Permit GraphShortlistSan Francisco building permits since 2000

Mei-Mei Chan

License
C29350
Look the license up with the state
Listed as
architect, authorized agent-others, engineer
Firm
Mei Architects
Based in
San Francisco
On San Francisco permits
Apr 2004 to Sep 2026

61 permits since 2000 (architect on 57 permits, engineer on 3 permits, authorized agent-others on 1 permit): 27 completed, 10 in progress, 17 never finaled, 7 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 1, 2026In progress
issued Sep 2026
1970 Ocean AvSjk Developmentinterior buildout of (e) east and west building. all demo work completed under pa# 202601239927.
Details
Permit
202609017532
Status
issued
Filed
Sep 1, 2026
Permit issued
Sep 22, 2026
Declared cost
$280,000
Address
1970 Ocean Av

interior buildout of (e) east and west building. all demo work completed under pa# 202601239927.

Open the permit page

$280,000
Jul 7, 2026In progress
issued Jul 2026
1970 Ocean AvSjk Developmentdemo & brace hallow claytiles and walls. expand bathroom doors.
Details
Permit
202607074647
Status
issued
Filed
Jul 7, 2026
Permit issued
Jul 21, 2026
Declared cost
$20,000
Address
1970 Ocean Av

demo & brace hallow claytiles and walls. expand bathroom doors.

Open the permit page

$20,000
May 19, 2026In progress
issued Jul 2026
1 Warriors WyIdeal Sign Companyadd interior awning with logo signage to (e) bar @ level 200. all interior work. no work visible from exterior.
Details
Permit
202605191532
Status
issued
Filed
May 19, 2026
Permit issued
Jul 31, 2026
Declared cost
$4,000
Address
1 Warriors Wy

add interior awning with logo signage to (e) bar @ level 200. all interior work. no work visible from exterior.

Open the permit page

$4,000
Apr 23, 2026In progress
issued Apr 2026
1970 Ocean AvSjk Developmentdemo of interior improvement of east & west annexes. removal of non-structural interior walls, door, finishes
Details
Permit
202604239927
Status
issued
Filed
Apr 23, 2026
Permit issued
Apr 23, 2026
Declared cost
$30,000
Address
1970 Ocean Av

demo of interior improvement of east & west annexes. removal of non-structural interior walls, door, finishes

Open the permit page

$30,000
Mar 31, 2026In progress
issued Jul 2026
750 Kearny Stremoval of kearny street pedestrian bridge that connects sf rec and park property to hilton hotel.
Details
Permit
202603318621
Status
issued
Filed
Mar 31, 2026
Permit issued
Jul 17, 2026
Declared cost
$950,000
Address
750 Kearny St

removal of kearny street pedestrian bridge that connects sf rec and park property to hilton hotel.

Open the permit page

$950,000
Mar 12, 2026In progress
issued Mar 2026
1970 Ocean AvSjk Developmentexpand bathrooms on main level. 2 new drinking fountains.
Details
Permit
202603127471
Status
issued
Filed
Mar 12, 2026
Permit issued
Mar 19, 2026
Declared cost
$30,000
Address
1970 Ocean Av

expand bathrooms on main level. 2 new drinking fountains.

Open the permit page

$30,000
Jul 29, 2024Completed
final sign-off Dec 2024
1 Warriors WyDpr Construction Aste 102: revision to 202403208274 change in storefront design @ level 2 & 3 south tower. removal of structure scope of additional structural support for new storefront construction. removal of speccial inspection in association w/ removal of structure scope
Details
Permit
202407297493
Status
complete
Filed
Jul 29, 2024
Permit issued
Nov 21, 2024
Final sign-off
Dec 17, 2024
Address
1 Warriors Wy

ste 102: revision to 202403208274 change in storefront design @ level 2 & 3 south tower. removal of structure scope of additional structural support for new storefront construction. removal of speccial inspection in association w/ removal of structure scope

