Michael Tauber

License
C25947
Look the license up with the state
Listed as
architect, authorized agent-others
Firm
Michael Tauber Architecture
Based in
San Francisco
On San Francisco permits
May 2006 to Aug 2026

89 permits since 2000 (architect on 88 permits, authorized agent-others on 1 permit): 70 completed, 7 in progress, 6 never finaled, 6 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 19, 2026In progress
issued Sep 2026
3 Presidio TrBlack Mountain Developmentrevision to 202606042559, int remodel @ all floors. add bathroom @ 2nd fl, remodel primary closet. add laundry room @ 2nd flr. new lighting & electrical throughout. remove 2 interior stairs. new hvac @ 3rd floor. also, revise scope of work for pa 202606042559 to: remodel of 6 bathrooms 1 kitcen
Details
Permit
202608196823
Status
issued
Filed
Aug 19, 2026
Permit issued
Sep 23, 2026
Declared cost
$95,000
Address
3 Presidio Tr

revision to 202606042559, int remodel @ all floors. add bathroom @ 2nd fl, remodel primary closet. add laundry room @ 2nd flr. new lighting & electrical throughout. remove 2 interior stairs. new hvac @ 3rd floor. also, revise scope of work for pa 202606042559 to: remodel of 6 bathrooms 1 kitcen

Open the permit page

$95,000
Jul 23, 2026In progress
issued Jul 2026
1347 40th AvHealthy Building Science Increvision to #202603167679. material change to wall assembly located in exterior breezeway. replace gympsum with lp fireblock osb to provide fire protection for exterior application.
Details
Permit
202607235484
Status
issued
Filed
Jul 23, 2026
Permit issued
Jul 23, 2026
Address
1347 40th Av

revision to #202603167679. material change to wall assembly located in exterior breezeway. replace gympsum with lp fireblock osb to provide fire protection for exterior application.

Open the permit page

Apr 14, 2026In progress
issued May 2026
1347 40th AvHealthy Building Science Incconvert existing conditioned space on street level to adu.
Details
Permit
202603167679
Status
issued
Filed
Apr 14, 2026
Permit issued
May 29, 2026
Declared cost
$185,000
Address
1347 40th Av

convert existing conditioned space on street level to adu.

Open the permit page

$185,000
Feb 24, 2026Completed
final sign-off Aug 2026
595 Pacific AvPrincipal Builders Inc.2nd fl - office ti installation of new non-bearing partitions, ceilings, power/data and finishes. structural & mep deferred
Details
Permit
202602246389
Status
complete
Filed
Feb 24, 2026
Permit issued
Feb 27, 2026
Final sign-off
Aug 14, 2026
Declared cost
$1,407,813
Address
595 Pacific Av

2nd fl - office ti installation of new non-bearing partitions, ceilings, power/data and finishes. structural & mep deferred

Open the permit page

$1,407,813
Jan 28, 2026Completed
final sign-off Jul 2026
595 Pacific AvPrincipal Builders Inc.3rd floor: ti non-structural partitions , ceiling power data and finishes. mep deferred.
Details
Permit
202601284695
Status
complete
Filed
Jan 28, 2026
Permit issued
Feb 2, 2026
Final sign-off
Jul 20, 2026
Declared cost
$652,080
Address
595 Pacific Av

3rd floor: ti non-structural partitions , ceiling power data and finishes. mep deferred.

Open the permit page

$652,080
Jun 6, 2025Completed
final sign-off Apr 2026
2121 Webster StBlack Mountain Developmentgph3: replace exterior window and door system-west wall on one floor. provide new concrete curb for new window/door sill. patch and repair finishes around window replacement.
Details
Permit
202506068143
Status
complete
Filed
Jun 6, 2025
Permit issued
Jul 1, 2025
Final sign-off
Apr 14, 2026
Declared cost
$15,000
Address
2121 Webster St

gph3: replace exterior window and door system-west wall on one floor. provide new concrete curb for new window/door sill. patch and repair finishes around window replacement.

Open the permit page

$15,000
May 27, 2025In progress
issued Jun 2025
280 Spear StBlack Mountain Developmentremove closet in the media room and add 2x soffits
Details
Permit
202505277286
Status
issued
Filed
May 27, 2025
Permit issued
Jun 6, 2025
Declared cost
$1,000
Address
280 Spear St

remove closet in the media room and add 2x soffits

Open the permit page

$1,000
Feb 12, 2025In progress
issued Feb 2025
1750 Taylor StBlack Mountain Developmentunit #305: remodel primary bathroom and closet, remodel bath 2 and powder room, new cabinetry in bedroom 2 and entry, reconfigure kitchen including new appliances and finishes. new lighting throughout, new tile and waterproofing at balconies. replace in kind window wall on west bedroom and north
Details
Permit
202502120200
Status
issued
Filed
Feb 12, 2025
Permit issued
Feb 27, 2025
Declared cost
$100,000
Address
1750 Taylor St

unit #305: remodel primary bathroom and closet, remodel bath 2 and powder room, new cabinetry in bedroom 2 and entry, reconfigure kitchen including new appliances and finishes. new lighting throughout, new tile and waterproofing at balconies. replace in kind window wall on west bedroom and north

Open the permit page

$100,000
Sep 20, 2024In progress
filed Sep 2024, not yet issued
160 Ewing TrO'kane Construction Llcrepair water damage at dining rm/kitchen sliding patio door, kitchen replacement in kind (not shown on drawings), relocate ground floor laundry and bathroom, replace in kind rear sliding door, replace in kind 4 windows in (e) jamb w/smaller windows.
Details
Permit
202409201274
Status
filed
Filed
Sep 20, 2024
Declared cost
$105,000
Address
160 Ewing Tr

repair water damage at dining rm/kitchen sliding patio door, kitchen replacement in kind (not shown on drawings), relocate ground floor laundry and bathroom, replace in kind rear sliding door, replace in kind 4 windows in (e) jamb w/smaller windows.

Open the permit page

$105,000
Aug 28, 2024Completed
final sign-off May 2025
1101 Green StBlack Mountain Developmentlayout change for interior remodel of bathrooms, kitchen & closets. replace floorings, re-paint entire space, replace doors, replace kitchen appliances w/energy efficient modles, replace window shade. replace all lighting outlets & controls. revision to pa 202405142083
Details
Permit
202408289640
Status
complete
Filed
Aug 28, 2024
Permit issued
Sep 19, 2024
Final sign-off
May 13, 2025
Declared cost
$50,000
Address
1101 Green St

layout change for interior remodel of bathrooms, kitchen & closets. replace floorings, re-paint entire space, replace doors, replace kitchen appliances w/energy efficient modles, replace window shade. replace all lighting outlets & controls. revision to pa 202405142083

Open the permit page

$50,000
Jul 17, 2024Completed
final sign-off Mar 2025
1750 Taylor StBaxter Constructionunit 2302: remodel 2 bathrooms & kitchen, replace plumbing fixture in kind. no structural or exterior work
Details
Permit
202407176648
Status
complete
Filed
Jul 17, 2024
Permit issued
Jul 17, 2024
Final sign-off
Mar 24, 2025
Declared cost
$125,000
Address
1750 Taylor St

unit 2302: remodel 2 bathrooms & kitchen, replace plumbing fixture in kind. no structural or exterior work

Open the permit page

$125,000
May 16, 2024Completed
final sign-off Sep 2024
2121 Webster StBlack Mountain Developmentremodel laundry room. remove (e) lower cabinetry and plumbing fixtures. install (n) cabinetry & plumbing fixtures
Details
Permit
202405162307
Status
complete
Filed
May 16, 2024
Permit issued
May 17, 2024
Final sign-off
Sep 25, 2024
Declared cost
$10,000
Address
2121 Webster St

remodel laundry room. remove (e) lower cabinetry and plumbing fixtures. install (n) cabinetry & plumbing fixtures

Open the permit page

$10,000
Feb 28, 2024In progress
filed Feb 2024, not yet issued
477 Bryant Stchange of occupancy from b to r-3, renovate (e) bath and kitchen.
Details
Permit
202402286747
Status
filed
Filed
Feb 28, 2024
Declared cost
$40,000
Address
477 Bryant St

change of occupancy from b to r-3, renovate (e) bath and kitchen.

