Rcp Construction Llc
- Based in
- El Dorado Hills
- On San Francisco permits
- Jul 2025 to May 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued Jun 2026 | 399 10th Av | at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant.Details
at commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant. | $190,000 |
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 155 05th St | revision to pa #2025-0718-1191: modification to sim lab, 602b-302 change of lab to office, four sound booths and been added throughout the plan.Details
revision to pa #2025-0718-1191: modification to sim lab, 602b-302 change of lab to office, four sound booths and been added throughout the plan. | |
| Jul 22, 2025 | In progress issued Oct 2025 | 750 El Camino Del Mar | replace all doors & window, replace all exterior stucco, 44sf infill on rear facade, (n) front, side & rear fencing, replace tile roof in kind, interior remodel: including (e) kitchen & bathrooms, add 2 bathooms on 3/f. (n) elevator, updating all mep (n) rear yard pool & terrace under separate pa.Details
replace all doors & window, replace all exterior stucco, 44sf infill on rear facade, (n) front, side & rear fencing, replace tile roof in kind, interior remodel: including (e) kitchen & bathrooms, add 2 bathooms on 3/f. (n) elevator, updating all mep (n) rear yard pool & terrace under separate pa. | $500,000 |
| Jul 18, 2025 | Completed final sign-off Apr 2026 | 155 05th St | 6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators.Details
6th fl: tenant improvement for uop audiology dept. relocating from the 1st fl to a portion of the 6th fl (10,580 ft). includes room repurposing and internal layout modifications. shared common area to provide access for uop & future tenant. access includes restrooms, electrical room & elevators. | $500,000 |