Open the permit page

May 14, 2024In progress
issued Aug 2024
1515 Vallejo StJ M Construction Llcinterior office renovation includes removal of existing finishes; selected non-structural walls, electrical and plumbing; renovation to provide new floor; wall and ceiling finishes; new non-structural partitions and lighting fixtures. renovation include restroom and pantry no exterior work
Details
Permit
202405142085
Status
issued
Filed
May 14, 2024
Permit issued
Aug 26, 2024
Declared cost
$220,000
Address
1515 Vallejo St

interior office renovation includes removal of existing finishes; selected non-structural walls, electrical and plumbing; renovation to provide new floor; wall and ceiling finishes; new non-structural partitions and lighting fixtures. renovation include restroom and pantry no exterior work

Open the permit page

$220,000
Mar 25, 2024In progress
issued Apr 2024
1000 Market StD & H Constructionrevision 201912270786 and 202208019636 to include change of occupancy from office space (b) to storage space (s-2) for sro hotel
Details
Permit
202403258536
Status
issued
Filed
Mar 25, 2024
Permit issued
Apr 9, 2024
Address
1000 Market St

revision 201912270786 and 202208019636 to include change of occupancy from office space (b) to storage space (s-2) for sro hotel

Open the permit page

Mar 20, 2024Completed
final sign-off Dec 2024
1 Warriors WyDpr Construction Asouth tower level 2&3 space 11: demo of (e) storefront system and construction of (n) storefront system and supports on level 2 and 3. oc11
Details
Permit
202403208274
Status
complete
Filed
Mar 20, 2024
Permit issued
Jun 14, 2024
Final sign-off
Dec 17, 2024
Declared cost
$200,000
Address
1 Warriors Wy

south tower level 2&3 space 11: demo of (e) storefront system and construction of (n) storefront system and supports on level 2 and 3. oc11

Open the permit page

$200,000
Jan 29, 2024Completed
final sign-off Oct 2024
1 Warriors WyDpr Construction Asouth tower level 2 and 3, space 11: work includes concrete topping slab at level 2, infill slab opening and new concrete slab on level 3, new steel stair frame, and improvements as shown on plans.
Details
Permit
202401294827
Status
complete
Filed
Jan 29, 2024
Permit issued
May 22, 2024
Final sign-off
Oct 31, 2024
Declared cost
$525,000
Address
1 Warriors Wy

south tower level 2 and 3, space 11: work includes concrete topping slab at level 2, infill slab opening and new concrete slab on level 3, new steel stair frame, and improvements as shown on plans.

Open the permit page

$525,000
Nov 29, 2023In progress
issued Mar 2024
1000 Market StD & H Constructionrevision to pa# 201912270786: add push button accuator per da-05 due to conditions in public right-of-way grading.
Details
Permit
202311291589
Status
issued
Filed
Nov 29, 2023
Permit issued
Mar 15, 2024
Declared cost
$7,000
Address
1000 Market St

revision to pa# 201912270786: add push button accuator per da-05 due to conditions in public right-of-way grading.

Open the permit page

$7,000
Jul 27, 2023Completed
final sign-off Aug 2025
201 Van Ness AvW E Lyons Construction Corevision to bpa#201803274726 & 202210204766, additional drawings for elevator #1 & #2 modernization
Details
Permit
202307273091
Status
complete
Filed
Jul 27, 2023
Permit issued
May 13, 2024
Final sign-off
Aug 25, 2025
Declared cost
$70,000
Address
201 Van Ness Av

revision to bpa#201803274726 & 202210204766, additional drawings for elevator #1 & #2 modernization

Open the permit page

$70,000
Jun 26, 2023Completed
final sign-off Sep 2026
1 Warriors WyDpr Construction At.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location.
Details
Permit
202306260826
Status
complete
Filed
Jun 26, 2023
Permit issued
Aug 30, 2023
Final sign-off
Sep 17, 2026
Declared cost
$420,000
Address
1 Warriors Wy

t.i. furnishing all equipment, materias and labor necessary for the construction and renovation of a laundry facility in room ed.02.19 and ed.02.20 on level 000 of the arena. remove and reinstall in same location.