Open the permit page

$40,000
Nov 21, 2023Completed
final sign-off Mar 2024
2121 Webster StBlack Mountain Developmentbedroom 3- remove (e) cabinetry. bulkhead diffuser and recessed downlights then patch ceiling. install furniture by others and relocate (e) downlights. siting room- remove cabinetry, non structural walls, (e) diffuser bulkhead, recessed downlights, patch ceiling. relocate diffuser and downlights...
Details
Permit
202311211267
Status
complete
Filed
Nov 21, 2023
Permit issued
Dec 4, 2023
Final sign-off
Mar 4, 2024
Declared cost
$10,000
Address
2121 Webster St

bedroom 3- remove (e) cabinetry. bulkhead diffuser and recessed downlights then patch ceiling. install furniture by others and relocate (e) downlights. siting room- remove cabinetry, non structural walls, (e) diffuser bulkhead, recessed downlights, patch ceiling. relocate diffuser and downlights...

Open the permit page

$10,000
Nov 21, 2023Completed
final sign-off Mar 2024
2121 Webster StBlack Mountain Developmentadd new closet at entryway. dining room- remove (e) recessed downlight and replace with (n) chandelier. replace bathroom vanities in kind.
Details
Permit
202311211269
Status
complete
Filed
Nov 21, 2023
Permit issued
Dec 4, 2023
Final sign-off
Mar 4, 2024
Declared cost
$10,000
Address
2121 Webster St

add new closet at entryway. dining room- remove (e) recessed downlight and replace with (n) chandelier. replace bathroom vanities in kind.

Open the permit page

$10,000
Aug 16, 2023Completed
final sign-off Dec 2025
1080 Chestnut StBlack Mountain Developmentreplace non confirming railing w/new code compliant guards, replace drain at 1 balcany. add topping and waterproofing to (e) balcony surface to improve slope drainage at north and east balconies. add new pedestal pavers at all balcanies
Details
Permit
202308164573
Status
complete
Filed
Aug 16, 2023
Permit issued
Aug 31, 2023
Final sign-off
Dec 8, 2025
Declared cost
$20,000
Address
1080 Chestnut St

replace non confirming railing w/new code compliant guards, replace drain at 1 balcany. add topping and waterproofing to (e) balcony surface to improve slope drainage at north and east balconies. add new pedestal pavers at all balcanies

Open the permit page

$20,000
Dec 14, 2022Completed
final sign-off Jun 2023
1254 06th AvAlder Construction1/f: remodel kitchen in rear of building. no change in square footage
Details
Permit
202212148244
Status
complete
Filed
Dec 14, 2022
Permit issued
Dec 14, 2022
Final sign-off
Jun 12, 2023
Declared cost
$68,000
Address
1254 06th Av

1/f: remodel kitchen in rear of building. no change in square footage

Open the permit page

$68,000
Nov 22, 2022Completed
final sign-off Mar 2024
595 Pacific AvTrust Construction Company Increvision to pa# 201806212538. revise sheet a.2 in lobby eliminate the wall at lobby entrance to stair vestibule and leave exisitng door to vestibule as shown in the existing/demo plan.
Details
Permit
202211227000
Status
complete
Filed
Nov 22, 2022
Permit issued
Nov 22, 2022
Final sign-off
Mar 7, 2024
Address
595 Pacific Av

revision to pa# 201806212538. revise sheet a.2 in lobby eliminate the wall at lobby entrance to stair vestibule and leave exisitng door to vestibule as shown in the existing/demo plan.

Open the permit page

Nov 9, 2022Completed
final sign-off Nov 2024
1080 Chestnut StBlack Mountain Development18 fl: demo (e) int walls and finishes. construct new walls, ceilings, install new plumbing, cabinetry, and appliances. paint and new floor finishes.
Details
Permit
202211096211
Status
complete
Filed
Nov 9, 2022
Permit issued
Dec 13, 2022
Final sign-off
Nov 22, 2024
Declared cost
$400,000
Address
1080 Chestnut St

18 fl: demo (e) int walls and finishes. construct new walls, ceilings, install new plumbing, cabinetry, and appliances. paint and new floor finishes.

Open the permit page

$400,000
Jun 11, 2021Completed
final sign-off May 2023
117 Frederick StStonebridge Construction Inc, Maximo Constructionremodel kitchen, new lighting, cabinets and appliances.
Details
Permit
202106112228
Status
complete
Filed
Jun 11, 2021
Permit issued
Jun 11, 2021
Final sign-off
May 18, 2023
Declared cost
$75,000
Address
117 Frederick St

remodel kitchen, new lighting, cabinets and appliances.

Open the permit page

$75,000
Mar 24, 2021Completed
final sign-off Feb 2022
45 Crescent AvOne Stop Shop Constructionrevise app#201811266628 and 201903014172. 1) relocate kitchen and bathroom to approved permit #201811266628 and 201903014172. 2) revise structural drawings for arch. design changes
Details
Permit
202103247239
Status
complete
Filed
Mar 24, 2021
Permit issued
May 13, 2021
Final sign-off
Feb 7, 2022
Address
45 Crescent Av

revise app#201811266628 and 201903014172. 1) relocate kitchen and bathroom to approved permit #201811266628 and 201903014172. 2) revise structural drawings for arch. design changes

Open the permit page

Nov 9, 2020Completed
final sign-off Dec 2022
1990 Newcomb Avtenant improvement for sfpuc office and deck railing: install fire separation wall, non bearing partitions, new cabinetry, breakroom, remodel restrooms, new flooring, ceiling, new mechanical, new electrical and lighting, restripe parking for ada, new dock railing
Details
Permit
202011098525
Status
complete
Filed
Nov 9, 2020
Permit issued
Mar 31, 2021
Final sign-off
Dec 12, 2022
Declared cost
$1,000,000
Address
1990 Newcomb Av

tenant improvement for sfpuc office and deck railing: install fire separation wall, non bearing partitions, new cabinetry, breakroom, remodel restrooms, new flooring, ceiling, new mechanical, new electrical and lighting, restripe parking for ada, new dock railing

