Nathan Williams
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Mosswood Engineering
- Based in
- Berkeley
- On San Francisco permits
- Sep 2003 to Oct 2026
181 permits since 2000 (engineer on 168 permits, architect on 11 permits, authorized agent-others on 2 permits, designer on 1 permit): 117 completed, 15 in progress, 22 never finaled, 27 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 181.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 183 24th Av | to comply with nov 202662646. bathroom relocation of tub. rebuild existing roof deck and make the railing up to code with glass. replace in kind 5 windows on the side of the house. replace in kind knee walls. new full height walls.Details
to comply with nov 202662646. bathroom relocation of tub. rebuild existing roof deck and make the railing up to code with glass. replace in kind 5 windows on the side of the house. replace in kind knee walls. new full height walls. | $15,000 | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 2853 Green St | Jeff King And Company Inc | new construction of a 2-story type v-b adu in rear lot to include a gym with crawlspace, studio space with a kitchen, bathroom and sauna.Details
new construction of a 2-story type v-b adu in rear lot to include a gym with crawlspace, studio space with a kitchen, bathroom and sauna. | $145,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 23 07th Av | Jeff King And Company Inc | voluntary structural strengthening. new interior plywood shearwalls in short direction only. new concrete footing at previous rear addition. no changes to the footprint or exterior. raising of existing chimneyDetails
voluntary structural strengthening. new interior plywood shearwalls in short direction only. new concrete footing at previous rear addition. no changes to the footprint or exterior. raising of existing chimney | $175,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 2853 Green St | Jeff King And Company Inc | interior remodel at level 2 & attic. minor window changes, including in kind windows at front facade dormer. level 2 work includes: remodel x 2 bathrooms, relocate x 2 baths, interior partiton changes, new finishes, casework throughout. attic work includes: int partitions to create officeDetails
interior remodel at level 2 & attic. minor window changes, including in kind windows at front facade dormer. level 2 work includes: remodel x 2 bathrooms, relocate x 2 baths, interior partiton changes, new finishes, casework throughout. attic work includes: int partitions to create office | $114,698 |
| May 7, 2026 | In progress issued Jun 2026 | 2251 Moraga St | Building Lab | exterior backyard improvement include demo of (e) backyard & construction of (n) retaining walls w/ fence, (n) backyard hardscape, (n) side gate, and site draininge. build a storage shed less than 100 sq.sf.Details
exterior backyard improvement include demo of (e) backyard & construction of (n) retaining walls w/ fence, (n) backyard hardscape, (n) side gate, and site draininge. build a storage shed less than 100 sq.sf. | $30,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 900 Clayton St | At6 Design Build | remodel to include 153 sf addition at floor 3 with flat service platform above and 61 sf addition at level 1 garage. all within (e) footprint. (n) windows at level 3 at rear facade and lightwell, replace (1) door at level 2 rear, 2 window sashs at level 3 front , 1 skylight and bathroom remodel, (n)Details
remodel to include 153 sf addition at floor 3 with flat service platform above and 61 sf addition at level 1 garage. all within (e) footprint. (n) windows at level 3 at rear facade and lightwell, replace (1) door at level 2 rear, 2 window sashs at level 3 front , 1 skylight and bathroom remodel, (n) | $250,000 |
| Jan 14, 2026 | In progress issued Jun 2026 | 167 Bonview St | Mc Gowan Builders | 1st/f-partial new foundation. excavate 19 cu.yds for slab & footings. convert 386sf of garage to jadu & stairwell.2nd/f-remodel kitchen & dining, relocate bath, add stairwell & steps to rear yard.3rd/f-restructure & raise part of roof to enclose 2 bdrms, 1 bath & 2 decks.front facade- remove...Details
1st/f-partial new foundation. excavate 19 cu.yds for slab & footings. convert 386sf of garage to jadu & stairwell.2nd/f-remodel kitchen & dining, relocate bath, add stairwell & steps to rear yard.3rd/f-restructure & raise part of roof to enclose 2 bdrms, 1 bath & 2 decks.front facade- remove... | $867,500 |
| Dec 15, 2025 | In progress issued Dec 2025 | 363 Douglass St | Thomas Doherty Construction Dba Doherty | basement - voluntary seismic upgrade. replace west half of floor with slab on grade and reframe east floor. create tradesman corridor. remove laundry and install wet bar. add bathroom. replace east windows and doors. 1/f - remove bath for breakfast nook. change east door to window. 2/f - add laundryDetails
basement - voluntary seismic upgrade. replace west half of floor with slab on grade and reframe east floor. create tradesman corridor. remove laundry and install wet bar. add bathroom. replace east windows and doors. 1/f - remove bath for breakfast nook. change east door to window. 2/f - add laundry | $108,600 |
| Jun 30, 2025 | Completed final sign-off May 2026 | 420 Monterey Bl | Planart Construction Corp | existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted.Details
existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted. | $30,000 |