Open the permit page

$420,000
Apr 11, 2023Never finaled
issued Aug 2023, no final
300 16th StHasz Construction Increvision to 201908138652 and 201910164647. changes to tenant space 23. includes kitchen, indoor and patio seating area, patio bar, restroom and other support spaces. mep. project includes roof equipment and roof screen
Details
Permit
202304115453
Status
issued
Filed
Apr 11, 2023
Permit issued
Aug 28, 2023
Address
300 16th St

revision to 201908138652 and 201910164647. changes to tenant space 23. includes kitchen, indoor and patio seating area, patio bar, restroom and other support spaces. mep. project includes roof equipment and roof screen

Open the permit page

Mar 29, 2023Never finaled
issued Aug 2023, no final
1000 Market StD & H Constructionremove and replace with new store front windows on the 1st fl.
Details
Permit
202303294600
Status
issued
Filed
Mar 29, 2023
Permit issued
Aug 17, 2023
Declared cost
$50,000
Address
1000 Market St

remove and replace with new store front windows on the 1st fl.

Open the permit page

$50,000
Aug 1, 2022Never finaled
issued May 2023, no final
1000 Market StD & H Constructionrevision to 201912270786. scope basement level: addition of rooms and reconfig spaces. 1st lvl: new built in bench, reconfiguration of spaces, demo of e restaurant. misc details added for repair of existing ratings, water proofing at shower pans.
Details
Permit
202208019636
Status
issued
Filed
Aug 1, 2022
Permit issued
May 30, 2023
Declared cost
$100,000
Address
1000 Market St

revision to 201912270786. scope basement level: addition of rooms and reconfig spaces. 1st lvl: new built in bench, reconfiguration of spaces, demo of e restaurant. misc details added for repair of existing ratings, water proofing at shower pans.

Open the permit page

$100,000
Jul 27, 2022Completed
final sign-off Jan 2023
1 Warriors WyDpr Construction Arenovate (e) dock command ed 71.01 to first aid rm. add office space in (e) commissary room ec.75.01.
Details
Permit
202207279376
Status
complete
Filed
Jul 27, 2022
Permit issued
Sep 8, 2022
Final sign-off
Jan 17, 2023
Declared cost
$350,000
Address
1 Warriors Wy

renovate (e) dock command ed 71.01 to first aid rm. add office space in (e) commissary room ec.75.01.

Open the permit page

$350,000
Apr 26, 2022In progress
issued Jun 2026
733 Kearny StSwinerton Builderspriority processing ab-004. demolition of existing facilities exposing existing garage roof structure. installation of new waterproofing over existing garage roof structure. construction of new clubhouse and landscape/playground elements. miscellaneous offsite sidewalk and crosswalk improvements.
Details
Permit
202204263027
Status
issued
Filed
Apr 26, 2022
Permit issued
Jun 23, 2026
Declared cost
$43,000,000
Address
733 Kearny St

priority processing ab-004. demolition of existing facilities exposing existing garage roof structure. installation of new waterproofing over existing garage roof structure. construction of new clubhouse and landscape/playground elements. miscellaneous offsite sidewalk and crosswalk improvements.

Open the permit page

$43,000,000
Apr 1, 2022Never finaled
issued Sep 2022, no final
220 Geary Stunion square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reserv
Details
Permit
202204011386
Status
issued
Filed
Apr 1, 2022
Permit issued
Sep 30, 2022
Declared cost
$1,000,000
Address
220 Geary St

union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reserv

Open the permit page

$1,000,000
Feb 16, 2022Completed
final sign-off May 2023
1 Warriors Wyconfirm (e) requirement at the south, east and west services corridors on level 000 of the chase center. existing tape boundary for temp sotrage shall be adjusted accordingly.
Details
Permit
202202168133
Status
complete
Filed
Feb 16, 2022
Permit issued
Apr 22, 2022
Final sign-off
May 17, 2023
Address
1 Warriors Wy

confirm (e) requirement at the south, east and west services corridors on level 000 of the chase center. existing tape boundary for temp sotrage shall be adjusted accordingly.

