa# 202502180460, radiant flrs @ ground flr, ducted mini-split heat pump system at 2nd, 3rd, and 4th flr. mini-split condensors located at roof. title 24 revision.

Open the permit page

$1,000
Nov 12, 2025Completed
final sign-off Feb 2026
81 Jersey StS L M Development Inc.remove rear wood stair, (e) 2nd floor deck to remain
Details
Permit
202511129462
Status
complete
Filed
Nov 12, 2025
Permit issued
Dec 4, 2025
Final sign-off
Feb 10, 2026
Declared cost
$500
Address
81 Jersey St

remove rear wood stair, (e) 2nd floor deck to remain

Open the permit page

$500
Nov 6, 2025Completed
final sign-off Dec 2025
1658 Kirkwood AvR Group, Incconvert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.
Details
Permit
202511069092
Status
complete
Filed
Nov 6, 2025
Permit issued
Nov 26, 2025
Final sign-off
Dec 10, 2025
Declared cost
$8,000
Address
1658 Kirkwood Av

convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.

Open the permit page

$8,000
Nov 6, 2025Completed
final sign-off Dec 2025
1654 Kirkwood AvR Group, Incconvert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.
Details
Permit
202511069089
Status
complete
Filed
Nov 6, 2025
Permit issued
Nov 26, 2025
Final sign-off
Dec 10, 2025
Declared cost
$8,000
Address
1654 Kirkwood Av

convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.

Open the permit page

$8,000
Sep 30, 2025In progress
filed Sep 2025, not yet issued
572 Chestnut Stinstall (2) new adu at groudn flr; reconfigure front stair; minor street encroachment under separate permit; modification to (e) guardrail at front stair; new sidewalk landscaping permit under separate permit; install new sprinklers through ground floor-nfpa 13r per fs-05-under separate permit.
Details
Permit
202507100522
Status
approved
Filed
Sep 30, 2025
Declared cost
$276,000
Address
572 Chestnut St

install (2) new adu at groudn flr; reconfigure front stair; minor street encroachment under separate permit; modification to (e) guardrail at front stair; new sidewalk landscaping permit under separate permit; install new sprinklers through ground floor-nfpa 13r per fs-05-under separate permit.

Open the permit page

$276,000
Sep 3, 2025In progress
filed Sep 2025, not yet issued
120 Green Stinstallation of roll up security gate at 120 green street entrance.revision to pa #202410233581 and pa #202507171057. revise door at 120 green to be out swinging. reconfigure stair shaft at 2nd and 3rd floor. relocate fire/atmospheric. seperation from previously approved plans.
Details
Permit
202509034480
Status
filed
Filed
Sep 3, 2025
Declared cost
$1,000
Address
120 Green St

installation of roll up security gate at 120 green street entrance.revision to pa #202410233581 and pa #202507171057. revise door at 120 green to be out swinging. reconfigure stair shaft at 2nd and 3rd floor. relocate fire/atmospheric. seperation from previously approved plans.

Open the permit page

$1,000
Aug 5, 2025In progress
issued Mar 2026
1654 Kirkwood AvR Group, Incconvert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323
Details
Permit
202506269542
Status
issued
Filed
Aug 5, 2025
Permit issued
Mar 17, 2026
Declared cost
$5,000
Address
1654 Kirkwood Av

convert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323

Open the permit page

$5,000
Aug 5, 2025In progress
issued Mar 2026
1658 Kirkwood AvR Group, Incconvert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323
Details
Permit
202506269528
Status
issued
Filed
Aug 5, 2025
Permit issued
Mar 17, 2026
Declared cost
$5,000
Address
1658 Kirkwood Av

convert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323

Open the permit page

$5,000
Jul 18, 2025In progress
issued Dec 2025
554 Athens StSdi Insulation Inclegalization of (e) ground floor unit at rear of buldilng per ordiance 43-14. convert (e) bedroom, bathroom and family room into a separate unit. ref bpa8802787. remove connecting interior stair; infill floor framing assembly to separate ground floor and second floor
Details
Permit
202506047898
Status
issued
Filed
Jul 18, 2025
Permit issued
Dec 12, 2025
Declared cost
$25,000
Address
554 Athens St

legalization of (e) ground floor unit at rear of buldilng per ordiance 43-14. convert (e) bedroom, bathroom and family room into a separate unit. ref bpa8802787. remove connecting interior stair; infill floor framing assembly to separate ground floor and second floor

Open the permit page

$25,000
Jul 17, 2025In progress
issued Oct 2025
100 Green StDe Brus Construction Increvision and deferred electrical for office ti permit 202410233581. reconfigure previously approved ada bathroom #2. replace entry door at 120 green. remove non load bearing walls at ground floor meeting rooms.
Details
Permit
202507171057
Status
issued
Filed
Jul 17, 2025
Permit issued
Oct 28, 2025
Address
100 Green St

revision and deferred electrical for office ti permit 202410233581. reconfigure previously approved ada bathroom #2. replace entry door at 120 green. remove non load bearing walls at ground floor meeting rooms.

Open the permit page

Jul 8, 2025In progress
issued May 2026
1347 Sacramento StRei Build Up Construction Corpreconfigure former laudromat on ground floor to 3-adus; provide fire sprinklers at proposed units per fs-05 hazard class nfpa 13r; provide one hour rated horizontal & vertical separation between units & uuper flrs; provide or upgrade manual fa system per sfbc & sffc sec 907 (under sep permit)
Details
Permit
202506188989
Status
issued
Filed
Jul 8, 2025
Permit issued
May 4, 2026
Declared cost
$750,000
Address
1347 Sacramento St

reconfigure former laudromat on ground floor to 3-adus; provide fire sprinklers at proposed units per fs-05 hazard class nfpa 13r; provide one hour rated horizontal & vertical separation between units & uuper flrs; provide or upgrade manual fa system per sfbc & sffc sec 907 (under sep permit)

Open the permit page

$750,000
Jun 18, 2025Completed
final sign-off May 2026
835 Geary StG M Building And Construction Incdocumentation of existing condition at 835 geary: establish b occupancy and limited service restaurant at 835 geary. previos work filed under address #837 geary. no constuction work proposed under this permit.
Details
Permit
202506188992
Status
complete
Filed
Jun 18, 2025
Permit issued
May 1, 2026
Final sign-off
May 6, 2026
Address
835 Geary St

documentation of existing condition at 835 geary: establish b occupancy and limited service restaurant at 835 geary. previos work filed under address #837 geary. no constuction work proposed under this permit.

