Robert Shaffer
- Listed as
- architect, engineer
- Firm
- Morris Shaffer Engineering
- Based in
- San Carlos
- On San Francisco permits
- Apr 2017 to Jul 2026
34 permits since 2000 (engineer on 31 permits, architect on 3 permits): 23 completed, 7 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 4145 Ocean Av | new 1 bed & 1 bath attached adu. convert one car garage & conditioned space in lower level of a 2 story split level sfd into an adu. upper floor work entails only straightening stair down to lower level. laundry moved from mechanical basement to new laundry room.Details
new 1 bed & 1 bath attached adu. convert one car garage & conditioned space in lower level of a 2 story split level sfd into an adu. upper floor work entails only straightening stair down to lower level. laundry moved from mechanical basement to new laundry room. | $155,000 | |
| Apr 2, 2026 | In progress filed Apr 2026, not yet issued | 435 Urbano Dr | comply with nov 202540677 replace (e) fireplace on 2nd fl; demol walls @ 2nd fl; replace interior stairs; dry rot repairDetails
comply with nov 202540677 replace (e) fireplace on 2nd fl; demol walls @ 2nd fl; replace interior stairs; dry rot repair | $20,000 | |
| Dec 23, 2025 | In progress filed Dec 2025, not yet issued | 275 Burnett Av | roof deck expansion. install new ceramic tile on (e) roof, on standard pedestal and clip system. install new glass rail to match(e) glass rail, height at 64". install new skylight at (e) skylight. install new window to match (e) windows, in (e) stairDetails
roof deck expansion. install new ceramic tile on (e) roof, on standard pedestal and clip system. install new glass rail to match(e) glass rail, height at 64". install new skylight at (e) skylight. install new window to match (e) windows, in (e) stair | $75,000 | |
| Dec 3, 2025 | Completed final sign-off May 2026 | 2525 Balboa St | H Construction Co | revision to 202507030114: removing & replacing e) steel beam & steel post along west wall damaged from dryrotDetails
revision to 202507030114: removing & replacing e) steel beam & steel post along west wall damaged from dryrot | $27,000 |
| Jul 23, 2025 | In progress issued Jul 2025 | 4257 23rd St | Aurora Builders | alterations to pa #202109148342 (s1). change sprinkler designation from nfpa code standard 13r to 13d. eliminate gray water landscape system. add foundation phase installation plan. alter some existing wall framing stud thickness from 2x6 to 2x4 and provide revised energy calcs. mp 3.0 and mp 3.1Details
alterations to pa #202109148342 (s1). change sprinkler designation from nfpa code standard 13r to 13d. eliminate gray water landscape system. add foundation phase installation plan. alter some existing wall framing stud thickness from 2x6 to 2x4 and provide revised energy calcs. mp 3.0 and mp 3.1 | |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 762 29th Av | Olcote Builders Inc | revision pa 2024-0201-5085 structural changes to proposed deck. remove window #2 from proposed scope & shear wallsDetails
revision pa 2024-0201-5085 structural changes to proposed deck. remove window #2 from proposed scope & shear walls | |
| Oct 8, 2024 | In progress issued Jan 2025 | 4079 24th St | G J Chavez Inc | repair for fire damage at rear covered porch to compliance with current building codes including covered porch floor framing and (e) top stair landing. review of (e) structure or lateral analysis is not part of this scope. work not visible from street. comply with 202038901 #3Details
repair for fire damage at rear covered porch to compliance with current building codes including covered porch floor framing and (e) top stair landing. review of (e) structure or lateral analysis is not part of this scope. work not visible from street. comply with 202038901 #3 | $5,000 |
| Sep 11, 2024 | Completed final sign-off Oct 2025 | 858 25th Av | North Bay Construction | rev 202303304778: foundation revision to remove and replace (e) substandard foundation.Details
rev 202303304778: foundation revision to remove and replace (e) substandard foundation. | $2,000 |
| May 29, 2024 | Completed final sign-off Sep 2024 | 871 34th Av | Sunset Remodeling And Design Inc | revision to pa# 2024-0322-8384 new foundation at rear portion of building between gridline 5 & 6 on gridline c. to clarify hardy frame foundation sizeDetails
revision to pa# 2024-0322-8384 new foundation at rear portion of building between gridline 5 & 6 on gridline c. to clarify hardy frame foundation size | $5,000 |
