Innovative Construction Implement
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Aug 2024
- Last 24 months
- 0 permits filed
144 permits since 2000: 100 completed, 34 never finaled, 10 expired or cancelled.
Of the 34 never-finaled permits, 3 are 3 to 5 years old, 24 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 144.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2024 | Completed final sign-off Nov 2024 | 30 Loomis St | comply w/ nov #202425833: remove un-permitted cannabis grow operation & revert back to (e) commercial space. remove all un-permitted electrical, mech, & plumbing work with operation.Details
comply w/ nov #202425833: remove un-permitted cannabis grow operation & revert back to (e) commercial space. remove all un-permitted electrical, mech, & plumbing work with operation. | $8,000 |
| Feb 12, 2024 | Completed final sign-off Oct 2024 | 325 Leavenworth St | unit #2b: cosmetic remodel like-to-like all rooms due to deterioration & mold. no window replacement and structural work involved. bathroom & kitchen new plumbing and lighting fixtures.Details
unit #2b: cosmetic remodel like-to-like all rooms due to deterioration & mold. no window replacement and structural work involved. bathroom & kitchen new plumbing and lighting fixtures. | $5,000 |
| Dec 19, 2023 | Completed final sign-off Apr 2024 | 3636 Cesar Chavez St | rev to pa 202210134322: to reflect the as-built site condition per inspection correction action. update mechanical hvac unit and update water heater unit per plan.Details
rev to pa 202210134322: to reflect the as-built site condition per inspection correction action. update mechanical hvac unit and update water heater unit per plan. | $15,000 |
| Aug 10, 2023 | Completed final sign-off Oct 2023 | 2112 29th Av | replacement of rear siding approx 500 sq.ft.Details
replacement of rear siding approx 500 sq.ft. | $4,500 |
| Jun 14, 2023 | Completed final sign-off May 2024 | 1563 Underwood Av | enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind.Details
enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind. | $100,000 |
| Apr 3, 2023 | Completed final sign-off Sep 2024 | 1943 Jennings St | 2 new bedrooms, 1 new media, 2 new closets, 1 new bathroom on g/f per lans. reolcoate (e) laundry machines, wash basin, tank water heater and havac into the parking ggarage plan planDetails
2 new bedrooms, 1 new media, 2 new closets, 1 new bathroom on g/f per lans. reolcoate (e) laundry machines, wash basin, tank water heater and havac into the parking ggarage plan plan | $70,000 |
| Jan 17, 2023 | Expired or cancelled cancelled Feb 2023 | 1 Chicago Wy | remodel (e) 1 kitchen (120 sf) & 1 bathroom (50 sf) with new countertop, new appliances, new plumbing fixtures in same layout, all work in-link-kind. no layout or wall modifications/changes.Details
remodel (e) 1 kitchen (120 sf) & 1 bathroom (50 sf) with new countertop, new appliances, new plumbing fixtures in same layout, all work in-link-kind. no layout or wall modifications/changes. | $38,000 |
| Oct 13, 2022 | Completed final sign-off Dec 2022 | 30 Baltimore Wy | rev to pa202205184534: r/r stucco at front of building. facade characteristics remain the same. r/r siding at rear of building wall and replace rear (e) deck in-kind due to dry-rot damage per bid c/nDetails
rev to pa202205184534: r/r stucco at front of building. facade characteristics remain the same. r/r siding at rear of building wall and replace rear (e) deck in-kind due to dry-rot damage per bid c/n | $30,000 |
| Oct 12, 2022 | Completed final sign-off Jul 2024 | 1926 42nd Av | comply w/ 2021-012253enf: legalize the (e) bedroom, living room, bathroom and laundry on g/f. remove the roof shade above rear deck. remove one (e) shed at rear yard.Details
comply w/ 2021-012253enf: legalize the (e) bedroom, living room, bathroom and laundry on g/f. remove the roof shade above rear deck. remove one (e) shed at rear yard. | $50,000 |
| Oct 12, 2022 | Completed final sign-off Dec 2022 | 329 25th Av | remodel kitchen & bathroom on 2/f unit 2. like to like, new kitchen counter, new appliances. new plumbing fixtures. all work in unit #2 only.Details
remodel kitchen & bathroom on 2/f unit 2. like to like, new kitchen counter, new appliances. new plumbing fixtures. all work in unit #2 only. | $80,000 |
| Sep 15, 2022 | Expired or cancelled cancelled Feb 2026 | 2864 San Bruno Av | englarge the (e) rear deck on 2/f.Details
englarge the (e) rear deck on 2/f. | $25,000 |
| Aug 29, 2022 | Completed final sign-off Sep 2022 | 3123 Clement St | to comply with complaint 202293985: cosmetic upgrade to (e) restaurant exterior facaed wall with new paint & 1 new signage above storefront 7x5ft (25sf - as measured around sign text) wall non-illuminatedDetails