Open the permit page

Jun 17, 2025In progress
issued Aug 2026
3736 Irving St1/f: convert (e) storage into adu per planning code sec 207.2.
Details
Permit
202504013425
Status
issued
Filed
Jun 17, 2025
Permit issued
Aug 26, 2026
Declared cost
$50,000
Address
3736 Irving St

1/f: convert (e) storage into adu per planning code sec 207.2.

Open the permit page

$50,000
May 29, 2025Completed
final sign-off Feb 2026
81 Jersey StS L M Development Inc.relocate garage door to reduce recess at front facade.
Details
Permit
202505297518
Status
complete
Filed
May 29, 2025
Permit issued
Jun 3, 2025
Final sign-off
Feb 10, 2026
Declared cost
$5,000
Address
81 Jersey St

relocate garage door to reduce recess at front facade.

Open the permit page

$5,000
May 28, 2025In progress
issued Sep 2025
4088 25th Sttitle 24 revision to install 2 gas on -demand water heaters for radiant floor heating and domestic hot water for al units associated with bpa#201907297231.
Details
Permit
202505287431
Status
issued
Filed
May 28, 2025
Permit issued
Sep 5, 2025
Address
4088 25th St

title 24 revision to install 2 gas on -demand water heaters for radiant floor heating and domestic hot water for al units associated with bpa#201907297231.

Open the permit page

May 15, 2025Completed
final sign-off Jun 2025
1301 La PlayaN C Blanch Companyinstallation of security grilles over window and doors. revision to heights of privacy fences along greaty hwy.
Details
Permit
202505156566
Status
complete
Filed
May 15, 2025
Permit issued
Jun 2, 2025
Final sign-off
Jun 11, 2025
Declared cost
$11,000
Address
1301 La Playa

installation of security grilles over window and doors. revision to heights of privacy fences along greaty hwy.

Open the permit page

$11,000
May 6, 2025Completed
final sign-off Feb 2026
81 Jersey StS L M Development Inc.convert portion of (e) garage into 1 bed, 1 living room and 1 bath layout. reconfigure interior stair to ground floor. install new stair and roof hatch to roof.
Details
Permit
202505065905
Status
complete
Filed
May 6, 2025
Permit issued
Jun 3, 2025
Final sign-off
Feb 10, 2026
Declared cost
$80,000
Address
81 Jersey St

convert portion of (e) garage into 1 bed, 1 living room and 1 bath layout. reconfigure interior stair to ground floor. install new stair and roof hatch to roof.

Open the permit page

$80,000
Apr 30, 2025Completed
final sign-off Jan 2026
333 Frederick StFlores General Buildingremodel 3 bed/1bath at 2nd flr into 3 bed/3 bath unit. remove 4 (e) windows, install (2) fiberglass windows.
Details
Permit
202504305529
Status
complete
Filed
Apr 30, 2025
Permit issued
Oct 6, 2025
Final sign-off
Jan 2, 2026
Declared cost
$69,937
Address
333 Frederick St

remodel 3 bed/1bath at 2nd flr into 3 bed/3 bath unit. remove 4 (e) windows, install (2) fiberglass windows.

Open the permit page

$69,937
Apr 1, 2025In progress
issued Jun 2026
800 Innes AvDoherty Restoration, Inc.convert 2nd story of (e) commercial unit #10 into (1) adu per ordinance 162-16 local adu program. ground flr commercial space to remain. remove (e) stair assembly connecting ground flr and 2nd flr at commercial unit #10. in exist. covered multi family dwelling per cbc chapter 11a
Details
Permit
202502240937
Status
issued
Filed
Apr 1, 2025
Permit issued
Jun 17, 2026
Declared cost
$40,000
Address
800 Innes Av

convert 2nd story of (e) commercial unit #10 into (1) adu per ordinance 162-16 local adu program. ground flr commercial space to remain. remove (e) stair assembly connecting ground flr and 2nd flr at commercial unit #10. in exist. covered multi family dwelling per cbc chapter 11a

Open the permit page

$40,000
Mar 18, 2025In progress
issued Jun 2025
30 Jersey StS L M Development Inc.convert ground floor den and bathroom into 1-new adu. work includes a small rear addition 1-bedroom / 1-bathroom per goverment code section 65852.2 renovate and expand single family home includeing small rear addition at all levels and a new vertical addition for a total of 4 stories.
Details
Permit
202502180460
Status
issued
Filed
Mar 18, 2025
Permit issued
Jun 23, 2025
Declared cost
$240,000
Address
30 Jersey St

convert ground floor den and bathroom into 1-new adu. work includes a small rear addition 1-bedroom / 1-bathroom per goverment code section 65852.2 renovate and expand single family home includeing small rear addition at all levels and a new vertical addition for a total of 4 stories.

Open the permit page

$240,000
Jan 28, 2025Completed
final sign-off Sep 2025
1500 Revere AvDoherty Restoration, Inc.ab1114:convert (e) ground floor exercise room into (1) accessory dwelling unit per government code section 65852.2 (state adu) provide one hour rated fire separation between ground floor & 2nd floor per information sheet no. fs-05.
Details
Permit
202412177013
Status
complete
Filed
Jan 28, 2025
Permit issued
May 14, 2025
Final sign-off
Sep 15, 2025
Declared cost
$48,000
Address
1500 Revere Av

ab1114:convert (e) ground floor exercise room into (1) accessory dwelling unit per government code section 65852.2 (state adu) provide one hour rated fire separation between ground floor & 2nd floor per information sheet no. fs-05.