Open the permit page

$1,000,000
Sep 2, 2020Completed
final sign-off Jun 2021
33 Alta StFontana Construction, Inc.interior renovation of (e) bathroom, new finishes, lighting, door, plumbing fixtures & fittings
Details
Permit
202009023329
Status
complete
Filed
Sep 2, 2020
Permit issued
Sep 12, 2020
Final sign-off
Jun 30, 2021
Declared cost
$35,000
Address
33 Alta St

interior renovation of (e) bathroom, new finishes, lighting, door, plumbing fixtures & fittings

Open the permit page

$35,000
Sep 2, 2020Completed
final sign-off Sep 2021
706 Mission StBlack Mountain Developmentunit 17a: replace (3) toilets, reconfigure master closet, lower ceiling in living room, dining room, family room, & master bedroom to add recessed lighting, create soffits for downlights in bedrooms, install window shades. mech & fire protection are deferred under separate permit
Details
Permit
202009023333
Status
complete
Filed
Sep 2, 2020
Permit issued
Oct 15, 2020
Final sign-off
Sep 13, 2021
Declared cost
$100,000
Address
706 Mission St

unit 17a: replace (3) toilets, reconfigure master closet, lower ceiling in living room, dining room, family room, & master bedroom to add recessed lighting, create soffits for downlights in bedrooms, install window shades. mech & fire protection are deferred under separate permit

Open the permit page

$100,000
Aug 22, 2020Completed
final sign-off Feb 2021
1656 Beach StFontana Construction, Inc.revision to bpa#201705317985. reduced scope of work, bedroom changes & fire place removal elminated. revised kitchen & bathroom layout - new architect/engineer, new drawings.
Details
Permit
202008222367
Status
complete
Filed
Aug 22, 2020
Permit issued
Sep 12, 2020
Final sign-off
Feb 2, 2021
Address
1656 Beach St

revision to bpa#201705317985. reduced scope of work, bedroom changes & fire place removal elminated. revised kitchen & bathroom layout - new architect/engineer, new drawings.

Open the permit page

Jan 14, 2020Expired or cancelled
withdrawn Jan 2021
2740 Union Staddition of a roof deck(less than 500 s.f.) and stair penthouse. relocate 3rd flr units front door, upgrade hanrail and guards. sprinklers under separate permit.
Details
Permit
202001141847
Status
withdrawn
Filed
Jan 14, 2020
Declared cost
$125,000
Address
2740 Union St

addition of a roof deck(less than 500 s.f.) and stair penthouse. relocate 3rd flr units front door, upgrade hanrail and guards. sprinklers under separate permit.

Open the permit page

$125,000
Nov 18, 2019Completed
final sign-off Jan 2021
108 11th AvUrban Builder General Contracting Increv pa# 201902072362; new condenser unit and update to title 24
Details
Permit
201911187509
Status
complete
Filed
Nov 18, 2019
Permit issued
Nov 20, 2019
Final sign-off
Jan 21, 2021
Address
108 11th Av

rev pa# 201902072362; new condenser unit and update to title 24

Open the permit page

Jun 12, 2019Completed
final sign-off Nov 2019
595 Pacific AvOne Stop Shop Construction3rd fl: interior t.i. sf office: installation of new cabinetry, new bearing partitions, break room, new floor & new ceiling.
Details
Permit
201906123199
Status
complete
Filed
Jun 12, 2019
Permit issued
Jun 18, 2019
Final sign-off
Nov 25, 2019
Declared cost
$300,000
Address
595 Pacific Av

3rd fl: interior t.i. sf office: installation of new cabinetry, new bearing partitions, break room, new floor & new ceiling.

Open the permit page

$300,000
Jun 10, 2019Completed
final sign-off Sep 2021
1365 04th StYerba Buena Builders Incti - interior only install of new cabinetry, non-bearing walls, partitions, break room, some new floors, some ceiling, mech, electrical & fire protection/srpinkler work deferred and under separate permit
Details
Permit
201906102971
Status
complete
Filed
Jun 10, 2019
Permit issued
Jun 13, 2019
Final sign-off
Sep 8, 2021
Declared cost
$75,000
Address
1365 04th St

ti - interior only install of new cabinetry, non-bearing walls, partitions, break room, some new floors, some ceiling, mech, electrical & fire protection/srpinkler work deferred and under separate permit

Open the permit page

$75,000
May 30, 2019Completed
final sign-off Aug 2020
595 Pacific AvM-Projectsinstallation of new cabinetry, non-bearing partitions; interior window partitions, break room, new flooring & new ceiling @ 5th floor. ti @ 5th fl - mep deferred
Details
Permit
201905302023
Status
complete
Filed
May 30, 2019
Permit issued
Jun 4, 2019
Final sign-off
Aug 10, 2020
Declared cost
$300,000
Address
595 Pacific Av

installation of new cabinetry, non-bearing partitions; interior window partitions, break room, new flooring & new ceiling @ 5th floor. ti @ 5th fl - mep deferred

Open the permit page

$300,000
Apr 25, 2019Never finaled
issued Apr 2019, no final
2121 Webster StBlack Mountain Development5/f - unit #501 - remove non-structural walls as noted and reconfigure. remove portion of master bath, cap utility, use area as additional closet space. construct new walls, install new plumbing, new cabinetry and appliances, paint, install cardio/video system
Details
Permit
201904258893
Status
issued
Filed
Apr 25, 2019
Permit issued
Apr 25, 2019
Declared cost
$500,000
Address
2121 Webster St

5/f - unit #501 - remove non-structural walls as noted and reconfigure. remove portion of master bath, cap utility, use area as additional closet space. construct new walls, install new plumbing, new cabinetry and appliances, paint, install cardio/video system

Open the permit page

$500,000
Apr 19, 2019Completed
final sign-off Oct 2020
2375 Bay StFontana Construction, Inc.interior work only - remodel kitchen, bathrooms and closets. provide (n) outlets and lights in those areas
Details
Permit
201904198468
Status
complete
Filed
Apr 19, 2019
Permit issued
Apr 26, 2019
Final sign-off
Oct 2, 2020
Declared cost
$200,000
Address
2375 Bay St

interior work only - remodel kitchen, bathrooms and closets. provide (n) outlets and lights in those areas

Open the permit page

$200,000
Feb 7, 2019Completed
final sign-off Jan 2021
108 11th AvUrban Builder General Contracting Increnovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom.
Details
Permit
201902072362
Status
complete
Filed
Feb 7, 2019
Permit issued
Oct 3, 2019
Final sign-off
Jan 21, 2021
Declared cost
$350,000
Address
108 11th Av

renovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom.

Open the permit page

$350,000
Oct 18, 2018Completed
final sign-off May 2022
301 Main StBlack Mountain Developmentrenovation of apt 37b - demo of non-bearing walls & drop ceiling; construct new walls & ceiling, install new finishes and plumbing fixtures to replace existing. mep and fire sprinkler to be under separate permit
Details
Permit
201810183568
Status
complete
Filed
Oct 18, 2018
Permit issued
Nov 8, 2018
Final sign-off
May 23, 2022
Declared cost
$1,000,000
Address
301 Main St

renovation of apt 37b - demo of non-bearing walls & drop ceiling; construct new walls & ceiling, install new finishes and plumbing fixtures to replace existing. mep and fire sprinkler to be under separate permit

Open the permit page

$1,000,000
Sep 13, 2018Completed
final sign-off Oct 2021
777 06th AvSincere Construction Company Inc(n) accessory dwelling unit per ord# 162-16 in previously unfinished ground flr. change from u occupancy to r for adu. mechanical & fire suppresssion under separate permit. soft story filed under pa# 2017-0905-6829.
Details
Permit
201809139975
Status
complete
Filed
Sep 13, 2018
Permit issued
Aug 16, 2019
Final sign-off
Oct 15, 2021
Declared cost
$125,000
Address
777 06th Av

(n) accessory dwelling unit per ord# 162-16 in previously unfinished ground flr. change from u occupancy to r for adu. mechanical & fire suppresssion under separate permit. soft story filed under pa# 2017-0905-6829.