to comply with complaint 202293985: cosmetic upgrade to (e) restaurant exterior facaed wall with new paint & 1 new signage above storefront 7x5ft (25sf - as measured around sign text) wall non-illuminated | $2,000 |
| Jul 22, 2022 | Completed final sign-off Mar 2024 | 72 Moneta Wy | remodel (e) kitchen & bathroom all in-kind. no change in (e) layout/ wall modification.electrical upgrade to main level & g/f with h.e. lights. remove (e) wall & ceiling plaster for electrical installation/upgrade remove and patch only. remoev (e) fireplace insert in living room & patch.Details
remodel (e) kitchen & bathroom all in-kind. no change in (e) layout/ wall modification.electrical upgrade to main level & g/f with h.e. lights. remove (e) wall & ceiling plaster for electrical installation/upgrade remove and patch only. remoev (e) fireplace insert in living room & patch. | $35,000 |
| Jul 14, 2022 | Completed final sign-off Mar 2024 | 531 20th Av | comply with nov 202292225: legalize the pergola at rear yard with 11ftx9ft and 8ft max from finished grade per plan, the two rear yard retaining walls were pre-(e per photo provided on sheet a1.2. one new retaining wall less than 4 feet with no permit required.Details
comply with nov 202292225: legalize the pergola at rear yard with 11ftx9ft and 8ft max from finished grade per plan, the two rear yard retaining walls were pre-(e per photo provided on sheet a1.2. one new retaining wall less than 4 feet with no permit required. | $10,000 |
| Jun 13, 2022 | Completed final sign-off Oct 2024 | 1319 Brussels St | remodel (e) bathroom & ktichen. no change in layout/wall demo/modfications. electrical upgrade to main level and g/f with h.e. lights; remove (e) wall and ceiling plaster for electrical upgrade and installationg to ocmly w/ cec - patch and replace. remove (e) fireplace insert in living room & patch.Details
remodel (e) bathroom & ktichen. no change in layout/wall demo/modfications. electrical upgrade to main level and g/f with h.e. lights; remove (e) wall and ceiling plaster for electrical upgrade and installationg to ocmly w/ cec - patch and replace. remove (e) fireplace insert in living room & patch. | $35,000 |
| Mar 18, 2022 | Completed final sign-off Feb 2023 | 588 12th Av | stucco repair at front of building. siding rpelacement at rear. all work like to like.Details
stucco repair at front of building. siding rpelacement at rear. all work like to like. | $5,000 |
| Jan 24, 2022 | Completed final sign-off Mar 2024 | 531 20th Av | rev to pa202109138254. infill 1/f at rear.add 1 entertainment, 1 play room with wet bar and 1 bathroom and 1 mech room on 1/f. relocate and remodel (e) kitchen & living room on 2/f. add 1 powder room & 1 storage on 2/f. convert (e) bedrooms into a master bedroom on 3/f.new deck less than 10ft gradeDetails
rev to pa202109138254. infill 1/f at rear.add 1 entertainment, 1 play room with wet bar and 1 bathroom and 1 mech room on 1/f. relocate and remodel (e) kitchen & living room on 2/f. add 1 powder room & 1 storage on 2/f. convert (e) bedrooms into a master bedroom on 3/f.new deck less than 10ft grade | $340,000 |
| Jan 24, 2022 | Completed final sign-off Feb 2023 | 588 12th Av | rev to pa202106243178: replace side p.l. window glazing only (exist. frame to remain). filling (e) storage room at rear on 1/f. relocate bathroom, replace 6 front window. new master bath layout plumbing fixture locations,remove 1 skylight on 3/fDetails
rev to pa202106243178: replace side p.l. window glazing only (exist. frame to remain). filling (e) storage room at rear on 1/f. relocate bathroom, replace 6 front window. new master bath layout plumbing fixture locations,remove 1 skylight on 3/f | |
| Dec 21, 2021 | Completed final sign-off Mar 2022 | 459 Turk St | 4 (e) showers. replace tile and shower drains.Details
4 (e) showers. replace tile and shower drains. | $4,000 |
| Nov 19, 2021 | Completed final sign-off Jan 2022 | 8400 Oceanview Tr | apt 220: remodel kitchen like to like including new appliances. remodel bathroom with new fixtures. retile kitchen & bathroom. no structural work.Details
apt 220: remodel kitchen like to like including new appliances. remodel bathroom with new fixtures. retile kitchen & bathroom. no structural work. | $16,000 |
| Nov 15, 2021 | Completed final sign-off Dec 2021 | 329 25th Av | apt 1: kitchen remodel on 2. new counter top, appliances fixtures. inkind replacement. no layout changes. no walls infilled/modified. no structural work. no framing modifications.Details
apt 1: kitchen remodel on 2. new counter top, appliances fixtures. inkind replacement. no layout changes. no walls infilled/modified. no structural work. no framing modifications. | $8,000 |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 2258 25th Av | structural rev to pa202109208771. remove structural beam. reconfigure bathroom vanity location. remove structural beams, reconfigure bathroom vanity location & window size.Details