Open the permit page

$48,000
Jan 7, 2025Completed
final sign-off Aug 2026
1201 12th AvDoherty Restoration, Inc.rev pa201902082492 -reduction of original socpe from 5 adu to 4 adu.reconfigure garages (5) on g/f to become 4 adu. horizontal extension of side light court.
Details
Permit
202411195326
Status
complete
Filed
Jan 7, 2025
Permit issued
Jun 18, 2025
Final sign-off
Aug 20, 2026
Address
1201 12th Av

rev pa201902082492 -reduction of original socpe from 5 adu to 4 adu.reconfigure garages (5) on g/f to become 4 adu. horizontal extension of side light court.

Open the permit page

Nov 6, 2024In progress
issued Nov 2024
901 Pine StAxel8 Constructionrevision to pa # 2022-1223-9112 revise fire sprinkler specification from (e) nfpa 13 to (e) nfpa 13r. provide nfpa 13r fire sprinkler system at proposed unit
Details
Permit
202411064518
Status
issued
Filed
Nov 6, 2024
Permit issued
Nov 13, 2024
Address
901 Pine St

revision to pa # 2022-1223-9112 revise fire sprinkler specification from (e) nfpa 13 to (e) nfpa 13r. provide nfpa 13r fire sprinkler system at proposed unit

Open the permit page

Oct 23, 2024In progress
issued Mar 2025
100 Green StDe Brus Construction Inccommercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada compliance
Details
Permit
202410233581
Status
issued
Filed
Oct 23, 2024
Permit issued
Mar 5, 2025
Declared cost
$300,000
Address
100 Green St

commercial ti: reconfigure ground fl lobby. reframe (e) stairs at 2nd fl. installation of (n) ada bathroom. upgrade (e) bathroom for ada compliance

Open the permit page

$300,000
Sep 26, 2024Completed
final sign-off Jun 2025
101 Mission StRudolph Commercial Interiors Inc, Rci9th fl- commericial ti construct 2 (n) meeting rooms. carpet replacement. light fixture replacement no change in use, occupancy or area, mech & electrical deferred.
Details
Permit
202409261737
Status
complete
Filed
Sep 26, 2024
Permit issued
Oct 30, 2024
Final sign-off
Jun 23, 2025
Declared cost
$150,000
Address
101 Mission St

9th fl- commericial ti construct 2 (n) meeting rooms. carpet replacement. light fixture replacement no change in use, occupancy or area, mech & electrical deferred.

Open the permit page

$150,000
Aug 14, 2024In progress
filed Aug 2024, not yet issued
1301 La Playarevision to pa# 2022-1129-7306 title 24 installation of hydronic boiler system installation of gas fueled tank water heaters new lighting elec layout for (n) units
Details
Permit
202408148637
Status
filed
Filed
Aug 14, 2024
Address
1301 La Playa

revision to pa# 2022-1129-7306 title 24 installation of hydronic boiler system installation of gas fueled tank water heaters new lighting elec layout for (n) units

Open the permit page

Jul 25, 2024In progress
issued Jan 2026
704 Broderick StBay Insight Builders Llclegalize unauthorized dwelling unit at the ground floor per government code section 658.52.2 (state adu program) in response to planning enforment case 2015-001328enf re-instate pre-existing garage door and single car garage
Details
Permit
202407106213
Status
issued
Filed
Jul 25, 2024
Permit issued
Jan 28, 2026
Declared cost
$60,000
Address
704 Broderick St

legalize unauthorized dwelling unit at the ground floor per government code section 658.52.2 (state adu program) in response to planning enforment case 2015-001328enf re-instate pre-existing garage door and single car garage

Open the permit page

$60,000
Jul 3, 2024Expired or cancelled
cancelled Jul 2024
800 Innes Avconvert second story of (e) commercial unit #10 into 1-adu per government code section 65852.2 (state adu program). ground floor commercial space to remain. remove (e) stair assembly connecting ground floor and second floor at commercial unit #10. (e) sprinkler system to be modified where impacted
Details
Permit
202407035737
Status
cancelled
Filed
Jul 3, 2024
Declared cost
$40,000
Address
800 Innes Av

convert second story of (e) commercial unit #10 into 1-adu per government code section 65852.2 (state adu program). ground floor commercial space to remain. remove (e) stair assembly connecting ground floor and second floor at commercial unit #10. (e) sprinkler system to be modified where impacted

Open the permit page

$40,000
Jul 3, 2024Completed
final sign-off Nov 2024
1329 Bay StRei Build Up Construction Corpreplacement of 11 existing wood windows at front facade on 2nd & 3rd floors with 7 nw wood or wood clad windows: replace 3 extg center windows with 1 nw picture frame windows; replace both 2 extg windows at ends with 2 nw tilt-up casement windows. replacement of 1 existing window @ 3rd floor clos
Details
Permit
202407035820
Status
complete
Filed
Jul 3, 2024
Permit issued
Aug 29, 2024
Final sign-off
Nov 4, 2024
Declared cost
$8,000
Address
1329 Bay St

replacement of 11 existing wood windows at front facade on 2nd & 3rd floors with 7 nw wood or wood clad windows: replace 3 extg center windows with 1 nw picture frame windows; replace both 2 extg windows at ends with 2 nw tilt-up casement windows. replacement of 1 existing window @ 3rd floor clos