| Jun 17, 2025 | In progress issued Jul 2025 | 1371 06th Av | Hawke Construction | revision to pa# 202501098027: to include 98 sf horizontal extension (kitchen) at rear yard.Details
revision to pa# 202501098027: to include 98 sf horizontal extension (kitchen) at rear yard. | $6,319 |
| May 7, 2025 | Completed final sign-off Apr 2026 | 45 San Pablo Av | Bloom And Lawn Landscape Inc., The 519 Corp/Dba:Janet Moyer Landscaping | rear yard: remove existing retaining wall closet to house.in rear yard,install new retaining wall, further back. install new staircase. all work within property line.Details
rear yard: remove existing retaining wall closet to house.in rear yard,install new retaining wall, further back. install new staircase. all work within property line. | $100,000 |
| Apr 16, 2025 | In progress issued Jul 2025 | 3226 18th St | Cronin Construction & Development Inc. | replacement existing foundation and slab with new concrete footing and slab. provide seismic upgrade or basement level. no change to exterior.Details
replacement existing foundation and slab with new concrete footing and slab. provide seismic upgrade or basement level. no change to exterior. | $60,000 |
| Mar 20, 2025 | In progress issued Mar 2025 | 679 12th Av | Jeff King And Company Inc | voluntary structural strengthening, new plywood shearwalls in short direction only. no changes to the footprint or exterior.Details
voluntary structural strengthening, new plywood shearwalls in short direction only. no changes to the footprint or exterior. | $50,000 |
| Dec 23, 2024 | Completed final sign-off Mar 2026 | 148 Highland Av | At6 Design Build | 114 sf addition at lvl 1. convert 30 sf of unconditioned garage space to conditioned living space, kitchen & bathroom renovation including filling in lightwell at level 2. lvl 2: new door & windows & replacing 1 door lvl 1: rear facade replacing (1) door. add 2 skylights. n)furnance & tankless w/hDetails
114 sf addition at lvl 1. convert 30 sf of unconditioned garage space to conditioned living space, kitchen & bathroom renovation including filling in lightwell at level 2. lvl 2: new door & windows & replacing 1 door lvl 1: rear facade replacing (1) door. add 2 skylights. n)furnance & tankless w/h | $189,000 |
| Nov 18, 2024 | Expired or cancelled expired Jan 2026 | 404 Marietta Dr | Bayward Builders | structural revision to 202303214040. 1 flush header, (n) steel beam at roof, (n) rear deack beams at grade.Details
structural revision to 202303214040. 1 flush header, (n) steel beam at roof, (n) rear deack beams at grade. | |
| Sep 19, 2024 | Expired or cancelled expired Nov 2025 | 2319 Funston Av | Timberline Const Co | revision pa#: 202303083267; foundation walls north, south, west and east per mosswood engineeringDetails
revision pa#: 202303083267; foundation walls north, south, west and east per mosswood engineering | $50,000 |
| Sep 16, 2024 | In progress issued Feb 2025 | 330 Linden St | Axelson Builders Inc | installation of (n) storefront opening entry & egress doors on linden st side of 425-427 hayes st throughout building. (n) interior ramp to provide ada compliance structural scope includes storefront opening interior steps. (n) slab on grade & columns. existing sam flores mural on linden stDetails
installation of (n) storefront opening entry & egress doors on linden st side of 425-427 hayes st throughout building. (n) interior ramp to provide ada compliance structural scope includes storefront opening interior steps. (n) slab on grade & columns. existing sam flores mural on linden st | $400,000 |
| Sep 13, 2024 | Completed final sign-off Feb 2026 | 3595 Folsom St | Wei Li Construction | interior and exterior renovation to single family home. interior work includes new primary suite, kitchen remodel, replace e gas fireplace. exterior work includes new windows, new siding, new doors, new parapetDetails
interior and exterior renovation to single family home. interior work includes new primary suite, kitchen remodel, replace e gas fireplace. exterior work includes new windows, new siding, new doors, new parapet | $240,000 |
| Aug 1, 2024 | Completed final sign-off Jul 2025 | 3771 Clay St | At6 Design Build | revision to permit 202311140775 to address dbi issued correction notice dated 7/22/24 regarding new scope fo demolition. revision includes replacement in kind of 1st and 2nd level southwest corner demo and reframe blind wall, floor systems & roof per plans.all work under this permit shall be cloudedDetails
revision to permit 202311140775 to address dbi issued correction notice dated 7/22/24 regarding new scope fo demolition. revision includes replacement in kind of 1st and 2nd level southwest corner demo and reframe blind wall, floor systems & roof per plans.all work under this permit shall be clouded | $20,000 |
| Jul 12, 2024 | Expired or cancelled expired Jun 2026 | 53 Sussex St | Ronan O'dea Inc Dba O'dea Ronan Inc | shoring for permit 202104269314Details
shoring for permit 202104269314 | |
| Jun 18, 2024 | Completed final sign-off Jan 2025 | 1801 Union St | Bai Construction | replace damaged rot at corner of retail store. repair exterior siding in kind.Details
replace damaged rot at corner of retail store. repair exterior siding in kind. | $5,000 |
| Mar 26, 2024 | Completed final sign-off May 2025 | 4027 23rd St | Cameron Builders Sf | rev to pa# 2024-0109-3669; structural revisions to lower level footing. remove 1st floor framing and re-frame at elevation of 10-inches lower.Details
