Medrano Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Feb 2019
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2019 | Completed final sign-off Apr 2019 | 389 Arguello Bl | addition of 1 hand sink, 2 partition walls and sliding barn door.Details
addition of 1 hand sink, 2 partition walls and sliding barn door. | $10,000 |
| Sep 22, 2017 | Never finaled issued Jun 2018, no final | 100 Bush St | replace (e) sink, replace (e) water heater with new electric water heater, install (n) sink, install egg cooker prep area; install portable hood for egg cooker, install vinyl flooring in mezzanine area. maher naDetails
replace (e) sink, replace (e) water heater with new electric water heater, install (n) sink, install egg cooker prep area; install portable hood for egg cooker, install vinyl flooring in mezzanine area. maher na | $2,500 |
| Nov 17, 2011 | Completed final sign-off Dec 2011 | 389 Arguello Bl | change (e) office to salon shop. modify (e) restroom.Details
change (e) office to salon shop. modify (e) restroom. | $5,000 |
| Nov 2, 2010 | Completed final sign-off Jan 2011 | 370 De Haro St | unit a3 - remodel an existing commercial loft/ live work space for new "a doll up " hair salon. work includes teh addition of 2 hairwashing sinks w/built in hair removal system, and a partial height wall to support them, and work to provide an accessible threshold at teh unit entry door.Details
unit a3 - remodel an existing commercial loft/ live work space for new "a doll up " hair salon. work includes teh addition of 2 hairwashing sinks w/built in hair removal system, and a partial height wall to support them, and work to provide an accessible threshold at teh unit entry door. | $2,500 |