Nicholas Thomas
- Listed as
- architect, authorized agent-others
- Firm
- Thomas Works A+D
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Jul 2026
19 permits since 2000 (architect on 16 permits, authorized agent-others on 3 permits): 9 completed, 6 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 33 Iris Av | convert office to bedroom and add (n) bathroom, and (n) exterior door at rear.Details
convert office to bedroom and add (n) bathroom, and (n) exterior door at rear. | $10,000 | |
| Jul 7, 2026 | In progress issued Jul 2026 | 29 West Clay St | Jeff King And Company Inc | infill of a two window and a door on the basement level of the rear facade. relocation of the electrical panel from the basement to the exterior of the garage on the alley way. removal of fireplace on the first fl. chimeny to remain. conversion of a closet into laundry room on 2nd floor.Details
infill of a two window and a door on the basement level of the rear facade. relocation of the electrical panel from the basement to the exterior of the garage on the alley way. removal of fireplace on the first fl. chimeny to remain. conversion of a closet into laundry room on 2nd floor. | $125,000 |
| Feb 11, 2026 | In progress issued Aug 2026 | 3221 Market St | Jva 27 Construction | legalization of a ground floor unit into an adu through state program. renovation of kitchen and bathroom. new egress window.Details
legalization of a ground floor unit into an adu through state program. renovation of kitchen and bathroom. new egress window. | $20,000 |
| Aug 21, 2025 | In progress issued Nov 2025 | 436 Eureka St | Perez Construction Llc. | altered site permit (ref 2018-10009-2526) to allow for the expansion of the basement, add a sky light, and change windows sizes.this set is still in conformance with the board of appeals decision (appeal #22-013) and the subsequent boa permit #2022-0527-2182.Details
altered site permit (ref 2018-10009-2526) to allow for the expansion of the basement, add a sky light, and change windows sizes.this set is still in conformance with the board of appeals decision (appeal #22-013) and the subsequent boa permit #2022-0527-2182. | |
| May 2, 2025 | Completed final sign-off Aug 2025 | 1540 15th St | 2/f: remodel (e) laundry into combo laundry and bath.Details
2/f: remodel (e) laundry into combo laundry and bath. | $10,000 | |
| May 1, 2025 | Completed final sign-off Jun 2025 | 121 Elsie St | Jeff King And Company Inc | to comply with nov#202536235 -legalization of a screening wall.Details
to comply with nov#202536235 -legalization of a screening wall. | $100 |
| Mar 24, 2025 | Completed final sign-off Aug 2025 | 1542 15th St | convert (e) laundry room located at 2nd floor into (n) full bathroom to include adding toilet, vanity and shower waste pipe repair . electrical work to add gfci, recessed lights timer light controls. bathroom converted into powder room with laundry.Details
convert (e) laundry room located at 2nd floor into (n) full bathroom to include adding toilet, vanity and shower waste pipe repair . electrical work to add gfci, recessed lights timer light controls. bathroom converted into powder room with laundry. | $18,500 | |
| Jan 21, 2025 | Completed final sign-off Dec 2025 | 10 Ina Ct | Orchard Construction | remodel to include (n) interior partitions, relocate (e) kitchen, relocate 2 (e) bathrooms and add 1 (n) bathroom at 2nd floor. convert (e) garage into conditioned space. adding 1 (n) skylight at rear roof and add 5 (n) windows throughout house not visible from street and replace (e) windows.Details
remodel to include (n) interior partitions, relocate (e) kitchen, relocate 2 (e) bathrooms and add 1 (n) bathroom at 2nd floor. convert (e) garage into conditioned space. adding 1 (n) skylight at rear roof and add 5 (n) windows throughout house not visible from street and replace (e) windows. | $100,000 |
| May 28, 2024 | In progress filed May 2024, not yet issued | 2153 Lake St | Jeff King And Company Inc | reconfig of interior structural and non structural walls, (n) kitchen, (n) powder, (n) hvac and hw, (n) windows and ext door.Details
