Richard Sambucetti
- Listed as
- architect, designer, engineer
- Firm
- Borges Arch Group
- Based in
- Roseville
- On San Francisco permits
- Apr 2014 to Nov 2019
49 permits since 2000 (architect on 45 permits, engineer on 3 permits, designer on 1 permit): 30 completed, 10 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2019 | Expired or cancelled cancelled Jan 2026 | 246 Judah St | modifications to an (e) site. r&r (1)(e) sprint antenna w/1 new sprint antenna typ.ea of 3 sectors 1,2&3. add 2.5 equipment inside (e) mmbs cabinet, (1) string of (4)2.5 batteries inside (e) bbu cabinet, (1)2.5rrh, typ.ea of 3 sectors 1,2&3. (1) hybrid per sector inside (e) cabletray for total of 3.Details
modifications to an (e) site. r&r (1)(e) sprint antenna w/1 new sprint antenna typ.ea of 3 sectors 1,2&3. add 2.5 equipment inside (e) mmbs cabinet, (1) string of (4)2.5 batteries inside (e) bbu cabinet, (1)2.5rrh, typ.ea of 3 sectors 1,2&3. (1) hybrid per sector inside (e) cabletray for total of 3. | $15,000 | |
| Sep 13, 2019 | Expired or cancelled cancelled Jan 2026 | 88 King St | sprint - install 2(p) & 2(e) equip cabinets on (p) steel skid platform, ppc cabinet, disconnect telo cabinet & ciena cabinet w/vam, 1 panel antenna per sector, 3 rrhs per sector, 9 total below parapet for sector a or inside roof top mech wall at sector b & c, 1 mw antenna, 1 gps antenna & stealthDetails
sprint - install 2(p) & 2(e) equip cabinets on (p) steel skid platform, ppc cabinet, disconnect telo cabinet & ciena cabinet w/vam, 1 panel antenna per sector, 3 rrhs per sector, 9 total below parapet for sector a or inside roof top mech wall at sector b & c, 1 mw antenna, 1 gps antenna & stealth | $45,000 | |
| Apr 16, 2019 | Never finaled issued Apr 2019, no final | 8 Montgomery St | Quality Telecom Consultants | modification of unmanned telecommunications facility, sprint. temporarily relocate listed equip't r&r (e) 2 antennas @ sectors a&b, 4 total; r&r (e) 3 rrus @ sectors a&b, 6 total; r&r (e)(1) gps antenna; install (4)ballast mounts; r&r (e) hybrid run; phase 2 - relocate all listed equip't back to (e)Details
modification of unmanned telecommunications facility, sprint. temporarily relocate listed equip't r&r (e) 2 antennas @ sectors a&b, 4 total; r&r (e) 3 rrus @ sectors a&b, 6 total; r&r (e)(1) gps antenna; install (4)ballast mounts; r&r (e) hybrid run; phase 2 - relocate all listed equip't back to (e) | $15,000 |
| Feb 1, 2019 | Expired or cancelled cancelled Jan 2026 | 318 Main St | roof top: installation of 3 panel antennas. install 200a att elec panel in (e) telecom. install 2 xmus - remove and replace emerson 502 powerplant. install 4 rhhs.Details
roof top: installation of 3 panel antennas. install 200a att elec panel in (e) telecom. install 2 xmus - remove and replace emerson 502 powerplant. install 4 rhhs. | $175,000 | |
| Nov 2, 2018 | Never finaled issued Oct 2019, no final | 965 Mission St | Velex Inc | sprint - modification to wirless site. r&r 3 (e) antennas, 1 per sector, r&r 3 (e) rrh replace with 3(p)2.5 rrh, 1 per sector. install 3 4port 800 mhz rrh, install 3 1900mhz rrus, r&r (e) equip rack w/charles cabinet. r&r (e) cables w/(p)hybrid cables in (p) cable trayDetails
sprint - modification to wirless site. r&r 3 (e) antennas, 1 per sector, r&r 3 (e) rrh replace with 3(p)2.5 rrh, 1 per sector. install 3 4port 800 mhz rrh, install 3 1900mhz rrus, r&r (e) equip rack w/charles cabinet. r&r (e) cables w/(p)hybrid cables in (p) cable tray | $20,000 |
| Sep 25, 2018 | Completed final sign-off Jun 2020 | 370 Grove St | Metropolitan Electrical Construction | modification to an extg unmanned telecom.site swap (3) 2 part 800 rrus for (3) 4 port 800 rrus, one per sector. install (3) 2.5 rrus one per sector. remove and replace (3) sprint wall mounted antennas with (3) sprint triband antennas. install (3) hybrid lines, (1) per sector. n/a for maherDetails
