R Group, Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Dec 2025
- Last 24 months
- 8 permits filed
72 permits since 2000: 59 completed, 3 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2025 | Completed final sign-off Mar 2026 | 1800 Bryant St | replace bathtub at mezzanine level with shower.Details
replace bathtub at mezzanine level with shower. | $15,000 |
| Nov 26, 2025 | Completed final sign-off Mar 2026 | 1800 Bryant St | unit #204: replace kitchen cabinets & countertop. replace (2) bathroom vanities in bathrooms only.Details
unit #204: replace kitchen cabinets & countertop. replace (2) bathroom vanities in bathrooms only. | $40,000 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 1658 Kirkwood Av | convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.Details
convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application. | $8,000 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 1654 Kirkwood Av | convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application.Details
convert portion of existing unit to storage at ground floor. remove (e) unit stair from ground floor to second floor. work tacitly required by cpc as part of the in-review adu application. | $8,000 |
| Sep 29, 2025 | Completed final sign-off May 2026 | 3258 Market St | to comply with complaint #20239345 item #2 section of ceiling at laundry area: to repair dryrot and notched framing.Details
to comply with complaint #20239345 item #2 section of ceiling at laundry area: to repair dryrot and notched framing. | $10,000 |
| Aug 26, 2025 | Completed final sign-off Dec 2025 | 1278 Minnesota St | tenant improvement to install new mechanical systems for pdr (light manufacturing) on ground & mezzanine floorsDetails
tenant improvement to install new mechanical systems for pdr (light manufacturing) on ground & mezzanine floors | $35,000 |
| Aug 5, 2025 | In progress issued Mar 2026 | 1654 Kirkwood Av | convert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323Details
convert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323 | $5,000 |
| Aug 5, 2025 | In progress issued Mar 2026 | 1658 Kirkwood Av | convert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323Details
convert ground floor portion of (e) storage to (1) new adu per ca govt code section 66323 | $5,000 |
| Oct 20, 2023 | In progress issued Apr 2026 | 170 Montcalm St | erect a 3 story, type 5b, single family dwelling plus adu (state) with one basement.Details
erect a 3 story, type 5b, single family dwelling plus adu (state) with one basement. | $905,500 |
| Mar 31, 2023 | Completed final sign-off Nov 2023 | 1278 Minnesota St | partition (e) pdr space into two sep pdr spaces. basement is on minnesota st level. ground fl is one flr above minnesota. proposed change is entirely within the (e) envelope. scope of work localized. new internal stairs from ground to basement at north industrial area.Details
partition (e) pdr space into two sep pdr spaces. basement is on minnesota st level. ground fl is one flr above minnesota. proposed change is entirely within the (e) envelope. scope of work localized. new internal stairs from ground to basement at north industrial area. | $5,000 |
| Jan 27, 2022 | Completed final sign-off Apr 2022 | 208 Montcalm St | to obtain final inspection for work approved under pa's 9304485 and 9405330. all work is complete.Details
to obtain final inspection for work approved under pa's 9304485 and 9405330. all work is complete. | |
| Nov 30, 2021 | Completed final sign-off Dec 2021 | 696 Pennsylvania Av | to obtain final inspection for pa# 201807205070. all work is complete.Details
to obtain final inspection for pa# 201807205070. all work is complete. | |
| Nov 30, 2021 | Completed final sign-off Apr 2022 | 208 Montcalm St | renew permit pa# 201311262937. 208 moncalm st. for final inspection. all work is complete.Details
renew permit pa# 201311262937. 208 moncalm st. for final inspection. all work is complete. | |
| Oct 4, 2021 | Completed final sign-off Nov 2022 | 21 Mountain Spring Av | to obtain final inspection for work approved under pa# 201009171089, 201609097342, and 201705035512. all work is complete.Details
to obtain final inspection for work approved under pa# 201009171089, 201609097342, and 201705035512. all work is complete. | |
| Nov 19, 2019 | Completed final sign-off Feb 2024 | 1400 Tennessee St | ref pa# 201910114334; install new electrical power and lighting for t.iDetails
ref pa# 201910114334; install new electrical power and lighting for t.i | $3,000 |