rev to pa# 2024-0109-3669; structural revisions to lower level footing. remove 1st floor framing and re-frame at elevation of 10-inches lower. | |
| Mar 21, 2024 | Completed final sign-off Jun 2025 | 2929 20th Av | At6 Design Build | interior remodel to existing sfd. work to include kitchen rennovation, (1) bathroom remodel, (1) new bathroom and window replacements at the side (6) totalDetails
interior remodel to existing sfd. work to include kitchen rennovation, (1) bathroom remodel, (1) new bathroom and window replacements at the side (6) total | $85,000 |
| Feb 15, 2024 | Completed final sign-off Sep 2024 | 24 17th Av | Jeff King And Company Inc | revision to permit 202306029127. change rear elevation to accommodate replacement of shearwall.Details
revision to permit 202306029127. change rear elevation to accommodate replacement of shearwall. | |
| Feb 1, 2024 | Completed final sign-off Dec 2024 | 100 Turquoise Wy | The 519 Corp/Dba:Janet Moyer Landscaping, Teutonic Construction Inc | remove and replace existing deck using fortress steel decking system. reconfigure stairs in back yard.Details
remove and replace existing deck using fortress steel decking system. reconfigure stairs in back yard. | $57,000 |
| Jan 26, 2024 | In progress issued Jun 2024 | 2251 Moraga St | Building Lab | convert (e) bedroom on 1/f into (n) adu.Details
convert (e) bedroom on 1/f into (n) adu. | $55,000 |
| Dec 4, 2023 | In progress issued Nov 2024 | 3224 Folsom St | renovation of single family home no expansion beyond (e) foot print additional habitalbe space (650) added in (e) garage and below rear extension interior remodel work includes updated kitchen, new stairway, new living space exterior work at rear only.Details
renovation of single family home no expansion beyond (e) foot print additional habitalbe space (650) added in (e) garage and below rear extension interior remodel work includes updated kitchen, new stairway, new living space exterior work at rear only. | $500,000 | |
| Nov 21, 2023 | Completed final sign-off Mar 2024 | 574 03rd St | Bai Construction | repair cracks on rear wall (ritch st)Details
repair cracks on rear wall (ritch st) | $10,000 |
| Nov 14, 2023 | Completed final sign-off Jul 2025 | 3771 Clay St | At6 Design Build | remodel (e) kitchen renovation, (3) bathroom renovations, window replacements at rear and sash replacements at front elevation, (3) skylights at (e) openings. (n) heating and water heater upgrades. minor 'fill in' at level 1 under.Details
remodel (e) kitchen renovation, (3) bathroom renovations, window replacements at rear and sash replacements at front elevation, (3) skylights at (e) openings. (n) heating and water heater upgrades. minor 'fill in' at level 1 under. | $438,000 |
| Oct 2, 2023 | Never finaled filed Oct 2023, never issued | 221 Lake St | Christopher Wells Construction Inc. | exterior stairs and deck: demo and rebuild (e) stairs with code-compliant stairs and improved layout.Details
exterior stairs and deck: demo and rebuild (e) stairs with code-compliant stairs and improved layout. | $50,000 |
| Oct 2, 2023 | Never finaled filed Oct 2023, never issued | 219 Lake St | Christopher Wells Construction Inc. | exterior stairs and deck: demo and rebuild (e) stairs with code-compliant stairs and improved layout.Details
exterior stairs and deck: demo and rebuild (e) stairs with code-compliant stairs and improved layout. | $50,000 |
| Jun 14, 2023 | Completed final sign-off Feb 2025 | 527 Alvarado St | Cameron Builders Sf | revision to 2021-1101-1515. structural changesDetails
revision to 2021-1101-1515. structural changes | |
| Jun 9, 2023 | Completed final sign-off Mar 2025 | 149 Hartford St | At6 Design Build | new retaining wall @ rear yardDetails
new retaining wall @ rear yard | $5,000 |
| May 31, 2023 | Completed final sign-off Jun 2026 | 3240 25th St | At6 Design Build | addition to level 1. work to include 2 (n) bedrooms, bath, and laundry closet at level 1. (n) roof deck at level 2.Details
addition to level 1. work to include 2 (n) bedrooms, bath, and laundry closet at level 1. (n) roof deck at level 2. | $150,000 |
| May 22, 2023 | Completed final sign-off Mar 2025 | 149 Hartford St | At6 Design Build | revision to address complaint# 202305617 & pa# 202209162629, structural upgrades include new underpinned footing at east wall, new concrete slab at lvl1, new sistered footing along south property line wall at location of lowered slab, new floor framing @ lvl2 & new 2x10 roof framing.Details
revision to address complaint# 202305617 & pa# 202209162629, structural upgrades include new underpinned footing at east wall, new concrete slab at lvl1, new sistered footing along south property line wall at location of lowered slab, new floor framing @ lvl2 & new 2x10 roof framing. | $20,000 |
| May 19, 2023 | Never finaled issued May 2023, no final | 225 Edgehill Wy | At6 Design Build | replace exterior siding in-kind, structural upgrades @ exterior, new exterior plywood & ledger board installation in preparation for future decks under separate permit (202207148464)Details
replace exterior siding in-kind, structural upgrades @ exterior, new exterior plywood & ledger board installation in preparation for future decks under separate permit (202207148464) | $20,000 |
