Luke Gilligan Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Apr 2025
- Last 24 months
- 3 permits filed
82 permits since 2000: 63 completed, 2 in progress, 14 never finaled, 3 expired or cancelled.
Of the 14 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2025 | Completed final sign-off Jun 2026 | 1250 Chestnut St | revision to previously approved p.a. #2024-1127-5819 to include: replace proposed shear wall at line b.8 with new steel frame.Details
revision to previously approved p.a. #2024-1127-5819 to include: replace proposed shear wall at line b.8 with new steel frame. | $15,000 |
| Mar 18, 2025 | In progress issued Apr 2025 | 2262 48th Av | revision to pa #202303143688 to remove fire sprinkler requirement per nfpa 13rDetails
revision to pa #202303143688 to remove fire sprinkler requirement per nfpa 13r | |
| Nov 27, 2024 | Completed final sign-off Jun 2026 | 1250 Chestnut St | ground floor: add a proposed 1-bed replacement dwelling unit. 2nd flr: merge and remodel 2 existing 1-bed dwelling units into one proposed 3-bedroom dwelling unit. 3rd floor: remodel the existing 3rd fl. unit kitchen and bath; add one full bath. uprade/replace -in - kind exiting windows throughoutDetails
ground floor: add a proposed 1-bed replacement dwelling unit. 2nd flr: merge and remodel 2 existing 1-bed dwelling units into one proposed 3-bedroom dwelling unit. 3rd floor: remodel the existing 3rd fl. unit kitchen and bath; add one full bath. uprade/replace -in - kind exiting windows throughout | $628,776 |
| Jul 11, 2024 | Completed final sign-off Jan 2025 | 543 Marina Bl | kitchen upgrade - new cabinets, new countertops, same location. for hood and stove. new plumbing fixtures. remodel (e) bathroom: tile and vanity upgrade. new plumbing fixtures.Details
kitchen upgrade - new cabinets, new countertops, same location. for hood and stove. new plumbing fixtures. remodel (e) bathroom: tile and vanity upgrade. new plumbing fixtures. | $55,000 |
| Jul 7, 2023 | Never finaled issued Jul 2023, no final | 1241 04th Av | retile bathroom wall and floor repaint: tile kitchen floor- replace countertops all electrical and plumbing remains in same locationsDetails
retile bathroom wall and floor repaint: tile kitchen floor- replace countertops all electrical and plumbing remains in same locations | $8,500 |
| Mar 14, 2023 | In progress issued Jan 2024 | 2262 48th Av | interior remodel to existing 2-story single family home with 4 bedrooms and 2 baths and vertical addition of new 3rd story with front and rear terraces. new count to be 5 bedrooms and 3.5 974-384-467Details
interior remodel to existing 2-story single family home with 4 bedrooms and 2 baths and vertical addition of new 3rd story with front and rear terraces. new count to be 5 bedrooms and 3.5 974-384-467 | $746,000 |
| May 3, 2022 | Completed final sign-off Feb 2023 | 2101 Vallejo St | revision of bpa 201810163302. renovation of (e) 3 story, 2 unit residential bldg. 2 residential units to remain. scope of work under this permit is minor changes to approved floor plans and exterior finishes.Details
revision of bpa 201810163302. renovation of (e) 3 story, 2 unit residential bldg. 2 residential units to remain. scope of work under this permit is minor changes to approved floor plans and exterior finishes. | |
| Mar 22, 2022 | Completed final sign-off May 2023 | 522 Hickory St | to obtain final inspection for work approved under pa# 201501297021 & 2017062704433. all work is complete.Details
to obtain final inspection for work approved under pa# 201501297021 & 2017062704433. all work is complete. | |
| Mar 8, 2022 | Completed final sign-off Mar 2022 | 111 Hoffman Av | renew permits 201906072926 & 201910093954 for final inspection. all work is complete.Details
renew permits 201906072926 & 201910093954 for final inspection. all work is complete. | |
| Mar 8, 2022 | Completed final sign-off Mar 2022 | 4251 23rd St | renew permit for final 201403059932 & 201309267844 for final inspection. all work is complete.Details