Open the permit page

$125,000
Sep 12, 2018Completed
final sign-off Nov 2021
2121 Webster StBlack Mountain Developmentconstruct new walls, ceiling, install new plumbing, new cabinetry & appliances. paint and new floor finishes. (build out of unfinished condo unit #ph7.)
Details
Permit
201809129838
Status
complete
Filed
Sep 12, 2018
Permit issued
Dec 20, 2018
Final sign-off
Nov 18, 2021
Declared cost
$840,000
Address
2121 Webster St

construct new walls, ceiling, install new plumbing, new cabinetry & appliances. paint and new floor finishes. (build out of unfinished condo unit #ph7.)

Open the permit page

$840,000
Sep 12, 2018Completed
final sign-off Nov 2021
2121 Webster StBlack Mountain Developmentconstruct new walls, ceiling, install new plumbing, new cabinetry & appliances. paint and new floor finishes. (build out of unfinished condo unit #ph1.)
Details
Permit
201809129837
Status
complete
Filed
Sep 12, 2018
Permit issued
Dec 20, 2018
Final sign-off
Nov 18, 2021
Declared cost
$840,000
Address
2121 Webster St

construct new walls, ceiling, install new plumbing, new cabinetry & appliances. paint and new floor finishes. (build out of unfinished condo unit #ph1.)

Open the permit page

$840,000
Sep 12, 2018Completed
final sign-off Nov 2021
2121 Webster StBlack Mountain Developmentbuild out of (2) unfinished condo units ph1 & ph7 including: demo existing wall. new (1) hour separation wall w/ communicating door.
Details
Permit
201809129834
Status
complete
Filed
Sep 12, 2018
Permit issued
Dec 20, 2018
Final sign-off
Nov 18, 2021
Declared cost
$20,000
Address
2121 Webster St

build out of (2) unfinished condo units ph1 & ph7 including: demo existing wall. new (1) hour separation wall w/ communicating door.

Open the permit page

$20,000
Aug 7, 2018Completed
final sign-off Oct 2018
595 Pacific Avremoval of non bearing partitions, ceiling tiles, liighting and switches, eztension of non-bearing walls to underside of structure, new lighting & switches, and minor patch work. mech/fire protection under sep permit. all work in suite 100
Details
Permit
201808076611
Status
complete
Filed
Aug 7, 2018
Permit issued
Aug 10, 2018
Final sign-off
Oct 30, 2018
Declared cost
$25,000
Address
595 Pacific Av

removal of non bearing partitions, ceiling tiles, liighting and switches, eztension of non-bearing walls to underside of structure, new lighting & switches, and minor patch work. mech/fire protection under sep permit. all work in suite 100

Open the permit page

$25,000
Jun 21, 2018Completed
final sign-off Mar 2024
595 Pacific AvTrust Construction Company Inclobby area on ground floor. demo of non-structural walls, floor finishes. installation of (n) window systems, installation of stone panels, (n) flooring
Details
Permit
201806212538
Status
complete
Filed
Jun 21, 2018
Permit issued
Aug 25, 2021
Final sign-off
Mar 7, 2024
Declared cost
$110,000
Address
595 Pacific Av

lobby area on ground floor. demo of non-structural walls, floor finishes. installation of (n) window systems, installation of stone panels, (n) flooring

Open the permit page

$110,000
Apr 11, 2018Completed
final sign-off Jun 2018
595 Pacific AvM-Projects4th floor: revision to app#201711103710 for sf health department.
Details
Permit
201804116043
Status
complete
Filed
Apr 11, 2018
Permit issued
May 16, 2018
Final sign-off
Jun 20, 2018
Address
595 Pacific Av

4th floor: revision to app#201711103710 for sf health department.

Open the permit page

Mar 22, 2018Completed
final sign-off Jun 2019
4355 Geary BlYerba Buena Builders Incground floor: t.i. of 3035 sq ft office. scope of work to include the following: remove (e) ceiling, new non bearing partitions, new finishes including casework ada restroom upgrades. mech, elec, & sprinklers system deferred under separate permit.
Details
Permit
201803224324
Status
complete
Filed
Mar 22, 2018
Permit issued
Mar 29, 2018
Final sign-off
Jun 24, 2019
Declared cost
$250,000
Address
4355 Geary Bl

ground floor: t.i. of 3035 sq ft office. scope of work to include the following: remove (e) ceiling, new non bearing partitions, new finishes including casework ada restroom upgrades. mech, elec, & sprinklers system deferred under separate permit.

Open the permit page

$250,000
Mar 14, 2018Never finaled
issued Mar 2018, no final
2501 Harrison StStonebridge Construction Incremodel of kitchen - new cabinetry and fixtures, new lightning in unit #16.
Details
Permit
201803143606
Status
issued
Filed
Mar 14, 2018
Permit issued
Mar 16, 2018
Declared cost
$25,000
Address
2501 Harrison St

remodel of kitchen - new cabinetry and fixtures, new lightning in unit #16.

Open the permit page

$25,000
Mar 5, 2018Never finaled
issued Mar 2018, no final
4355 Geary BlYerba Buena Builders Incremove non bearing partitions select (e) cabinetry, selected doors, store front lighting, flooring/finishes, suspended ceiling and (e) plm fixtures/cap utilities per ab-017. ti under sep permit inc - mech/ele/fire protection
Details
Permit
201803052808
Status
issued
Filed
Mar 5, 2018
Permit issued
Mar 12, 2018
Declared cost
$12,500
Address
4355 Geary Bl

remove non bearing partitions select (e) cabinetry, selected doors, store front lighting, flooring/finishes, suspended ceiling and (e) plm fixtures/cap utilities per ab-017. ti under sep permit inc - mech/ele/fire protection

Open the permit page

$12,500
Dec 6, 2017Expired or cancelled
cancelled Jan 2026
595 Pacific Avremodel of two restrooms on 3rd floor.
Details
Permit
201712065631
Status
cancelled
Filed
Dec 6, 2017
Declared cost
$60,000
Address
595 Pacific Av

remodel of two restrooms on 3rd floor.

