Advanced Wireless & Logistics Inc
- Based in
- Shingle Springs
- On San Francisco permits
- Sep 2014 to Apr 2023
- Last 24 months
- 0 permits filed
21 permits since 2000: 12 completed, 9 never finaled.
Of the 9 never-finaled permits, 7 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 510 26th Av | revision to pa# 202208301538, fiber design added w/ revised platform and frame, 2022 bid codes, updaed structurals.Details
revision to pa# 202208301538, fiber design added w/ revised platform and frame, 2022 bid codes, updaed structurals. | $38,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 510 Frederick St | revision to pa# 202208301540, revision to as-built structural correction needed.Details
revision to pa# 202208301540, revision to as-built structural correction needed. | $38,000 |
| Aug 30, 2022 | Never finaled issued Nov 2022, no final | 510 Frederick St | dish wireless propose to install 3 antennas, 1 persector, (6) rru's (2 per sector) (3) antenna mounts and an euipment cabinet on the rooftop. install (1) sector at three locations on roof both power and fiber lines will be placed in new cable tray on rooftop.Details
dish wireless propose to install 3 antennas, 1 persector, (6) rru's (2 per sector) (3) antenna mounts and an euipment cabinet on the rooftop. install (1) sector at three locations on roof both power and fiber lines will be placed in new cable tray on rooftop. | $68,000 |
| Aug 30, 2022 | Never finaled issued Nov 2022, no final | 510 26th Av | dish wireless propose to install 3 antennas, 1 persector, (6) rru's (2 per sector) (3) antenna mounts and an euipment cabinet on the rooftop. install (1) sector at three locations on roof both power and fiber lines will be placed in new cable tray on rooftop.Details
dish wireless propose to install 3 antennas, 1 persector, (6) rru's (2 per sector) (3) antenna mounts and an euipment cabinet on the rooftop. install (1) sector at three locations on roof both power and fiber lines will be placed in new cable tray on rooftop. | $68,000 |
| Aug 23, 2022 | Never finaled issued Nov 2022, no final | 1650 Owens St | dish wireless proposing to install 3 antennas 6 rrus,2 frp screenwalls, 1 equp cabinet on rooftop. antennas will be 2 sectors of rooftop, concealed with frp wall. power and fiber lines placed in new cable tray on roof, to run from equip cab to ea location. all installs to be painted to matchDetails
dish wireless proposing to install 3 antennas 6 rrus,2 frp screenwalls, 1 equp cabinet on rooftop. antennas will be 2 sectors of rooftop, concealed with frp wall. power and fiber lines placed in new cable tray on roof, to run from equip cab to ea location. all installs to be painted to match | $68,000 |
| Jul 26, 2022 | Never finaled issued Nov 2022, no final | 1344 Ocean Av | dish wireless llc to install 3 antennas, 6 rrus and wquip cabinet on rooftop. propsed to install 1 per sector at 3 locations on roof. antennas will be concealed within frp screen wall. both power and fiber lines will be placed in new cable tray on roof top. cable tray will run from equip cabinet toDetails
dish wireless llc to install 3 antennas, 6 rrus and wquip cabinet on rooftop. propsed to install 1 per sector at 3 locations on roof. antennas will be concealed within frp screen wall. both power and fiber lines will be placed in new cable tray on roof top. cable tray will run from equip cabinet to | $68,000 |
| Jun 15, 2022 | Never finaled issued Nov 2022, no final | 2696 Geary Bl | install 6 antennas (2/sect), 12 rru's (4/sect) & equip cabinets on roof. 3 sects at 3 locations on roof, antennas concealed w/in frp radomes.power lines & fiber lines will be placed in new cable tray on roof and run from equipment cabinet to ea antenna.all proposed screening/concealment/paint match.Details
install 6 antennas (2/sect), 12 rru's (4/sect) & equip cabinets on roof. 3 sects at 3 locations on roof, antennas concealed w/in frp radomes.power lines & fiber lines will be placed in new cable tray on roof and run from equipment cabinet to ea antenna.all proposed screening/concealment/paint match. | $68,000 |
| Sep 8, 2020 | Completed final sign-off Dec 2022 | 1453 Mission St | modification to an unmanned telecommunications facility consisting of rem & rep 3 antenna with 3 new antenna inside e frp. rem and repl 2 rbs2102 cab with new6160 cab and b160 bat cab. install 3 6x12 hybrid cbls, 3 rrus-4415 and remove coax, tma.Details
modification to an unmanned telecommunications facility consisting of rem & rep 3 antenna with 3 new antenna inside e frp. rem and repl 2 rbs2102 cab with new6160 cab and b160 bat cab. install 3 6x12 hybrid cbls, 3 rrus-4415 and remove coax, tma. | $25,000 |
| Jul 16, 2019 | Completed final sign-off Jan 2024 | 755 Stanyan St | installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps.Details
installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps. | $200,000 |
| Jan 22, 2019 | Never finaled issued Sep 2019, no final | 380 Clementina St | replace 4 e sprint panel antennas w 1 p sprint nr panel antenna +3 p sprint rrh 800 mhz 1 per sector install 2 p sprint nv panel antennas on p mounts install 3 p sprint rrh 1900 hhz 1 per sector, install 3 p sprint rrh 2.5 ghz 1 per sector, 18 p pipe mounts for p rrh 6 per sector. 3 run of p hybridDetails
