Michael Storer
- Listed as
- architect, engineer
- Firm
- Exforma Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2017 to Sep 2026
54 permits since 2000 (engineer on 52 permits, architect on 3 permits): 38 completed, 10 in progress, 1 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Sep 2026 | 1296 29th Av | foundation replacement like for like at garage level.Details
foundation replacement like for like at garage level. | $25,000 | |
| Aug 28, 2026 | In progress issued Sep 2026 | 1272 California St | Dawson - Clinton Gen Contr Corp | revision to pa#202607084677: interior remodel, reconfigure all (e) bathrooms & kitchen layout. (e) 5 front windows to be replaced in kind, reframe interior walls & doors. (n) 2 skylights. new mini split, water heater & elec throughout. no work in living, dining, foyer, entry stairs & bedroom#1.Details
revision to pa#202607084677: interior remodel, reconfigure all (e) bathrooms & kitchen layout. (e) 5 front windows to be replaced in kind, reframe interior walls & doors. (n) 2 skylights. new mini split, water heater & elec throughout. no work in living, dining, foyer, entry stairs & bedroom#1. | $25,000 |
| Apr 27, 2026 | Completed final sign-off Aug 2026 | 723 44th Av | Fox Brothers Construction Inc | new interior stair, new laundry room and bathroom remodel on lower level. new breakfast nook. removing existing exterior rear door.Details
new interior stair, new laundry room and bathroom remodel on lower level. new breakfast nook. removing existing exterior rear door. | $190,000 |
| Apr 27, 2026 | In progress issued May 2026 | 1274 California St | Dawson - Clinton Gen Contr Corp | revision to permit# 2025-1110-9254. unit 1274: interior remodel, reconfigure all (e) barhrooms & kitchen layout. (e) front windows to be replaced in-kind. replace interior walls & doors, new mini-split, water heater and electrical throughout.Details
revision to permit# 2025-1110-9254. unit 1274: interior remodel, reconfigure all (e) barhrooms & kitchen layout. (e) front windows to be replaced in-kind. replace interior walls & doors, new mini-split, water heater and electrical throughout. | $50,000 |
| Mar 27, 2026 | In progress filed Mar 2026, not yet issued | 1700 Great Hy | single family residence addition. existing coverved entry area to be converted to new conditioned space. relocation of front door, 2 new windows and new enclosed alcove for the existing gas meter.Details
single family residence addition. existing coverved entry area to be converted to new conditioned space. relocation of front door, 2 new windows and new enclosed alcove for the existing gas meter. | $65,000 | |
| Mar 24, 2026 | In progress issued Apr 2026 | 67 Blake St | Kenneally Construction | revision to permit # 202508122793: expanding horizontal addition. revised deck to steel design. new laundry level 1, new storage closet level 2, + new luandry level 3.Details
revision to permit # 202508122793: expanding horizontal addition. revised deck to steel design. new laundry level 1, new storage closet level 2, + new luandry level 3. | $62,208 |
| Mar 3, 2026 | In progress issued Apr 2026 | 2414 47th Av | Aotearoa Construction | remove the (e) concrete porch and stairs at the front and replace them with new wood frame landing and stairs.Details
remove the (e) concrete porch and stairs at the front and replace them with new wood frame landing and stairs. | $30,000 |
| Aug 12, 2025 | In progress issued Sep 2025 | 67 Blake St | Kenneally Construction | two units: level 1 177 sf addition, new bedroom, bath, storage, lower foundation, new windows & doors. level 2: 32 sf addition, interior remodel, new rear deck in-kind, new windows & doors, new stair to level 1, replace front stair in-kind. level 3:32 sf addition, inter remodel, new rear yard deck,Details
two units: level 1 177 sf addition, new bedroom, bath, storage, lower foundation, new windows & doors. level 2: 32 sf addition, interior remodel, new rear deck in-kind, new windows & doors, new stair to level 1, replace front stair in-kind. level 3:32 sf addition, inter remodel, new rear yard deck, | $257,800 |