Open the permit page

$60,000
Dec 6, 2017Completed
final sign-off Sep 2018
595 Pacific Av2nd floors - remodel of two restrooms for ada compliant and tile
Details
Permit
201712065633
Status
complete
Filed
Dec 6, 2017
Permit issued
Jun 13, 2018
Final sign-off
Sep 10, 2018
Declared cost
$20,000
Address
595 Pacific Av

2nd floors - remodel of two restrooms for ada compliant and tile

Open the permit page

$20,000
Nov 10, 2017Completed
final sign-off Jun 2018
595 Pacific AvM-Projects4th fl: ti of office - installation of new cabinets, non-bearing partition walls, remodel restrooms, breakrooms. mep under seperate permit. demo under permit #201710201791. fully sprinklered building.
Details
Permit
201711103710
Status
complete
Filed
Nov 10, 2017
Permit issued
Dec 8, 2017
Final sign-off
Jun 20, 2018
Declared cost
$350,000
Address
595 Pacific Av

4th fl: ti of office - installation of new cabinets, non-bearing partition walls, remodel restrooms, breakrooms. mep under seperate permit. demo under permit #201710201791. fully sprinklered building.

Open the permit page

$350,000
Oct 20, 2017Completed
final sign-off Nov 2017
595 Pacific AvM-Projectsinterio demo only. remove all non bearing partitions, e cabinetry, remove and salavage 1 closet door. remove all e restroom partitions, sinks, faucets, countertop. remove and salvage all restroom accessories. ti under sep permit incl ele,mech,fire
Details
Permit
201710201791
Status
complete
Filed
Oct 20, 2017
Permit issued
Oct 20, 2017
Final sign-off
Nov 13, 2017
Declared cost
$5,000
Address
595 Pacific Av

interio demo only. remove all non bearing partitions, e cabinetry, remove and salavage 1 closet door. remove all e restroom partitions, sinks, faucets, countertop. remove and salvage all restroom accessories. ti under sep permit incl ele,mech,fire

Open the permit page

$5,000
Sep 15, 2017Completed
final sign-off May 2018
35 Clement Stbarrier removal. upgrade existing bath to ada chp 11 b standards
Details
Permit
201709158517
Status
complete
Filed
Sep 15, 2017
Permit issued
Sep 15, 2017
Final sign-off
May 31, 2018
Declared cost
$15,000
Address
35 Clement St

barrier removal. upgrade existing bath to ada chp 11 b standards

Open the permit page

$15,000
Aug 28, 2017Completed
final sign-off Nov 2017
595 Pacific AvOne Stop Shop Constructionsuite 240tenant improvementof 3538 office. remove & replace (e) ceiling tile throughout the office, (n) non-bearing partitions, (n) doors, & some lighting upgrades.
Details
Permit
201708286097
Status
complete
Filed
Aug 28, 2017
Permit issued
Aug 31, 2017
Final sign-off
Nov 7, 2017
Declared cost
$27,500
Address
595 Pacific Av

suite 240tenant improvementof 3538 office. remove & replace (e) ceiling tile throughout the office, (n) non-bearing partitions, (n) doors, & some lighting upgrades.

Open the permit page

$27,500
Aug 22, 2017Completed
final sign-off Dec 2018
146 05th Av1st fl: bathroom remodel reconfigure laundry/storage area (n) service sink in garage.
Details
Permit
201708225496
Status
complete
Filed
Aug 22, 2017
Permit issued
Aug 29, 2017
Final sign-off
Dec 26, 2018
Declared cost
$35,000
Address
146 05th Av

1st fl: bathroom remodel reconfigure laundry/storage area (n) service sink in garage.

Open the permit page

$35,000
Aug 11, 2017Completed
final sign-off Jul 2020
2106 22nd StAlef Construction Corphorizontal addition of a bedroom & bathroom. renovate (e) kitchen & bathroom. new outdoor patio. replace (e) furnace.
Details
Permit
201708114593
Status
complete
Filed
Aug 11, 2017
Permit issued
Jun 28, 2018
Final sign-off
Jul 28, 2020
Declared cost
$250,000
Address
2106 22nd St

horizontal addition of a bedroom & bathroom. renovate (e) kitchen & bathroom. new outdoor patio. replace (e) furnace.

Open the permit page

$250,000
Aug 11, 2017Expired or cancelled
withdrawn Apr 2018
4338 26th Sthorizontal addition of master bedroom & master bathroom on 2nd floor. a great room on the 1st floor & a family room on basement. renovate (e) powder room & guest bathroom. new deck & patio.
Details
Permit
201708114597
Status
withdrawn
Filed
Aug 11, 2017
Declared cost
$600,000
Address
4338 26th St

horizontal addition of master bedroom & master bathroom on 2nd floor. a great room on the 1st floor & a family room on basement. renovate (e) powder room & guest bathroom. new deck & patio.

Open the permit page

$600,000
Apr 25, 2017Completed
final sign-off Jan 2018
1182 Market StAngotti & Reilly Inc.suite 425: t.i. for new cabinet, replace extg sink and water heater at breakspace, new non bearing partitions, new doors, ada upgrades at entry and restrooms and extend extg ducts to new rooms,reswitch extg lighting.
Details
Permit
201704254788
Status
complete
Filed
Apr 25, 2017
Permit issued
May 3, 2017
Final sign-off
Jan 29, 2018
Declared cost
$165,382
Address
1182 Market St

suite 425: t.i. for new cabinet, replace extg sink and water heater at breakspace, new non bearing partitions, new doors, ada upgrades at entry and restrooms and extend extg ducts to new rooms,reswitch extg lighting.

Open the permit page

$165,382
Apr 10, 2017Completed
final sign-off Jan 2018
595 Pacific AvOne Stop Shop Constructionconvert storage to office and unisex restroom, remodel 2 restrooms on 1st floor. no exterior work. two existing bathrooms to be upgraded to fully comply w/ ada
Details
Permit
201704103566
Status
complete
Filed
Apr 10, 2017
Permit issued
May 31, 2017
Final sign-off
Jan 4, 2018
Declared cost
$85,000
Address
595 Pacific Av

convert storage to office and unisex restroom, remodel 2 restrooms on 1st floor. no exterior work. two existing bathrooms to be upgraded to fully comply w/ ada

Open the permit page

$85,000
Feb 13, 2017Expired or cancelled
withdrawn Jul 2017
4326 Cesar Chavez Stnew roof/canopy extension to rear of house
Details
Permit
201702139254
Status
withdrawn
Filed
Feb 13, 2017
Declared cost
$75,000
Address
4326 Cesar Chavez St

new roof/canopy extension to rear of house

Open the permit page

$75,000
Jan 19, 2017Completed
final sign-off Jan 2018
535 15th AvUrban Builder General Contracting Increv. to approved pa#201606039075. scope includes changes on 3/f reconfiguration,window changes on n/s. switch deck railing from glass to cable, hvac change from furnace to radiant heating.
Details
Permit
201701197483
Status
complete
Filed
Jan 19, 2017
Permit issued
Jan 25, 2017
Final sign-off
Jan 16, 2018
Address
535 15th Av

rev. to approved pa#201606039075. scope includes changes on 3/f reconfiguration,window changes on n/s. switch deck railing from glass to cable, hvac change from furnace to radiant heating.

