Michael Hager
- Listed as
- architect
- Firm
- Hager Design Group
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Feb 2016
14 permits since 2000 (architect on 14 permits): 9 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2016 | Expired or cancelled expired Mar 2026 | 37 Sussex St | Mullins General Construction & Fine Pain | vertical and horizontal addition and remodel to (e) sfd. the design steps the new construction down steep hillside @ rear and raises fron from a 1-story to 2-story facade. all levels would be connected by an elevator and stairs would be fire sprinklered.Details
vertical and horizontal addition and remodel to (e) sfd. the design steps the new construction down steep hillside @ rear and raises fron from a 1-story to 2-story facade. all levels would be connected by an elevator and stairs would be fire sprinklered. | $500,000 |
| May 28, 2015 | Completed final sign-off Jul 2016 | 245 Fowler Av | Luke Gilligan Inc. | interior retrofit of an extg residence which includes all new insulation, drywall and interior finishes, new appliances & fixtures, etc. some exterior work will also be done such as new roofing, some wall repairs & exterior painting.Details
interior retrofit of an extg residence which includes all new insulation, drywall and interior finishes, new appliances & fixtures, etc. some exterior work will also be done such as new roofing, some wall repairs & exterior painting. | $150,000 |
| Sep 23, 2014 | Completed final sign-off Nov 2015 | 127 Central Av | Cullinane Plastering | new skylight 4'x14' on flat roof not visible from street.Details
new skylight 4'x14' on flat roof not visible from street. | $5,000 |
| Jun 9, 2014 | Expired or cancelled withdrawn Jul 2014 | 66 Landers St | Cullinane Plastering | rear bldg. remodel single family cottage. new kitchen, bathrooms & laundry room. some walls will be removed. cottage to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech system.Details
rear bldg. remodel single family cottage. new kitchen, bathrooms & laundry room. some walls will be removed. cottage to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech system. | $245,000 |
| Jun 9, 2014 | Expired or cancelled withdrawn Jul 2014 | 68 Landers St | Cullinane Plastering | front bldg. remodel 2-unit over garage bldg. new kitchens, bathrooms & laundry room will be provided for each living unit. some walls will be removed.garage will be expanded within (e) foot print.bldg to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech systems.Details
front bldg. remodel 2-unit over garage bldg. new kitchens, bathrooms & laundry room will be provided for each living unit. some walls will be removed.garage will be expanded within (e) foot print.bldg to receive new foundation & extensive structural improvements, & upgrade elec,plumb & mech systems. | $500,000 |
| Jun 2, 2014 | Completed final sign-off Nov 2015 | 127 Central Av | Cullinane Plastering | new roof deck in addition to pa# 2014/01/09/5946.Details
new roof deck in addition to pa# 2014/01/09/5946. | $5,000 |
| Jan 9, 2014 | Completed final sign-off Nov 2015 | 127 Central Av | Cullinane Plastering | remodel (e) building. new kitchens, bathrooms & laundry rooms will be provided for each unit. some walls will be removed. garage will be expanded & an elevator added. ground floor will be lowered with new foundations. repair porches at rear of building, in kind. no roof deck. sprinklers required.Details
remodel (e) building. new kitchens, bathrooms & laundry rooms will be provided for each unit. some walls will be removed. garage will be expanded & an elevator added. ground floor will be lowered with new foundations. repair porches at rear of building, in kind. no roof deck. sprinklers required. | $700,000 |
| Nov 2, 2010 | Completed final sign-off Jan 2011 | 370 De Haro St | Medrano Construction Corp | unit a3 - remodel an existing commercial loft/ live work space for new "a doll up " hair salon. work includes teh addition of 2 hairwashing sinks w/built in hair removal system, and a partial height wall to support them, and work to provide an accessible threshold at teh unit entry door.Details
unit a3 - remodel an existing commercial loft/ live work space for new "a doll up " hair salon. work includes teh addition of 2 hairwashing sinks w/built in hair removal system, and a partial height wall to support them, and work to provide an accessible threshold at teh unit entry door. | $2,500 |
| Jul 7, 2009 | Completed final sign-off Apr 2010 | 1790 Armstrong Av | installation of fuel cell to provide electricity to an adjacent 120,000 sq ft light industrial building complex. for security the fuel cell will be enclosed in a chanin link fence structure that includes a chain link roofDetails
installation of fuel cell to provide electricity to an adjacent 120,000 sq ft light industrial building complex. for security the fuel cell will be enclosed in a chanin link fence structure that includes a chain link roof | $20,000 | |
| Mar 12, 2008 | Completed final sign-off Sep 2009 | 41 Ford St | remodel of (e) single family residence with rear horizontal and vertical addition of 1 story. kitchen remodel, add new bathrooms and install elevator.Details
remodel of (e) single family residence with rear horizontal and vertical addition of 1 story. kitchen remodel, add new bathrooms and install elevator. | $350,000 | |
| Dec 7, 2005 | Completed final sign-off Dec 2005 | 1775 Yosemite Av | removal of abatement order related to violation notice #200002696 per neil friedmanDetails
removal of abatement order related to violation notice #200002696 per neil friedman | $31,750 | |
| Mar 15, 2005 | Expired or cancelled expired Mar 2006 | 238 28th St | replace small rear yard deck & stair to grade with a much larger deck.variance case #2005.0050vDetails
replace small rear yard deck & stair to grade with a much larger deck.variance case #2005.0050v | $5,000 | |
| Jan 27, 2005 | Completed final sign-off Feb 2006 | 238 28th St | interior remodel of (e)res.to add a bedroom,toilet,laundry room to 1/f behind garage expanded inDetails
interior remodel of (e)res.to add a bedroom,toilet,laundry room to 1/f behind garage expanded in | $50,000 | |
| Oct 27, 2004 | Expired or cancelled expired Jun 2006 | 140 Avila St | remodel grd fl-add a new bathrm, repl rear windows,& a new furnace per plan.Details
remodel grd fl-add a new bathrm, repl rear windows,& a new furnace per plan. | $18,000 |