| Nov 8, 2019 | Expired or cancelled withdrawn Dec 2020 | 1627 Jerrold Av | erect a 3 story,no basement, 1 dwelling type v-b mixed use building. **maher n/a**Details
erect a 3 story,no basement, 1 dwelling type v-b mixed use building. **maher n/a** | $250,000 |
| Oct 11, 2019 | Completed final sign-off Feb 2024 | 1400 Tennessee St | revision to app#201909181966. t.i. adding break room to unit #3 to include non-bearing partition walls.Details
revision to app#201909181966. t.i. adding break room to unit #3 to include non-bearing partition walls. | $125,000 |
| Sep 18, 2019 | Completed final sign-off Dec 2021 | 1400 Tennessee St | office tenant improvement. add offices into warehouseDetails
office tenant improvement. add offices into warehouse | $10,000 |
| May 25, 2018 | Completed final sign-off May 2025 | 1658 Kirkwood Av | vertical addition and change of use. add 2 stories. modify existing garage level concrete block walls and concrete slab floor as needed to allow for the creation of a 2 car parking garage and 2 residential units above.Details
vertical addition and change of use. add 2 stories. modify existing garage level concrete block walls and concrete slab floor as needed to allow for the creation of a 2 car parking garage and 2 residential units above. | $300,000 |
| May 25, 2018 | Completed final sign-off May 2025 | 1654 Kirkwood Av | vertical addition & change of use. add 2 stories. modify existing garage level concrete block walls and concrete slab floor as needed to allow for the creation of a 2 car parking garage and 2 residential units above.Details
vertical addition & change of use. add 2 stories. modify existing garage level concrete block walls and concrete slab floor as needed to allow for the creation of a 2 car parking garage and 2 residential units above. | $300,000 |
| May 3, 2017 | Completed final sign-off Nov 2022 | 21 Mountain Spring Av | replace (e) site retaining wallDetails
replace (e) site retaining wall | $25,000 |
| Jan 10, 2017 | Completed final sign-off Dec 2017 | 239 Arleta Av | kitchen - replace existing cabinets, new counter tops, up grade electrical and plumbing to add garbage disposal. bathroom - replace all bathroom fixtures.Details
kitchen - replace existing cabinets, new counter tops, up grade electrical and plumbing to add garbage disposal. bathroom - replace all bathroom fixtures. | $30,000 |
| Sep 9, 2016 | Expired or cancelled expired Nov 2022 | 21 Mountain Spring Av | revision to previously approved shoring scope on pa 2010-0917-1084(s1) shoring at hem of 21 mountain spring.Details
revision to previously approved shoring scope on pa 2010-0917-1084(s1) shoring at hem of 21 mountain spring. | |
| Sep 1, 2015 | Completed final sign-off Mar 2016 | 2126 32nd Av | kitchen: replacing (e) cabinet, new countertop - replace old, upgrade elect/plumb add garbage disposal. living room: remove (e) solid fuel fireplace and replace with gas fireplace, no walls to be altered or removedDetails
kitchen: replacing (e) cabinet, new countertop - replace old, upgrade elect/plumb add garbage disposal. living room: remove (e) solid fuel fireplace and replace with gas fireplace, no walls to be altered or removed | $25,000 |
| Jun 25, 2015 | Completed final sign-off Mar 2024 | 1400 Tennessee St | install mechanical units & lighting. n/a maher ordinance installing sprinklers in new bathrooms and other revisions required to sprinkler system under separate application.Details
install mechanical units & lighting. n/a maher ordinance installing sprinklers in new bathrooms and other revisions required to sprinkler system under separate application. | $75,000 |
| Feb 26, 2015 | Completed final sign-off Mar 2016 | 1400 Tennessee St | t.i. to extg vacant warehouse. upgrade extg mezzanine joists, extg glulams and posts to remain. provide new footings for posts. provide 2 ada restrooms per tenant space as 20% upgrade. n/a for the maher ordinance.Details
t.i. to extg vacant warehouse. upgrade extg mezzanine joists, extg glulams and posts to remain. provide new footings for posts. provide 2 ada restrooms per tenant space as 20% upgrade. n/a for the maher ordinance. | $60,000 |
| Jan 30, 2015 | Completed final sign-off Mar 2015 | 1258 Minnesota St | 1st floor: install new lighting for t.i. ref. appl. 2014.0825.4643. maher n/a.Details
1st floor: install new lighting for t.i. ref. appl. 2014.0825.4643. maher n/a. | $10,000 |
| Sep 9, 2014 | Completed final sign-off Mar 2015 | 1258 Minnesota St | install new mechanical system for t.i. for p.d.r (light manufacturing) on basement and ground floor. ref app#201408254643. n/a for the maher ordinance #155-13.Details