| Mar 23, 2023 | Completed final sign-off May 2025 | 2251 Moraga St | Building Lab | 2nd and 3rd floor remodel. demo (e) outdoor stairs and build new stairs.Details
2nd and 3rd floor remodel. demo (e) outdoor stairs and build new stairs. | $160,000 |
| Mar 21, 2023 | Completed final sign-off Jan 2026 | 404 Marietta Dr | Bayward Builders | enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylightsDetails
enclose 165 sq. ft. below f/2 to become conditioned space w/wet bar & bath, remodel kitchen + (2) baths f/2 + laundry, add (2) skylights | $187,000 |
| Mar 6, 2023 | Completed final sign-off May 2025 | 1760 Union St | convert 660 sf of (e) garage to (n) adu under the state program. (n) deck at rear w/ stairs to rear yard and crawl space below. 1 (n) window & 1 (n) sliding glass door at level 1, adu.Details
convert 660 sf of (e) garage to (n) adu under the state program. (n) deck at rear w/ stairs to rear yard and crawl space below. 1 (n) window & 1 (n) sliding glass door at level 1, adu. | $135,000 | |
| Feb 17, 2023 | Completed final sign-off Feb 2025 | 527 Alvarado St | structural revision to permit 202111011515. replace west footing and foundation wall.Details
structural revision to permit 202111011515. replace west footing and foundation wall. | $20,000 | |
| Jan 11, 2023 | Completed final sign-off Jul 2024 | 359 Cumberland St | Dijeau Poage Construction Inc. | further excavation of (e) crawl space and installation of retaining wall to stabilize slope, to provide positive drainage away from (e) retaining wall and to remedy water infiltration @ (e) retaining wall.Details
further excavation of (e) crawl space and installation of retaining wall to stabilize slope, to provide positive drainage away from (e) retaining wall and to remedy water infiltration @ (e) retaining wall. | $25,000 |
| Dec 8, 2022 | Never finaled issued Jan 2023, no final | 50 Rosemont Pl | Cbp Construction Inc | interior renovation of second floor condominium. renovation of bathrooms. removal of interior wall. two window replacement in-kind.Details
interior renovation of second floor condominium. renovation of bathrooms. removal of interior wall. two window replacement in-kind. | $75,000 |
| Nov 21, 2022 | Expired or cancelled cancelled Nov 2023 | 10 El Sereno Ct | Building Lab | revision to bpa#202203210423. repair/replace in kind (e) rear deck & trellis, permitted original under bpa#85006634/13 adding 50 percent or less - repair only per dbi e.o 11/23/2022Details
revision to bpa#202203210423. repair/replace in kind (e) rear deck & trellis, permitted original under bpa#85006634/13 adding 50 percent or less - repair only per dbi e.o 11/23/2022 | $16,000 |
| Nov 18, 2022 | Completed final sign-off Nov 2024 | 1760 Union St | interior renovation (n) storage space at the ground fl. (n) bathroom at level 3, two (n) laundry closets at levle 3, (n) hvac system throughout. move bedroom wall at level 2.Details
interior renovation (n) storage space at the ground fl. (n) bathroom at level 3, two (n) laundry closets at levle 3, (n) hvac system throughout. move bedroom wall at level 2. | $30,000 | |
| Oct 25, 2022 | Never finaled issued Nov 2022, no final | 1350 06th Av | Art Of Construction Inc | rev to pa# 2022-0111-5753: remove sheetrock wrap at steel lmoment frame in garage apply fbl-200 intumescent thin film fireproofing material to steel moment frameDetails
rev to pa# 2022-0111-5753: remove sheetrock wrap at steel lmoment frame in garage apply fbl-200 intumescent thin film fireproofing material to steel moment frame | $3,500 |
| Oct 25, 2022 | Completed final sign-off Jan 2024 | 10 El Sereno Ct | Building Lab | rev to pa# 2022-0321-0423: new foundation work at lower levelDetails
rev to pa# 2022-0321-0423: new foundation work at lower level | $800 |
| Oct 24, 2022 | In progress issued Feb 2024 | 2530 14th Av | Barahona Brothers Construction Inc. | 1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl.Details
1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl. | $200,000 |
| Aug 3, 2022 | Never finaled issued Aug 2022, no final | 2530 14th Av | Barahona Brothers Construction Inc. | revision to bpa# 202204293330 ; widen and deepen continuous footingsDetails
revision to bpa# 202204293330 ; widen and deepen continuous footings | $25,000 |
| Jun 10, 2022 | Completed final sign-off Jun 2024 | 225 Edgehill Wy | At6 Design Build | (e) hipped roof reframing and replacement. interior renovation of (e) kitchen including removal of interior walls. front door replacement. replace rear windows and doors all other work not visible from public row.Details
(e) hipped roof reframing and replacement. interior renovation of (e) kitchen including removal of interior walls. front door replacement. replace rear windows and doors all other work not visible from public row. | $187,000 |
| Jun 8, 2022 | Expired or cancelled expired Oct 2025 | 455 Melrose Av | Rinaldi Construction | add new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater.Details
add new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater. | $175,000 |
| Apr 29, 2022 | Completed final sign-off May 2024 | 148 Otsego Av | Bayward Builders | revision of 202201286874. update t-24 & foundation detail.Details
revision of 202201286874. update t-24 & foundation detail. | |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 2530 14th Av | Barahona Brothers Construction Inc. | demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level.Details
demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level. | $60,000 |
| Mar 21, 2022 | Completed final sign-off Jan 2024 | 10 El Sereno Ct | Building Lab | interior remodel including kitchen and 3 bathrooms; new powder room, new windows at arear & east elevations; no addition or change to buildng footprintDetails
interior remodel including kitchen and 3 bathrooms; new powder room, new windows at arear & east elevations; no addition or change to buildng footprint | $150,000 |
| Mar 21, 2022 | Completed final sign-off Nov 2022 | 244 04th Av | Graham Moore Construction Inc | revise bpa#202102124625. as requested by bldg inspector robert power. revisions include repair (e) property line wall, (n) fire-rated parapet details. revise 3rd fl bathroom. revise foundation details.Details
revise bpa#202102124625. as requested by bldg inspector robert power. revisions include repair (e) property line wall, (n) fire-rated parapet details. revise 3rd fl bathroom. revise foundation details. | |
| Mar 4, 2022 | Completed final sign-off Nov 2022 | 300 Magellan Av | The 519 Corp/Dba:Janet Moyer Landscaping | excavate soil, construct reinforced concrete retaining wall.Details
excavate soil, construct reinforced concrete retaining wall. | $40,000 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 1350 06th Av | Art Of Construction Inc | remodel of kitchen, master bath and powder room. relocate (e) interior stairs. no wall alterations. replace exterior bedroom door with like size. add cabinets to living room.Details
remodel of kitchen, master bath and powder room. relocate (e) interior stairs. no wall alterations. replace exterior bedroom door with like size. add cabinets to living room. | $395,000 |
| Dec 28, 2021 | Completed final sign-off Sep 2022 | 2201 16th Av | Peters Design-Build Inc. | revision to pa #202012030195, structural addendum includes addition of plywood shearwall at gridline 8, epoxy holdown in lieu of cast-in-place, and minor structral member changes; item 18b and 24e required for special inspectionDetails
revision to pa #202012030195, structural addendum includes addition of plywood shearwall at gridline 8, epoxy holdown in lieu of cast-in-place, and minor structral member changes; item 18b and 24e required for special inspection | |
| Nov 19, 2021 | Completed final sign-off Apr 2026 | 2750 Harrison St | foundation repair, lay slab, dry rot framing repair, drywall, roof repair/replacement siding, window & door replacement, add new electrical outlets, lights, new full bath with shower and sink and toilet; add new water heater & 220v convert utililty shed to home office. sleeping not allowed.Details
foundation repair, lay slab, dry rot framing repair, drywall, roof repair/replacement siding, window & door replacement, add new electrical outlets, lights, new full bath with shower and sink and toilet; add new water heater & 220v convert utililty shed to home office. sleeping not allowed. | $40,000 | |
| Nov 15, 2021 | Completed final sign-off May 2022 | 389 Upper Tr | The 519 Corp/Dba:Janet Moyer Landscaping | comply with nov 202183376 install retaining wall. dig footers, pour concrete with steel columns, install pressure treated lagging.Details
comply with nov 202183376 install retaining wall. dig footers, pour concrete with steel columns, install pressure treated lagging. | $25,000 |
| Nov 1, 2021 | Completed final sign-off Feb 2025 | 527 Alvarado St | Cameron Builders Sf, Graham Moore Construction Inc | addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.Details
addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping. | $500,000 |
| Apr 16, 2021 | Completed final sign-off Jul 2022 | 112 Molimo Dr | Barahona Brothers Construction Inc. | 1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights.Details
1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights. | $300,000 |
| Mar 11, 2021 | Never finaled issued Aug 2021, no final | 148 Otsego Av | Cronin Construction & Development Inc. | build 742 sqft habitable space at ground floor. excavade 1' to achieve 8' ceiling height. upgrade electrical. remodel kitchen/dining at 2nd fl.Details
build 742 sqft habitable space at ground floor. excavade 1' to achieve 8' ceiling height. upgrade electrical. remodel kitchen/dining at 2nd fl. | $180,000 |
| Feb 9, 2021 | Expired or cancelled cancelled Jul 2024 | 549 Liberty St | remodel (e) 3rd fl & stair to 3rd fl includes (n) roofline @ rear. conversion of (e) 1st fl unconditional storage to (n) habitable space & garage, includes remodeled exterior entry stairs to accomodate (n) driveway. (n) mech, elec & plumb in area or work as notedDetails
remodel (e) 3rd fl & stair to 3rd fl includes (n) roofline @ rear. conversion of (e) 1st fl unconditional storage to (n) habitable space & garage, includes remodeled exterior entry stairs to accomodate (n) driveway. (n) mech, elec & plumb in area or work as noted | $180,000 | |
| Jan 7, 2021 | Never finaled issued Apr 2021, no final | 31 El Sereno Ct | Building Lab | remodel 3rd fl. c onvert non-habitable space, add 1 bed/ 1 bath/ family room at 2nd fl, and add play room/ 1 bath at 1st floor. add, replace windows & skylights. less than 50% repair to rear deck.Details
remodel 3rd fl. c onvert non-habitable space, add 1 bed/ 1 bath/ family room at 2nd fl, and add play room/ 1 bath at 1st floor. add, replace windows & skylights. less than 50% repair to rear deck. | $160,000 |