Open the permit page

$8,000
Jun 26, 2024Completed
final sign-off Sep 2024
719 47th AvBurton Builders Llcrevision to 202208170678: installation of new mini-split heat pump insteaded of direct vent wall heater
Details
Permit
202406265294
Status
complete
Filed
Jun 26, 2024
Permit issued
Sep 5, 2024
Final sign-off
Sep 25, 2024
Address
719 47th Av

revision to 202208170678: installation of new mini-split heat pump insteaded of direct vent wall heater

Open the permit page

May 29, 2024Expired or cancelled
cancelled Jul 2024
30 Jersey Stconvert ground floor den and bathroom into 1-new adu. work includes a small rear addition 1-bedroom / 1-bathroom per goverment code section 65852.2 renovate and expand single family home includeing small rear addition at all levels and a new vertical addition for a total of 4 stories.
Details
Permit
202405293137
Status
cancelled
Filed
May 29, 2024
Declared cost
$240,000
Address
30 Jersey St

convert ground floor den and bathroom into 1-new adu. work includes a small rear addition 1-bedroom / 1-bathroom per goverment code section 65852.2 renovate and expand single family home includeing small rear addition at all levels and a new vertical addition for a total of 4 stories.

Open the permit page

$240,000
May 28, 2024Completed
final sign-off Jul 2024
3875 18th StS L M Development Inc.revision to pa# 2017-0228-0256 revision to (1) window at front facade
Details
Permit
202405283092
Status
complete
Filed
May 28, 2024
Permit issued
Jun 11, 2024
Final sign-off
Jul 30, 2024
Address
3875 18th St

revision to pa# 2017-0228-0256 revision to (1) window at front facade

Open the permit page

May 24, 2024In progress
issued Aug 2024
1290 Stanyan StCardoza Builder Llc, D E F Corevision to pa# 201910073775, reconfigure wood framed front stairs and guardraul; replace exterior wood siding; convert storage @ 1/f to bedroom, bathroom; minor improvements @ 2nd & 3rd flr; add 4 sklylights
Details
Permit
202402155999
Status
issued
Filed
May 24, 2024
Permit issued
Aug 21, 2024
Declared cost
$45,000
Address
1290 Stanyan St

revision to pa# 201910073775, reconfigure wood framed front stairs and guardraul; replace exterior wood siding; convert storage @ 1/f to bedroom, bathroom; minor improvements @ 2nd & 3rd flr; add 4 sklylights

Open the permit page

$45,000
May 10, 2024In progress
issued Jan 2025
227 07th Avlegalize previously removed 2nd floor unit #227 to grd. floor per gov code section 65852.2 (ca adu program): conv.storage & garage area to a 2 bed, 1 bath. proposed sq ft. is >75% of subject unit; cond. use does not apply per sf statecode section 317. convert 2nd & 3rd fl. to 1-unit w/int stair.
Details
Permit
202404129912
Status
issued
Filed
May 10, 2024
Permit issued
Jan 31, 2025
Declared cost
$120,000
Address
227 07th Av

legalize previously removed 2nd floor unit #227 to grd. floor per gov code section 65852.2 (ca adu program): conv.storage & garage area to a 2 bed, 1 bath. proposed sq ft. is >75% of subject unit; cond. use does not apply per sf statecode section 317. convert 2nd & 3rd fl. to 1-unit w/int stair.

Open the permit page

$120,000
May 7, 2024Completed
final sign-off Oct 2024
2015 Sacramento StAligned Technologies Llc Dba Aligned Devrevision to 202208170711. install 2 new steps at side yard rather than 3, install 1 step at unit 104 entry. coordinate with revised structural design.
Details
Permit
202405071616
Status
complete
Filed
May 7, 2024
Permit issued
May 14, 2024
Final sign-off
Oct 24, 2024
Address
2015 Sacramento St

revision to 202208170711. install 2 new steps at side yard rather than 3, install 1 step at unit 104 entry. coordinate with revised structural design.

Open the permit page

Apr 3, 2024Expired or cancelled
withdrawn Jul 2024
3875 18th Strevision to bpa# 201702280256: installation of rear yard deck and fence;
Details
Permit
202404039214
Status
withdrawn
Filed
Apr 3, 2024
Declared cost
$15,000
Address
3875 18th St

revision to bpa# 201702280256: installation of rear yard deck and fence;

Open the permit page

$15,000
Feb 29, 2024In progress
issued Feb 2024
322 30th AvChiang C M Construction Inc.revision to pa# 2016-1222-5772 new kitchen layout, install and relocate new gas meter and electrical meter. new wall for storage area. new ceiling layout. new windows in the rear
Details
Permit
202402296840
Status
issued
Filed
Feb 29, 2024
Permit issued
Feb 29, 2024
Declared cost
$40,000
Address
322 30th Av

revision to pa# 2016-1222-5772 new kitchen layout, install and relocate new gas meter and electrical meter. new wall for storage area. new ceiling layout. new windows in the rear

Open the permit page

$40,000
Feb 12, 2024Completed
final sign-off Apr 2026
540 Page Stremoval of the additionn of rooms and bathroom on the 1/f above detached garage.no work being perform anywhere esle.
Details
Permit
202402125763
Status
complete
Filed
Feb 12, 2024
Permit issued
Oct 31, 2025
Final sign-off
Apr 29, 2026
Declared cost
$3,000
Address
540 Page St

removal of the additionn of rooms and bathroom on the 1/f above detached garage.no work being perform anywhere esle.

Open the permit page

$3,000
Jan 2, 2024Completed
final sign-off May 2026
151 Ralston StSincere Construction Company Inc2ft extension of the structure at rear. install an adu studio at garage level. legalize rear deck. replace (e) furnace with a newer model.
Details
Permit
202401023317
Status
complete
Filed
Jan 2, 2024
Permit issued
Feb 18, 2025
Final sign-off
May 15, 2026
Declared cost
$60,000
Address
151 Ralston St

2ft extension of the structure at rear. install an adu studio at garage level. legalize rear deck. replace (e) furnace with a newer model.