modification to an extg unmanned telecom.site swap (3) 2 part 800 rrus for (3) 4 port 800 rrus, one per sector. install (3) 2.5 rrus one per sector. remove and replace (3) sprint wall mounted antennas with (3) sprint triband antennas. install (3) hybrid lines, (1) per sector. n/a for maher | $15,000 |
| Nov 30, 2017 | Completed final sign-off Nov 2018 | 1515 19th Av | Quality Telecom Consultants | modification of extg: 1) install one prop. 800 rru at each of sectors a,b,c on extg pipe mount for a total of 3. 2)install 1 prop. 2.5 rru at each of sectors a,b,c on extg pipe mount. 3) install one prop. 2.5 antennas at each of sectors a,b,c on extg pipe mount for a total of 3. n/a for maher.Details
modification of extg: 1) install one prop. 800 rru at each of sectors a,b,c on extg pipe mount for a total of 3. 2)install 1 prop. 2.5 rru at each of sectors a,b,c on extg pipe mount. 3) install one prop. 2.5 antennas at each of sectors a,b,c on extg pipe mount for a total of 3. n/a for maher. | $15,000 |
| Nov 30, 2017 | Completed final sign-off Nov 2018 | 30 Onondaga Av | Duvane Building Specialites | modification of extg: 1)add one string of 2.5 batteries inside extg bbu cabinet< 50 gal. total in cabinet. 2)add 2.5 equipment inside extg mmbs cabinet. 3)add one 2.5 antennas per sector for a total of two. 4) add one 2.5 rrh at each sector for a total of two rrh sector.Details
modification of extg: 1)add one string of 2.5 batteries inside extg bbu cabinet< 50 gal. total in cabinet. 2)add 2.5 equipment inside extg mmbs cabinet. 3)add one 2.5 antennas per sector for a total of two. 4) add one 2.5 rrh at each sector for a total of two rrh sector. | $15,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 310 Townsend St | Advanced Wireless & Logistics Inc | modification of existing cell site. remove and replace 3 existing antennas with 3 new like antennas behind rf stealthing. add 3 new radio unions, 1 per antenna. add 4 batteries and du equipent inside existing cabinets sprint site id fs04xc038Details
modification of existing cell site. remove and replace 3 existing antennas with 3 new like antennas behind rf stealthing. add 3 new radio unions, 1 per antenna. add 4 batteries and du equipent inside existing cabinets sprint site id fs04xc038 | $35,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 1633 Taraval St | Advanced Wireless & Logistics Inc | replace 3 (e) antennas with similar new antennas, add 1 new radio unit per sector, total 3. add 4 batteries and pu unit into existing cabinets.Details
replace 3 (e) antennas with similar new antennas, add 1 new radio unit per sector, total 3. add 4 batteries and pu unit into existing cabinets. | $35,000 |
| Aug 29, 2017 | Never finaled issued Sep 2017, no final | 615 Market St | Kr Construction Of Ca Llc | new unisex restroom to be constructed on ground level. new sink, toilet, vanity light. ref 201701318348. maher n/aDetails
new unisex restroom to be constructed on ground level. new sink, toilet, vanity light. ref 201701318348. maher n/a | $75,000 |
| Aug 3, 2017 | Completed final sign-off Oct 2018 | 81 Jefferson St | Svb Construction Co. Inc. | t.i. to existing restaurant space. n/a ordinance #155-13Details
t.i. to existing restaurant space. n/a ordinance #155-13 | $350,000 |
| May 22, 2017 | Completed final sign-off Jun 2017 | 680 Folsom St | R 3 Builders Inc. | revision to 201512735875. revising t-bar ceilingDetails
revision to 201512735875. revising t-bar ceiling | $5,000 |
| Apr 13, 2017 | Expired or cancelled withdrawn May 2017 | 415 Mission St | the installation of equipment associated with the das system inside the bld located in the head end room of the salesforce towerDetails
