Duvane Building Specialites
- Based in
- Rocklin
- On San Francisco permits
- Apr 2014 to Nov 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2017 | Completed final sign-off Nov 2018 | 30 Onondaga Av | modification of extg: 1)add one string of 2.5 batteries inside extg bbu cabinet< 50 gal. total in cabinet. 2)add 2.5 equipment inside extg mmbs cabinet. 3)add one 2.5 antennas per sector for a total of two. 4) add one 2.5 rrh at each sector for a total of two rrh sector.Details
modification of extg: 1)add one string of 2.5 batteries inside extg bbu cabinet< 50 gal. total in cabinet. 2)add 2.5 equipment inside extg mmbs cabinet. 3)add one 2.5 antennas per sector for a total of two. 4) add one 2.5 rrh at each sector for a total of two rrh sector. | $15,000 |
| Apr 8, 2014 | Completed final sign-off Jul 2014 | 1075 Evans Av | remove pre fabricated equipment bldg and ship to different location. demo and aremove concrete slab and fence.Details
remove pre fabricated equipment bldg and ship to different location. demo and aremove concrete slab and fence. | $15,000 |