Open the permit page

Jan 6, 2017Expired or cancelled
cancelled Sep 2019
544 Clayton Stto comply with nov 201637301 - reverting non-permitted attic of occupancy back to last permitted use as an attic. restore original configuration of room on lower floor. install new tube skylights at roof
Details
Permit
201701066639
Status
cancelled
Filed
Jan 6, 2017
Declared cost
$70,000
Address
544 Clayton St

to comply with nov 201637301 - reverting non-permitted attic of occupancy back to last permitted use as an attic. restore original configuration of room on lower floor. install new tube skylights at roof

Open the permit page

$70,000
Dec 14, 2016Completed
final sign-off Feb 2017
595 Pacific AvOne Stop Shop Constructionunit #120, ti: remove lay-in ceiling in open office space & extend (e)walls at perimeter of open office to underside of structure above,replace lighting with high efficacy fixtures,provide new power door opener & actuation bars.
Details
Permit
201612144911
Status
complete
Filed
Dec 14, 2016
Permit issued
Dec 16, 2016
Final sign-off
Feb 9, 2017
Declared cost
$30,000
Address
595 Pacific Av

unit #120, ti: remove lay-in ceiling in open office space & extend (e)walls at perimeter of open office to underside of structure above,replace lighting with high efficacy fixtures,provide new power door opener & actuation bars.

Open the permit page

$30,000
Oct 25, 2016Completed
final sign-off Feb 2017
240 Liberty Stunit b - kitchen & bathroom remodel, add gas line to kitchen, add lighting at kitchen and living room. add vent at kitchen.
Details
Permit
201610251065
Status
complete
Filed
Oct 25, 2016
Permit issued
Oct 25, 2016
Final sign-off
Feb 3, 2017
Declared cost
$60,000
Address
240 Liberty St

unit b - kitchen & bathroom remodel, add gas line to kitchen, add lighting at kitchen and living room. add vent at kitchen.

Open the permit page

$60,000
Aug 11, 2016Completed
final sign-off Mar 2017
1000 Mason StFontana Construction, Inc.#503- interior remodel, kitchen, master bath, powder room and closet, new electrical outlets & lighting in remodel area. n/a ordinance #155-13
Details
Permit
201608114769
Status
complete
Filed
Aug 11, 2016
Permit issued
Aug 15, 2016
Final sign-off
Mar 27, 2017
Declared cost
$100,000
Address
1000 Mason St

#503- interior remodel, kitchen, master bath, powder room and closet, new electrical outlets & lighting in remodel area. n/a ordinance #155-13

Open the permit page

$100,000
Mar 31, 2016Completed
final sign-off Jun 2017
369 Oak StSeamus R Cuddeninfill (e) overhanging second floor for horizontal expansion into rear yard on first floor. reconfigure (e) rear deck reconfigure access to deck for upper unit.
Details
Permit
201603313570
Status
complete
Filed
Mar 31, 2016
Permit issued
Aug 1, 2016
Final sign-off
Jun 15, 2017
Declared cost
$125,000
Address
369 Oak St

infill (e) overhanging second floor for horizontal expansion into rear yard on first floor. reconfigure (e) rear deck reconfigure access to deck for upper unit.

Open the permit page

$125,000
Mar 22, 2016Completed
final sign-off Jun 2017
369 Oak Stremodel interior adding an additional full master bathroom, (n) lighting and electrical and (n) heating. new insulation in exterior walls, replace in kind wood windows. kitchen remodel.
Details
Permit
201603222685
Status
complete
Filed
Mar 22, 2016
Permit issued
Mar 30, 2016
Final sign-off
Jun 16, 2017
Declared cost
$135,000
Address
369 Oak St

remodel interior adding an additional full master bathroom, (n) lighting and electrical and (n) heating. new insulation in exterior walls, replace in kind wood windows. kitchen remodel.

Open the permit page

$135,000
Jan 29, 2016Completed
final sign-off Mar 2016
595 Pacific AvOne Stop Shop Construction#115: demolish existing non bearing partitions to connect storage room to #115,remove plumbing at sink and at plumbing prep. & cap utilities as necessary in vacant tenant space,no new construction,demo per sfbc ab-017. full accessibility will be submitted under future t.i. permit when space occupy.
Details
Permit
201601298411
Status
complete
Filed
Jan 29, 2016
Permit issued
Feb 9, 2016
Final sign-off
Mar 10, 2016
Declared cost
$2,000
Address
595 Pacific Av

#115: demolish existing non bearing partitions to connect storage room to #115,remove plumbing at sink and at plumbing prep. & cap utilities as necessary in vacant tenant space,no new construction,demo per sfbc ab-017. full accessibility will be submitted under future t.i. permit when space occupy.

Open the permit page

$2,000
Jan 29, 2016Never finaled
filed Jan 2016, never issued
371 Oak Strelocate door to rear yard.
Details
Permit
201601298400
Status
filed
Filed
Jan 29, 2016
Declared cost
$15,000
Address
371 Oak St

relocate door to rear yard.

Open the permit page

$15,000
Jan 29, 2016Never finaled
filed Jan 2016, never issued
369 Oak Stinfill (e) overhanging 2nd floor (371 oak street) for horizontal expansion into rear yard on 1st floor (369 oak street). remodel interior of 369 oak street. adding an additional full master bathroom. kitchen & bath remodel. new lighting, electrical & hvac. reconfig (e) rear deck.
Details
Permit
201601298382
Status
filed
Filed
Jan 29, 2016
Declared cost
$210,000
Address
369 Oak St

infill (e) overhanging 2nd floor (371 oak street) for horizontal expansion into rear yard on 1st floor (369 oak street). remodel interior of 369 oak street. adding an additional full master bathroom. kitchen & bath remodel. new lighting, electrical & hvac. reconfig (e) rear deck.

Open the permit page

$210,000
Dec 18, 2015Completed
final sign-off May 2016
1 Beach StRockaway Construction Inc.suite 300 improvement to existing interior only, minor demolitoin of non-load bearing partitions, doors, frames, & hardward & construction of non load bearing partitoins, new doors, frames glazing & select finishes. n/a maher ordinance
Details
Permit
201512185444
Status
complete
Filed
Dec 18, 2015
Permit issued
Dec 18, 2015
Final sign-off
May 10, 2016
Declared cost
$50,000
Address
1 Beach St

suite 300 improvement to existing interior only, minor demolitoin of non-load bearing partitions, doors, frames, & hardward & construction of non load bearing partitoins, new doors, frames glazing & select finishes. n/a maher ordinance

Open the permit page

$50,000
Nov 24, 2015Completed
final sign-off May 2018
832 Fell StDaoust Design And Constructionseismic upgrade. replace siding at walls to receive plywood in kind, add 5/8" gyp bd to walls and ceiling of garage, add 3 skylights, add trough drain at west wall, pint and flooring. all work in rear garrage house
Details
Permit
201511243487
Status
complete
Filed
Nov 24, 2015
Permit issued
Mar 24, 2016
Final sign-off
May 16, 2018
Declared cost
$60,000
Address
832 Fell St

seismic upgrade. replace siding at walls to receive plywood in kind, add 5/8" gyp bd to walls and ceiling of garage, add 3 skylights, add trough drain at west wall, pint and flooring. all work in rear garrage house

Open the permit page

$60,000
Jul 14, 2014Completed
final sign-off Dec 2014
170 Columbus AvOne Stop Shop Construction#280- demolition of non-bearing partitions at private offices in suite 280 per ab-017
Details
Permit
201407141161
Status
complete
Filed
Jul 14, 2014
Permit issued
Jul 15, 2014
Final sign-off
Dec 11, 2014
Declared cost
$5,000
Address
170 Columbus Av

#280- demolition of non-bearing partitions at private offices in suite 280 per ab-017