| Jul 16, 2025 | Completed final sign-off May 2026 | 1854 Jefferson St | Mission Home Remodeling Inc | revision to pa# 2022-0524-4906 removed glass and metal railing at roof deck and replace with wood frame and stucco finish walls and paint. ref bpa# 2022 1102 5704Details
revision to pa# 2022-0524-4906 removed glass and metal railing at roof deck and replace with wood frame and stucco finish walls and paint. ref bpa# 2022 1102 5704 | |
| Jul 14, 2025 | In progress filed Jul 2025, not yet issued | 267 Ellsworth St | revision to pa# 202405172389: demo all plaster interior walls, adding new drywall, insulation, new electrical, new plumbing, adding new shear walls, new stud walls at 3 locations. repairing of (e) deck, adding (n) footings at post.Details
revision to pa# 202405172389: demo all plaster interior walls, adding new drywall, insulation, new electrical, new plumbing, adding new shear walls, new stud walls at 3 locations. repairing of (e) deck, adding (n) footings at post. | $275,000 | |
| May 20, 2025 | Completed final sign-off Mar 2026 | 151 15th Av | Itu Construction | legalize rear deck and to comply with complaint#: 201782961: item 2,3,4 and 5.Details
legalize rear deck and to comply with complaint#: 201782961: item 2,3,4 and 5. | $10,000 |
| May 8, 2025 | Completed final sign-off May 2026 | 1856 Jefferson St | Mission Home Remodeling Inc | revision to 202211025704 and 202205244906. added spa to the roof deck.Details
revision to 202211025704 and 202205244906. added spa to the roof deck. | $9,000 |
| Apr 28, 2025 | Completed final sign-off Apr 2026 | 410 29th St | address nov #202536837 with the correction work reviewed and approved by planning & building structural at pa 2025-0403-3675. correction work ensures the approved permit 2019-0204-2033 proceeds with no changeDetails
address nov #202536837 with the correction work reviewed and approved by planning & building structural at pa 2025-0403-3675. correction work ensures the approved permit 2019-0204-2033 proceeds with no change | $6 | |
| Apr 3, 2025 | Completed final sign-off Apr 2026 | 410 29th St | following up minor correction to (2) 5' fo9undation sections on site to ensure the approved sow at permit #201902042033 proceeds with no change of its design and sections.Details
following up minor correction to (2) 5' fo9undation sections on site to ensure the approved sow at permit #201902042033 proceeds with no change of its design and sections. | $600 | |
| Mar 7, 2025 | Completed final sign-off Jul 2026 | 3900 Kirkham St | Pjd Construction Inc | interior remodel and 2 story addition at the rear of an (e) 2 story 1305 sq ft sfr with a proposed total increase of 690 sq ft. the project includes a 142 sq ft roof deck above the addition with an exterior spiral staircase for access.Details
interior remodel and 2 story addition at the rear of an (e) 2 story 1305 sq ft sfr with a proposed total increase of 690 sq ft. the project includes a 142 sq ft roof deck above the addition with an exterior spiral staircase for access. | $300,000 |
| Feb 20, 2025 | Completed final sign-off Apr 2026 | 410 29th St | small horizontal only addition to (e) approved at sides and rear only. small dormers less than 20% of roof area. no change to front facade, proposed change starts 22 ft from front. no work in public right of way.Details
small horizontal only addition to (e) approved at sides and rear only. small dormers less than 20% of roof area. no change to front facade, proposed change starts 22 ft from front. no work in public right of way. | $42,000 | |
| Feb 10, 2025 | In progress issued Mar 2025 | 262 Bella Vista Wy | F J Sandoval Co | 71.98 sf add'n by enclosing (e) covered porch on rear of house; kitehcn remodel in same location; 2nd fl - bathrm in same location; additional bathrm on 2nd fl; new enclosure for mech equipment, electrical service upgrade to 200 amp and relocating on meter front porchDetails
71.98 sf add'n by enclosing (e) covered porch on rear of house; kitehcn remodel in same location; 2nd fl - bathrm in same location; additional bathrm on 2nd fl; new enclosure for mech equipment, electrical service upgrade to 200 amp and relocating on meter front porch | $122,000 |