structural rev to pa202109208771. remove structural beam. reconfigure bathroom vanity location. remove structural beams, reconfigure bathroom vanity location & window size. | |
| Sep 20, 2021 | Completed final sign-off Mar 2022 | 2258 25th Av | infill at g/f underneath (e) cantiliver structure on 2/f. relocate the (e) bathroom on (e) g/f. turn the (e) bedroom into entertainment area.Details
infill at g/f underneath (e) cantiliver structure on 2/f. relocate the (e) bathroom on (e) g/f. turn the (e) bedroom into entertainment area. | $40,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2024 | 531 20th Av | remodel 1 bathroom & 1 kitchen. no change in layout. electrical upgrade to main slevel and g/f with h.e. lights; remove (e) wall sheetrock and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace). remove (e) fireplace insert in living roomDetails
remodel 1 bathroom & 1 kitchen. no change in layout. electrical upgrade to main slevel and g/f with h.e. lights; remove (e) wall sheetrock and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace). remove (e) fireplace insert in living room | $20,000 |
| Aug 30, 2021 | Never finaled issued Nov 2021, no final | 1900 Irving St | rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021)Details
rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021) | |
| Aug 30, 2021 | Never finaled issued Nov 2021, no final | 1906 Irving St | rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021)Details
rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021) | |
| Aug 23, 2021 | Completed final sign-off Sep 2021 | 626 Mission Bay Blvd North Bl | room 209: instll ada grab bar around the shower pan area.Details
room 209: instll ada grab bar around the shower pan area. | $1,000 |
| Jul 14, 2021 | Completed final sign-off Jul 2022 | 1234 40th Av | revision to pa# 202106243150 to clarify the foundation condition at property line. revised detail to confirm no underpinning occurs at adjacent propertyDetails
revision to pa# 202106243150 to clarify the foundation condition at property line. revised detail to confirm no underpinning occurs at adjacent property | |
| Jul 13, 2021 | Completed final sign-off Jul 2022 | 1234 40th Av | remove and replace four windows with single hung aluminum frame and wood clad at building front with similar opening to meet the current u-factor requirement and to match the original design and operation. all facing street.Details
remove and replace four windows with single hung aluminum frame and wood clad at building front with similar opening to meet the current u-factor requirement and to match the original design and operation. all facing street. | $8,000 |
| Jul 9, 2021 | Completed final sign-off Nov 2021 | 201 Chicago Wy | rev pa202007089810: r/r 3 windows on 2/f rear.r/r 3 windows on 1/f rear. wdws not visible to stret. repair (e) siding at rear (east and right side (south) approx 30% - not visible to street.Details
rev pa202007089810: r/r 3 windows on 2/f rear.r/r 3 windows on 1/f rear. wdws not visible to stret. repair (e) siding at rear (east and right side (south) approx 30% - not visible to street. | |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 196 Urbano Dr | stucco repair at front, rear and side of the building. total work less than 50%.Details
stucco repair at front, rear and side of the building. total work less than 50%. | $3,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2023 | 588 12th Av | 1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124.Details
1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124. | $45,000 |
| Jun 24, 2021 | Completed final sign-off Jul 2022 | 1234 40th Av | rev to pa202011199280 structural only. proposed underpinning on garage level along guildline 1 & 4 to comply with min height requirement by excavation approx 8in. replace (e) overhead beam at garage level due to dryrot per plan.replace (e) roof joist on 2/f master bedroom at rear.Details
rev to pa202011199280 structural only. proposed underpinning on garage level along guildline 1 & 4 to comply with min height requirement by excavation approx 8in. replace (e) overhead beam at garage level due to dryrot per plan.replace (e) roof joist on 2/f master bedroom at rear. | |
| Jun 21, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | rev pa202102184908: update structural plan acording to (e) conditions. relocated (e) bedroom and add 1 new bathroom, 1 wet bar on 1/f per plan. revised rear deck layout per plan. no change in height.Details
rev pa202102184908: update structural plan acording to (e) conditions. relocated (e) bedroom and add 1 new bathroom, 1 wet bar on 1/f per plan. revised rear deck layout per plan. no change in height. | $10,000 |