renew permit for final 201403059932 & 201309267844 for final inspection. all work is complete. | |
| Jun 1, 2021 | Completed final sign-off Feb 2023 | 2101 Vallejo St | remodel 2 kitchens and 3 bathrooms. repair dry rot. repair walls and floors at these rooms. no change to layout or walls and openings.Details
remodel 2 kitchens and 3 bathrooms. repair dry rot. repair walls and floors at these rooms. no change to layout or walls and openings. | $20,000 |
| Jan 7, 2021 | Completed final sign-off Mar 2022 | 4251 23rd St | to comply with nov#202064651. repair to siding along property line on the west side of the bldg. repair to roof, repair to framing if damaged behind charged siding. remove sheet rock on interior level1, level 2, & level 3. bathrooms, hallway and bedroom. remove all tile in basement bathroom, powderDetails
to comply with nov#202064651. repair to siding along property line on the west side of the bldg. repair to roof, repair to framing if damaged behind charged siding. remove sheet rock on interior level1, level 2, & level 3. bathrooms, hallway and bedroom. remove all tile in basement bathroom, powder | $75,000 |
| Oct 6, 2020 | Never finaled issued Nov 2020, no final | 1819 Baker St | revision to pa 201901099877. facade restoration - alter approved bay window, revise entry stair design, change facade material to wood-siding, add historically accurae trim, casing, moding, cornice. to replace 5 nearly identical adjacent residences. work to floors 1 and 2 only at facade only.Details
revision to pa 201901099877. facade restoration - alter approved bay window, revise entry stair design, change facade material to wood-siding, add historically accurae trim, casing, moding, cornice. to replace 5 nearly identical adjacent residences. work to floors 1 and 2 only at facade only. | $2,500 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 111 Hoffman Av | amend 201906072926 for additional work: install under floor (hydronic) heating. install new hardwood flooring, remodel 2 (e) powder rooms in-kind. boiler located in garage - high efficency flu to roofDetails
amend 201906072926 for additional work: install under floor (hydronic) heating. install new hardwood flooring, remodel 2 (e) powder rooms in-kind. boiler located in garage - high efficency flu to roof | $70,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 4203 23rd St | remodel of existing (1) kitchen & 1 (e) bathroom, in-kind. new lighting ledDetails
remodel of existing (1) kitchen & 1 (e) bathroom, in-kind. new lighting led | $25,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 4201 23rd St | to obtain a final inspection for work approved under previous permit pa#200903093618. all work is complete.Details
to obtain a final inspection for work approved under previous permit pa#200903093618. all work is complete. | |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 111 Hoffman Av | remodel kitchen and (3) bathroomsDetails
remodel kitchen and (3) bathrooms | $105,000 |
| Jan 9, 2019 | Never finaled issued Oct 2019, no final | 1819 Baker St | rear addition & 3rd flr addition to (e) residence. create (n) living bedroom & bathroom spaces on 1st flr. reconfigure kitchen, dining, bathroom & bedroom spaces on 2nd flr. (n) 3 bedrooms, 2 bath & laudry on 3rd flr. (n) internal staircase. renovate facade. (n) deck access stair to rear yardDetails
rear addition & 3rd flr addition to (e) residence. create (n) living bedroom & bathroom spaces on 1st flr. reconfigure kitchen, dining, bathroom & bedroom spaces on 2nd flr. (n) 3 bedrooms, 2 bath & laudry on 3rd flr. (n) internal staircase. renovate facade. (n) deck access stair to rear yard | $340,000 |
| Oct 16, 2018 | Completed final sign-off Feb 2023 | 2101 Vallejo St | renovation of (e) 3-story, 2-unit residential building. 2-residential units to remain. design-build fire sprinkler system throughout per nfpa13r under separate permit.Details