install new mechanical system for t.i. for p.d.r (light manufacturing) on basement and ground floor. ref app#201408254643. n/a for the maher ordinance #155-13. | $90,000 |
| Aug 25, 2014 | Completed final sign-off Aug 2014 | 1275 Indiana St | revision to app#200212244171 s3 r-1. reconfigure units 403,404,405, and 406 on the 5th floor.Details
revision to app#200212244171 s3 r-1. reconfigure units 403,404,405, and 406 on the 5th floor. | |
| Jul 31, 2014 | Completed final sign-off Aug 2014 | 1275 Indiana St | to obtain final inspection for work approved under pa#200212244171. all work is complete.Details
to obtain final inspection for work approved under pa#200212244171. all work is complete. | |
| Jul 28, 2014 | Completed final sign-off Aug 2014 | 1275 Indiana St | ref. permit #2002.1224.4171. as builts to reflect change in operational matrix from 2nd floor to 1st floor for alt. recall. n/a ordinance #155-13.Details
ref. permit #2002.1224.4171. as builts to reflect change in operational matrix from 2nd floor to 1st floor for alt. recall. n/a ordinance #155-13. | |
| Jul 8, 2014 | Completed final sign-off Sep 2014 | 810 07th St | install lighting for tenant improvement. ref 201308083824Details
install lighting for tenant improvement. ref 201308083824 | $3,000 |
| Jun 2, 2014 | Completed final sign-off Aug 2014 | 1275 Indiana St | evacuation maps for new building-10 total, 4 floors, ref app #2002.1224.4171. compliance with ordinance 155-13 not requiredDetails
evacuation maps for new building-10 total, 4 floors, ref app #2002.1224.4171. compliance with ordinance 155-13 not required | $5,000 |
| May 8, 2014 | Completed final sign-off May 2014 | 2419 Mission St | to comply with nov# 200875513 dated 10/14/08. to obtain final inspection for work approved under pa# 201108051883. all work is complete.Details
to comply with nov# 200875513 dated 10/14/08. to obtain final inspection for work approved under pa# 201108051883. all work is complete. | $3,000 |
| May 8, 2014 | Completed final sign-off Mar 2016 | 1400 Tennessee St | structural strengthening @ 1/f level, cap (e) exterior foundation & tie (e) foundation with new grade beams. ba-017 vacant, no da checklist. n/a ordinance #155-13.Details
structural strengthening @ 1/f level, cap (e) exterior foundation & tie (e) foundation with new grade beams. ba-017 vacant, no da checklist. n/a ordinance #155-13. | $50,000 |
| Aug 8, 2013 | Completed final sign-off Sep 2014 | 890 07th St | install new hvac system for tenant improvementDetails
install new hvac system for tenant improvement | $15,000 |
| Aug 8, 2013 | Completed final sign-off Sep 2014 | 810 07th St | install new hvac system for tenant improvementDetails
install new hvac system for tenant improvement | $9,000 |
| May 1, 2013 | Never finaled issued Jul 2013, no final | 2175 Harrison St | install entry awning with lighting above door for mr muggles dog kennelDetails
install entry awning with lighting above door for mr muggles dog kennel | $5,000 |
| Apr 9, 2013 | Never finaled issued Apr 2013, no final | 2175 Harrison St | paint two signs dor dog care center. non structural.Details
paint two signs dor dog care center. non structural. | $5,000 |
| Apr 9, 2013 | Never finaled issued Apr 2013, no final | 2175 Harrison St | paint two signs dor dog care center. non structural.Details
paint two signs dor dog care center. non structural. | $5,000 |
| Nov 13, 2012 | Completed final sign-off Jun 2013 | 2175 Harrison St | interior remodel for dog daycare facility.Details
interior remodel for dog daycare facility. | $90,000 |
| Oct 22, 2012 | Completed final sign-off Sep 2014 | 888 07th St | provide lighting plans & t-24 energy compliance for lighting for unit r2-2. work is only in the b occupancy (no work in the r-2 under this scope. this is not a high-rise).Details
provide lighting plans & t-24 energy compliance for lighting for unit r2-2. work is only in the b occupancy (no work in the r-2 under this scope. this is not a high-rise). | $4,000 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 2175 Harrison St | remodel 1st fl. add parition walls, new concrete sog. repair accessible lift. space to remain vacant. future ti under separate permit. (per ab-017).Details
remodel 1st fl. add parition walls, new concrete sog. repair accessible lift. space to remain vacant. future ti under separate permit. (per ab-017). | $25,000 |
| Aug 16, 2012 | Completed final sign-off Nov 2012 | 888 07th St | install new mechanical systems for tenant improvement for offices in unit r2-2. gr fl on 7th stDetails