| Jun 10, 2021 | Expired or cancelled cancelled Feb 2023 | 588 12th Av | remodel (e) kitchen & bathroom. no change in layout or mod of walls.electrical upgrade to maimn level, upper level and garage floor with h.e. lights. remove plaster from (e) walls and ceilings for electrical upgrade and install insulation with current energy code and replace in-kind.Details
remodel (e) kitchen & bathroom. no change in layout or mod of walls.electrical upgrade to maimn level, upper level and garage floor with h.e. lights. remove plaster from (e) walls and ceilings for electrical upgrade and install insulation with current energy code and replace in-kind. | $22,000 |
| May 20, 2021 | Completed final sign-off Jun 2021 | 909 Geary St | room 623: install grab bar around the shower. maher n/a.Details
room 623: install grab bar around the shower. maher n/a. | $500 |
| May 20, 2021 | Completed final sign-off Jun 2021 | 540 Jones St | room 202: replace/install grab bars in shower tub stall in unit. maher n/aDetails
room 202: replace/install grab bars in shower tub stall in unit. maher n/a | $500 |
| May 20, 2021 | Completed final sign-off Jun 2021 | 626 Polk St | installation of grab bar in room 306. n/a for maher.Details
installation of grab bar in room 306. n/a for maher. | $500 |
| Apr 29, 2021 | Completed final sign-off Aug 2021 | 571 Myra Wy | rev to pa202006128650: to propose to replace and adding upper right unauthorized 9x7 sliding door with 9x5 window with center fixed, side casement aluminum-clad wood window.Details
rev to pa202006128650: to propose to replace and adding upper right unauthorized 9x7 sliding door with 9x5 window with center fixed, side casement aluminum-clad wood window. | $1,500 |
| Apr 16, 2021 | Completed final sign-off Oct 2022 | 5 Encline Ct | ref pa#: 201903215891 & 202011259705. additional scope of work. replace siding at rear. extend deck at rear. replace deck boards with wood or wood composite boards. replace (e) deck railings with cable railings. replace rotten deck posts if needed.Details
ref pa#: 201903215891 & 202011259705. additional scope of work. replace siding at rear. extend deck at rear. replace deck boards with wood or wood composite boards. replace (e) deck railings with cable railings. replace rotten deck posts if needed. | $21,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 56 Mason St | room 310: install folding ada chair with grab bar in bathroom. provide & install appriopated blocking in support of added grab bars & related features. maher n/aDetails
room 310: install folding ada chair with grab bar in bathroom. provide & install appriopated blocking in support of added grab bars & related features. maher n/a | $1,200 |
| Apr 6, 2021 | Completed final sign-off Jun 2022 | 3636 Cesar Chavez St | to comply with nov # 202172316. exterior wall to be repaired in kind due to car crash damageDetails
to comply with nov # 202172316. exterior wall to be repaired in kind due to car crash damage | $3,000 |
| Mar 30, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | remodel (e) bathroom & kitchen on 2/f & 3/f. new coutner tops & cabinet at kitchen rea. electrical upgrade to main level and 3/f with h.e lights. remove (e) wall plaster and ceiling plaster for electrical upgrade and installtion to comply with current energy code.Details
remodel (e) bathroom & kitchen on 2/f & 3/f. new coutner tops & cabinet at kitchen rea. electrical upgrade to main level and 3/f with h.e lights. remove (e) wall plaster and ceiling plaster for electrical upgrade and installtion to comply with current energy code. | $30,000 |
| Mar 12, 2021 | Completed final sign-off Feb 2022 | 485 23rd Av | rev to pa201809241148 s1. upgragde structural according to (e) field condition. change proposed strong walls to new steel ordinary frames at front of bldg and repair (e) foundation along gridline 1 on 1/f. redesign interior staircase. relocate kitchen at 1/f. relocate rear stair, add retaining wall.Details
rev to pa201809241148 s1. upgragde structural according to (e) field condition. change proposed strong walls to new steel ordinary frames at front of bldg and repair (e) foundation along gridline 1 on 1/f. redesign interior staircase. relocate kitchen at 1/f. relocate rear stair, add retaining wall. | $18,000 |
| Feb 18, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bathDetails
reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bath | $200,000 |
| Feb 8, 2021 | Completed final sign-off Mar 2024 | 612 Broadway | accessiblity barrier removal at extg restroom with restroom enlargement, plumbing fixture replacement and new water heater.Details
accessiblity barrier removal at extg restroom with restroom enlargement, plumbing fixture replacement and new water heater. | $15,000 |