Open the permit page

Feb 8, 2022Completed
final sign-off Sep 2024
1000 Market StD & H Constructionbasement: demolition of existing switchboard. provide new switchboard for electrical service. provide new splice box for intercept of existing panelboards.
Details
Permit
202202087594
Status
complete
Filed
Feb 8, 2022
Permit issued
Sep 25, 2023
Final sign-off
Sep 4, 2024
Declared cost
$75,000
Address
1000 Market St

basement: demolition of existing switchboard. provide new switchboard for electrical service. provide new splice box for intercept of existing panelboards.

Open the permit page

$75,000
May 28, 2021Never finaled
issued Oct 2021, no final
1 Warriors WyPan-Pacific Mechanical Llcchange existing main janitorial storage ea.61.01 and existing storage ea.09.04 to janitor offices. change existing site storage ek.01.01 to court storage and install service rolling door at existing cmu wall. fire alarm and sprinkler (if applic) under sep permits.
Details
Permit
202105281296
Status
issued
Filed
May 28, 2021
Permit issued
Oct 8, 2021
Declared cost
$100,000
Address
1 Warriors Wy

change existing main janitorial storage ea.61.01 and existing storage ea.09.04 to janitor offices. change existing site storage ek.01.01 to court storage and install service rolling door at existing cmu wall. fire alarm and sprinkler (if applic) under sep permits.

Open the permit page

$100,000
Apr 20, 2021Expired or cancelled
cancelled Feb 2025
99 Castenada AvK A Lau Constructionadd 2nd story, expand (e) partial basement, rebuild the rear retaining wall, and landscape front & rear yards. the new residence will include living room, fam room, dining room, three bedrooms, three full bathrooms, powder room, laundry room and storage spaces. full permit.
Details
Permit
202104208880
Status
cancelled
Filed
Apr 20, 2021
Declared cost
$650,000
Address
99 Castenada Av

add 2nd story, expand (e) partial basement, rebuild the rear retaining wall, and landscape front & rear yards. the new residence will include living room, fam room, dining room, three bedrooms, three full bathrooms, powder room, laundry room and storage spaces. full permit.

Open the permit page

$650,000
Mar 1, 2021Completed
final sign-off Nov 2021
54 Rockaway Av1st fl: remodel (e) master bathroom and closet, 2nd fl: remodel (e) dining area, kitchen, and bathroom, install new closet in (e) bedroom at (e) exterior east elevation, remove (e) exterior windows on 2nd fl. and replace with new windows for new layout( windows not visible from the street) n/a maher
Details
Permit
202103015560
Status
complete
Filed
Mar 1, 2021
Permit issued
Apr 21, 2021
Final sign-off
Nov 4, 2021
Declared cost
$100,000
Address
54 Rockaway Av

1st fl: remodel (e) master bathroom and closet, 2nd fl: remodel (e) dining area, kitchen, and bathroom, install new closet in (e) bedroom at (e) exterior east elevation, remove (e) exterior windows on 2nd fl. and replace with new windows for new layout( windows not visible from the street) n/a maher

Open the permit page

$100,000
Jan 4, 2021Expired or cancelled
cancelled Jan 2026
949 Grant Avchange of use from commercial to institutional. addition of partial height screen wall at 2nd floor and addition of sliding gate at top of basement stairs (ground level).
Details
Permit
202101042025
Status
cancelled
Filed
Jan 4, 2021
Declared cost
$5,000
Address
949 Grant Av

change of use from commercial to institutional. addition of partial height screen wall at 2nd floor and addition of sliding gate at top of basement stairs (ground level).