replace 4 e sprint panel antennas w 1 p sprint nr panel antenna +3 p sprint rrh 800 mhz 1 per sector install 2 p sprint nv panel antennas on p mounts install 3 p sprint rrh 1900 hhz 1 per sector, install 3 p sprint rrh 2.5 ghz 1 per sector, 18 p pipe mounts for p rrh 6 per sector. 3 run of p hybrid | $30,000 |
| Sep 18, 2018 | Completed final sign-off Jan 2020 | 3838 California St | modify existing unmanned telecom facility, install (4) mimo antennas, (1)per sector, remove/replace (4) nv antennas w/(4) 8 part rfs antennas, install mimo du inside (e) mmbs cabinet. install (4) hybrid cables (1) per sector. install (1) string of batteries inside exsiting cabinet.Details
modify existing unmanned telecom facility, install (4) mimo antennas, (1)per sector, remove/replace (4) nv antennas w/(4) 8 part rfs antennas, install mimo du inside (e) mmbs cabinet. install (4) hybrid cables (1) per sector. install (1) string of batteries inside exsiting cabinet. | $15,000 |
| Aug 28, 2018 | Never finaled issued Jan 2020, no final | 1 Saint Francis Pl | remove 1 (e)cabinet, 3 (e)rrhs & 3 (e)antennas. install 3 proposed commscope antennas 1 per sector. install 3 mimo antennas 1 per sector. install 6 proposed rrhs, 3 1900mhz and 3 800 1 each per sector. install 1 proposed e-cabinet & 1 cabinet. remove all (e)coax cables. install 3 proposed hybrid cabDetails
remove 1 (e)cabinet, 3 (e)rrhs & 3 (e)antennas. install 3 proposed commscope antennas 1 per sector. install 3 mimo antennas 1 per sector. install 6 proposed rrhs, 3 1900mhz and 3 800 1 each per sector. install 1 proposed e-cabinet & 1 cabinet. remove all (e)coax cables. install 3 proposed hybrid cab | $20,000 |
| Aug 9, 2018 | Completed final sign-off Nov 2019 | 100 Powell St | sprint - remove and replace 6 antenas, 3 rrus and removal of a 24" frp shroud for a 36" shroud. n/a for maher.Details
sprint - remove and replace 6 antenas, 3 rrus and removal of a 24" frp shroud for a 36" shroud. n/a for maher. | $20,000 |
| Mar 23, 2018 | Completed final sign-off Mar 2019 | 555 De Haro St | roof: sprint - r&r (e) antenna add 3 new rru maher naDetails
roof: sprint - r&r (e) antenna add 3 new rru maher na | $12,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 1633 Taraval St | replace 3 (e) antennas with similar new antennas, add 1 new radio unit per sector, total 3. add 4 batteries and pu unit into existing cabinets.Details
replace 3 (e) antennas with similar new antennas, add 1 new radio unit per sector, total 3. add 4 batteries and pu unit into existing cabinets. | $35,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 310 Townsend St | modification of existing cell site. remove and replace 3 existing antennas with 3 new like antennas behind rf stealthing. add 3 new radio unions, 1 per antenna. add 4 batteries and du equipent inside existing cabinets sprint site id fs04xc038Details
modification of existing cell site. remove and replace 3 existing antennas with 3 new like antennas behind rf stealthing. add 3 new radio unions, 1 per antenna. add 4 batteries and du equipent inside existing cabinets sprint site id fs04xc038 | $35,000 |
| May 5, 2017 | Completed final sign-off Oct 2018 | 222 Front St | install (2) new panel antennas(2) rrhs (2) frp enclosures. relocate (1) panel antenna, (2) rrhs and install (1) frp enclosure. replace (1) panel antenna, install (1) rrh (maher ord. extended 155-13 n/a)Details
install (2) new panel antennas(2) rrhs (2) frp enclosures. relocate (1) panel antenna, (2) rrhs and install (1) frp enclosure. replace (1) panel antenna, install (1) rrh (maher ord. extended 155-13 n/a) | $42,000 |
| Feb 2, 2016 | Completed final sign-off Sep 2016 | 201 Spear St | install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinanceDetails
install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinance | $5,000 |
| Nov 23, 2015 | Completed final sign-off Dec 2016 | 631 Ofarrell St | install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinanceDetails
install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinance | $5,000 |
| Sep 16, 2014 | Completed final sign-off Sep 2017 | 488 Bryant St | sprint modify(e)unmanned telecommunications facility.replc(3)(e)nv antennas w/(3)new 2.5 antennas.reloc(e)mmbs cabinet&bbu to g/f.add new 2.5 gttz equip inside(e)mmbs cabinet.add(1)new string batteries inside(e) bbu.add(3)new rru at the roof.add 2 faux vent pipes to conceal antennas(maher n/a).Details
sprint modify(e)unmanned telecommunications facility.replc(3)(e)nv antennas w/(3)new 2.5 antennas.reloc(e)mmbs cabinet&bbu to g/f.add new 2.5 gttz equip inside(e)mmbs cabinet.add(1)new string batteries inside(e) bbu.add(3)new rru at the roof.add 2 faux vent pipes to conceal antennas(maher n/a). | $20,000 |
| Sep 8, 2014 | Completed final sign-off Feb 2017 | 420 Taylor St | sprint: remove(2)nv 800/1900 antennas(1)each at sectors a ^ b/add(2)triband panel antennas(1)each at sectors a & b/add(2)2.5 rrh(1)each at sectors a & b/add new 2.5 equipmt inside(e)mmbs cabinet/add(n)2.5 batteries inside(e)bbu cabinet/add(n jumper lines fr rrhs to(n) antennas/re-use(e) hybrid cableDetails
sprint: remove(2)nv 800/1900 antennas(1)each at sectors a ^ b/add(2)triband panel antennas(1)each at sectors a & b/add(2)2.5 rrh(1)each at sectors a & b/add new 2.5 equipmt inside(e)mmbs cabinet/add(n)2.5 batteries inside(e)bbu cabinet/add(n jumper lines fr rrhs to(n) antennas/re-use(e) hybrid cable | $20,000 |