the installation of equipment associated with the das system inside the bld located in the head end room of the salesforce tower | $5,000 | |
| Feb 16, 2017 | Expired or cancelled cancelled Oct 2023 | 470 Columbus Av | to remove and replace an (e) antenna, add 2 antennas to (e) tripod and remove and replace an (e) radome to an (e) unmanned wireless facilityDetails
to remove and replace an (e) antenna, add 2 antennas to (e) tripod and remove and replace an (e) radome to an (e) unmanned wireless facility | $30,000 | |
| Jan 31, 2017 | Never finaled issued Jul 2017, no final | 615 Market St | Kr Construction Of Ca Llc, Kr Construction Of Ca Llc | t.i. to (e) boudin's restaurant, formally hoffman's grill.repair extr wood paneling w/same finish&color.exterior canopy to be painted& repair.interor elevr,flr,ceiling&brick wall will remain&repair in kind as needed.all historic items will be retained per constr docs.maher n/a. life safety deferredDetails
t.i. to (e) boudin's restaurant, formally hoffman's grill.repair extr wood paneling w/same finish&color.exterior canopy to be painted& repair.interor elevr,flr,ceiling&brick wall will remain&repair in kind as needed.all historic items will be retained per constr docs.maher n/a. life safety deferred | $175,000 |
| Jan 5, 2017 | Completed final sign-off Dec 2018 | 107 Sagamore St | Process Cellular Inc Dba Procell | modify an unmaned mobile services facility to remove & replace 3 (e) antennas & associated equipment to (e) site, remove radome & add proposed stealth box enclosure. ** maher: n/a **Details
modify an unmaned mobile services facility to remove & replace 3 (e) antennas & associated equipment to (e) site, remove radome & add proposed stealth box enclosure. ** maher: n/a ** | $30,000 |
| Sep 9, 2016 | Never finaled issued Dec 2016, no final | 220 Golden Gate Av | Electric Tech Construction Inc | install one microwave antenna behind extg sprint equipment screen wall. n/a for maher. install one microwave antenna behind extg sprint equipment screen wall. n/a for maher.Details
install one microwave antenna behind extg sprint equipment screen wall. n/a for maher. install one microwave antenna behind extg sprint equipment screen wall. n/a for maher. | $4,000 |
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 680 Folsom St | R 3 Builders Inc. | remove window insert signDetails
remove window insert sign | $8,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2018 | 680 Folsom St | R 3 Builders Inc. | suite 120 - install air and cooling system in basement for restaurant - ref pa 201512235875Details
suite 120 - install air and cooling system in basement for restaurant - ref pa 201512235875 | |
| Dec 23, 2015 | Completed final sign-off Oct 2018 | 680 Folsom St | R 3 Builders Inc. | new restaurant in 1985 sq ft restaurant with kitchen and seating areaDetails
new restaurant in 1985 sq ft restaurant with kitchen and seating area | $400,000 |
| Nov 19, 2015 | Completed final sign-off Apr 2016 | 121 Spear St | Ron Thorn Construction Inc | add 2, 2.5 antenns, add 2 , 2.5 rrh , new coax jumper lines from rrhs to new antennas, install new hydbrid lines to new sector locations, add n 2.5 equipment inside e mmbs cabinet, new 2.5 batteries inside e bbu cab,replace damaged cable trays,remove old mounts, walls patched,painted. sprintDetails
add 2, 2.5 antenns, add 2 , 2.5 rrh , new coax jumper lines from rrhs to new antennas, install new hydbrid lines to new sector locations, add n 2.5 equipment inside e mmbs cabinet, new 2.5 batteries inside e bbu cab,replace damaged cable trays,remove old mounts, walls patched,painted. sprint | $20,000 |