| Oct 25, 2020 | Never finaled issued Mar 2022, no final | 647 Edinburgh St | Bayward Builders | 1st fl: add (n) bath with minor expansion under (e) rear fl 2 deck. remodel bedrm, bath & laundry. reconfigure rear deck & exterior stair. (n) 1 hr wall @ north & south p.l. 2nd fl: remove (e) exterior stair @ rear. repair (e) deck & replace railings. add 1 hr wall @ south deck. no interior work.Details
1st fl: add (n) bath with minor expansion under (e) rear fl 2 deck. remodel bedrm, bath & laundry. reconfigure rear deck & exterior stair. (n) 1 hr wall @ north & south p.l. 2nd fl: remove (e) exterior stair @ rear. repair (e) deck & replace railings. add 1 hr wall @ south deck. no interior work. | $75,000 |
| Sep 22, 2020 | Completed final sign-off Aug 2022 | 751 Haight St | Trinity Building Co Llc, Partners Contracting Inc. | revision to pa# 201912230435 to include lowering of basement floor & expand area of existing second unit within existing unconditioned space. misc improvemtns due to site conditions.Details
revision to pa# 201912230435 to include lowering of basement floor & expand area of existing second unit within existing unconditioned space. misc improvemtns due to site conditions. | $155,000 |
| Sep 21, 2020 | Never finaled filed Sep 2020, never issued | 2519 20th Av | alter an (e), single family residence, add a new, no waiver adu at an (e) storage space on the 1st story, and add two decks on the 2nd story. remove and replace stair in rear yard. remove porch at the third story. replace windows and doors. add a first story horizontal addition at the adu.Details
alter an (e), single family residence, add a new, no waiver adu at an (e) storage space on the 1st story, and add two decks on the 2nd story. remove and replace stair in rear yard. remove porch at the third story. replace windows and doors. add a first story horizontal addition at the adu. | $150,000 | |
| Jul 8, 2020 | Expired or cancelled cancelled Jul 2020 | 134 Taraval St | At6 Design Build | 7remodel of kitchen & 3 bathrms, rebuild stair to level 1, new door to rear yard. new french door at family room, new egress window at bedrm 3 & fill in (e) door at level 1. replace 3 windows & fill in one window at kitchen (level 2). fill in one window at master bedrm at level 3.Details
7remodel of kitchen & 3 bathrms, rebuild stair to level 1, new door to rear yard. new french door at family room, new egress window at bedrm 3 & fill in (e) door at level 1. replace 3 windows & fill in one window at kitchen (level 2). fill in one window at master bedrm at level 3. | $180,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2021 | 76 Molimo Dr | Barahona Brothers Construction Inc. | 1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bathDetails
1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bath | $110,000 |
| Jan 8, 2020 | Expired or cancelled cancelled Nov 2024 | 549 Liberty St | ext'r improvements - horizontal infill addition below (e) 2nd fl @ rear. kitchen & bath remodel & (n) stair to ground fl/basement. replace (e) kitchen windows. (n) mech, elec & plumbDetails
ext'r improvements - horizontal infill addition below (e) 2nd fl @ rear. kitchen & bath remodel & (n) stair to ground fl/basement. replace (e) kitchen windows. (n) mech, elec & plumb | $85,000 | |
| Dec 19, 2019 | Completed final sign-off Jul 2020 | 260 Upper Tr | Gartan Construction | kitchen remodel - convert (e) closet to bar. remove (e) wood buring fireplace & replace w/(n) gas insert. remove & replace (e) skylight. structural upgrade to roof. repair extg windows. replace windows in kind only if required.Details
kitchen remodel - convert (e) closet to bar. remove (e) wood buring fireplace & replace w/(n) gas insert. remove & replace (e) skylight. structural upgrade to roof. repair extg windows. replace windows in kind only if required. | $100,000 |
| Nov 27, 2019 | Completed final sign-off Dec 2021 | 4277 23rd St | Bay Building Structures Inc | renovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout.Details
renovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout. | $140,000 |
| Sep 27, 2019 | Completed final sign-off Jan 2022 | 136 Lawton St | At6 Design Build | 1 story vertical addition above (e) 2 story. scope to include interior remodel & conditioning of (e) entry way & some basement space. project will add 3 bedrooms & 2 bathrooms.Details
1 story vertical addition above (e) 2 story. scope to include interior remodel & conditioning of (e) entry way & some basement space. project will add 3 bedrooms & 2 bathrooms. | $216,447 |
| Aug 21, 2019 | Completed final sign-off Oct 2021 | 1474 06th Av | Seamus R Cudden | provide temporary shoring to facilitate excavation & construction of the proposed garage and lower level buid out approved under pa 2018-0102-7653Details
provide temporary shoring to facilitate excavation & construction of the proposed garage and lower level buid out approved under pa 2018-0102-7653 | $10,000 |
| May 7, 2019 | Completed final sign-off Feb 2020 | 37 Aztec St | At6 Design Build | remodel to sfr. work to include rmeodel to level 1 bath, rmeodel kitchen, new windows at west and rear (not visible from street), lightwell infill (not visible from st). new roof.Details
remodel to sfr. work to include rmeodel to level 1 bath, rmeodel kitchen, new windows at west and rear (not visible from street), lightwell infill (not visible from st). new roof. | $95,000 |