Open the permit page

$60,000
Oct 19, 2023In progress
filed Oct 2023, not yet issued
331 Frederick St3/f: reconfigure 1-bathroom unit into 3 bathrooms
Details
Permit
202310199042
Status
filed
Filed
Oct 19, 2023
Declared cost
$60,000
Address
331 Frederick St

3/f: reconfigure 1-bathroom unit into 3 bathrooms

Open the permit page

$60,000
Aug 30, 2023Completed
final sign-off Apr 2024
352 17th AvReinhardt Construction Solutions Llcinstallation of 2-new bathroom @ 2nd flr master bedroom, 2-new bathroom @ 3rd flr for a total of 4 bathrooms. replace front window to be egress compliant w/ casement sdl.
Details
Permit
202308305633
Status
complete
Filed
Aug 30, 2023
Permit issued
Sep 5, 2023
Final sign-off
Apr 11, 2024
Declared cost
$18,000
Address
352 17th Av

installation of 2-new bathroom @ 2nd flr master bedroom, 2-new bathroom @ 3rd flr for a total of 4 bathrooms. replace front window to be egress compliant w/ casement sdl.

Open the permit page

$18,000
Aug 22, 2023Never finaled
filed Aug 2023, never issued
671 21st Avinterior remodel of (e) 3-story single family residence for 4 bedroom 3.5 bath layout. remodel (e) kitchen.
Details
Permit
202308224960
Status
filed
Filed
Aug 22, 2023
Declared cost
$110,000
Address
671 21st Av

interior remodel of (e) 3-story single family residence for 4 bedroom 3.5 bath layout. remodel (e) kitchen.

Open the permit page

$110,000
Aug 8, 2023Completed
final sign-off Jan 2024
1514 Larkin Stupgrade existing commercial entry per ordinance 51-16 abe program. to comply with accessible entrance program. abe 202206230649. new entrance door is manual.
Details
Permit
202308083999
Status
complete
Filed
Aug 8, 2023
Permit issued
Dec 4, 2023
Final sign-off
Jan 22, 2024
Declared cost
$4,000
Address
1514 Larkin St

upgrade existing commercial entry per ordinance 51-16 abe program. to comply with accessible entrance program. abe 202206230649. new entrance door is manual.

Open the permit page

$4,000
Jul 19, 2023Never finaled
filed Jul 2023, never issued
2001 17th Stto comply with accessible buildilng entrance ord 51-16, abe#202207072412, install new power door operators
Details
Permit
202307192461
Status
filed
Filed
Jul 19, 2023
Declared cost
$6,000
Address
2001 17th St

to comply with accessible buildilng entrance ord 51-16, abe#202207072412, install new power door operators

Open the permit page

$6,000
Jul 19, 2023Never finaled
filed Jul 2023, never issued
2001 17th Stre-install kitchen, reconfigure interior to a (4) bedroom (2) bathroom layout, legalize residential use at second fl. convert to single family residential use in response to nov# 201930281
Details
Permit
202307192463
Status
filed
Filed
Jul 19, 2023
Declared cost
$80,000
Address
2001 17th St

re-install kitchen, reconfigure interior to a (4) bedroom (2) bathroom layout, legalize residential use at second fl. convert to single family residential use in response to nov# 201930281

Open the permit page

$80,000
Jul 13, 2023Never finaled
filed Jul 2023, never issued
175 Margaret AvKenny Gong Constructionto comply with nov 202298988 #4. remove structural unsound deck @ ground floor and repair basement level deck.
Details
Permit
202307132094
Status
filed
Filed
Jul 13, 2023
Declared cost
$10,000
Address
175 Margaret Av

to comply with nov 202298988 #4. remove structural unsound deck @ ground floor and repair basement level deck.

Open the permit page

$10,000
Jul 6, 2023Never finaled
filed Jul 2023, never issued
289 Castro Strevision to permit 202009244947. expand previously approved new unit 13 into adjacent vacant garage for new 2 bedroom, 1 bath configuration. coordinate work with permit 202009244947.
Details
Permit
202307061615
Status
approved
Filed
Jul 6, 2023
Declared cost
$30,000
Address
289 Castro St

revision to permit 202009244947. expand previously approved new unit 13 into adjacent vacant garage for new 2 bedroom, 1 bath configuration. coordinate work with permit 202009244947.

Open the permit page

$30,000
Jun 29, 2023Expired or cancelled
cancelled Jan 2026
1332 Van Ness Avupgrade to (e) commercial entry per ordinance# 51-16 abe program. to comply with abe# 201812173101. install power door operator. replace door with compliant width.
Details
Permit
202306291244
Status
cancelled
Filed
Jun 29, 2023
Declared cost
$7,000
Address
1332 Van Ness Av

upgrade to (e) commercial entry per ordinance# 51-16 abe program. to comply with abe# 201812173101. install power door operator. replace door with compliant width.

Open the permit page

$7,000
Jun 28, 2023Expired or cancelled
cancelled Jan 2026
1508 Union Stto comply with accessible business entrance ord 51-16, abe #202306217634. upgrade (e)comm entry for ada compliance, replace swing security gate w/scissor, relocate power door operator, replace door w/compliant hardware. no residential guestroom will be removed/demo/converted.
Details
Permit
202306281102
Status
cancelled
Filed
Jun 28, 2023
Declared cost
$3,500
Address
1508 Union St

to comply with accessible business entrance ord 51-16, abe #202306217634. upgrade (e)comm entry for ada compliance, replace swing security gate w/scissor, relocate power door operator, replace door w/compliant hardware. no residential guestroom will be removed/demo/converted.