Open the permit page

$5,000
Dec 17, 2020Completed
final sign-off Sep 2022
1 Warriors WyDpr Constructionti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200
Details
Permit
202012171212
Status
complete
Filed
Dec 17, 2020
Permit issued
Jul 2, 2021
Final sign-off
Sep 9, 2022
Declared cost
$320,000
Address
1 Warriors Wy

ti work for community service center includes open work space, conference room, restrooms & other support spaces. work is located in tenant space 20 & 21 on level 200

Open the permit page

$320,000
Nov 23, 2020Never finaled
issued Jan 2021, no final
1 Warriors WyRudolph Commercial Interiors Inc, Rcireplace (e) door 254 a.4 with new door
Details
Permit
202011239548
Status
issued
Filed
Nov 23, 2020
Permit issued
Jan 21, 2021
Declared cost
$5,000
Address
1 Warriors Wy

replace (e) door 254 a.4 with new door

Open the permit page

$5,000
Oct 19, 2020Never finaled
issued May 2021, no final
1 Warriors WyShawmut Woodworking & Supply Increplace (e) ceiling of (e) corridor ea. 02.27 w/ (n) metal panel ceiling. replace (e) doors 139a and 160a w/ (n) doors. provide (n) lighting fixtures for the (n) ceiling layout. reroute (e) mechanical and fire sprinkler system in (e) corridor ea.02.27 to match (n) ceiling layout.
Details
Permit
202010196892
Status
issued
Filed
Oct 19, 2020
Permit issued
May 5, 2021
Declared cost
$190,000
Address
1 Warriors Wy

replace (e) ceiling of (e) corridor ea. 02.27 w/ (n) metal panel ceiling. replace (e) doors 139a and 160a w/ (n) doors. provide (n) lighting fixtures for the (n) ceiling layout. reroute (e) mechanical and fire sprinkler system in (e) corridor ea.02.27 to match (n) ceiling layout.

Open the permit page

$190,000
Oct 2, 2020Completed
final sign-off Aug 2021
1 Warriors WyShawmut Woodworking & Supply Incremodel of (e) roadie kitchen and (e) east kitchen
Details
Permit
202010025776
Status
complete
Filed
Oct 2, 2020
Permit issued
Jan 5, 2021
Final sign-off
Aug 18, 2021
Declared cost
$450,000
Address
1 Warriors Wy

remodel of (e) roadie kitchen and (e) east kitchen

Open the permit page

$450,000
Jul 6, 2020Completed
final sign-off Feb 2021
300 16th Stdemolition of existing float tank, existing cyro trreatment room, and existing storage, and remodel into new recovery room.
Details
Permit
202007069606
Status
complete
Filed
Jul 6, 2020
Permit issued
Aug 27, 2020
Final sign-off
Feb 19, 2021
Declared cost
$320,076
Address
300 16th St

demolition of existing float tank, existing cyro trreatment room, and existing storage, and remodel into new recovery room.

Open the permit page

$320,076
Apr 20, 2020Completed
final sign-off Jun 2021
2241 Jerrold AvS J Amoroso Constructioninstallation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129.
Details
Permit
202004207236
Status
complete
Filed
Apr 20, 2020
Permit issued
Sep 18, 2020
Final sign-off
Jun 10, 2021
Declared cost
$2,977,000
Address
2241 Jerrold Av

installation of propose 6" underground fire water. tie in of 6" fw in jerrold street water main. tie in to fire sprinkler system. sprinkler service in building was inspected and approved by dbi under app#2019-11-25-8129.