| May 14, 2015 | Expired or cancelled withdrawn May 2018 | 2300 California St | add 3 2.5 panel antas,1 at @sectors a,b&c.add 3 2.5rrh,1at@sectors a,b&c.add coax jumper lines fr rrhs to new antas,re-use(e)hybird cables or instl new.add new 2.5 equip inside(e)mmbs cabinet.add new 2.5batteries inside(e)bbu cabinet.add rf compliance signage per emf report.add stealh box at sectr cDetails
add 3 2.5 panel antas,1 at @sectors a,b&c.add 3 2.5rrh,1at@sectors a,b&c.add coax jumper lines fr rrhs to new antas,re-use(e)hybird cables or instl new.add new 2.5 equip inside(e)mmbs cabinet.add new 2.5batteries inside(e)bbu cabinet.add rf compliance signage per emf report.add stealh box at sectr c | $20,000 | |
| Apr 29, 2015 | Completed final sign-off Dec 2015 | 5000 Geary Bl | Electric Tech Construction Inc | sprint remove & replace (e) nv panels antennas. 1 each @ all sectors. add 3 triband panel antennas. 1 ea @ all sectors. add 3-2.5 rrh, 1 @ ea all sectors. add new coax jumper lines from rrhs to new antennas. reuse (e) hybrid cables or install new as needed. add new 2.5 equipment inside (e) cabinet.Details
sprint remove & replace (e) nv panels antennas. 1 each @ all sectors. add 3 triband panel antennas. 1 ea @ all sectors. add 3-2.5 rrh, 1 @ ea all sectors. add new coax jumper lines from rrhs to new antennas. reuse (e) hybrid cables or install new as needed. add new 2.5 equipment inside (e) cabinet. | $20,000 |
| Apr 6, 2015 | Completed final sign-off Dec 2015 | 44 Montgomery St | Electric Tech Construction Inc | add(2) 2.5 panel antennas & rrh. (1) at each sectors a & b. add new 2.5 equipment inside (e) mmbs cabinet, add new 2.5 batteries inside (e) bbu cabinet, add new coax jumper ilines from rrhs to new antennas, re-use (e) hybrid cables or install new as needed, remove/replace all damaged/missing cableDetails
add(2) 2.5 panel antennas & rrh. (1) at each sectors a & b. add new 2.5 equipment inside (e) mmbs cabinet, add new 2.5 batteries inside (e) bbu cabinet, add new coax jumper ilines from rrhs to new antennas, re-use (e) hybrid cables or install new as needed, remove/replace all damaged/missing cable | $20,000 |
| Jan 21, 2015 | Completed final sign-off Dec 2015 | 990 Columbus Av | Electric Tech Construction Inc | add (3) (n) 2.5 antennas, (3) 2.5 rrj. (1)(n)2.5 mmbs cabinet, add new 2.5 batteries inside (e) bbu cabinet, add new coax jumper lines from rrhs to new antennas,add new stealthbox at sector a, re-use (e) hybrid cables or install new as needed. sprintDetails
add (3) (n) 2.5 antennas, (3) 2.5 rrj. (1)(n)2.5 mmbs cabinet, add new 2.5 batteries inside (e) bbu cabinet, add new coax jumper lines from rrhs to new antennas,add new stealthbox at sector a, re-use (e) hybrid cables or install new as needed. sprint | $20,000 |
| Jan 6, 2015 | Never finaled issued Mar 2016, no final | 220 Golden Gate Av | Slc Inc | sprint: add (2) 2.5 antennas, add (n) coax shields to (e) and (n) antennas add (2) 2.5 rrh units, add (n) coax jumper lines from rrho to(n) antennas, re-use (e) hybrid cable or install new, ad (n) 2.5 equipment inside (e) mmbs cabinet, add (n) 2.5 batteries inside (e) bbs cabinet, remove and replaceDetails
sprint: add (2) 2.5 antennas, add (n) coax shields to (e) and (n) antennas add (2) 2.5 rrh units, add (n) coax jumper lines from rrho to(n) antennas, re-use (e) hybrid cable or install new, ad (n) 2.5 equipment inside (e) mmbs cabinet, add (n) 2.5 batteries inside (e) bbs cabinet, remove and replace | $20,000 |
| Dec 3, 2014 | Completed final sign-off Sep 2015 | 2000 Van Ness Av | Slc Inc | sprint: add (3) 2.5 antennas, add 3 rrh units. add new coax jumper lines from rrhs to new antennas. add new cable tray. re-use hybrid cables or install new as needed. add new 2.5 equipment inside (e) mmbs cabinet, add new 2.5 batteries inside (e) bbu cabinet. add new stealth enclosures around (e) nvDetails