Open the permit page

$5,000
Dec 9, 2013Completed
final sign-off Jun 2014
150 Columbus AvOne Stop Shop Constructiont.i. at lower level - remodel existing restrooms, add breakroom including cabinets and sink. new walls to create 2 small rooms. add glas wall with 2 doors at now lounge
Details
Permit
201312093692
Status
complete
Filed
Dec 9, 2013
Permit issued
Dec 11, 2013
Final sign-off
Jun 30, 2014
Declared cost
$125,000
Address
150 Columbus Av

t.i. at lower level - remodel existing restrooms, add breakroom including cabinets and sink. new walls to create 2 small rooms. add glas wall with 2 doors at now lounge

Open the permit page

$125,000
Dec 9, 2013Completed
final sign-off Dec 2014
2923 Harrison StK And D Construction Increvision to pa#2012-0328-7050. keep (e) concrete slabs & foundations. eliminate stairs in previous permit. remove some lighting -d1,d2,d3. eliminate cove in kitchen/living room. eliminate fireplace.
Details
Permit
201312093727
Status
complete
Filed
Dec 9, 2013
Permit issued
Dec 24, 2013
Final sign-off
Dec 19, 2014
Address
2923 Harrison St

revision to pa#2012-0328-7050. keep (e) concrete slabs & foundations. eliminate stairs in previous permit. remove some lighting -d1,d2,d3. eliminate cove in kitchen/living room. eliminate fireplace.

Open the permit page

Aug 8, 2013Completed
final sign-off Sep 2013
170 Columbus AvBbc Construction Inc.4th floor; t.i consisting of removing partitions, 3 new partitions, restroom ada upgrades, new cabinets, new finishes. reswitch (e) lighting, new lighting to replace (e) in 3 offices. new electrical outlets
Details
Permit
201308083876
Status
complete
Filed
Aug 8, 2013
Permit issued
Aug 9, 2013
Final sign-off
Sep 30, 2013
Declared cost
$134,074
Address
170 Columbus Av

4th floor; t.i consisting of removing partitions, 3 new partitions, restroom ada upgrades, new cabinets, new finishes. reswitch (e) lighting, new lighting to replace (e) in 3 offices. new electrical outlets

Open the permit page

$134,074
Feb 12, 2013Completed
final sign-off Apr 2013
690 05th StOak Park Constructionrevision to pa# 2012-1226-6870-hardship request, slope of (e) parking is 2.75%. exceeds 2%
Details
Permit
201302120008
Status
complete
Filed
Feb 12, 2013
Permit issued
Feb 21, 2013
Final sign-off
Apr 8, 2013
Address
690 05th St

revision to pa# 2012-1226-6870-hardship request, slope of (e) parking is 2.75%. exceeds 2%

Open the permit page

Dec 26, 2012Completed
final sign-off Apr 2013
690 05th StOak Park Constructionnew reception area, break room and new partition walls to create conference room on 1st floor. accessibility upgrades to parking area, path of travel from the parking area and accessible restrooms, new snack bar on 2nd floor, new floor finishes throughout.
Details
Permit
201212266870
Status
complete
Filed
Dec 26, 2012
Permit issued
Jan 30, 2013
Final sign-off
Apr 8, 2013
Declared cost
$150,000
Address
690 05th St

new reception area, break room and new partition walls to create conference room on 1st floor. accessibility upgrades to parking area, path of travel from the parking area and accessible restrooms, new snack bar on 2nd floor, new floor finishes throughout.

Open the permit page

$150,000
Nov 30, 2012Completed
final sign-off Jan 2013
170 Columbus AvBbc Construction Inc.#110 - tenant improvement including new non-rated partitions, accessbiility upgrades, new door, relocate lights, add new cabient with sink.
Details
Permit
201211305243
Status
complete
Filed
Nov 30, 2012
Permit issued
Dec 3, 2012
Final sign-off
Jan 10, 2013
Declared cost
$20,000
Address
170 Columbus Av

#110 - tenant improvement including new non-rated partitions, accessbiility upgrades, new door, relocate lights, add new cabient with sink.

Open the permit page

$20,000
Jan 12, 2012Completed
final sign-off Oct 2012
371 11th StA/C Constructionnew openings between 2 formely separate bldgs (now 1 building with lot line adjustment) new restrooms, handrails and bar area. all m.e.p. under separate permit.
Details
Permit
201201122129
Status
complete
Filed
Jan 12, 2012
Permit issued
Jun 13, 2012
Final sign-off
Oct 11, 2012
Declared cost
$45,329
Address
371 11th St

new openings between 2 formely separate bldgs (now 1 building with lot line adjustment) new restrooms, handrails and bar area. all m.e.p. under separate permit.

Open the permit page

$45,329
Aug 23, 2011Completed
final sign-off Sep 2011
170 Columbus AvBbc Construction Inc.office ti on 3rd floor, ste 310. new walls, remove 2 data and 2 duplex outlets. new data and duplex outlets
Details
Permit
201108233063
Status
complete
Filed
Aug 23, 2011
Permit issued
Aug 29, 2011
Final sign-off
Sep 29, 2011
Declared cost
$5,000
Address
170 Columbus Av

office ti on 3rd floor, ste 310. new walls, remove 2 data and 2 duplex outlets. new data and duplex outlets

Open the permit page

$5,000
Dec 29, 2010Completed
final sign-off Jun 2011
217 Upper Trexcavate at gr floor and convert into laundry/exercise room, walk in closet/master bath. work to include new concrete slab, lighting, new fixtures and finishes. demolish e bath and fixtures to be replaced in master bath. remove 2 furnaces and replace with single furnace. add new on demand hot water
Details
Permit
201012297559
Status
complete
Filed
Dec 29, 2010
Permit issued
Dec 29, 2010
Final sign-off
Jun 16, 2011
Declared cost
$80,000
Address
217 Upper Tr

excavate at gr floor and convert into laundry/exercise room, walk in closet/master bath. work to include new concrete slab, lighting, new fixtures and finishes. demolish e bath and fixtures to be replaced in master bath. remove 2 furnaces and replace with single furnace. add new on demand hot water

Open the permit page

$80,000
Oct 20, 2010Completed
final sign-off Jan 2011
217 Upper Trbathroom remodel.wall change. remove e plumbing fixtures, finishes, and lighting. new finishes, cabinetry, lighting, plumbing fixtures.replacing extg in kind. relocate non-bearing wall.
Details
Permit
201010203407
Status
complete
Filed
Oct 20, 2010
Permit issued
Oct 21, 2010
Final sign-off
Jan 27, 2011
Declared cost
$20,000
Address
217 Upper Tr

bathroom remodel.wall change. remove e plumbing fixtures, finishes, and lighting. new finishes, cabinetry, lighting, plumbing fixtures.replacing extg in kind. relocate non-bearing wall.