install new mechanical systems for tenant improvement for offices in unit r2-2. gr fl on 7th st | $18,000 |
| Jun 4, 2012 | Completed final sign-off Jun 2012 | 1301 Indiana St | revision to appl #2002.12.24.4169/s3 -provide as-built to change basement garage exhaust discharge from courtyard to rooftop.Details
revision to appl #2002.12.24.4169/s3 -provide as-built to change basement garage exhaust discharge from courtyard to rooftop. | $1,000 |
| Apr 12, 2012 | Completed final sign-off Sep 2014 | 888 07th St | structural ti for 201101198590 for tenant space r2-2 on second floor only.Details
structural ti for 201101198590 for tenant space r2-2 on second floor only. | $50,000 |
| Apr 2, 2012 | Completed final sign-off Jun 2012 | 1301 Indiana St | refer to pa# 2002-1224-4169-location for evacuation mapsDetails
refer to pa# 2002-1224-4169-location for evacuation maps | $1,500 |
| Aug 5, 2011 | Expired or cancelled expired May 2014 | 2419 Mission St | to replace rear stairs as needed. less than 50% stairs being replaced. to comply with his nov #200875513 dated 10/14/2008.Details
to replace rear stairs as needed. less than 50% stairs being replaced. to comply with his nov #200875513 dated 10/14/2008. | $3,000 |
| Feb 8, 2011 | Completed final sign-off Mar 2011 | 1310 Minnesota St | remove north facing property line windows per plan infill opening with 2x6 studs at wood walls. exterior stucco to match existing. remove windows not for light & ventilation. total 6 windows.Details
remove north facing property line windows per plan infill opening with 2x6 studs at wood walls. exterior stucco to match existing. remove windows not for light & ventilation. total 6 windows. | $500 |
| Feb 8, 2011 | Completed final sign-off May 2011 | 1310 Minnesota St | remove north facing property line windows per plan infill opening with 2x6 studs at wood walls. removed windows not for light, ventatilation, 4 totalexterior stucco ti match existingDetails
remove north facing property line windows per plan infill opening with 2x6 studs at wood walls. removed windows not for light, ventatilation, 4 totalexterior stucco ti match existing | $500 |
| Feb 8, 2011 | Completed final sign-off May 2011 | 1310 Minnesota St | remove north facing property line windows per plan in fill opening with 2x6 studs at wood walls. exterior stucco to match existingDetails
remove north facing property line windows per plan in fill opening with 2x6 studs at wood walls. exterior stucco to match existing | $500 |
| Feb 7, 2011 | Completed final sign-off May 2011 | 1310 Minnesota St | remove north facing property line windows at all floors per plan. in-fill frame with 2x6 studs with wood walls & shotcrete at concrete wall. stucco to match (e) stucco exterior. work @ common area only, 1/f-garage level & stairs. remove window total 9 windows. not required for light & vent.Details
remove north facing property line windows at all floors per plan. in-fill frame with 2x6 studs with wood walls & shotcrete at concrete wall. stucco to match (e) stucco exterior. work @ common area only, 1/f-garage level & stairs. remove window total 9 windows. not required for light & vent. | $500 |
| Jan 19, 2011 | Completed final sign-off Sep 2014 | 888 07th St | interior t.i. for 3 (e) story vacant retail spaces ( #r-2-1, #r-2-2, #r-2-3), mep & structural(space 2-2) under separate permit, new ada bathrooms, new partition walls, new floor & wall finishes. no ext. work. fire sprinkler & fire alarm on separate permit.Details
interior t.i. for 3 (e) story vacant retail spaces ( #r-2-1, #r-2-2, #r-2-3), mep & structural(space 2-2) under separate permit, new ada bathrooms, new partition walls, new floor & wall finishes. no ext. work. fire sprinkler & fire alarm on separate permit. | $230,000 |
| Sep 17, 2010 | Expired or cancelled expired Nov 2022 | 21 Mountain Spring Av | erect 3 stories, 1 basement, 1 unit building.Details
erect 3 stories, 1 basement, 1 unit building. | $600,000 |
| Sep 17, 2010 | Completed final sign-off Oct 2022 | 15 Mountain Spring Av | demolish 1 story, 1 unit bldg on 2 lots.Details
demolish 1 story, 1 unit bldg on 2 lots. | $10,000 |
| Jul 23, 2010 | Completed final sign-off Apr 2023 | 25 Rutledge St | remodel interior space. add new inter connecting stairs between floors. add new full baths and bedroom at ground level, add new flat skylights at upper floorDetails
remodel interior space. add new inter connecting stairs between floors. add new full baths and bedroom at ground level, add new flat skylights at upper floor | $45,000 |