sprint: add (3) 2.5 antennas, add 3 rrh units. add new coax jumper lines from rrhs to new antennas. add new cable tray. re-use hybrid cables or install new as needed. add new 2.5 equipment inside (e) mmbs cabinet, add new 2.5 batteries inside (e) bbu cabinet. add new stealth enclosures around (e) nv | $20,000 |
| Nov 7, 2014 | Completed final sign-off Apr 2016 | 191 02nd St | Ron Thorn Construction Inc | sprint reloc(3)nv800/1900 antennas,add(3)2.5antenas,add(3)2.5rrh,add(n) 2.5 equip.inside(e)mmbs cabinet.add(n)2.5 batteries insied(e)bbu cabinet, add(n)coax jumper lines fr rrhs to(n)antenas,re-use(e)hybrid cables or install(n)as needed.remove(e)radome,add 6(n)radomes.add 5(n)tripop mounts to match.Details
sprint reloc(3)nv800/1900 antennas,add(3)2.5antenas,add(3)2.5rrh,add(n) 2.5 equip.inside(e)mmbs cabinet.add(n)2.5 batteries insied(e)bbu cabinet, add(n)coax jumper lines fr rrhs to(n)antenas,re-use(e)hybrid cables or install(n)as needed.remove(e)radome,add 6(n)radomes.add 5(n)tripop mounts to match. | $20,000 |
| Oct 23, 2014 | Expired or cancelled withdrawn Jul 2018 | 706 Polk St | remove (2)(e) radomes, add (2) 2.5 antennas add (2) 2.5 rrh, add (n) coax jumpers from rrhs to (n) antennas. re-use (e) hybrid cables or install (n) as needed, add (n) 2.5 equip. inside (e) mmbs cabinet. add (n) 2.5 batteries inside (e) bbu cabinet, add (n) rf barrier extension. sprintDetails
remove (2)(e) radomes, add (2) 2.5 antennas add (2) 2.5 rrh, add (n) coax jumpers from rrhs to (n) antennas. re-use (e) hybrid cables or install (n) as needed, add (n) 2.5 equip. inside (e) mmbs cabinet. add (n) 2.5 batteries inside (e) bbu cabinet, add (n) rf barrier extension. sprint | $20,000 | |
| Oct 8, 2014 | Never finaled filed Oct 2014, never issued | 950 Market St | add(3)sprint 2.5panel antennas,(1)ea sector a,b&c.add(3)sprint2.5rrhs(1)ea sectors a,b&c.add(n)coax jumper lines from rrhs to(n)antennas. re-use(e)hybrid cables or install(n)as needed.add(n)equip inside(e)rf compliant signage per emf report.add(i)stealth radome enclosure for sprint2.5antenna @ sectoDetails
add(3)sprint 2.5panel antennas,(1)ea sector a,b&c.add(3)sprint2.5rrhs(1)ea sectors a,b&c.add(n)coax jumper lines from rrhs to(n)antennas. re-use(e)hybrid cables or install(n)as needed.add(n)equip inside(e)rf compliant signage per emf report.add(i)stealth radome enclosure for sprint2.5antenna @ secto | $20,000 | |
| Oct 8, 2014 | Expired or cancelled cancelled Jan 2026 | 930 Gough St | sprint remove 2 e nv 800/1900 antennas, 1 ea sector a/b.2 triband antennas 1 ea sec a/b.2 rrh 1 ea sec a/b new 2.5 equip in mmbs cabinet. new 2.5 batteries inside e bbu cabinet, new coax jumber lines fro rrhs to n anteennas,new coax and rrh shields below and beside antennas, reuse e hybrid cablesDetails
sprint remove 2 e nv 800/1900 antennas, 1 ea sector a/b.2 triband antennas 1 ea sec a/b.2 rrh 1 ea sec a/b new 2.5 equip in mmbs cabinet. new 2.5 batteries inside e bbu cabinet, new coax jumber lines fro rrhs to n anteennas,new coax and rrh shields below and beside antennas, reuse e hybrid cables | $20,000 | |
| Sep 29, 2014 | Completed final sign-off Nov 2015 | 55 04th St | Triton Tower Inc | sprint reloc 3 nv 800/1900 antennas.1@sector a,b,c.add 3 2.5 panel antennas.1@sectors a,b,c.add 3 2.5 rrh 1@sector a,b,c.add(n)2.5 equip inside(e)mmbs cabinet.(n)2.5 batteries inside(e)bbu 4th.add(n)coax jumper lines fr rrh to(n)antennas.re-use(e)hybrid cable or install(n)as needed.add stealth enclDetails
sprint reloc 3 nv 800/1900 antennas.1@sector a,b,c.add 3 2.5 panel antennas.1@sectors a,b,c.add 3 2.5 rrh 1@sector a,b,c.add(n)2.5 equip inside(e)mmbs cabinet.(n)2.5 batteries inside(e)bbu 4th.add(n)coax jumper lines fr rrh to(n)antennas.re-use(e)hybrid cable or install(n)as needed.add stealth encl | $20,000 |