Open the permit page

$3,500
Jun 28, 2023Expired or cancelled
cancelled Jan 2026
2501 Van Ness Avto comply with accessible business entrance ord 51-16, abe #202306217636. upgrade (e)comm entry for ada compliance, relocate functional power door operator, replace door w/compliant hardware for compliant height. remove door mat. no residential guestroom will be removed/demo/converted.
Details
Permit
202306281108
Status
cancelled
Filed
Jun 28, 2023
Declared cost
$1,500
Address
2501 Van Ness Av

to comply with accessible business entrance ord 51-16, abe #202306217636. upgrade (e)comm entry for ada compliance, relocate functional power door operator, replace door w/compliant hardware for compliant height. remove door mat. no residential guestroom will be removed/demo/converted.

Open the permit page

$1,500
Jun 28, 2023Expired or cancelled
cancelled Jan 2026
1520 Union Stto comply with accessible business entrance/technical infeasibility or unreasonable hardship per ord 51-16, abe #20230617637. no residential guestroom will be removed/demo/converted.
Details
Permit
202306281107
Status
cancelled
Filed
Jun 28, 2023
Declared cost
$20,000
Address
1520 Union St

to comply with accessible business entrance/technical infeasibility or unreasonable hardship per ord 51-16, abe #20230617637. no residential guestroom will be removed/demo/converted.

Open the permit page

$20,000
Jun 28, 2023Expired or cancelled
cancelled Jan 2026
1514 Union Stto comply with accessible business entrance ord 51-16, abe #202306217635. upgrade (e)comm entry for ada compliance, install new power door operator, reslope recessed entrance w/in prop line, replace door w/compliant hardware, clear opening/operating force...
Details
Permit
202306281104
Status
cancelled
Filed
Jun 28, 2023
Declared cost
$7,500
Address
1514 Union St

to comply with accessible business entrance ord 51-16, abe #202306217635. upgrade (e)comm entry for ada compliance, install new power door operator, reslope recessed entrance w/in prop line, replace door w/compliant hardware, clear opening/operating force...

Open the permit page

$7,500
Jun 21, 2023Never finaled
filed Jun 2023, never issued
326 Irving Stconvert (e) g/f vacant space into (2) new adus per ord. 162-16, for a bldg total of 4 units. entire g/f ceiling to be upgraded to a 1-hour rated assembly per info sheet fs-05. entire basement level to be sprinkler per info sheet fs-05, hazard classification nfpa 13, sprinkler under sep. permit.
Details
Permit
202306210508
Status
filed
Filed
Jun 21, 2023
Declared cost
$90,000
Address
326 Irving St

convert (e) g/f vacant space into (2) new adus per ord. 162-16, for a bldg total of 4 units. entire g/f ceiling to be upgraded to a 1-hour rated assembly per info sheet fs-05. entire basement level to be sprinkler per info sheet fs-05, hazard classification nfpa 13, sprinkler under sep. permit.

Open the permit page

$90,000
Jun 7, 2023Completed
final sign-off Nov 2024
1301 La PlayaRei Build Up Construction Corp, N C Blanch Companyrev to pa# 2023-0404-5048: to comply w/ nov 202304913, remove 28 decorative balconies at west facade. patch and repair exterior cement plaster wall finish where balconies were removed.
Details
Permit
202306079460
Status
complete
Filed
Jun 7, 2023
Permit issued
Jun 14, 2023
Final sign-off
Nov 20, 2024
Declared cost
$10,000
Address
1301 La Playa

rev to pa# 2023-0404-5048: to comply w/ nov 202304913, remove 28 decorative balconies at west facade. patch and repair exterior cement plaster wall finish where balconies were removed.

Open the permit page

$10,000
Jun 7, 2023Completed
final sign-off Jan 2025
673 BroadwayG Legarte Constructionrevision to pa 202212168531 project proposes to remove and reinstall walls where shown on plan 2 2dnf and 3rd floors; replace sheetrock @ 2nd and 3rd floors; 2nd fl - ceiling will have 2 layers of sheetrock for a 1-hr rated assembly. all rated assemblies are to be maintained to current code
Details
Permit
202306079437
Status
complete
Filed
Jun 7, 2023
Permit issued
Feb 15, 2024
Final sign-off
Jan 9, 2025
Declared cost
$30,000
Address
673 Broadway

revision to pa 202212168531 project proposes to remove and reinstall walls where shown on plan 2 2dnf and 3rd floors; replace sheetrock @ 2nd and 3rd floors; 2nd fl - ceiling will have 2 layers of sheetrock for a 1-hr rated assembly. all rated assemblies are to be maintained to current code

Open the permit page

$30,000
Jun 6, 2023Completed
final sign-off Jul 2025
246 Alma StDoherty Restoration, Inc.eliminate (1)residential unit @ grd level,expand top unit(250)down into portion of 2nd level(248). expand bottow unit (246) up into a portion (248). change bldg from to r-2 to r-3. infill (e) lightwell. reconfig all flrs, install roof access & roof deck less than 500 sq ft.
Details
Permit
202306069370
Status
complete
Filed
Jun 6, 2023
Permit issued
Jan 24, 2024
Final sign-off
Jul 29, 2025
Declared cost
$300,000
Address
246 Alma St

eliminate (1)residential unit @ grd level,expand top unit(250)down into portion of 2nd level(248). expand bottow unit (246) up into a portion (248). change bldg from to r-2 to r-3. infill (e) lightwell. reconfig all flrs, install roof access & roof deck less than 500 sq ft.

Open the permit page

$300,000
May 3, 2023Expired or cancelled
cancelled Jan 2026
1010 Bush Stconvert (e) ground floor vacant room and unused bathroom to common laundry, no changes to exterior. no residential guestroom will be moved/converted.
Details
Permit
202305037041
Status
cancelled
Filed
May 3, 2023
Declared cost
$5,000
Address
1010 Bush St

convert (e) ground floor vacant room and unused bathroom to common laundry, no changes to exterior. no residential guestroom will be moved/converted.