renovation of (e) 3-story, 2-unit residential building. 2-residential units to remain. design-build fire sprinkler system throughout per nfpa13r under separate permit. | $719,850 |
| Aug 22, 2018 | Completed final sign-off Mar 2022 | 522 Hickory St | soldier piers, walers and lagging (temporary) ref pa 2017-0627-0443Details
soldier piers, walers and lagging (temporary) ref pa 2017-0627-0443 | $65,000 |
| Aug 3, 2018 | Completed final sign-off Jan 2024 | 2651 Octavia St | horizontal & vertical addition to an (e) 3-story residential bldg. interior layout changes to include (n) partitions, fixtures & finishes, mep & life safety to be deferred submittal as req'dDetails
horizontal & vertical addition to an (e) 3-story residential bldg. interior layout changes to include (n) partitions, fixtures & finishes, mep & life safety to be deferred submittal as req'd | $400,000 |
| Jul 19, 2018 | Completed final sign-off Oct 2019 | 125 Ashbury St | retrofit of extg residences on 2nd and 3rd floors, ref adu pa#: 2018-0129-9802. n/a for maher.Details
retrofit of extg residences on 2nd and 3rd floors, ref adu pa#: 2018-0129-9802. n/a for maher. | $125,000 |
| Jun 25, 2018 | Completed final sign-off Dec 2018 | 466 27th St | to obtain final inspection for work approved under pa# 201007136444. all work is complete.Details
to obtain final inspection for work approved under pa# 201007136444. all work is complete. | |
| Jan 29, 2018 | Completed final sign-off Oct 2019 | 123 Ashbury St | ordinance #162-16. conversion of a portion of an (e) attached garage into an adu which includes a new kitchen, bathroom, doors, finishes & fixtures throughout. mep to be under seperate permit as required.Details
ordinance #162-16. conversion of a portion of an (e) attached garage into an adu which includes a new kitchen, bathroom, doors, finishes & fixtures throughout. mep to be under seperate permit as required. | $75,000 |
| Dec 5, 2017 | Completed final sign-off Oct 2019 | 125 Ashbury St | remodel 2 kitchen, 4 bathrooms, upgrade electrical, plumbing, heating, comply with nov. #201602822 - #1, #2, #3, #4, #5. comply with nov #201603091 item #1 & #2, comply with nov. #201603111 item #1 thru 14. repair back stairs 50%, repair dry & siding, repair and replace windows on the rear of buildiDetails
remodel 2 kitchen, 4 bathrooms, upgrade electrical, plumbing, heating, comply with nov. #201602822 - #1, #2, #3, #4, #5. comply with nov #201603091 item #1 & #2, comply with nov. #201603111 item #1 thru 14. repair back stairs 50%, repair dry & siding, repair and replace windows on the rear of buildi | $41,250 |
| Sep 18, 2017 | Completed final sign-off Feb 2018 | 75 San Lorenzo Wy | replace (e) windows and doors at rear of bldg. revision to permit # 201706058378. remodel utility room, insulate utility room and kitchen area. repair existing skylights, install beams over (e) doors. marvin doors and custom wood windows installedDetails
replace (e) windows and doors at rear of bldg. revision to permit # 201706058378. remodel utility room, insulate utility room and kitchen area. repair existing skylights, install beams over (e) doors. marvin doors and custom wood windows installed | $18,000 |
| Jun 5, 2017 | Completed final sign-off Feb 2018 | 75 San Lorenzo Wy | remodel kitchen plus 3 bathrooms. no structural work. upgrade plumbing & electrical in remodel area. painting, p0lus some hardwood floor repair. all work is interior of building.Details
remodel kitchen plus 3 bathrooms. no structural work. upgrade plumbing & electrical in remodel area. painting, p0lus some hardwood floor repair. all work is interior of building. | $50,000 |
| Nov 3, 2016 | Completed final sign-off Sep 2018 | 233 Franconia St | project proposes new retaining & garden walls as part of landscaping. ref pa #201401085795.Details
project proposes new retaining & garden walls as part of landscaping. ref pa #201401085795. | $15,750 |