| Sep 26, 2014 | Completed final sign-off Oct 2015 | 2130 Ofarrell St | Metropolitan Electrical Construction | sprint: remove(1)(e)sprint nv antenna at sector b,add(2)sprint 2.5 panel antennas(1)each at sectors a & c,add(1)tribano antenna at sector b,add (3) sprint rrhs(1)each at sectors a,b & c, add new coax jumper lines from rrhs to(n)antennas, add(n) antenna shroud(1)each at sectors a,b & c, re-use (e)Details
sprint: remove(1)(e)sprint nv antenna at sector b,add(2)sprint 2.5 panel antennas(1)each at sectors a & c,add(1)tribano antenna at sector b,add (3) sprint rrhs(1)each at sectors a,b & c, add new coax jumper lines from rrhs to(n)antennas, add(n) antenna shroud(1)each at sectors a,b & c, re-use (e) | $20,000 |
| Sep 26, 2014 | Expired or cancelled cancelled Mar 2020 | 5 Embarcadero Center | sprint:add(3)2.5 panel antennas(1)each at sectors, a,b & c; add(3) 2.5 rrh,(1)each at sectors a,b & c,add new 2.5 equipment inside(e)mmbs cabinet add new 2.5 batteries inside(e)bbo cabinet,add(n)coax jumper lines from rrhs to (n) antennas,add new stealth screening at each of sectors a,b & c, addDetails
sprint:add(3)2.5 panel antennas(1)each at sectors, a,b & c; add(3) 2.5 rrh,(1)each at sectors a,b & c,add new 2.5 equipment inside(e)mmbs cabinet add new 2.5 batteries inside(e)bbo cabinet,add(n)coax jumper lines from rrhs to (n) antennas,add new stealth screening at each of sectors a,b & c, add | $20,000 | |
| Sep 26, 2014 | Completed final sign-off Jul 2015 | 1520 Stockton St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | sprint: add (3)2.5 panel antenna(1)ea @ sectors a,b&c, add(3)(n)rrh(1)ea @ sectors a,b&c,add(n)2.5 equipmt inside(e)mmbs cabinet,add(n)2.5 batteries inside(e)bbu cabinet,add (n)coax juimper lines from rrhs to(n)antennas, reuse(e)hybrid cables or install(n)as needed, add(n)tripod mounts @ sectorsDetails
sprint: add (3)2.5 panel antenna(1)ea @ sectors a,b&c, add(3)(n)rrh(1)ea @ sectors a,b&c,add(n)2.5 equipmt inside(e)mmbs cabinet,add(n)2.5 batteries inside(e)bbu cabinet,add (n)coax juimper lines from rrhs to(n)antennas, reuse(e)hybrid cables or install(n)as needed, add(n)tripod mounts @ sectors | $20,000 |
| Sep 8, 2014 | Completed final sign-off Feb 2017 | 420 Taylor St | Advanced Wireless & Logistics Inc | sprint: remove(2)nv 800/1900 antennas(1)each at sectors a ^ b/add(2)triband panel antennas(1)each at sectors a & b/add(2)2.5 rrh(1)each at sectors a & b/add new 2.5 equipmt inside(e)mmbs cabinet/add(n)2.5 batteries inside(e)bbu cabinet/add(n jumper lines fr rrhs to(n) antennas/re-use(e) hybrid cableDetails
sprint: remove(2)nv 800/1900 antennas(1)each at sectors a ^ b/add(2)triband panel antennas(1)each at sectors a & b/add(2)2.5 rrh(1)each at sectors a & b/add new 2.5 equipmt inside(e)mmbs cabinet/add(n)2.5 batteries inside(e)bbu cabinet/add(n jumper lines fr rrhs to(n) antennas/re-use(e) hybrid cable | $20,000 |
| Sep 8, 2014 | Never finaled issued Nov 2014, no final | 1212 Geary Bl | Cal North Telecom Corporation | sprint:remove 3 extg nv 800/1900 antennas one each at sectors a,b,&c add 3 triband panel antennas, one each at sectors a,b, & c, add three 2.5 rrh, one each at sectors a,b, & c. add new 2.5 equip. inside extg mmbs cabinet, add new 2.5 batteries inside extg bbu cabinet. add new coax jumper linesDetails
sprint:remove 3 extg nv 800/1900 antennas one each at sectors a,b,&c add 3 triband panel antennas, one each at sectors a,b, & c, add three 2.5 rrh, one each at sectors a,b, & c. add new 2.5 equip. inside extg mmbs cabinet, add new 2.5 batteries inside extg bbu cabinet. add new coax jumper lines | $20,000 |
| Sep 2, 2014 | Completed final sign-off Dec 2017 | 1334 Van Ness Av | Electric Tech Construction Inc | remove (3)nv 800/1900 antennas(1)each a sectors a,b & c/add(3)triband panel antennas(1)each at sectors a,b & c/add(3) 2.5 rrh(1)each at sectors a,b & c/add new coax jumper lines fr rrhs to(n)antennas/re-use(e)hybrid cables or install(n) as needed/add(n)2.5 equipmet inside(e)mmbs cabinet/add (n) 2.5Details