Open the permit page

$5,000
Apr 26, 2023Expired or cancelled
cancelled Jan 2026
2099 Market Stto comply with abe program per ord 51-16. abe # 201812173048. upgrade (e) commercial entry
Details
Permit
202304266550
Status
cancelled
Filed
Apr 26, 2023
Declared cost
$500
Address
2099 Market St

to comply with abe program per ord 51-16. abe # 201812173048. upgrade (e) commercial entry

Open the permit page

$500
Apr 26, 2023Expired or cancelled
cancelled Jan 2026
2095 Market Stto comply with abe program per ord 51-16. abe # 201812173049. upgrade (e) commercial entry
Details
Permit
202304266549
Status
cancelled
Filed
Apr 26, 2023
Declared cost
$8,000
Address
2095 Market St

to comply with abe program per ord 51-16. abe # 201812173049. upgrade (e) commercial entry

Open the permit page

$8,000
Apr 26, 2023Expired or cancelled
cancelled Jan 2026
213 Church Stto comply with abe program per ord 51-16. abe # 202304176796. upgrade (e) commercial entry
Details
Permit
202304266548
Status
cancelled
Filed
Apr 26, 2023
Declared cost
$8,000
Address
213 Church St

to comply with abe program per ord 51-16. abe # 202304176796. upgrade (e) commercial entry

Open the permit page

$8,000
Apr 26, 2023Completed
final sign-off May 2024
340 Judah StHon's Construction Inc.upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 202304176798.
Details
Permit
202304266516
Status
complete
Filed
Apr 26, 2023
Permit issued
Apr 26, 2024
Final sign-off
May 6, 2024
Declared cost
$8,000
Address
340 Judah St

upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 202304176798.

Open the permit page

$8,000
Apr 26, 2023Completed
final sign-off May 2024
338 Judah StHon's Construction Inc.upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 201812122905.
Details
Permit
202304266515
Status
complete
Filed
Apr 26, 2023
Permit issued
Apr 26, 2024
Final sign-off
May 6, 2024
Declared cost
$8,000
Address
338 Judah St

upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 201812122905.

Open the permit page

$8,000
Apr 20, 2023Expired or cancelled
cancelled Jan 2026
2361 Van Ness Avto comply with abe program per ord 51-16. abe #202304176797. upgrade (e) commercial entry. install power door operator
Details
Permit
202304206156
Status
cancelled
Filed
Apr 20, 2023
Declared cost
$5,000
Address
2361 Van Ness Av

to comply with abe program per ord 51-16. abe #202304176797. upgrade (e) commercial entry. install power door operator

Open the permit page

$5,000
Feb 23, 2023Expired or cancelled
cancelled Jan 2026
985 Ellis Stto comply with accessible business entrance program per ord 51-16. ref abe 202301066024. install new power door operator per da-05.
Details
Permit
202302232510
Status
cancelled
Filed
Feb 23, 2023
Declared cost
$5,000
Address
985 Ellis St

to comply with accessible business entrance program per ord 51-16. ref abe 202301066024. install new power door operator per da-05.

Open the permit page

$5,000
Feb 23, 2023Expired or cancelled
cancelled Jan 2026
995 Ellis Stto comply with accessible business entrance program per ord 51-16. ref abe 201812173068. install new power door operator per da-05.
Details
Permit
202302232512
Status
cancelled
Filed
Feb 23, 2023
Declared cost
$5,000
Address
995 Ellis St

to comply with accessible business entrance program per ord 51-16. ref abe 201812173068. install new power door operator per da-05.

Open the permit page

$5,000
Feb 2, 2023Expired or cancelled
withdrawn Sep 2023
1400 Sutter Stupgrade (e) commercial business entry per ordinance 51-16 abe program, to comply with accessible business entrace progam abe 2018-1217-3058
Details
Permit
202302021323
Status
withdrawn
Filed
Feb 2, 2023
Declared cost
$8,000
Address
1400 Sutter St

upgrade (e) commercial business entry per ordinance 51-16 abe program, to comply with accessible business entrace progam abe 2018-1217-3058

Open the permit page

$8,000
Feb 2, 2023Completed
final sign-off Jul 2025
1649 Market StAxel8 Constructionupgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. abe# 201901294776.
Details
Permit
202302021313
Status
complete
Filed
Feb 2, 2023
Permit issued
Oct 21, 2024
Final sign-off
Jul 17, 2025
Declared cost
$8,000
Address
1649 Market St

upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. abe# 201901294776.

Open the permit page

$8,000
Feb 2, 2023Completed
final sign-off Jun 2024
1407 Franklin StAxel8 Constructionupgrade (e) commercial business entry per ordinance 51-16 abe program, to comply with accessible business entrace progam abe 2023-0106-6018. replace door
Details
Permit
202302021320
Status
complete
Filed
Feb 2, 2023
Permit issued
Sep 29, 2023
Final sign-off
Jun 27, 2024
Declared cost
$8,000
Address
1407 Franklin St

upgrade (e) commercial business entry per ordinance 51-16 abe program, to comply with accessible business entrace progam abe 2023-0106-6018. replace door

Open the permit page

$8,000
Feb 2, 2023Expired or cancelled
cancelled Oct 2025
8 Brady StAxel8 Constructionupgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. abe# 202301066025.
Details
Permit
202302021310
Status
cancelled
Filed
Feb 2, 2023
Permit issued
Oct 21, 2024
Declared cost
$25,000
Address
8 Brady St

upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. abe# 202301066025.

Open the permit page

$25,000
Feb 2, 2023Expired or cancelled
cancelled Oct 2025
10 Brady StAxel8 Constructionupgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. including storefront remodel. abe# 202301032417.
Details
Permit
202302021311
Status
cancelled
Filed
Feb 2, 2023
Permit issued
Oct 21, 2024
Declared cost
$25,000
Address
10 Brady St

upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. including storefront remodel. abe# 202301032417.