| Nov 3, 2016 | Completed final sign-off May 2017 | 2455 Vallejo St | revision 201603303424. 1st redesign stairs to 2nd flr/ add wetbar. 2nd flr: open new stairs to flr below. 3rd flr - relocate hall wall, reconfigure mstr bath, delete (2) skylights. 4th flr - replace proposed pocket door w/barn door, enlarge (e) showerDetails
revision 201603303424. 1st redesign stairs to 2nd flr/ add wetbar. 2nd flr: open new stairs to flr below. 3rd flr - relocate hall wall, reconfigure mstr bath, delete (2) skylights. 4th flr - replace proposed pocket door w/barn door, enlarge (e) shower | $4,000 |
| Aug 2, 2016 | Completed final sign-off Sep 2018 | 233 Franconia St | revision to pa 201401085795 - work includes revisions to interior wall partitions, window & door locations and exterior finishes. new garage door finishesDetails
revision to pa 201401085795 - work includes revisions to interior wall partitions, window & door locations and exterior finishes. new garage door finishes | |
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 1607 Dolores St | repair approx 200 sq ft on rear of property. remodel kitchen & 2 bathrooms cabinets plus tile. new flooring, painting. no change in wall & opening layout. min 50% kitchen light wattage high efficacy, high efficacy bathroom lighting or controlled by manual on sensor with high efficacy main light.Details
repair approx 200 sq ft on rear of property. remodel kitchen & 2 bathrooms cabinets plus tile. new flooring, painting. no change in wall & opening layout. min 50% kitchen light wattage high efficacy, high efficacy bathroom lighting or controlled by manual on sensor with high efficacy main light. | $25,000 |
| Mar 30, 2016 | Completed final sign-off May 2017 | 2455 Vallejo St | 1st floor - relocate stairs to 2nd flr, relocate bathroom; 2nd floor - remodel kitchen & dining areas; 3rd floor - add bathroom & laundry room, remodel master suite, install (3) skylights; 4th floor - add door @ top of stairs, change window & doors to sliding door @ 2nd floor.Details
1st floor - relocate stairs to 2nd flr, relocate bathroom; 2nd floor - remodel kitchen & dining areas; 3rd floor - add bathroom & laundry room, remodel master suite, install (3) skylights; 4th floor - add door @ top of stairs, change window & doors to sliding door @ 2nd floor. | $145,000 |
| Feb 10, 2016 | Never finaled issued May 2016, no final | 1605 Dolores St | interior remodel of both floors of existing two unit residence. changes to front facade with new entry & windows. changes to rear facade with new windows.Details
interior remodel of both floors of existing two unit residence. changes to front facade with new entry & windows. changes to rear facade with new windows. | $120,000 |
| Feb 9, 2016 | Completed final sign-off Jan 2019 | 1424 Sanchez St | (n) horizontal add on the 1st flr to include (n) study & laundry rm with renovation of bathroom. 2nd flr renovation of living room, kitchen & horizontal add for family room. (n) vertical & horizontal add to the 3rd flr for (n) bathroom & bedroom with renovation to existing bathroom & bedroomDetails
(n) horizontal add on the 1st flr to include (n) study & laundry rm with renovation of bathroom. 2nd flr renovation of living room, kitchen & horizontal add for family room. (n) vertical & horizontal add to the 3rd flr for (n) bathroom & bedroom with renovation to existing bathroom & bedroom | $700,000 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 1605 Dolores St | remodel 2 kitchens and 4 bathrooms upgrade electrical & plumbing. new painting, new flooring, new tile work. repair dry rotDetails
remodel 2 kitchens and 4 bathrooms upgrade electrical & plumbing. new painting, new flooring, new tile work. repair dry rot | $30,000 |
| Jun 2, 2015 | Completed final sign-off Jun 2015 | 4241 23rd St | revision appl. 2014.1027.9928. clarification of 1-hr ceiling assembly.Details
revision appl. 2014.1027.9928. clarification of 1-hr ceiling assembly. | |