| Jan 15, 2025 | Completed final sign-off Aug 2025 | 427 16th Av | Tn Building | remodel (e) kitchen, powder/laundry room. demo (e) bay window & replace w/door. new rear yard deck & stairs. (e) windows replace in kind. new master bath & closet. remodel (e) bath & skylight. voluntary seismic retrofitDetails
remodel (e) kitchen, powder/laundry room. demo (e) bay window & replace w/door. new rear yard deck & stairs. (e) windows replace in kind. new master bath & closet. remodel (e) bath & skylight. voluntary seismic retrofit | $210,000 |
| Nov 27, 2024 | Completed final sign-off Aug 2025 | 427 16th Av | Tn Building | single family residence. garage level: lower existing foundation to new ceiling height of 8 feet, new stair connecting to level, new bedroom, new bath, new family room, new electrical level 1: new stair connecting to level 1. no change in unit count.Details
single family residence. garage level: lower existing foundation to new ceiling height of 8 feet, new stair connecting to level, new bedroom, new bath, new family room, new electrical level 1: new stair connecting to level 1. no change in unit count. | $210,000 |
| Nov 20, 2024 | Expired or cancelled expired Apr 2026 | 557 Jersey St | rev 202406144512- revision is to add (n) lightwell to east side of buldling. redesign 2 bathroom and kitchen on 1st floor. on floor 3 redesign bathroom.Details
rev 202406144512- revision is to add (n) lightwell to east side of buldling. redesign 2 bathroom and kitchen on 1st floor. on floor 3 redesign bathroom. | ||
| Jun 27, 2024 | Completed final sign-off May 2026 | 557 Jersey St | lowering the garage slab and expanding the footprint of the 1/f to add a second unit with 1 bedroom and 1.5 bathrooms to the 1/f, and a 2 car garage. the 2/f & 3/f will expand the original unit for a total of 4 bedrooms and 3.5 bathrooms with the addition of two rear decks.Details
lowering the garage slab and expanding the footprint of the 1/f to add a second unit with 1 bedroom and 1.5 bathrooms to the 1/f, and a 2 car garage. the 2/f & 3/f will expand the original unit for a total of 4 bedrooms and 3.5 bathrooms with the addition of two rear decks. | $750,000 | |
| May 29, 2024 | Completed final sign-off Aug 2024 | 2453 Filbert St | revision to pa #202207219054, change doors facing rear yard. new header and no changes to (e) shear wallDetails
revision to pa #202207219054, change doors facing rear yard. new header and no changes to (e) shear wall | ||
| Feb 29, 2024 | Completed final sign-off Jun 2025 | 586 27th Av | remodel bedrooms and bathroom on lower fl add a tv room on upper fl. kitchen will be remodeled. added shearwall toward rear of bldg on lower level.Details
remodel bedrooms and bathroom on lower fl add a tv room on upper fl. kitchen will be remodeled. added shearwall toward rear of bldg on lower level. | $125,000 | |
| Feb 5, 2024 | Completed final sign-off Oct 2024 | 460 29th St | revision update with field verified information at rear yard. no change to approved pa#202308285440. replace in-kind (e) retaining wallsDetails
revision update with field verified information at rear yard. no change to approved pa#202308285440. replace in-kind (e) retaining walls | $10 | |
| Jan 9, 2024 | Completed final sign-off Jan 2024 | 1850 Jefferson St | Mission Home Remodeling Inc | repair small portion of neighbor's foundation where is was undermined during excavation for new foundation under 202211025704 (1854-1856 jefferson st)Details
repair small portion of neighbor's foundation where is was undermined during excavation for new foundation under 202211025704 (1854-1856 jefferson st) | $500 |
| Jan 4, 2024 | Expired or cancelled withdrawn May 2024 | 460 29th St | proposed small side addition at the western lightwell, 78 sq.ft, 2nd level only. no change to front facade, 15'-0" setback from front. no work in public right of way. interior remodel / structural upgrade under pa# 202308285440.Details