remove (3)nv 800/1900 antennas(1)each a sectors a,b & c/add(3)triband panel antennas(1)each at sectors a,b & c/add(3) 2.5 rrh(1)each at sectors a,b & c/add new coax jumper lines fr rrhs to(n)antennas/re-use(e)hybrid cables or install(n) as needed/add(n)2.5 equipmet inside(e)mmbs cabinet/add (n) 2.5 | $20,000 |
| Sep 2, 2014 | Completed final sign-off Dec 2015 | 417 31st Av | Electric Tech Construction Inc, Process Cellular Inc Dba Procell | remove(3)nv 800/1900 antennas,(1)ea @ sectors a,b&c, add(3)triband panel antennas(1)ea @ sectors a,b&c; add(3)2.5 rrh(1)ea @ sectors a,b&c, add(n) 2.5 equip inside(e)mmbs cabinet; add(n)2.5 batteries inside(e) bbu cabinet; add(n)coax jumper lines from rrhs to(n)antennas, reuse(e)hybrid cables orDetails
remove(3)nv 800/1900 antennas,(1)ea @ sectors a,b&c, add(3)triband panel antennas(1)ea @ sectors a,b&c; add(3)2.5 rrh(1)ea @ sectors a,b&c, add(n) 2.5 equip inside(e)mmbs cabinet; add(n)2.5 batteries inside(e) bbu cabinet; add(n)coax jumper lines from rrhs to(n)antennas, reuse(e)hybrid cables or | $20,000 |
| Aug 22, 2014 | Completed final sign-off Oct 2015 | 545 Powell St | Cal North Telecom Corporation | sprint add (2) 2.5 panel antennas. 1 ea @ sectors a & b. add (2) 2.5 rrh. 1 @ sector . add new coax jumper lines from rrhs to new antennas. re-use (e) hybrid cables or install new as needed. add new 2.5 equipment in (e) mmbs cabinet. add new batteries in (e) bbu cabinet. add coax & rrh shield @Details
sprint add (2) 2.5 panel antennas. 1 ea @ sectors a & b. add (2) 2.5 rrh. 1 @ sector . add new coax jumper lines from rrhs to new antennas. re-use (e) hybrid cables or install new as needed. add new 2.5 equipment in (e) mmbs cabinet. add new batteries in (e) bbu cabinet. add coax & rrh shield @ | $20,000 |
| Aug 14, 2014 | Completed final sign-off Sep 2015 | 735 Montgomery St | Electric Tech Construction Inc | add new 2.5 equipment inside (e) mmbs cabinet & (e) bbu cabinet. remove & replace (e) sprint nv antennas w/ 1 new triband antenna at each of 3 sectors, a, b & c. (net total: 3 antenna). add new coaz jumper lines from rrhs to new antennas. add new 36" 0 radome at sector a & c. new 36" h-frame.Details
add new 2.5 equipment inside (e) mmbs cabinet & (e) bbu cabinet. remove & replace (e) sprint nv antennas w/ 1 new triband antenna at each of 3 sectors, a, b & c. (net total: 3 antenna). add new coaz jumper lines from rrhs to new antennas. add new 36" 0 radome at sector a & c. new 36" h-frame. | $20,000 |
| Jun 30, 2014 | Completed final sign-off Mar 2015 | 4131 Geary Bl | Metropolitan Electrical Construction | add (3) 2.5 panel antennas (1) each at sectors a b c. add (3) rrh,(1) each at sectors a, b & c. add coax jumper lines from rrhs to new antennas. reuse (e) hybrid cable or install (n) as needed. add (n) cable shrounds at each of 3 (e) & 3 (p) antennas. add (n) 2.5 equipment in (e) mmbs cabinet sprintDetails
add (3) 2.5 panel antennas (1) each at sectors a b c. add (3) rrh,(1) each at sectors a, b & c. add coax jumper lines from rrhs to new antennas. reuse (e) hybrid cable or install (n) as needed. add (n) cable shrounds at each of 3 (e) & 3 (p) antennas. add (n) 2.5 equipment in (e) mmbs cabinet sprint | $20,000 |
| Jun 11, 2014 | Completed final sign-off Apr 2015 | 112 07th St | Metropolitan Electrical Construction | replc 2 of 2 panel antennas.1ea at sectors a&b.add2 2.5 rrh,1ea at sectors a&b.add new coax jumper lines fr rrhs to new antennas,reuse(e)hybrid cables or install new as needed.add(n)cable shrouds at ea of 3 antennas.add new 2.5 equip inside(e)mmbs cabinet.add new 2.5 batteries inside (e) bbu cabinetDetails