| May 28, 2015 | Completed final sign-off Jul 2016 | 245 Fowler Av | interior retrofit of an extg residence which includes all new insulation, drywall and interior finishes, new appliances & fixtures, etc. some exterior work will also be done such as new roofing, some wall repairs & exterior painting.Details
interior retrofit of an extg residence which includes all new insulation, drywall and interior finishes, new appliances & fixtures, etc. some exterior work will also be done such as new roofing, some wall repairs & exterior painting. | $150,000 |
| Mar 31, 2015 | Never finaled issued Apr 2015, no final | 577 Alvarado St | revision to pa# 2014 0205 7899; revise skylights, deck & infill (e) windows.Details
revision to pa# 2014 0205 7899; revise skylights, deck & infill (e) windows. | |
| Nov 12, 2014 | Expired or cancelled cancelled Jul 2023 | 42 Digby St | revision permit #2014.0919.6839. remove 1 window and relocate 1 window per elevation per board of appeal decision appeal no. 14-181.Details
revision permit #2014.0919.6839. remove 1 window and relocate 1 window per elevation per board of appeal decision appeal no. 14-181. | $600 |
| Sep 19, 2014 | Completed final sign-off Jul 2017 | 42 Digby St | alteration to single family residence. no added sq footage. replace and add windows. new steel moment frame. add powder room.new fence. new deck at rear yard. replace extg roof.Details
alteration to single family residence. no added sq footage. replace and add windows. new steel moment frame. add powder room.new fence. new deck at rear yard. replace extg roof. | $175,000 |
| Aug 22, 2014 | Completed final sign-off Jun 2015 | 471 Hoffman Av | comply with nov 201478311. revision to appl 2013-0405-3894 & 2014-0606-7728. changes to rear yard layout per plan and reduce 5'-0" setback of rear living room and add a rear roof deck on second floor per plan. change railing details on second and third floor roof deck.Details
comply with nov 201478311. revision to appl 2013-0405-3894 & 2014-0606-7728. changes to rear yard layout per plan and reduce 5'-0" setback of rear living room and add a rear roof deck on second floor per plan. change railing details on second and third floor roof deck. | |
| Jul 14, 2014 | Completed final sign-off Sep 2014 | 546 29th St | retile bathroom/new plumbing fixture on 2nd floor.Details
retile bathroom/new plumbing fixture on 2nd floor. | $5,000 |
| Jun 9, 2014 | Completed final sign-off Jun 2015 | 4241 23rd St | garage level remodel: new habitable media room with bathroom, open extg stair to 2nd level, new windows and door at rear, and replace or repair extg side entry door at front. no changes to upper levels.Details
garage level remodel: new habitable media room with bathroom, open extg stair to 2nd level, new windows and door at rear, and replace or repair extg side entry door at front. no changes to upper levels. | $45,000 |
| Jun 6, 2014 | Completed final sign-off Jun 2015 | 471 Hoffman Av | minor changes to 201304053894. interior remodel of existing single family dwelling. minorchange to rear yard layout, lwr fl revision to home office. 2nd fl kitchen removal of non load bearing interior walls, 4th fl removal of entertainment rm closet/addition of window over main stair, roof planDetails
minor changes to 201304053894. interior remodel of existing single family dwelling. minorchange to rear yard layout, lwr fl revision to home office. 2nd fl kitchen removal of non load bearing interior walls, 4th fl removal of entertainment rm closet/addition of window over main stair, roof plan | |
| May 13, 2014 | Completed final sign-off Sep 2014 | 2316 Leavenworth St | steel beam and post at kitchen remodel. ref app#201404072582Details
steel beam and post at kitchen remodel. ref app#201404072582 | $7,500 |
| Apr 7, 2014 | Completed final sign-off Sep 2014 | 2316 Leavenworth St | remodel of kitchen, 2nd bathroom at bedroom level, refinish floors upgrade, electrical & plumbing, painting, new trim, room size 15' x 15' bathroom 5 x 12.Details