proposed small side addition at the western lightwell, 78 sq.ft, 2nd level only. no change to front facade, 15'-0" setback from front. no work in public right of way. interior remodel / structural upgrade under pa# 202308285440. | $8,580 | |
| Aug 31, 2023 | In progress issued May 2024 | 1051 Page St | We Do Construction Inc. | replace existing rear yard retaining wall due to damage, the existing retaining wall varies in height 3'-5'.Details
replace existing rear yard retaining wall due to damage, the existing retaining wall varies in height 3'-5'. | $20,000 |
| Jun 14, 2023 | Completed final sign-off Jul 2024 | 19 Porter St | to comply w/ nov# 202306897, address redtag notice for non-permited rear yard deck, new deck and site retaining wall less than 36"tallDetails
to comply w/ nov# 202306897, address redtag notice for non-permited rear yard deck, new deck and site retaining wall less than 36"tall | $18,000 | |
| May 12, 2023 | Completed final sign-off Jul 2025 | 268 Church St | Jwl 888 Construction Inc | change of use from retail to cannabis retail- tenant improvement to demo extg interior partitions, accessibility upgrades to extg bathrooms, new private office, storage rooms, new electrical throughout. install exterior security gate.Details
change of use from retail to cannabis retail- tenant improvement to demo extg interior partitions, accessibility upgrades to extg bathrooms, new private office, storage rooms, new electrical throughout. install exterior security gate. | $25,000 |
| Apr 3, 2023 | Never finaled issued Apr 2023, no final | 11 Yerba Buena Av | O'neill Construction | revision to pa 2022-1014-4399 structural change to create soffit in master ceilingDetails
revision to pa 2022-1014-4399 structural change to create soffit in master ceiling | |
| Mar 13, 2023 | Completed final sign-off Jul 2024 | 1654 Alabama St | Liang General Construction Inc | upper level only: demo of some windows, floor partitions, bathroom, kitchen, and portion of (e) deck. new windows, new partition, bathroom remodel, new bathroom, kitchen remodel, legitimize (e) deck and remodel portions to meet planning code and relocation of deck stair. new electrical throughout.Details
upper level only: demo of some windows, floor partitions, bathroom, kitchen, and portion of (e) deck. new windows, new partition, bathroom remodel, new bathroom, kitchen remodel, legitimize (e) deck and remodel portions to meet planning code and relocation of deck stair. new electrical throughout. | $100,000 |
| Mar 1, 2023 | Completed final sign-off Mar 2025 | 74 Francis St | Velic Construction Inc | converting existing storage space on the garage/basement level into living space area.staircase will be added to the rear of the house to connect the basement/garage floor to the 1st floor.Details
converting existing storage space on the garage/basement level into living space area.staircase will be added to the rear of the house to connect the basement/garage floor to the 1st floor. | $125,000 |
| Feb 14, 2023 | Completed final sign-off Jul 2023 | 3860 Cesar Chavez St | Mdc Drilling | rev to pa# 202106162571; to account for changes implemented during construction including sizes of skylights, windows in primary bedroom, reconstruction of rear yard fences, and addition of wet bar on the 1st fl.Details
rev to pa# 202106162571; to account for changes implemented during construction including sizes of skylights, windows in primary bedroom, reconstruction of rear yard fences, and addition of wet bar on the 1st fl. | |
| Dec 27, 2022 | Completed final sign-off Mar 2023 | 1251 43rd Av | Barcci Builders Inc | revision to permit 202211227072. structural revision to the load-bearing wall.Details
revision to permit 202211227072. structural revision to the load-bearing wall. | |
| Nov 2, 2022 | Completed final sign-off May 2026 | 1854 Jefferson St | Mission Home Remodeling Inc | revision to bpa#202205244906, selective demo interior partitions, doors, stairs, windows, kitchens, & bathrooms, remodel bedrooms, 4 n bathrms, (n)stairs, kitchen layout, kitchenette, windows, balconies, 17 p.v. panels on roof/3 floor roof. new elec/hvac throughout. legalize three decks. 1 (n) deckDetails