| Jan 28, 2021 | Completed final sign-off Mar 2021 | 2791 16th St | install handrail from ground floor to 2nd floor at entrance staircase.Details
install handrail from ground floor to 2nd floor at entrance staircase. | $2,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2022 | 1601 Indiana St | remove 2 (e) storage sheds (1 less than 100sf, 1 -remove non-load bearing partitions maintaining roof structure) at (e) lumber storage yard. propose exterior storage rack with metal frame structural & rooftop cover.Details
remove 2 (e) storage sheds (1 less than 100sf, 1 -remove non-load bearing partitions maintaining roof structure) at (e) lumber storage yard. propose exterior storage rack with metal frame structural & rooftop cover. | $26,000 |
| Jan 14, 2021 | Completed final sign-off Feb 2021 | 909 Geary St | room 212: install grab bar around the shower pan area per is-da 01. maher n/a.Details
room 212: install grab bar around the shower pan area per is-da 01. maher n/a. | $500 |
| Jan 11, 2021 | Completed final sign-off Feb 2021 | 3000 23rd Av | main entrance landing only on 2/f level - repair leaking foyer, proposed to remove and replcae (e) floor, floor tiles and cement with new water proofing membrane at (e) foyer, approv 5ft x 4ft. no stair work.Details
main entrance landing only on 2/f level - repair leaking foyer, proposed to remove and replcae (e) floor, floor tiles and cement with new water proofing membrane at (e) foyer, approv 5ft x 4ft. no stair work. | $7,200 |
| Jan 8, 2021 | Never finaled issued Jan 2021, no final | 555 Bright St | to obtain final inspection for work approved under permit application no(s): 2017-1227-7452. all work is complete.Details
to obtain final inspection for work approved under permit application no(s): 2017-1227-7452. all work is complete. | $10,000 |
| Nov 25, 2020 | Completed final sign-off Jan 2022 | 5 Encline Ct | 1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891Details
1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891 | $280,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2022 | 1234 40th Av | add (n) mech room & laundry on 1/f. enlarge/remodel (e) interior stairscase & remodel (e) bathroom on 1/f. add new master bathroom, 1 powder room, relocate kitchen on 2/f per plans. add new wooden deck on 2/f with staircase to the rear yard.Details
add (n) mech room & laundry on 1/f. enlarge/remodel (e) interior stairscase & remodel (e) bathroom on 1/f. add new master bathroom, 1 powder room, relocate kitchen on 2/f per plans. add new wooden deck on 2/f with staircase to the rear yard. | $150,000 |
| Nov 13, 2020 | Completed final sign-off Jun 2022 | 730 Edinburgh St | to comply with nov# 202036983. build a 10'x10' deck at rear.Details
to comply with nov# 202036983. build a 10'x10' deck at rear. | $3,000 |
| Nov 13, 2020 | Completed final sign-off Nov 2020 | 540 Jones St | apts 203 & 714: replace/install grab bars in shower tub stalls in units. maher n/aDetails
apts 203 & 714: replace/install grab bars in shower tub stalls in units. maher n/a | $750 |
| Oct 30, 2020 | Never finaled issued Dec 2020, no final | 1906 Irving St | administrative permit only: revision to include 1906 irving street (1730/019a) into scope of work for bpa202001232622.Details
administrative permit only: revision to include 1906 irving street (1730/019a) into scope of work for bpa202001232622. | |
| Sep 17, 2020 | Completed final sign-off Jun 2021 | 56 Mason St | install handicap grab bars at bathroom for units 206 & unit 310. maher n/a.Details
install handicap grab bars at bathroom for units 206 & unit 310. maher n/a. | $1,000 |
| Sep 5, 2020 | Completed final sign-off Nov 2021 | 201 Chicago Wy | comply w/ n.o.v 202052051. provide shoring beams for temporary support of existing structure & level the floor as necessary. reference 202007089810Details
comply w/ n.o.v 202052051. provide shoring beams for temporary support of existing structure & level the floor as necessary. reference 202007089810 | $8,000 |
| Aug 13, 2020 | Completed final sign-off Jul 2024 | 1355 Minna St | to comply with complaints 202027525/202026711/202026791. repair and replace sheetrock at (e) bathroom due to water damange. all work in-kind.Details
to comply with complaints 202027525/202026711/202026791. repair and replace sheetrock at (e) bathroom due to water damange. all work in-kind. | $3,000 |
| Jul 8, 2020 | Completed final sign-off Nov 2021 | 201 Chicago Wy | remodel extg staircase to comply with code, create new hall on 1st floor, remodel garage, create separate laundry room, remodel extg family room, guest room and half bath into new family room, home office, 2 baths. convert extg dinning room into bedroom on 2nd floor. replace foundation.Details