remodel of kitchen, 2nd bathroom at bedroom level, refinish floors upgrade, electrical & plumbing, painting, new trim, room size 15' x 15' bathroom 5 x 12. | $30,000 |
| Mar 13, 2014 | Completed final sign-off Mar 2015 | 577 Alvarado St | interior remodel. kitchen & 4 bathrooms. upgrade plumbing & electrical, install rear windows and skylights. new interior doors, insulation, sheetrock, upgrade bedrooms, tile, new floors, dryrot repair on rear wall.Details
interior remodel. kitchen & 4 bathrooms. upgrade plumbing & electrical, install rear windows and skylights. new interior doors, insulation, sheetrock, upgrade bedrooms, tile, new floors, dryrot repair on rear wall. | $125,000 |
| Feb 11, 2014 | Completed final sign-off Jul 2017 | 175 Downey St | rear addition for new bedrooms family room, kitchen and master bedroom suite. interior remodel with new elevator.Details
rear addition for new bedrooms family room, kitchen and master bedroom suite. interior remodel with new elevator. | $430,000 |
| Feb 5, 2014 | Never finaled issued Sep 2014, no final | 577 Alvarado St | project proposes(n) garage, horiz. rear addition w/deck + spiral stair. scope incl. partial (n) roof + (2) (n) dormers. proj. proposes interior remodal to all floors mep shall be design build.Details
project proposes(n) garage, horiz. rear addition w/deck + spiral stair. scope incl. partial (n) roof + (2) (n) dormers. proj. proposes interior remodal to all floors mep shall be design build. | $200,000 |
| Nov 26, 2013 | Completed final sign-off Mar 2015 | 577 Alvarado St | replace foundation and slab on grade; voluntary basement shear wall upgradeDetails
replace foundation and slab on grade; voluntary basement shear wall upgrade | $75,000 |
| Nov 19, 2013 | Completed final sign-off Mar 2014 | 1108 Dolores St | remodel kitchen and bathroom - electrical upgrade in kitchen and bathroom also plumbing upgrade. lighting to comply with cec 150 (k)Details
remodel kitchen and bathroom - electrical upgrade in kitchen and bathroom also plumbing upgrade. lighting to comply with cec 150 (k) | $26,500 |
| Nov 12, 2013 | Completed final sign-off Jun 2015 | 471 Hoffman Av | replace (e) central wood beam w/ steel beam; upgrade (e) foundation and place (n) concrete slab; construct (n) retaining wall. all work on lower floor.Details
replace (e) central wood beam w/ steel beam; upgrade (e) foundation and place (n) concrete slab; construct (n) retaining wall. all work on lower floor. | $50,000 |
| Sep 26, 2013 | Completed final sign-off Mar 2022 | 4251 23rd St | remove siding & replace with redwood siding trim around door & window & garage doorDetails
remove siding & replace with redwood siding trim around door & window & garage door | $3,500 |
| Apr 5, 2013 | Completed final sign-off Jun 2015 | 471 Hoffman Av | improve (e) lower level, addition to rear of house, add (n) upper story with 15 foot setback from front property line. rear addition on lower 2 levels includes a 12 foot pop out into yard. remodel kitchen, add 2 1/2 bathrooms.Details
improve (e) lower level, addition to rear of house, add (n) upper story with 15 foot setback from front property line. rear addition on lower 2 levels includes a 12 foot pop out into yard. remodel kitchen, add 2 1/2 bathrooms. | $321,000 |
| Jan 15, 2013 | Completed final sign-off Jul 2013 | 33 Fountain St | revision to pa# 2012-0529-1410-infill at basement (rear) under (e) 1st floor inlcuding 1 new bedroom, 1 full bathroom & laundry room. repair (e) rear exterior stair for dry rotDetails
revision to pa# 2012-0529-1410-infill at basement (rear) under (e) 1st floor inlcuding 1 new bedroom, 1 full bathroom & laundry room. repair (e) rear exterior stair for dry rot | $7,500 |
| May 29, 2012 | Completed final sign-off Jul 2013 | 33 Fountain St | re:nov 201209761. foundation replacement and interior remodel of each floor and seismic up grade.Details
re:nov 201209761. foundation replacement and interior remodel of each floor and seismic up grade. | $40,000 |