Open the permit page

$2,977,000
Mar 11, 2020Expired or cancelled
cancelled Jan 2026
617 Mission Strevision to pa #201912230401. 2nd fl alteration of all-gender restroom (adding urinal)
Details
Permit
202003116734
Status
cancelled
Filed
Mar 11, 2020
Address
617 Mission St

revision to pa #201912230401. 2nd fl alteration of all-gender restroom (adding urinal)

Open the permit page

Jan 24, 2020Never finaled
issued Feb 2020, no final
300 16th StDome Construction Corpto construct (n) ocncrete slab infill at (e) slab opening at 3rd level. and to change (e) assembly a-2 occupancy to (n) b- occupancy. maher na
Details
Permit
202001242700
Status
issued
Filed
Jan 24, 2020
Permit issued
Feb 20, 2020
Declared cost
$190,000
Address
300 16th St

to construct (n) ocncrete slab infill at (e) slab opening at 3rd level. and to change (e) assembly a-2 occupancy to (n) b- occupancy. maher na

Open the permit page

$190,000
Jan 13, 2020Never finaled
issued Feb 2020, no final
300 16th StShawmut Woodworking & Supply Incto install new egress door with security card key access control system and to install transfer grille to balance the pressurization of egress passageway.
Details
Permit
202001131745
Status
issued
Filed
Jan 13, 2020
Permit issued
Feb 3, 2020
Declared cost
$50,000
Address
300 16th St

to install new egress door with security card key access control system and to install transfer grille to balance the pressurization of egress passageway.

Open the permit page

$50,000
Dec 27, 2019Completed
final sign-off Jul 2024
1010 Market StD & H Constructionexterior: renovate entrance. repair windows. interior: upgrade entrance and common area. on residential floors remodel (e) units, bathrooms & replae entry doors; provide code required mobility & communication rooms. mep included. life-safety under a seperate permit.
Details
Permit
201912270786
Status
complete
Filed
Dec 27, 2019
Permit issued
Jun 21, 2022
Final sign-off
Jul 11, 2024
Declared cost
$10,700,000
Address
1010 Market St

exterior: renovate entrance. repair windows. interior: upgrade entrance and common area. on residential floors remodel (e) units, bathrooms & replae entry doors; provide code required mobility & communication rooms. mep included. life-safety under a seperate permit.

Open the permit page

$10,700,000
Sep 25, 2019Expired or cancelled
expired Mar 2025
300 16th StShawmut Woodworking & Supply Inctenant improvent space 14 tenant furniture layout. hootopia ref pa #201904087340. retail amusement center with gift shop and game experiences and exhibitions. ti work will include set partitions, equip , fixtures, furniture
Details
Permit
201909252720
Status
expired
Filed
Sep 25, 2019
Permit issued
Oct 3, 2019
Declared cost
$55,000
Address
300 16th St

tenant improvent space 14 tenant furniture layout. hootopia ref pa #201904087340. retail amusement center with gift shop and game experiences and exhibitions. ti work will include set partitions, equip , fixtures, furniture

Open the permit page

$55,000
Sep 23, 2019Never finaled
filed Sep 2019, never issued
750 Phelps Stpriority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops building
Details
Permit
201909232334
Status
filed
Filed
Sep 23, 2019
Declared cost
$14,000,000
Address
750 Phelps St

priority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops building

Open the permit page

$14,000,000
Sep 23, 2019Never finaled
filed Sep 2019, never issued
750 Phelps Stpriority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops building
Details
Permit
201909232325
Status
filed
Filed
Sep 23, 2019
Declared cost
$25,000,000
Address
750 Phelps St

priority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops building

Open the permit page

$25,000,000
May 1, 2019Completed
final sign-off Jun 2019
1010 Market StTroyer's Door Control Increvision to pa 2017-1018-1538 automatic door power opener in lieu of level landing at door per no da-04 sfdbi
Details
Permit
201905019382
Status
complete
Filed
May 1, 2019
Permit issued
May 14, 2019
Final sign-off
Jun 19, 2019
Declared cost
$5,000
Address
1010 Market St

revision to pa 2017-1018-1538 automatic door power opener in lieu of level landing at door per no da-04 sfdbi

Open the permit page

$5,000
Apr 15, 2019Completed
final sign-off Nov 2022
3850 17th Stpartial interior renovations. exterior building seismic upgrade & landscape improvement.
Details
Permit
201904158002
Status
complete
Filed
Apr 15, 2019
Permit issued
May 28, 2020
Final sign-off
Nov 7, 2022
Declared cost
$5,000,000
Address
3850 17th St

partial interior renovations. exterior building seismic upgrade & landscape improvement.