revision to bpa#202205244906, selective demo interior partitions, doors, stairs, windows, kitchens, & bathrooms, remodel bedrooms, 4 n bathrms, (n)stairs, kitchen layout, kitchenette, windows, balconies, 17 p.v. panels on roof/3 floor roof. new elec/hvac throughout. legalize three decks. 1 (n) deck | $400,000 |
| Oct 24, 2022 | Completed final sign-off Jul 2023 | 3860 Cesar Chavez St | revision to bpa#202106162571. update plans to use (e) joists 2x8 lvl instead of prior indiciation.Details
revision to bpa#202106162571. update plans to use (e) joists 2x8 lvl instead of prior indiciation. | ||
| Aug 8, 2022 | Completed final sign-off Apr 2023 | 2959 23rd St | structural revisions to pa201707212560: shifted shearwall & walls.Details
structural revisions to pa201707212560: shifted shearwall & walls. | ||
| Jul 21, 2022 | Completed final sign-off Aug 2024 | 2453 Filbert St | Dromhus Inc. | demo (e) rear yard doors to be replaced w/ taller and winder doors. demo (e) side yard inoperable windows & replaced w/ (n) push out casement windows. minor inteiror remodel - walls.kitchen & bathrooms remodel under 202205114025.Details
demo (e) rear yard doors to be replaced w/ taller and winder doors. demo (e) side yard inoperable windows & replaced w/ (n) push out casement windows. minor inteiror remodel - walls.kitchen & bathrooms remodel under 202205114025. | $25,000 |
| Jul 20, 2022 | Completed final sign-off Nov 2022 | 289 Berkeley Wy | Professional Home Designs | replace existing vertical siding with horizontal hardie plank/ sheet siding on 3 sides. replace rotten deck boards and deck guardrail on front of building.Details
replace existing vertical siding with horizontal hardie plank/ sheet siding on 3 sides. replace rotten deck boards and deck guardrail on front of building. | $25,000 |
| Jul 11, 2022 | Completed final sign-off Mar 2023 | 3522 17th St | Sasso Construction Inc. | 2nd flr - remodel kitchen and one bathroom, drywall and insulation. replace all 9 wood windows in-kind (marvin) with integral lugs and 5 vinyl windows at the rear.Details
2nd flr - remodel kitchen and one bathroom, drywall and insulation. replace all 9 wood windows in-kind (marvin) with integral lugs and 5 vinyl windows at the rear. | $100,000 |
| Jun 16, 2022 | Completed final sign-off Oct 2023 | 1990 16th Av | Itu Construction | interior remodel. kitchen & bathroom remodel. basement unfinished space conversion to room, bedroom remodel.Details
interior remodel. kitchen & bathroom remodel. basement unfinished space conversion to room, bedroom remodel. | $300,000 |
| Mar 14, 2022 | Completed final sign-off Jul 2023 | 3860 Cesar Chavez St | revision to permit 202106162571 excavation at the garage level of 40 cy.Details
revision to permit 202106162571 excavation at the garage level of 40 cy. | ||
| Mar 2, 2022 | Completed final sign-off Sep 2022 | 61 Capp St | all 4 units: interior remodel with existing envelop. kitchens, bathrooms, utility/storage spaces.new finishes at kitchens and bathrooms, storage/office and bedrooms, new mep, furnace, skylights, flooring. repair in kid dryrot. no vertical or horizontal addition to existing envelope.Details
all 4 units: interior remodel with existing envelop. kitchens, bathrooms, utility/storage spaces.new finishes at kitchens and bathrooms, storage/office and bedrooms, new mep, furnace, skylights, flooring. repair in kid dryrot. no vertical or horizontal addition to existing envelope. | $50,000 | |
| Feb 22, 2022 | Completed final sign-off Nov 2023 | 3520 17th St | Sasso Construction Inc. | revision to fire on pa #202109027733 replace burnt members on roofDetails
revision to fire on pa #202109027733 replace burnt members on roof | $10,000 |
| Sep 1, 2021 | Expired or cancelled withdrawn Nov 2021 | 3860 Cesar Chavez St | new rear deck at second floor - within the buildable envelope, less than 10'0" above grade, 3'0 from property lines(no rated walls required)Details
new rear deck at second floor - within the buildable envelope, less than 10'0" above grade, 3'0 from property lines(no rated walls required) | $27,000 | |