remodel extg staircase to comply with code, create new hall on 1st floor, remodel garage, create separate laundry room, remodel extg family room, guest room and half bath into new family room, home office, 2 baths. convert extg dinning room into bedroom on 2nd floor. replace foundation. | $13,000 |
| Jul 1, 2020 | Completed final sign-off Jan 2021 | 555 Bright St | legalize as build family room, bathroom, guest room and entertaiment room on g/f per plan.Details
legalize as build family room, bathroom, guest room and entertaiment room on g/f per plan. | $20,000 |
| Jun 30, 2020 | Completed final sign-off Jan 2021 | 513 Lyon St | to comply with nov20209022: remodel (e) ktichen, dining room, powder room and bathroom on 2/f per plans.Details
to comply with nov20209022: remodel (e) ktichen, dining room, powder room and bathroom on 2/f per plans. | $10,000 |
| Jun 25, 2020 | Completed final sign-off Aug 2020 | 785 Sunnydale Av | proposed ada accessible toilet compartments at (e) men and women restroom at (e) school bldg.Details
proposed ada accessible toilet compartments at (e) men and women restroom at (e) school bldg. | $15,000 |
| Jun 12, 2020 | Completed final sign-off Jun 2021 | 571 Myra Wy | rev to pa201604064087 to updated for bid comment per plans. revised ext. railing on 3/f of (e) front patio, proposed (n) decking & railing on 2/f to connect the (e) wood deck to rear yeard retaining wall per plan. conver (e) entertainment rm into guest bedroom on g/f per plans.Details
rev to pa201604064087 to updated for bid comment per plans. revised ext. railing on 3/f of (e) front patio, proposed (n) decking & railing on 2/f to connect the (e) wood deck to rear yeard retaining wall per plan. conver (e) entertainment rm into guest bedroom on g/f per plans. | $5,000 |
| Jun 8, 2020 | Completed final sign-off Feb 2021 | 909 Geary St | unit 527: install handicap grab bar for shower to comply with chapter 11b cbc. grab bar min. load rating of 250 lbs. maher n/a.Details
unit 527: install handicap grab bar for shower to comply with chapter 11b cbc. grab bar min. load rating of 250 lbs. maher n/a. | $500 |
| Jun 8, 2020 | Never finaled issued Jun 2020, no final | 785 Brannan St | unit 205 & unit 310: each unit: install handicap grab bars at bathroom showers to comply with chapter 11b cbc. grab bars min. load rating of 250 lbs. maher n/a.Details
unit 205 & unit 310: each unit: install handicap grab bars at bathroom showers to comply with chapter 11b cbc. grab bars min. load rating of 250 lbs. maher n/a. | $1,000 |
| Jun 8, 2020 | Completed final sign-off Aug 2020 | 74 06th St | replace a total of (26) 90-min fire rated metal doors with frame in existing locations, in-kind, on floors 2-5 to all trash rooms and bathroom rooms in common/public areas in hallways. maher n/a.Details
replace a total of (26) 90-min fire rated metal doors with frame in existing locations, in-kind, on floors 2-5 to all trash rooms and bathroom rooms in common/public areas in hallways. maher n/a. | $30,000 |
| Jun 8, 2020 | Completed final sign-off Sep 2020 | 626 Polk St | unit 609: replace new shower panel.Details
unit 609: replace new shower panel. | $2,500 |
| Jun 5, 2020 | Completed final sign-off Aug 2020 | 446 31st Av | remodel kitchen & bathroomon 3/f in-kind. replace 4 windows at (e) sunroom on 3/f rear. all windows replaced in-kind same style and same operation. remove & replce all (e) wood flooring, repaint.Details
remodel kitchen & bathroomon 3/f in-kind. replace 4 windows at (e) sunroom on 3/f rear. all windows replaced in-kind same style and same operation. remove & replce all (e) wood flooring, repaint. | $15,000 |
| Mar 13, 2020 | Completed final sign-off Sep 2020 | 1211 Brussels St | repair and replace (e) rear deck and add new stair case connection between deckDetails
repair and replace (e) rear deck and add new stair case connection between deck | $8,000 |
| Feb 27, 2020 | Completed final sign-off Nov 2021 | 201 Chicago Wy | remove & replace all baseboard door casing on 2n fl. reside existing bathroom (floor & wall) replace new hardwood floor on 2nd fl. bathroom fixtues to remain, 800 sqftDetails
remove & replace all baseboard door casing on 2n fl. reside existing bathroom (floor & wall) replace new hardwood floor on 2nd fl. bathroom fixtues to remain, 800 sqft | $5,000 |
| Feb 27, 2020 | Completed final sign-off Apr 2021 | 1344 Goettingen St | replace old kitchen cabinets, 10x10 replace new tiles for kitchen counter top, remodel bathroom tiles, replace some sheet rock all work for 2nd fl onlyDetails
replace old kitchen cabinets, 10x10 replace new tiles for kitchen counter top, remodel bathroom tiles, replace some sheet rock all work for 2nd fl only | $6,000 |