| Jul 14, 2010 | Completed final sign-off Apr 2023 | 25 Rutledge St | revision to pa# 2010-0414-0274-revise foundation detail all revision labeled delta 1Details
revision to pa# 2010-0414-0274-revise foundation detail all revision labeled delta 1 | $1,000 |
| Jul 13, 2010 | Never finaled issued Jul 2010, no final | 19 Rutledge St | new foundation @ west side along property line, strengthen floor joistsDetails
new foundation @ west side along property line, strengthen floor joists | $8,500 |
| May 17, 2010 | Completed final sign-off Oct 2010 | 21 Fountain St | revision to p.a.#201002116362 landscape retaining wall replacement per plan.Details
revision to p.a.#201002116362 landscape retaining wall replacement per plan. | $12,000 |
| Feb 18, 2010 | Completed final sign-off Oct 2010 | 27 Fountain St | rear deck repair in kindDetails
rear deck repair in kind | $15,000 |
| Feb 11, 2010 | Completed final sign-off Oct 2010 | 21 Fountain St | repair & replace existing rear deck and add (n) reinforcing structural steel frame & footing.Details
repair & replace existing rear deck and add (n) reinforcing structural steel frame & footing. | $15,000 |
| Nov 12, 2009 | Completed final sign-off Oct 2010 | 21 Fountain St | for final inspection for work approved under appl. # 200810234907.Details
for final inspection for work approved under appl. # 200810234907. | |
| Nov 12, 2009 | Completed final sign-off Oct 2010 | 21 Fountain St | additional work to ba#200810234907, to replace (e) roof framing no change to floor plan.Details
additional work to ba#200810234907, to replace (e) roof framing no change to floor plan. | $5,000 |
| Nov 12, 2009 | Completed final sign-off Oct 2010 | 21 Fountain St | for final inspection for work approved under appl. # 200807086176.Details
for final inspection for work approved under appl. # 200807086176. | |
| Nov 12, 2009 | Completed final sign-off Oct 2010 | 21 Fountain St | for final inspection for work approved under appl. # 200808229893.Details
for final inspection for work approved under appl. # 200808229893. | $40,000 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 286 Holladay Av | rev. to pa# 2009.06.23.1034. new concrete wall in lieu of 2x stud wall per plans. replace ceiling joist at roof levelDetails
rev. to pa# 2009.06.23.1034. new concrete wall in lieu of 2x stud wall per plans. replace ceiling joist at roof level | $7,000 |
| Aug 26, 2009 | Completed final sign-off Mar 2010 | 286 Holladay Av | replace (e) 12 metal windows with energy effecient marvin integretity windows wood clad double hung ultrex by marvin. total 12 windows. same size & same location.Details
replace (e) 12 metal windows with energy effecient marvin integretity windows wood clad double hung ultrex by marvin. total 12 windows. same size & same location. | $6,000 |
| Jun 23, 2009 | Completed final sign-off Mar 2010 | 286 Holladay Av | interior remodel & lateral stiffening (voluntary). bathroom & kitchen remodel @ 2nd & 3rd floors. new bathroom & bedroom @ ground floor. new staircase. new bathroom @ 3rd floor. new powder room @ 2nd floor.Details
interior remodel & lateral stiffening (voluntary). bathroom & kitchen remodel @ 2nd & 3rd floors. new bathroom & bedroom @ ground floor. new staircase. new bathroom @ 3rd floor. new powder room @ 2nd floor. | $138,000 |
| Jan 8, 2009 | Completed final sign-off Oct 2010 | 21 Fountain St | interior remodel-new 7'6" horizonal addition at 3rd floor rear area. replacement of pitched roof with flat roof to match ridge line of (e) roof, facade modifications.Details
interior remodel-new 7'6" horizonal addition at 3rd floor rear area. replacement of pitched roof with flat roof to match ridge line of (e) roof, facade modifications. | $75,000 |
| Oct 3, 2008 | Completed final sign-off Oct 2008 | 690 Texas St | construction of non bearing interior partition walls and installation of non cooking kitchenDetails
construction of non bearing interior partition walls and installation of non cooking kitchen | $15,000 |
| Jul 8, 2008 | Expired or cancelled expired Mar 2010 | 21 Fountain St | foundation replacement with new slab on grade and spread footing.Details
foundation replacement with new slab on grade and spread footing. | $55,000 |
| Jul 2, 2008 | Expired or cancelled cancelled Jan 2020 | 21 Fountain St | removal of interior partition walls & replace with relocated partition walls, reconfiguration/relocate of interior stairway, new foundation throughoutDetails
removal of interior partition walls & replace with relocated partition walls, reconfiguration/relocate of interior stairway, new foundation throughout | $200,000 |