Oak Park Construction
- Based in
- Pleasant Hill
- On San Francisco permits
- Sep 2012 to May 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 6 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2026 | In progress issued Aug 2026 | 1569 Sloat Bl | proposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit).Details
proposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit). | $100,000 |
| Oct 18, 2023 | Completed final sign-off Mar 2024 | 1567 Sloat Bl | the work will primarily be anew mechanical chase penetrating the 2nd floor and roof deck. no work will be conducted within the existing 2nd floor tenant spaces. work to include new mechanical chase infrastructure for future tenantDetails
the work will primarily be anew mechanical chase penetrating the 2nd floor and roof deck. no work will be conducted within the existing 2nd floor tenant spaces. work to include new mechanical chase infrastructure for future tenant | $15,000 |
| Mar 12, 2015 | Completed final sign-off Jun 2015 | 835 Howard St | interior ti - 2nd floor 3 (n) private ofc 2 (n) teklephone/private call rooms reception area screen areaDetails
interior ti - 2nd floor 3 (n) private ofc 2 (n) teklephone/private call rooms reception area screen area | $50,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2017 | 135 Ulloa St | new interior renovations throughout the existing structure, new exterior door and window systems throughout, new skylights, new half bathDetails
new interior renovations throughout the existing structure, new exterior door and window systems throughout, new skylights, new half bath | $150,000 |
| Aug 28, 2013 | Completed final sign-off Oct 2013 | 230 California St | #303- remove (e) interior partition walls (all non structural), change light fixtures, install new breakroom sink, cabinet. supply & install 1 new 60 amp electrical sub-panel.Details
#303- remove (e) interior partition walls (all non structural), change light fixtures, install new breakroom sink, cabinet. supply & install 1 new 60 amp electrical sub-panel. | $63,000 |
| Feb 12, 2013 | Completed final sign-off Apr 2013 | 690 05th St | revision to pa# 2012-1226-6870-hardship request, slope of (e) parking is 2.75%. exceeds 2%Details
revision to pa# 2012-1226-6870-hardship request, slope of (e) parking is 2.75%. exceeds 2% | |
| Dec 26, 2012 | Completed final sign-off Apr 2013 | 690 05th St | new reception area, break room and new partition walls to create conference room on 1st floor. accessibility upgrades to parking area, path of travel from the parking area and accessible restrooms, new snack bar on 2nd floor, new floor finishes throughout.Details
new reception area, break room and new partition walls to create conference room on 1st floor. accessibility upgrades to parking area, path of travel from the parking area and accessible restrooms, new snack bar on 2nd floor, new floor finishes throughout. | $150,000 |
| Sep 11, 2012 | Never finaled issued Sep 2012, no final | 690 05th St | interior demo to vacant space. carpet, interior doors, data, kitchen, non-strcutrual wallsDetails
interior demo to vacant space. carpet, interior doors, data, kitchen, non-strcutrual walls | $6,000 |