| Apr 23, 2019 | Completed final sign-off Oct 2021 | 1474 06th Av | Seamus R Cudden | revision to pa 2018-0102-7653 alternate property line footing option using permeation grouting to stabilize clean sand/sp for excavation of new sistered footing. reference shoring p.a.#: 2019-0423-8749.Details
revision to pa 2018-0102-7653 alternate property line footing option using permeation grouting to stabilize clean sand/sp for excavation of new sistered footing. reference shoring p.a.#: 2019-0423-8749. | |
| Dec 12, 2018 | Never finaled issued Dec 2018, no final | 1983 Jefferson St | Ed Neale Construction Inc | revision to pa #201609268834. change ground floor shearwalls to moment frames.Details
revision to pa #201609268834. change ground floor shearwalls to moment frames. | $10,000 |
| Mar 26, 2018 | Completed final sign-off Nov 2024 | 70 02nd St | change of use. no physical changes proposed - admin only. conversion from medical cannabis dispensary to retail cannabis.Details
change of use. no physical changes proposed - admin only. conversion from medical cannabis dispensary to retail cannabis. | ||
| Feb 9, 2018 | Completed final sign-off Sep 2025 | 84 Harrington St | A G D Construction, A & A General Building Construction Inc, North South Construction Inc | interior remodel of (e) 2-story residence. (n) baths & bedrooms @1st flr. (n) renovated kitchen, bathrm & finishes @2nd flr & proposed 3rd flr addition. (n) windows & exit doors @2nd & 3rd flrs @rear of house. (n) stucco coat. rear exit stair relocated.Details
interior remodel of (e) 2-story residence. (n) baths & bedrooms @1st flr. (n) renovated kitchen, bathrm & finishes @2nd flr & proposed 3rd flr addition. (n) windows & exit doors @2nd & 3rd flrs @rear of house. (n) stucco coat. rear exit stair relocated. | $175,000 |
| Feb 5, 2018 | Never finaled issued Feb 2018, no final | 400 Fair Oaks St | Jeff King And Company Inc | replace existing site retaining wall at east property line and two concrete columns at existing entry stairs.Details
replace existing site retaining wall at east property line and two concrete columns at existing entry stairs. | $40,000 |
| Oct 17, 2017 | Expired or cancelled withdrawn Jun 2019 | 720 05th Av | Peters Design-Build Inc. | foundation replacementDetails
foundation replacement | $30,000 |
| Aug 3, 2017 | Completed final sign-off Jun 2019 | 4618 19th St | Doran Construction & Design | revision to pa#201509086320 addendum s2, revise roof framing/design per plan sheets s2.3, s4.1, and s4.2Details
revision to pa#201509086320 addendum s2, revise roof framing/design per plan sheets s2.3, s4.1, and s4.2 | |
| May 12, 2017 | Never finaled issued May 2017, no final | 145 Joost Av | Cronin Construction & Development Inc. | voluntary structural upgrade at rear wallDetails
voluntary structural upgrade at rear wall | $20,000 |
| Apr 14, 2017 | Expired or cancelled withdrawn Aug 2018 | 161 Hamerton Av | Keen Construction Incorporated | install new 2" dedicated water service from main in street for sprinkler system using 2" copper k braised to comply with ab2.09Details
install new 2" dedicated water service from main in street for sprinkler system using 2" copper k braised to comply with ab2.09 | $10,000 |
| Mar 15, 2017 | Completed final sign-off Jun 2019 | 1494 Rhode Island St | Bayward Builders | no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage.Details
no change to bldg footprint, relocate int stair, remodel kitchen & bath @ floor 2. add skylight over hallway, rebuild & refinish rear portion of roof. remodel bath @ floor 1. new windows at west facade. new rear stairs & shed roof. add cabana with half bath in former basement storage. | $250,000 |
| Mar 2, 2017 | Completed final sign-off Mar 2019 | 20 Beaver St | Bay Building Structures Inc | rear cottage -remodel within(e) bldg envelop will include lowering (e) 1st flr & adding 2nd flr bedroom, bathroom & laundry area. work on 1st flr to include renovated kitchen, new 1/2 bath, new door & windows on front (south). replace windows @ otehr 3 facades w/in(e) rough framing. new ext finish.Details
rear cottage -remodel within(e) bldg envelop will include lowering (e) 1st flr & adding 2nd flr bedroom, bathroom & laundry area. work on 1st flr to include renovated kitchen, new 1/2 bath, new door & windows on front (south). replace windows @ otehr 3 facades w/in(e) rough framing. new ext finish. | $200,000 |
| Nov 1, 2016 | Completed final sign-off Jan 2019 | 145 Bonview St | Cronin Construction & Development Inc. | revision to pa 2014-1121-2234(s1), strutural drawings and clacs partially revised based on (e) conditions that were found to be different than assumed during construction. no architectural changes. some shearwall lengths, nail spacing and holdown types changed. one beam changedDetails
revision to pa 2014-1121-2234(s1), strutural drawings and clacs partially revised based on (e) conditions that were found to be different than assumed during construction. no architectural changes. some shearwall lengths, nail spacing and holdown types changed. one beam changed | |
| Oct 6, 2016 | Completed final sign-off Mar 2017 | 1650 Florida St | Peters Design - Build | engineering documents to verify conventional framing is adequate for construction in progress under #201604285963. no change to architectural palns.Details
engineering documents to verify conventional framing is adequate for construction in progress under #201604285963. no change to architectural palns. | |