| Mar 22, 2024 | Completed final sign-off Sep 2024 | 871 34th Av | Sunset Remodeling And Design Inc | 1st fl: convert e garage into new liv rm,dining rm, kitchen, powder rm, existing rear staircase to be removed. 2nd fl 2 new bdrms, 2 full baths, 2 new skylights. siding repair up to 50 lf,repair roof as necessaryDetails
1st fl: convert e garage into new liv rm,dining rm, kitchen, powder rm, existing rear staircase to be removed. 2nd fl 2 new bdrms, 2 full baths, 2 new skylights. siding repair up to 50 lf,repair roof as necessary | $45,640 |
| Aug 25, 2023 | Completed final sign-off Aug 2024 | 1980 Eddy St | Cr Gonzales | new concrete retaining wall at rear along north & east property lineDetails
new concrete retaining wall at rear along north & east property line | $57,400 |
| Aug 4, 2023 | In progress issued Jul 2024 | 3470 Mission St | Waves Remodeling California | to comply with nov 202309077. storefront window replacement due to car crashing to the suite. underslab concrete repair @ basement w/in sidewalk due to car crashing in suiteDetails
to comply with nov 202309077. storefront window replacement due to car crashing to the suite. underslab concrete repair @ basement w/in sidewalk due to car crashing in suite | $35,000 |
| Mar 30, 2023 | Completed final sign-off Oct 2025 | 858 25th Av | North Bay Construction | extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side.Details
extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side. | $100,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2024 | 2734 Diamond St | Christopher Gate Construction Inc | rev pa# 202206287271: r/r (e) footings & sog in area of demo (kitchen). reframe portion of southern wall w/ inadequate (e) framing. add step between living room & kitchen to level floor. no exterior work.Details
rev pa# 202206287271: r/r (e) footings & sog in area of demo (kitchen). reframe portion of southern wall w/ inadequate (e) framing. add step between living room & kitchen to level floor. no exterior work. | $25,000 |
| Mar 3, 2023 | Completed final sign-off May 2023 | 47 Verna St | Realty Builders Inc | revision to pa# 202212228961, footings.Details
revision to pa# 202212228961, footings. | |
| Feb 16, 2023 | Completed final sign-off Sep 2023 | 42 Stanford Heights Av | Realty Builders Inc | revision for permit# 2022-1222-8957. deck is a complete re-built. plan submittal required by inspector. more than 50%.Details
revision for permit# 2022-1222-8957. deck is a complete re-built. plan submittal required by inspector. more than 50%. | |
| Dec 22, 2022 | Completed final sign-off May 2023 | 47 Verna St | Realty Builders Inc | remove one interior wall (btwn living and kitchen on 2nd flr), remodel one kitchen and one bathroomDetails
remove one interior wall (btwn living and kitchen on 2nd flr), remodel one kitchen and one bathroom | $35,000 |
| Oct 24, 2022 | In progress issued Feb 2026 | 172 Eureka St | Knab Builder | interior and exterior renovation of existing home including conversion of crawlspace square footage in the basement into habitable space.Details
interior and exterior renovation of existing home including conversion of crawlspace square footage in the basement into habitable space. | $500,000 |
| Aug 19, 2022 | Expired or cancelled withdrawn Jun 2023 | 556 Mangels Av | repair (e) retaining wall by adding brace to (e) retaining wall in backyard. (e) retaining wall remain untouched and will not be removed.Details
repair (e) retaining wall by adding brace to (e) retaining wall in backyard. (e) retaining wall remain untouched and will not be removed. | $30,000 | |
| Aug 8, 2022 | Completed final sign-off Oct 2023 | 1779 10th Av | Christopher Gate Construction Inc | 1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f.Details
1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f. | $85,000 |
| Jul 11, 2022 | Completed final sign-off Dec 2023 | 1027 Felton St | Behan Construction | addition to back side of single family residence to include new bedrooms with 2nd floor deck above. remodel at 1st floor to include media room and bathrooms.Details
addition to back side of single family residence to include new bedrooms with 2nd floor deck above. remodel at 1st floor to include media room and bathrooms. | $32,300 |
| Jun 7, 2022 | Completed final sign-off Oct 2022 | 5 Encline Ct | new header over garage door and 4 hold downs on front side of house; install 2 plywood shearwalls at front of building adjacent to garage door openingDetails
new header over garage door and 4 hold downs on front side of house; install 2 plywood shearwalls at front of building adjacent to garage door opening | $6,000 | |
| Sep 14, 2021 | Never finaled issued Jul 2023, no final | 4257 23rd St | Aurora Builders | to erect 2 stories, no basement, type v-b, single family dwelling.Details