reconfig of interior structural and non structural walls, (n) kitchen, (n) powder, (n) hvac and hw, (n) windows and ext door. | $200,000 |
| May 14, 2024 | Completed final sign-off Feb 2025 | 263 16th Av | Jeff King And Company Inc | reconfiguration of interior partitions, kitchen remodel, bathroom relocation, new replacement in kind windows at the rear of the house, new hvac and hw.Details
reconfiguration of interior partitions, kitchen remodel, bathroom relocation, new replacement in kind windows at the rear of the house, new hvac and hw. | $100,000 |
| Apr 30, 2024 | In progress issued May 2024 | 2153 Lake St | Jeff King And Company Inc | reconfiguration of non-structural walls. 2 new skylights. relocation and renovation of bathrooms. infill of 3 windows.Details
reconfiguration of non-structural walls. 2 new skylights. relocation and renovation of bathrooms. infill of 3 windows. | $100,000 |
| Feb 24, 2023 | Completed final sign-off Feb 2024 | 611 Washington St | Thoms Construction | kitchen renovation: replace (e) fixtures, (n) cabinets & lighting in-kind. replace wood flooring in living & bedrooms w/(n).Details
kitchen renovation: replace (e) fixtures, (n) cabinets & lighting in-kind. replace wood flooring in living & bedrooms w/(n). | $10,000 |
| Dec 28, 2022 | Completed final sign-off Oct 2024 | 121 States St | Speedy Building And Construction | construction of a deck at rear of property. reconfiguration of interior nonstructural walls. relocation of hvac and hw heaters. legalization of non-permitted bathroom. no work in public right of way. no work to front of building.Details
construction of a deck at rear of property. reconfiguration of interior nonstructural walls. relocation of hvac and hw heaters. legalization of non-permitted bathroom. no work in public right of way. no work to front of building. | $25,000 |
| Oct 18, 2022 | Completed final sign-off Dec 2023 | 440 36th Av | Gregory Loughran Construction | remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel.Details
remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel. | $250,000 |
| Jun 28, 2022 | Expired or cancelled cancelled Aug 2025 | 436 Eureka St | alter site permit# 2018-1009-2526-s to conform with exhibit 9 of appeal # 22-013 bpa# 2022-0527-5182Details
alter site permit# 2018-1009-2526-s to conform with exhibit 9 of appeal # 22-013 bpa# 2022-0527-5182 | ||
| May 27, 2022 | Never finaled issued Jun 2022, no final | 436 Eureka St | per board of appeals decision 22-013 revise permit app. 201810092526 tp reflect changes found on shets boa1, boa2, boa3 and boa4Details
per board of appeals decision 22-013 revise permit app. 201810092526 tp reflect changes found on shets boa1, boa2, boa3 and boa4 | ||
| Mar 10, 2022 | Expired or cancelled cancelled Jan 2026 | 48 Collins St | install (n) finishes & lights at access stair. demo of interior walls (no new walls). replace of (e) skylight in-kind. (n) entry gate.Details
install (n) finishes & lights at access stair. demo of interior walls (no new walls). replace of (e) skylight in-kind. (n) entry gate. | $50,000 | |
| Oct 9, 2018 | Never finaled issued Feb 2022, no final | 436 Eureka St | Perez Construction Llc. | horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchenDetails
horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchen | $800,000 |
| Mar 11, 2013 | Completed final sign-off Nov 2014 | 3871 Jackson St | Cal C A D E Construction Inc | proposes to build a new horizontal addition in the rear yard on the basement & first floor only. include are, new windows,lighting & finishes. new sprinklers througout addition. mechanical, electrical & sprinkler under separate permit.Details
proposes to build a new horizontal addition in the rear yard on the basement & first floor only. include are, new windows,lighting & finishes. new sprinklers througout addition. mechanical, electrical & sprinkler under separate permit. | $125,000 |