| Jan 23, 2020 | Never finaled issued Dec 2020, no final | 1900 Irving St | commerical ti to convert e kfc into vietnamese restaurantDetails
commerical ti to convert e kfc into vietnamese restaurant | $100,000 |
| Dec 19, 2019 | Completed final sign-off Mar 2020 | 74 06th St | remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level bedroom entrance. remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level to hotel rooms entrance. total of (16) 90 min fire rated matel doors with frame.Details
remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level bedroom entrance. remove and replace (8) 90 min fire rated metal doors with frame to 2nd,3rd,4th and 5th level to hotel rooms entrance. total of (16) 90 min fire rated matel doors with frame. | $3,000 |
| Dec 11, 2019 | Completed final sign-off Feb 2020 | 500 Bella Vista Wy | to comply with n.o.v. #201999491 and #201994501. legalize one new powder room on ground floor per plan. legalize family room on ground floor.Details
to comply with n.o.v. #201999491 and #201994501. legalize one new powder room on ground floor per plan. legalize family room on ground floor. | $5,000 |
| Dec 3, 2019 | Completed final sign-off Aug 2023 | 196 Urbano Dr | ref variance 2020-003283var 10/2/2020: lower level: excavation under (e) deck for (n) bedroom,closet,bathroom & office.2/f:renovate (e) bath and closet,add (n) laundry,replace doors to (e) bedrooms, add 3 skylights in (e) hall. electrical and plumbing work as req. rev to pa201903014213.Details
ref variance 2020-003283var 10/2/2020: lower level: excavation under (e) deck for (n) bedroom,closet,bathroom & office.2/f:renovate (e) bath and closet,add (n) laundry,replace doors to (e) bedrooms, add 3 skylights in (e) hall. electrical and plumbing work as req. rev to pa201903014213. | $47,500 |
| Nov 14, 2019 | Completed final sign-off Oct 2020 | 329 Prague St | administrative correction to pa #201907307359, w/correct construction valuation of $100,000.Details
administrative correction to pa #201907307359, w/correct construction valuation of $100,000. | $100,000 |
| Oct 29, 2019 | Never finaled issued Oct 2019, no final | 5527 California St | street spaceDetails
street space | |
| Oct 4, 2019 | Never finaled issued Dec 2019, no final | 470 Ellis St | minor ti to (e) open office space & meeting room @ lower level floor & (e) break room @ mezzanine floor. this includes cabinet replacements, 7 (n) pendant lights, replacement passage doors & swing direction of (e) front doors. (e) hvac system to remainDetails
minor ti to (e) open office space & meeting room @ lower level floor & (e) break room @ mezzanine floor. this includes cabinet replacements, 7 (n) pendant lights, replacement passage doors & swing direction of (e) front doors. (e) hvac system to remain | $45,000 |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 558 35th Av | street spaceDetails
street space | |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 1355 05th Av | street spaceDetails
street space | |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 2310 Steiner St | street spaceDetails
street space | |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 4820 Geary Bl | street spaceDetails
street space | |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 949 Grant Av | street spaceDetails
street space | |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 554 Clement St | street spaceDetails
street space | |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 2463 19th Av | street spaceDetails
street space | |
| Jul 11, 2019 | Completed final sign-off Feb 2020 | 300 03rd St | remodel two (e) bathrooms, retile, replace cabinets, replace fixtures to remain in all (e) locations. add led lights in (e) bathroom and gfci receptaclesDetails
remodel two (e) bathrooms, retile, replace cabinets, replace fixtures to remain in all (e) locations. add led lights in (e) bathroom and gfci receptacles | $36,000 |
| Jun 3, 2019 | Completed final sign-off Jan 2022 | 2050 Alemany Bl | convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan.Details
convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan. | $12,000 |
| Apr 26, 2019 | Completed final sign-off Jul 2021 | 1506 Innes Av | adu ordinance #162-16, propose 1 living rm, 1 storage rm, 1 bathroom, 2 bedrooms, 1 kitchen on 1st floor, comply w/ nov 201847851.Details
adu ordinance #162-16, propose 1 living rm, 1 storage rm, 1 bathroom, 2 bedrooms, 1 kitchen on 1st floor, comply w/ nov 201847851. | $80,000 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 59 Paulding St | remove and replace damged siding at front and south side of bldg. like for like. non street facing. approx 300 sq ft.Details
remove and replace damged siding at front and south side of bldg. like for like. non street facing. approx 300 sq ft. | $4,200 |