Open the permit page

$20,000
Jul 12, 2010Never finaled
issued Jul 2010, no final
311 Steiner St2nd fl: replace e cabinet in kitchen,add 2 new dedicated elec outlets. bath: remove e plumbing fixtures, finishes,ltg, replace. 1st fl: remodel bath, add new shower head and finishes. garage: enlarge door opening, replace driveway and flat work in setback. voluntary structural in garage wall
Details
Permit
201007126350
Status
issued
Filed
Jul 12, 2010
Permit issued
Jul 14, 2010
Declared cost
$75,000
Address
311 Steiner St

2nd fl: replace e cabinet in kitchen,add 2 new dedicated elec outlets. bath: remove e plumbing fixtures, finishes,ltg, replace. 1st fl: remodel bath, add new shower head and finishes. garage: enlarge door opening, replace driveway and flat work in setback. voluntary structural in garage wall

Open the permit page

$75,000
Apr 22, 2010Completed
final sign-off Jun 2010
220 Bush Stadd fixed cabinets, upgrade e door by adjusting closer and relocating push and pulls on door to meet accessibility. no exterior work.
Details
Permit
201004220808
Status
complete
Filed
Apr 22, 2010
Permit issued
Apr 22, 2010
Final sign-off
Jun 4, 2010
Declared cost
$3,000
Address
220 Bush St

add fixed cabinets, upgrade e door by adjusting closer and relocating push and pulls on door to meet accessibility. no exterior work.

Open the permit page

$3,000
Dec 30, 2008Completed
final sign-off Oct 2009
450 Bryant StD.P. Stearnst.i.-constr. of int. partition walls for (n) seminar rms., music rms., sound studio & off. space. improv. to (e) restrms. & constr. of (n) restrm. @ the 2/f, accessibility upgrades including addition of lift bet. 1 & 2 levels. removal/replacement of rear exit stairs. lighting/mech/plumbing upgrade
Details
Permit
200812309342
Status
complete
Filed
Dec 30, 2008
Permit issued
Mar 4, 2009
Final sign-off
Oct 29, 2009
Declared cost
$740,000
Address
450 Bryant St

t.i.-constr. of int. partition walls for (n) seminar rms., music rms., sound studio & off. space. improv. to (e) restrms. & constr. of (n) restrm. @ the 2/f, accessibility upgrades including addition of lift bet. 1 & 2 levels. removal/replacement of rear exit stairs. lighting/mech/plumbing upgrade

Open the permit page

$740,000
Dec 7, 2007Completed
final sign-off Jul 2009
546 12th Avrear yard addition on basement, first & second floors. remodel kitchen, add bathroom on 2nd floor, relocate plbg @ basement level, remove portion of wall at existing kitchen, replace existing windows, add new elec @ remodeled spaces.
Details
Permit
200712079922
Status
complete
Filed
Dec 7, 2007
Permit issued
Jun 4, 2008
Final sign-off
Jul 1, 2009
Declared cost
$150,000
Address
546 12th Av

rear yard addition on basement, first & second floors. remodel kitchen, add bathroom on 2nd floor, relocate plbg @ basement level, remove portion of wall at existing kitchen, replace existing windows, add new elec @ remodeled spaces.

Open the permit page

$150,000
Oct 2, 2007Expired or cancelled
expired May 2011
4332 19th Streplace brick stairs in kind,new pull down ladder for attic
Details
Permit
200710024288
Status
expired
Filed
Oct 2, 2007
Permit issued
Oct 2, 2007
Declared cost
$5,000
Address
4332 19th St

replace brick stairs in kind,new pull down ladder for attic

Open the permit page

$5,000
Jan 23, 2007Completed
final sign-off Oct 2007
49 Richland Avcode upgrade for condominium conversion, to correct with 3r report #3r-4563.
Details
Permit
200701232377
Status
complete
Filed
Jan 23, 2007
Permit issued
Jun 7, 2007
Final sign-off
Oct 15, 2007
Declared cost
$8,000
Address
49 Richland Av

code upgrade for condominium conversion, to correct with 3r report #3r-4563.

Open the permit page

$8,000
Dec 7, 2006Completed
final sign-off Jul 2007
33 Alta StFontana Construction, Inc.addition to existing remodel permit,200607086911.new work:remove liv rm 1st fl,gyp bd ceiling and gypsum bd at 2 walls 2nd floor,rec room walls.new light/speakers @ lv rm,new gyp bd.lights,outlets,rec room, extend seismic upgrade to 2nd fl walls rec room, repair dryrot and efficient framing as nec,
Details
Permit
200612079364
Status
complete
Filed
Dec 7, 2006
Permit issued
Dec 7, 2006
Final sign-off
Jul 23, 2007
Declared cost
$75,000
Address
33 Alta St

addition to existing remodel permit,200607086911.new work:remove liv rm 1st fl,gyp bd ceiling and gypsum bd at 2 walls 2nd floor,rec room walls.new light/speakers @ lv rm,new gyp bd.lights,outlets,rec room, extend seismic upgrade to 2nd fl walls rec room, repair dryrot and efficient framing as nec,

Open the permit page

$75,000
Jul 18, 2006Completed
final sign-off Jul 2007
33 Alta StFontana Construction, Inc.kitchen remodel, remove non bearing wall, (e) gyp.bd & provide new cabinetry, electrical, lighting & plumbing fixtures. provide voluntary seismic upgrade at 1/f walls, improve existing footings.
Details
Permit
200607186911
Status
complete
Filed
Jul 18, 2006
Permit issued
Jul 18, 2006
Final sign-off
Jul 18, 2007
Declared cost
$50,000
Address
33 Alta St

kitchen remodel, remove non bearing wall, (e) gyp.bd & provide new cabinetry, electrical, lighting & plumbing fixtures. provide voluntary seismic upgrade at 1/f walls, improve existing footings.

Open the permit page

$50,000
Jul 18, 2006Completed
final sign-off Aug 2007
3939 Washington StFontana Construction, Inc.remodel 2 bathroomsa, remove finishes, provide new finishes, lighting & electrical & new plumbing fixtures,one @1/f & one @3/f.remove sink in powder room,add countertop & vessel sink @2/f.remove finishes (tile)in master bath & replace,remove sonces,replace with new sconces @3/f
Details
Permit
200607186908
Status
complete
Filed
Jul 18, 2006
Permit issued
Jul 18, 2006
Final sign-off
Aug 31, 2007
Declared cost
$50,000
Address
3939 Washington St

remodel 2 bathroomsa, remove finishes, provide new finishes, lighting & electrical & new plumbing fixtures,one @1/f & one @3/f.remove sink in powder room,add countertop & vessel sink @2/f.remove finishes (tile)in master bath & replace,remove sonces,replace with new sconces @3/f

Open the permit page

$50,000
May 15, 2006Completed
final sign-off Jul 2007
33 Alta StFontana Construction, Inc.replace rotten rear wall (new rated) w/1 hr rated wall. remove & replace electrical outlets from wall, remove (e) window & replace with 3/4 hr rated window. remove cabinets & cap plumbing in kitchen. remove & replace asphaltt shingle roofing & replace built up roof. remove & replace (e)roof deck.
Details
Permit
200605151640
Status
complete
Filed
May 15, 2006
Permit issued
Aug 7, 2006
Final sign-off
Jul 18, 2007
Declared cost
$12,000
Address
33 Alta St

replace rotten rear wall (new rated) w/1 hr rated wall. remove & replace electrical outlets from wall, remove (e) window & replace with 3/4 hr rated window. remove cabinets & cap plumbing in kitchen. remove & replace asphaltt shingle roofing & replace built up roof. remove & replace (e)roof deck.

Open the permit page

$12,000