replc 2 of 2 panel antennas.1ea at sectors a&b.add2 2.5 rrh,1ea at sectors a&b.add new coax jumper lines fr rrhs to new antennas,reuse(e)hybrid cables or install new as needed.add(n)cable shrouds at ea of 3 antennas.add new 2.5 equip inside(e)mmbs cabinet.add new 2.5 batteries inside (e) bbu cabinet | $20,000 |
| Jun 11, 2014 | Completed final sign-off Jun 2015 | 201 Post St | Electric Tech Construction Inc | sprint replace (3 2.5 panel antennas.1 ea at sectors a,b&c.add 3 2.5 rrh,1 ea at 3 sectors.add new coax jumper lines fr rrhs to new antennas,install(p)hybrid cables.add(n) cable shrouds at ea of 3 antennas.add new 2.5 equip&batteries inside(p)2.5mmbs cabinet.remove 3 (e) nv antennas, 1 ea at sectorsDetails
sprint replace (3 2.5 panel antennas.1 ea at sectors a,b&c.add 3 2.5 rrh,1 ea at 3 sectors.add new coax jumper lines fr rrhs to new antennas,install(p)hybrid cables.add(n) cable shrouds at ea of 3 antennas.add new 2.5 equip&batteries inside(p)2.5mmbs cabinet.remove 3 (e) nv antennas, 1 ea at sectors | $20,000 |
| Jun 11, 2014 | Completed final sign-off Feb 2015 | 444 Presidio Av | Electric Tech Construction Inc | replce 4 of 4 panel antennas.1 ea at secs a,b,c&d.add 4 2.5 rrh,1 ea @ sec a,b,c&d.add(n)coax jumper lines fr rrhs to(n)antennas,reuse(e)hybrid cables or install(n)as need. add(n)cable shrouds @ ea of 3 antenas.add (n) 2.5 equip inside(e)mmbs cabinet.add(n) 2.5 batteries inside(e)bbu cabinetDetails
replce 4 of 4 panel antennas.1 ea at secs a,b,c&d.add 4 2.5 rrh,1 ea @ sec a,b,c&d.add(n)coax jumper lines fr rrhs to(n)antennas,reuse(e)hybrid cables or install(n)as need. add(n)cable shrouds @ ea of 3 antenas.add (n) 2.5 equip inside(e)mmbs cabinet.add(n) 2.5 batteries inside(e)bbu cabinet | $20,000 |
| Apr 24, 2014 | Never finaled issued Nov 2014, no final | 874 Harrison St | Unique Telecom Inc | add new 2.5 equipment inside (e) nv mmbs cabinet, add new 2.5 batteries inside (e) nv bbu cabinet, re-use hybrid cables or install new as needed, remove&replace (e) nv antenna with 1 new tri-band antenna @ each of 3 sectors a,b,& c. add 1 new 2.5 rrh at each of 3 sectors a,b,& c. add new coax jumperDetails
add new 2.5 equipment inside (e) nv mmbs cabinet, add new 2.5 batteries inside (e) nv bbu cabinet, re-use hybrid cables or install new as needed, remove&replace (e) nv antenna with 1 new tri-band antenna @ each of 3 sectors a,b,& c. add 1 new 2.5 rrh at each of 3 sectors a,b,& c. add new coax jumper | $20,000 |
| Apr 24, 2014 | Completed final sign-off Nov 2014 | 570 Beale St | Electric Tech Construction Inc | add new 2.5 equipment inside (e) mmbs cabinet. add new 2.5 batteries inside (e) bbu cabinet. re-use (e) hybrid cables or install new as needed. remove & replace (e) sprint nv antenna with (p) sprint tri-band antenna at each of 3 sectors, a,b & c. add 1 new 2.5 rrh at each of 3 sectors a,b & c.Details
add new 2.5 equipment inside (e) mmbs cabinet. add new 2.5 batteries inside (e) bbu cabinet. re-use (e) hybrid cables or install new as needed. remove & replace (e) sprint nv antenna with (p) sprint tri-band antenna at each of 3 sectors, a,b & c. add 1 new 2.5 rrh at each of 3 sectors a,b & c. | $20,000 |
| Apr 24, 2014 | Completed final sign-off Dec 2014 | 1111 California St | Electric Tech Construction Inc | add new 2.5 batteries inside (e) nv bbu cabinet, add new 2.5 equip inside (e) mmbs cabinet, remove & replace (e) sprint nv antenna with 1 new sprint tri-band antenna at sector a. add 1 new 2.5 rrh, add new coax jumper lines from rru to new antenna, add new coax shield below antenna.Details
add new 2.5 batteries inside (e) nv bbu cabinet, add new 2.5 equip inside (e) mmbs cabinet, remove & replace (e) sprint nv antenna with 1 new sprint tri-band antenna at sector a. add 1 new 2.5 rrh, add new coax jumper lines from rru to new antenna, add new coax shield below antenna. | $20,000 |