| Mar 21, 2019 | Completed final sign-off Jan 2022 | 5 Encline Ct | rooms down & interior remodeling. lower flr remodel incl 1 bed, 1 bath, new layout. add 1 (n) bedroom, 1 (n) bath, (n) laundry, reduced garage. upper flr incl remodel kitchen & bath w/ (n) layouts, 1 bedroom. add 2 windows at lower flr, 3 windows become doors.Details
rooms down & interior remodeling. lower flr remodel incl 1 bed, 1 bath, new layout. add 1 (n) bedroom, 1 (n) bath, (n) laundry, reduced garage. upper flr incl remodel kitchen & bath w/ (n) layouts, 1 bedroom. add 2 windows at lower flr, 3 windows become doors. | $300,000 |
| Mar 5, 2019 | Completed final sign-off Jun 2019 | 59 Paulding St | add 1 new guest room, one play room, one bathroom on 1st floor per plan. add 1 nw bedroom, 1 bathroom, one closet remodel kitchen on 2nd floor. relocate extg staircase. create nw interior connection between 1st and 2nd floor.Details
add 1 new guest room, one play room, one bathroom on 1st floor per plan. add 1 nw bedroom, 1 bathroom, one closet remodel kitchen on 2nd floor. relocate extg staircase. create nw interior connection between 1st and 2nd floor. | $80,000 |
| Mar 1, 2019 | Completed final sign-off Aug 2023 | 196 Urbano Dr | conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen.Details
conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen. | $164,000 |
| Jan 29, 2019 | Completed final sign-off Apr 2019 | 730 Cabrillo St | r&r (e) concrete slab w/like to like along driveway & back of walkway appox 12 sq ftDetails
r&r (e) concrete slab w/like to like along driveway & back of walkway appox 12 sq ft | $1,200 |
| Jan 24, 2019 | Completed final sign-off Sep 2019 | 746 Andover St | 1/f: create 1 new laundry room, mechanical room, covert (e) storage to one playroom & one study with full bathroom. create interior connection between the 1/f & 2/f per plan. foundation upgrade on 1/f.Details
1/f: create 1 new laundry room, mechanical room, covert (e) storage to one playroom & one study with full bathroom. create interior connection between the 1/f & 2/f per plan. foundation upgrade on 1/f. | $80,000 |
| Dec 19, 2018 | Completed final sign-off Sep 2019 | 746 Andover St | repair damage vinly shingle south side of bldg below windows bay area. repair damage roof shingle approx 5 ft by 5 ft like to like. remove and replace all interior . install 5 new led recessed light at existing bedroom. retile the existing bathroom at main floor. replace one floor drain at existingDetails
repair damage vinly shingle south side of bldg below windows bay area. repair damage roof shingle approx 5 ft by 5 ft like to like. remove and replace all interior . install 5 new led recessed light at existing bedroom. retile the existing bathroom at main floor. replace one floor drain at existing | $4,800 |
| Dec 5, 2018 | Completed final sign-off Sep 2019 | 2201 19th Av | 1st flr-add 1 (n) bathrm, remodel (e) kitchen, add 1 (n) study rm, relocate (e) bedrm & upgrade (e) lights to high efficiency recessed lighting. 2nd flr- add 1 (n) bathrm, remodel (e) kitchen, remodel (e) bedrm, uprade lights to high efficiency recessed lights. add 2 (n) skylights & infill litewellDetails
1st flr-add 1 (n) bathrm, remodel (e) kitchen, add 1 (n) study rm, relocate (e) bedrm & upgrade (e) lights to high efficiency recessed lighting. 2nd flr- add 1 (n) bathrm, remodel (e) kitchen, remodel (e) bedrm, uprade lights to high efficiency recessed lights. add 2 (n) skylights & infill litewell | $50,000 |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 1442 Taylor St | street spaceDetails
street space | |
| Oct 15, 2018 | Expired or cancelled cancelled Jul 2019 | 260 Girard St | r&r wooden fence@rear yard approx 10ft to match w/(e) height 5ft, repair concrete path about 100sf 5x20ft at rear yard, minor repairs to (e) interior cracked plaster at bahtroom & kitchen ceiling w/ 5/8 gypsum board, restore (e) hardwood floor change l.r. ,dining rm, & hallway replace all baseboardDetails
r&r wooden fence@rear yard approx 10ft to match w/(e) height 5ft, repair concrete path about 100sf 5x20ft at rear yard, minor repairs to (e) interior cracked plaster at bahtroom & kitchen ceiling w/ 5/8 gypsum board, restore (e) hardwood floor change l.r. ,dining rm, & hallway replace all baseboard | $2,400 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 2201 19th Av | 1)remove all extg baseboard on 2nd level,remove all interior wall papers and apply wall finish paint. 2)remove and replace kitchen floor tile. no electrical and plumbing work. 3)replace door casing at extg bedroom and bathroom.Details
1)remove all extg baseboard on 2nd level,remove all interior wall papers and apply wall finish paint. 2)remove and replace kitchen floor tile. no electrical and plumbing work. 3)replace door casing at extg bedroom and bathroom. | $3,500 |