Open the permit page

$5,000,000
Apr 8, 2019Never finaled
issued Sep 2019, no final
300 16th StShawmut Woodworking & Supply Incbuilding new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement)
Details
Permit
201904087340
Status
issued
Filed
Apr 8, 2019
Permit issued
Sep 17, 2019
Declared cost
$3,150,000
Address
300 16th St

building new electrical closets, janitor closets, 2 all-gender restrooms and 4 food prep areas. each space will be installed w/ plumbing fixtures, electrical equipment, electrical outlets, lighting fixtures, mechanical equipment and registers. (1st time tenant improvement)

Open the permit page

$3,150,000
May 15, 2018Completed
final sign-off Jul 2019
125 Bay Shore BlClw Builders Incchange extg warehouse into homeless shelter with laundry room. addition of modular trailers for toilet & bathing. new deck. minor site work for security & accessebility. minor renovation to first floor of extg office bldg. n/a for maher
Details
Permit
201805159091
Status
complete
Filed
May 15, 2018
Permit issued
May 31, 2018
Final sign-off
Jul 8, 2019
Declared cost
$2,000,000
Address
125 Bay Shore Bl

change extg warehouse into homeless shelter with laundry room. addition of modular trailers for toilet & bathing. new deck. minor site work for security & accessebility. minor renovation to first floor of extg office bldg. n/a for maher

Open the permit page

$2,000,000
Oct 18, 2017Completed
final sign-off Jun 2019
1010 Market StW. Wong Construction Co. Inc.change of use from retail to office, g/f- interior t.i. to convert retail space into public facility business office at ground floor. work includes non-structural work, new non-load bearing partitions, doors, windows, floor and wall finishes and ceiling repairs.
Details
Permit
201710181538
Status
complete
Filed
Oct 18, 2017
Permit issued
Nov 2, 2017
Final sign-off
Jun 19, 2019
Declared cost
$27,000
Address
1010 Market St

change of use from retail to office, g/f- interior t.i. to convert retail space into public facility business office at ground floor. work includes non-structural work, new non-load bearing partitions, doors, windows, floor and wall finishes and ceiling repairs.

Open the permit page

$27,000
Aug 29, 2017Completed
final sign-off Dec 2017
5160 Geary BlJ & J South West Construction Incti to existing building; all work are restricted to 1st floor interior office area. re-finish and update current interior paint, carpet & casework
Details
Permit
201708296275
Status
complete
Filed
Aug 29, 2017
Permit issued
Nov 17, 2017
Final sign-off
Dec 18, 2017
Declared cost
$108,000
Address
5160 Geary Bl

ti to existing building; all work are restricted to 1st floor interior office area. re-finish and update current interior paint, carpet & casework

Open the permit page

$108,000
Nov 16, 2016Never finaled
issued Nov 2016, no final
237 09th StJ M Lighting Design Increvised electrical scope for pa 2016-0629-1147, to include it wiring and outlet relocation
Details
Permit
201611162842
Status
issued
Filed
Nov 16, 2016
Permit issued
Nov 16, 2016
Declared cost
$12,000
Address
237 09th St

revised electrical scope for pa 2016-0629-1147, to include it wiring and outlet relocation

Open the permit page

$12,000
Nov 10, 2016Never finaled
issued Nov 2016, no final
235 09th Stto obtain final inspection for renewal under pa #200801112359, #200807116511, #200808199546. all work is complete.
Details
Permit
201611102491
Status
issued
Filed
Nov 10, 2016
Permit issued
Nov 10, 2016
Address
235 09th St

to obtain final inspection for renewal under pa #200801112359, #200807116511, #200808199546. all work is complete.