| Aug 18, 2021 | Expired or cancelled withdrawn Dec 2021 | 289 Berkeley Wy | Professional Home Designs | replace rotten siding on 3 sides of the building. change siding from vertical to horizontal. add james hardie panels on 1/2 of front. replace (e) rotten deck framing & deck boards & railing.Details
replace rotten siding on 3 sides of the building. change siding from vertical to horizontal. add james hardie panels on 1/2 of front. replace (e) rotten deck framing & deck boards & railing. | $25,000 |
| Jun 29, 2021 | Completed final sign-off Oct 2021 | 32 Massasoit St | to comply nov 2021179181. interior remodel within the envelope with the following items: open layout @ top floor, convert existing stoarage space to habitable @ ground floor within envelope, & add exterior stairs from top floor @ side yard. remodel includes mep, new kitchen & bathrooms, new finishesDetails
to comply nov 2021179181. interior remodel within the envelope with the following items: open layout @ top floor, convert existing stoarage space to habitable @ ground floor within envelope, & add exterior stairs from top floor @ side yard. remodel includes mep, new kitchen & bathrooms, new finishes | $75,000 | |
| Jun 16, 2021 | Completed final sign-off Jul 2023 | 3860 Cesar Chavez St | interior remodel kitchen and bedrooms. infill of non shared lightwell, infill gr fl covered area, remove bay at rear new roof deckDetails
interior remodel kitchen and bedrooms. infill of non shared lightwell, infill gr fl covered area, remove bay at rear new roof deck | $100,000 | |
| Apr 26, 2021 | Expired or cancelled withdrawn Jul 2021 | 289 Berkeley Wy | Professional Home Designs | replace rotten siding on 3 sides of the building. change from vertical to horizontal. add james hardie panels on 1/2 of front. replace rotten deck framing & deck boards. replace deck railing with new aluminum railingDetails
replace rotten siding on 3 sides of the building. change from vertical to horizontal. add james hardie panels on 1/2 of front. replace rotten deck framing & deck boards. replace deck railing with new aluminum railing | $25,000 |
| Mar 17, 2021 | Completed final sign-off Jul 2021 | 535 Dolores St | Professional Home Designs | revision to no-plan pa# 202011259697. fix correction notice to replace 2 water damaged non-structural walls in-kind. replace existing windows with fire rated windows. remove and replace existing unlevel concrete slab.Details
revision to no-plan pa# 202011259697. fix correction notice to replace 2 water damaged non-structural walls in-kind. replace existing windows with fire rated windows. remove and replace existing unlevel concrete slab. | $1,500 |
| Nov 30, 2020 | Completed final sign-off Oct 2023 | 3520 17th St | Sasso Construction Inc. | interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen 7 bathroom, new water heater, new furnace.Details
interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen 7 bathroom, new water heater, new furnace. | $96,000 |
| Nov 30, 2020 | Completed final sign-off Dec 2022 | 3524 17th St | interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen & bathroom, new water heater, new hvac/ducts.Details
interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen & bathroom, new water heater, new hvac/ducts. | $48,000 | |
| May 17, 2019 | Completed final sign-off Jun 2022 | 1061 Shotwell St | N A V R O Inc Dba Proyecto | remodel powder and kitchen at entry level. upper level - bath remodel, study converted to a master bath & adjacent closet updated, windows in sun room will be replaced (not visible from street)Details
remodel powder and kitchen at entry level. upper level - bath remodel, study converted to a master bath & adjacent closet updated, windows in sun room will be replaced (not visible from street) | $60,000 |
| Jul 21, 2017 | Completed final sign-off Apr 2023 | 2959 23rd St | Kohlmyer, Weitekamp Remodeling & Construction | not adu (no adu on project). addition to rear of bldg (no change to front)Details
not adu (no adu on project). addition to rear of bldg (no change to front) | $200,000 |