| Mar 28, 2012 | Completed final sign-off Mar 2013 | 1436 Sanchez St | filed revision to app#201011094574. enlarge garage, add one wall on basement floor. no change to elevationsDetails
filed revision to app#201011094574. enlarge garage, add one wall on basement floor. no change to elevations | |
| Jan 12, 2012 | Completed final sign-off Dec 2012 | 27 Duncan St | revision to permit 2012-01-05-1754. repair and replace existing garage foundation and slab on gradeDetails
revision to permit 2012-01-05-1754. repair and replace existing garage foundation and slab on grade | $25,000 |
| Jan 5, 2012 | Completed final sign-off Dec 2012 | 27 Duncan St | install new wood beam to allow for demo of extg wood posts in garage.Details
install new wood beam to allow for demo of extg wood posts in garage. | $8,500 |
| Aug 8, 2011 | Completed final sign-off Sep 2012 | 1427 Shrader St | revision to pa# 2008.08.06.8583. struc detail revisions and 2nd fl revisions shown as delta 2 , dated 8/3/11Details
revision to pa# 2008.08.06.8583. struc detail revisions and 2nd fl revisions shown as delta 2 , dated 8/3/11 | |
| Nov 9, 2010 | Completed final sign-off Feb 2012 | 1395 Clayton St | to complete work and obtain final inspection for work approved under pa#200208053129Details
to complete work and obtain final inspection for work approved under pa#200208053129 | $250,000 |
| Nov 9, 2010 | Completed final sign-off Feb 2012 | 1397 Clayton St | to complete work and obtain final inspection for work approved under pa#200208053133Details
to complete work and obtain final inspection for work approved under pa#200208053133 | $250,000 |
| Sep 28, 2010 | Completed final sign-off Sep 2010 | 689 Douglass St | increase cost of work from bldg permit #200912223719. cost of project= $30,000 as per request of bldg inspector.Details
increase cost of work from bldg permit #200912223719. cost of project= $30,000 as per request of bldg inspector. | $15,000 |
| Jul 28, 2010 | Completed final sign-off Feb 2012 | 1397 Clayton St | revision to pa# 2002.08.05.3133. revise foundation design to substitute shear caisson for shear key at bottom of foundation to take sliding (house b)Details
revision to pa# 2002.08.05.3133. revise foundation design to substitute shear caisson for shear key at bottom of foundation to take sliding (house b) | $1,000 |
| Jul 28, 2010 | Completed final sign-off Feb 2012 | 1395 Clayton St | revise foundation design to substitute shear caisson for shear key at bottom of foundation to take sliding house a. revision to pa# 2002.08.05.3129Details
revise foundation design to substitute shear caisson for shear key at bottom of foundation to take sliding house a. revision to pa# 2002.08.05.3129 | $1,000 |
| Dec 22, 2009 | Completed final sign-off Sep 2010 | 689 Douglass St | remove (e) beam & post, replace with flush beam, remodel kitchen into kitchen & dining room. plumbing, lighting for kitchen & dining roomDetails
remove (e) beam & post, replace with flush beam, remodel kitchen into kitchen & dining room. plumbing, lighting for kitchen & dining room | $15,000 |
| Sep 16, 2009 | Never finaled issued Sep 2009, no final | 2646 California St | shoring plans for work at 2614 california st undsr pa# 2009.07.06.2017Details
shoring plans for work at 2614 california st undsr pa# 2009.07.06.2017 | $3,000 |
| Mar 2, 2009 | Expired or cancelled expired Oct 2013 | 4278 25th St | revision to permit #2008/1124/7229 to show existing walls for 1/2 bath remodel.Details
revision to permit #2008/1124/7229 to show existing walls for 1/2 bath remodel. | $1,500 |
| Nov 24, 2008 | Expired or cancelled expired Sep 2013 | 4278 25th St | remodel existing bathroom at garage level. retile, repaint. install new sheetrock. install new electrical fixtures. install new plumbing fixtures. sheetrock garage area.Details
remodel existing bathroom at garage level. retile, repaint. install new sheetrock. install new electrical fixtures. install new plumbing fixtures. sheetrock garage area. | $12,500 |