| Sep 16, 2016 | Completed final sign-off Oct 2017 | 1512 Clay St | Barahona Brothers Construction Inc. | seismic strengthening of gr level per sf mandatory seismic retrofit program. sfbc chap 34 b 2012 iebc appendix a4Details
seismic strengthening of gr level per sf mandatory seismic retrofit program. sfbc chap 34 b 2012 iebc appendix a4 | $30,000 |
| Jul 22, 2016 | Completed final sign-off Sep 2016 | 158 Precita Av | Fulcrum Point Construction | revision to pa 2015-1103-1634, replace original footing detail with retaining wall @ property lineDetails
revision to pa 2015-1103-1634, replace original footing detail with retaining wall @ property line | $2,500 |
| May 20, 2016 | Completed final sign-off Jul 2016 | 590 Utah St | Great Hands | #102- structural repairs to structure supporting kitchen overhang. replacement of beam and posts @ deck. maher naDetails
#102- structural repairs to structure supporting kitchen overhang. replacement of beam and posts @ deck. maher na | $16,000 |
| May 17, 2016 | Completed final sign-off Sep 2017 | 1374 45th Av | rebuild rear roof & add partial 3rd story (490 sf) at rear. vertical addition for partial 3rd story. add one (n) bedroom & one (n) bath + 2 skylights.Details
rebuild rear roof & add partial 3rd story (490 sf) at rear. vertical addition for partial 3rd story. add one (n) bedroom & one (n) bath + 2 skylights. | $50,000 | |
| Apr 28, 2016 | Expired or cancelled cancelled Jan 2026 | 530 Linden St | replace deck and stair structure in kindDetails
replace deck and stair structure in kind | $40,000 | |
| Apr 15, 2016 | Expired or cancelled expired Jun 2020 | 700 Central Av | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, seismic strengthening of ground level crawl space.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, seismic strengthening of ground level crawl space. | $60,000 | |
| Mar 10, 2016 | Completed final sign-off Dec 2017 | 1490 Guerrero St | Post & Lintel Construction | revision to appl #201510159840 - structural columns in garage are being relocated. laundry & utility area is being adjusted in the garage. adjustment to entry foyer from garage . adjustments to stair config.Details
revision to appl #201510159840 - structural columns in garage are being relocated. laundry & utility area is being adjusted in the garage. adjustment to entry foyer from garage . adjustments to stair config. | |
| Dec 22, 2015 | Completed final sign-off Dec 2016 | 1558 23rd Av | Calidad Construction | remodel of (e) basement for addition of new living space including new bedroom, new bathroom and new family room, connect to existing 1/f living space by (e) visually open connecting stair, relocate laundry.Details
remodel of (e) basement for addition of new living space including new bedroom, new bathroom and new family room, connect to existing 1/f living space by (e) visually open connecting stair, relocate laundry. | $268,000 |
| Nov 3, 2015 | Completed final sign-off Sep 2016 | 158 Precita Av | Fulcrum Point Construction, Christopher Gate Construction Inc | extension to existing 2nd level deck and replacement of existing 182 sf. replace existing rear door, combine kitchen and adjacent room by removing wall. add closet and relocate door at front roomDetails
extension to existing 2nd level deck and replacement of existing 182 sf. replace existing rear door, combine kitchen and adjacent room by removing wall. add closet and relocate door at front room | $50,000 |
| Oct 27, 2015 | Completed final sign-off Jul 2018 | 1251 40th Av | Peters Design-Build Inc. | remodel (e) 2 story bldg. reconfigure (e) 1st fl over garage to 1 bedroom & two bath. add family room & bathroom to (e) footprint of garage level, replace garage floor slab at (e) elevation, move front entrance from 2nd floor to 1st floor, remodel (e) kitchen & bath.Details
remodel (e) 2 story bldg. reconfigure (e) 1st fl over garage to 1 bedroom & two bath. add family room & bathroom to (e) footprint of garage level, replace garage floor slab at (e) elevation, move front entrance from 2nd floor to 1st floor, remodel (e) kitchen & bath. | $450,000 |
| Oct 19, 2015 | Completed final sign-off Jul 2016 | 400 Eddy St | K Bali Construction | build out kitchen, restroom , and bar on ground floor. buildout 3 restrooms and bar in basement & storage rooms. new finishes, equipment and lighting. replace extg windows and doors on facade. replace extg tile w/brick on facade. no work on residential units.Details
build out kitchen, restroom , and bar on ground floor. buildout 3 restrooms and bar in basement & storage rooms. new finishes, equipment and lighting. replace extg windows and doors on facade. replace extg tile w/brick on facade. no work on residential units. | $800,000 |
| Oct 15, 2015 | Completed final sign-off Nov 2017 | 1490 Guerrero St | Post & Lintel Construction | addition of ground level living space in place of garage storage. this new space will incldue relocated ktichen & new bath. the 2nd story will include new bedrooms & new bath. interior finishes at 2nd floor to be refurbished. work permit only for 1490 guerrero st (lower unit).Details
addition of ground level living space in place of garage storage. this new space will incldue relocated ktichen & new bath. the 2nd story will include new bedrooms & new bath. interior finishes at 2nd floor to be refurbished. work permit only for 1490 guerrero st (lower unit). | $200,000 |