Open the permit page

$25,000
Feb 2, 2023Completed
final sign-off Aug 2024
1412 Sutter StAxel8 Constructionupgrade (e) commercial business entry per ordinance 51-16 abe program, to comply with accessible business entrace progam abe 2023-0106-6019. replace door
Details
Permit
202302021322
Status
complete
Filed
Feb 2, 2023
Permit issued
Sep 29, 2023
Final sign-off
Aug 23, 2024
Declared cost
$5,000
Address
1412 Sutter St

upgrade (e) commercial business entry per ordinance 51-16 abe program, to comply with accessible business entrace progam abe 2023-0106-6019. replace door

Open the permit page

$5,000
Feb 2, 2023Completed
final sign-off Jul 2025
4 Brady StAxel8 Constructionupgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. abe# 202301256116.
Details
Permit
202302021309
Status
complete
Filed
Feb 2, 2023
Permit issued
Oct 21, 2024
Final sign-off
Jul 17, 2025
Declared cost
$12,000
Address
4 Brady St

upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program. abe# 202301256116.

Open the permit page

$12,000
Feb 1, 2023Completed
final sign-off Aug 2025
246 Alma Stconvert (e) non-conforming office structure into (1) adu per s.g.c 65852.2 (e) non-confirming building footprints to remain proposed adu to conform with the findings of planning commission motion no. 21125.
Details
Permit
202302011167
Status
complete
Filed
Feb 1, 2023
Permit issued
May 23, 2023
Final sign-off
Aug 1, 2025
Address
246 Alma St

convert (e) non-conforming office structure into (1) adu per s.g.c 65852.2 (e) non-confirming building footprints to remain proposed adu to conform with the findings of planning commission motion no. 21125.

Open the permit page

Jan 25, 2023Completed
final sign-off Jan 2025
655 Powell StDoherty Restoration, Inc.revison to bpa 2020-1015-6602; omit mechanical ventilation at proposed (6) adu.
Details
Permit
202301250730
Status
complete
Filed
Jan 25, 2023
Permit issued
Mar 6, 2023
Final sign-off
Jan 24, 2025
Address
655 Powell St

revison to bpa 2020-1015-6602; omit mechanical ventilation at proposed (6) adu.

Open the permit page

Jan 25, 2023Completed
final sign-off Oct 2023
901 Pine StAxel8 Constructionconvert 218 sf storage room @ basement into (n) 209 sf trash room, no changes to the exterior
Details
Permit
202301250744
Status
complete
Filed
Jan 25, 2023
Permit issued
Jun 29, 2023
Final sign-off
Oct 24, 2023
Declared cost
$10,000
Address
901 Pine St

convert 218 sf storage room @ basement into (n) 209 sf trash room, no changes to the exterior

Open the permit page

$10,000
Jan 18, 2023Completed
final sign-off May 2024
20 Romolo PlGrizzly Builders Inc.second revision gas heating. permit #202006128512
Details
Permit
202301180350
Status
complete
Filed
Jan 18, 2023
Permit issued
Apr 7, 2023
Final sign-off
May 3, 2024
Address
20 Romolo Pl

second revision gas heating. permit #202006128512

Open the permit page

Dec 23, 2022In progress
issued Feb 2024
901 Pine StAxel8 Constructionlegalization of(e)unit @ 901 pine street,per ordinance 43-14(convert former commercial space into residential unit).reconfigure(e)unit to become a 860 sf 2-bedroom unit.(e)sprinkler system to be modified where impacted by new work;shall conform to nfpa 13 standards,under separate permit.
Details
Permit
202212239112
Status
issued
Filed
Dec 23, 2022
Permit issued
Feb 29, 2024
Declared cost
$60,000
Address
901 Pine St

legalization of(e)unit @ 901 pine street,per ordinance 43-14(convert former commercial space into residential unit).reconfigure(e)unit to become a 860 sf 2-bedroom unit.(e)sprinkler system to be modified where impacted by new work;shall conform to nfpa 13 standards,under separate permit.

Open the permit page

$60,000
Dec 22, 2022Completed
final sign-off Jan 2026
484 Guerrero StDoherty Restoration, Inc.renovate 1 guest room at ground floor, install full kitchen & reconfigure for 1-bedroom layout to become adu. convert 1-car garage into 1 adu (state program). adu to be a studio apartment. modifications to (e) sprinklers under separate permit. upgrade fire alarm under separate permit.
Details
Permit
202212228969
Status
complete
Filed
Dec 22, 2022
Permit issued
Feb 13, 2024
Final sign-off
Jan 29, 2026
Declared cost
$75,000
Address
484 Guerrero St

renovate 1 guest room at ground floor, install full kitchen & reconfigure for 1-bedroom layout to become adu. convert 1-car garage into 1 adu (state program). adu to be a studio apartment. modifications to (e) sprinklers under separate permit. upgrade fire alarm under separate permit.

Open the permit page

$75,000
Dec 20, 2022Never finaled
issued May 2023, no final
1240 Bush Ststructural revision to permit #202106293399. reduce number of new openings in masonry wall at courtyard. eliminate moment frames.
Details
Permit
202212208817
Status
issued
Filed
Dec 20, 2022
Permit issued
May 16, 2023
Address
1240 Bush St

structural revision to permit #202106293399. reduce number of new openings in masonry wall at courtyard. eliminate moment frames.

Open the permit page

Dec 20, 2022Expired or cancelled
cancelled Jan 2026
1010 Bush St4/f: remove unpermitted kitchen at 4/f for reinstatement of (2) sro units #314/316. no change to exterior.
Details
Permit
202212208795
Status
cancelled
Filed
Dec 20, 2022
Declared cost
$20,000
Address
1010 Bush St

4/f: remove unpermitted kitchen at 4/f for reinstatement of (2) sro units #314/316. no change to exterior.

Open the permit page

$20,000