| Jun 26, 2008 | Completed final sign-off Mar 2013 | 1730 Sanchez St | raise roof at (e) attic, add dormers. rear yard addition. modify facade. new kitchen, 1/2 bath and family at 2nd level. new habitable space at garage level. new bathrooms at attic level. seismic upgrade, rear roof deckDetails
raise roof at (e) attic, add dormers. rear yard addition. modify facade. new kitchen, 1/2 bath and family at 2nd level. new habitable space at garage level. new bathrooms at attic level. seismic upgrade, rear roof deck | $270,000 |
| Dec 3, 2007 | Completed final sign-off Apr 2008 | 21 Homestead St | install 2 vents in garage door. adjust interior stairs to code. comply with condo report# 3r-5047.Details
install 2 vents in garage door. adjust interior stairs to code. comply with condo report# 3r-5047. | $600 |
| Oct 17, 2007 | Completed final sign-off Aug 2010 | 42 Lundys Ln | renovation of existing rear addition of house including infill addition creating new bedroom. development of sub-basement to comply with nov #199708900. add a lower floor, no additional height.Details
renovation of existing rear addition of house including infill addition creating new bedroom. development of sub-basement to comply with nov #199708900. add a lower floor, no additional height. | $24,000 |
| Apr 25, 2007 | Completed final sign-off Jun 2008 | 3344 Market St | to move locations of p17, p13, p10, p5 on west side (right) side of property-line. structural revisions as indicated on plan. reference to appl#200603297845.Details
to move locations of p17, p13, p10, p5 on west side (right) side of property-line. structural revisions as indicated on plan. reference to appl#200603297845. | $2,500 |
| Oct 12, 2005 | Completed final sign-off Mar 2006 | 21 Homestead St | rev. to (e) pa#2005/02/24/6138 - 1st floor: switch door and window at rearDetails
rev. to (e) pa#2005/02/24/6138 - 1st floor: switch door and window at rear | $1,000 |
| Oct 5, 2005 | Completed final sign-off Apr 2006 | 274 Andover St | install new kitchen cabinets, lighting.Details
install new kitchen cabinets, lighting. | $8,000 |
| Oct 5, 2005 | Never finaled issued Oct 2005, no final | 564 Clipper St | retile 2 bathrooms,no plumbing work or electrical work,no lighting work.remove/replace some 2x6 decking boards on back deck dry rot.Details
retile 2 bathrooms,no plumbing work or electrical work,no lighting work.remove/replace some 2x6 decking boards on back deck dry rot. | $5,000 |
| Feb 24, 2005 | Completed final sign-off Mar 2006 | 21 Homestead St | kitchens and bathrm remodel new finished attic new parking lift facade remodel (n) dormers clad woodDetails
kitchens and bathrm remodel new finished attic new parking lift facade remodel (n) dormers clad wood | $150,000 |
| Jul 2, 2004 | Completed final sign-off Aug 2004 | 106 Clipper St | retile existing bathroom, replace existing fixtures, repaint bathroomDetails
retile existing bathroom, replace existing fixtures, repaint bathroom | $1,500 |
| Dec 6, 2001 | Completed final sign-off Dec 2001 | 105 Forest Side Av | revision to 200105249959:for final inspection and plans showing laundry, skylight and lay out of batDetails
revision to 200105249959:for final inspection and plans showing laundry, skylight and lay out of bat | |
| May 24, 2001 | Completed final sign-off Dec 2001 | 105 Forest Side Av | remodel master bathroom & guest re-tile sheetrock new plumbinhg & electrical install new closet systDetails
remodel master bathroom & guest re-tile sheetrock new plumbinhg & electrical install new closet syst | $20,000 |
| Jun 30, 2000 | Completed final sign-off May 2002 | 516 29th St | demolish a one story single family dwellingDetails
demolish a one story single family dwelling | |
| Jun 30, 2000 | Completed final sign-off Mar 2003 | 516 29th St | erect a four story two unit residential bldgDetails
erect a four story two unit residential bldg | $250,000 |