to erect 2 stories, no basement, type v-b, single family dwelling. | $1,141,200 |
| Jul 30, 2021 | Completed final sign-off Feb 2023 | 2973 Pine St | installatoin of new exterior stairscase (9ft high) from (e) balcony to (e) ground level patio. staircase to be with metal frame and concrete treads.Details
installatoin of new exterior stairscase (9ft high) from (e) balcony to (e) ground level patio. staircase to be with metal frame and concrete treads. | $25,000 | |
| Jul 8, 2021 | Completed final sign-off Apr 2023 | 1706 Alabama St | revision to 2018-0212-0989 replace concrete slab on grade and concrete foundation improvementsDetails
revision to 2018-0212-0989 replace concrete slab on grade and concrete foundation improvements | $36,000 | |
| Jun 10, 2021 | Expired or cancelled cancelled Aug 2023 | 60 Ventura Av | landscape improvements for an (e) house and includes new fence gate, retaining walls, pathways, stone paving, spa, spa equipment, water feature, firepit, fireplace, lights, outdoor kitchen and detached officeDetails
landscape improvements for an (e) house and includes new fence gate, retaining walls, pathways, stone paving, spa, spa equipment, water feature, firepit, fireplace, lights, outdoor kitchen and detached office | $200,000 | |
| Apr 16, 2021 | Completed final sign-off Oct 2022 | 5 Encline Ct | Innovative Construction Implement | ref pa#: 201903215891 & 202011259705. additional scope of work. replace siding at rear. extend deck at rear. replace deck boards with wood or wood composite boards. replace (e) deck railings with cable railings. replace rotten deck posts if needed.Details
ref pa#: 201903215891 & 202011259705. additional scope of work. replace siding at rear. extend deck at rear. replace deck boards with wood or wood composite boards. replace (e) deck railings with cable railings. replace rotten deck posts if needed. | $21,000 |
| Apr 8, 2021 | Never finaled issued May 2021, no final | 119 Crescent Av | Pacific Construction Company Inc | proposal to upgrade 7 post footing and 2 post base shown on s-1 in garage and crawspace.Details
proposal to upgrade 7 post footing and 2 post base shown on s-1 in garage and crawspace. | $10,000 |
| Jan 27, 2021 | Completed final sign-off Nov 2021 | 231 18th Av | Caruso Construction Inc. | revision to no plan pa# 202012090607: remodel unconditioned space on 1st level to convert to new living area to include new bedroom & bathroom. remodel 2nd level for new internal staircase.Details
revision to no plan pa# 202012090607: remodel unconditioned space on 1st level to convert to new living area to include new bedroom & bathroom. remodel 2nd level for new internal staircase. | $80,000 |
| Nov 25, 2020 | Completed final sign-off Jan 2022 | 5 Encline Ct | Innovative Construction Implement | 1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891Details
1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891 | $280,000 |
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 714 Chenery St | Mccormack Construction | new kitchen & master bathroom & 2 smaller bathrooms. one structural wall removal, new floors, electrical & plumbing, new closet.Details
new kitchen & master bathroom & 2 smaller bathrooms. one structural wall removal, new floors, electrical & plumbing, new closet. | $200,000 |
| Jun 19, 2018 | Completed final sign-off Nov 2020 | 285 South Van Ness Av | Camello Inc. | partial demo of interior portions of (e) blg. partial demo of ext facade. installation of exterior curtain wall and cladding system. new t.i. to (e) space includes: new and (e) office spaces, new restroom, new break area and new fire rated corridorDetails
partial demo of interior portions of (e) blg. partial demo of ext facade. installation of exterior curtain wall and cladding system. new t.i. to (e) space includes: new and (e) office spaces, new restroom, new break area and new fire rated corridor | $500,000 |
| Oct 5, 2017 | Completed final sign-off Oct 2018 | 27 Dorland St | Benjamin Shaw | addition of conditioned space at first floor to include 2 bedrooms, playroom, laundry and a bathroom and (n) interior and exterior stairs. no building expansion.Details
addition of conditioned space at first floor to include 2 bedrooms, playroom, laundry and a bathroom and (n) interior and exterior stairs. no building expansion. | $120,000 |
| Apr 18, 2017 | Completed final sign-off Mar 2018 | 35 Noe St | Behan Construction | convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall.Details
convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall. | $35,000 |