Rickert Henriksen
- Listed as
- engineer
- Firm
- Sacramento Engineering
- Based in
- Sacrmento
- On San Francisco permits
- Jul 2011 to May 2026
9 permits since 2000 (engineer on 9 permits): 5 completed, 1 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | In progress issued Jun 2026 | 399 10th Av | Rcp Construction Llc | at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant.Details
at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant. | $190,000 |
| Jan 31, 2022 | Never finaled issued Feb 2022, no final | 4230 18th St | Cookline Construction Inc | rev to pa202010267436. mechanical revision to add tankless gas water heaters (2) installation per dph request.Details
rev to pa202010267436. mechanical revision to add tankless gas water heaters (2) installation per dph request. | |
| Oct 26, 2020 | Completed final sign-off Apr 2022 | 4230 18th St | Cookline Construction Inc | first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381.Details
first time tenant improvement restaurant for ground floor; interior fixtures, furnishings, and equipment, interior finishes for the lobby, resturant, kitchen and bathroom, limited to level1. core and shell under separated permit #2018-0111-8381. | $148,000 |
| Jun 30, 2020 | Completed final sign-off Dec 2020 | 3251 20th Av | Trinity Built | xfinity space 315 new ada restrooms and drinking fountain. new access exit door, 1 hr demising wall mepDetails
xfinity space 315 new ada restrooms and drinking fountain. new access exit door, 1 hr demising wall mep | $360,000 |
| Jun 30, 2020 | Never finaled issued Jul 2020, no final | 3251 20th Av | Trinity Built | carbon health accessible door, new interior entrance door and storefront interior of mall, mep suite 2111Details
carbon health accessible door, new interior entrance door and storefront interior of mall, mep suite 2111 | $52,000 |
| Jan 17, 2020 | Never finaled issued Mar 2020, no final | 111 New Montgomery St | Yerba Buena Builders Inc | 2nd fl - interior demo of doors, partitions, ceiling and finishes. new construction to include new partitions, doors, ceilings, lighting. mechanical and electrical work included.Details
2nd fl - interior demo of doors, partitions, ceiling and finishes. new construction to include new partitions, doors, ceilings, lighting. mechanical and electrical work included. | $240,000 |
| Apr 11, 2019 | Completed final sign-off Aug 2019 | 1737 Post St | Terra Nova Industries | unit# 350: minor t.i in (e) benihan resturant, remove part of sushi bar to create small cooking are with hood & equipment, all else including lighting to remain the sameDetails
unit# 350: minor t.i in (e) benihan resturant, remove part of sushi bar to create small cooking are with hood & equipment, all else including lighting to remain the same | $100,000 |
| Oct 7, 2011 | Completed final sign-off Jan 2013 | 555 California St | Metropolitan Electrical Construction | installation of unmanned in building telecommunications equipment.Details
installation of unmanned in building telecommunications equipment. | $100,000 |
| Jul 8, 2011 | Completed final sign-off Mar 2012 | 897 Hyde St | N S A Wireless Inc | modification to an (e) at & t telecommunication facility consisting of removing (e) omni antennas and installing 9 new panel antenas on the penthouse and cabinets in the basement.Details
modification to an (e) at & t telecommunication facility consisting of removing (e) omni antennas and installing 9 new panel antenas on the penthouse and cabinets in the basement. | $125,000 |