Open the permit page

Jun 29, 2016Never finaled
issued Jul 2016, no final
237 09th St2nd floor inteior alterations, non-structural, tenant improvements, lighting. n/a maher ordinance
Details
Permit
201606291147
Status
issued
Filed
Jun 29, 2016
Permit issued
Jul 7, 2016
Declared cost
$197,000
Address
237 09th St

2nd floor inteior alterations, non-structural, tenant improvements, lighting. n/a maher ordinance

Open the permit page

$197,000
Apr 1, 2015Completed
final sign-off Feb 2018
990 Pacific Avmohcd rad program. seismic upgrade, replace windows, systems and finish upgrades 5% accessible upgrades, 1% hvi units. general scope of work. defered submittals: automatic fire sprinkler system, standpipe, fire alarm system, ext. building maintenance.
Details
Permit
201504012567
Status
complete
Filed
Apr 1, 2015
Permit issued
Dec 1, 2015
Final sign-off
Feb 1, 2018
Declared cost
$27,676,322
Address
990 Pacific Av

mohcd rad program. seismic upgrade, replace windows, systems and finish upgrades 5% accessible upgrades, 1% hvi units. general scope of work. defered submittals: automatic fire sprinkler system, standpipe, fire alarm system, ext. building maintenance.

Open the permit page

$27,676,322
Oct 28, 2014Never finaled
issued Jun 2015, no final
835 Jackson StDpr Constructionref pa #201303111902. installation of diesel fuel oil system for the hospital's emergency generators sytem consists of (2) 5,000 gallon underground fuel oil tanks, fuel oil pumps, leak detection system, (2) 660 roof top sub-base day tanks, valves, piping & related appurtenances. maher-n/a.
Details
Permit
201410280071
Status
issued
Filed
Oct 28, 2014
Permit issued
Jun 17, 2015
Declared cost
$800,000
Address
835 Jackson St

ref pa #201303111902. installation of diesel fuel oil system for the hospital's emergency generators sytem consists of (2) 5,000 gallon underground fuel oil tanks, fuel oil pumps, leak detection system, (2) 660 roof top sub-base day tanks, valves, piping & related appurtenances. maher-n/a.

Open the permit page

$800,000
Feb 21, 2014Completed
final sign-off Jun 2014
821 Jackson StBel Builders Inc#2- 2/f interior non-structural alterations of an existing apartment dwelling unit. alterations include demo of all interior partitions, enlarging bathroom for improved accessibility, new layout of kitchen, living and bedrooms, new lighting and elec outlets.
Details
Permit
201402219011
Status
complete
Filed
Feb 21, 2014
Permit issued
Feb 21, 2014
Final sign-off
Jun 11, 2014
Declared cost
$40,000
Address
821 Jackson St

#2- 2/f interior non-structural alterations of an existing apartment dwelling unit. alterations include demo of all interior partitions, enlarging bathroom for improved accessibility, new layout of kitchen, living and bedrooms, new lighting and elec outlets.

Open the permit page

$40,000
Jan 17, 2014Expired or cancelled
cancelled Jul 2015
1524 Powell StBel Builders Incnew t-bar ceiling in ground floor, 4 bathroom remodel, new interior staircase from ground floor to basement, interior partitions, remove fixtures in basement kitchen.
Details
Permit
201401176587
Status
cancelled
Filed
Jan 17, 2014
Declared cost
$52,000
Address
1524 Powell St

new t-bar ceiling in ground floor, 4 bathroom remodel, new interior staircase from ground floor to basement, interior partitions, remove fixtures in basement kitchen.

Open the permit page

$52,000
Nov 13, 2013Completed
final sign-off Mar 2014
2415 Noriega StArthulia Increplace front door & store front with glass. all work in-kind
Details
Permit
201311131829
Status
complete
Filed
Nov 13, 2013
Permit issued
Nov 13, 2013
Final sign-off
Mar 20, 2014
Declared cost
$5,000
Address
2415 Noriega St

replace front door & store front with glass. all work in-kind

Open the permit page

$5,000
Aug 21, 2008Expired or cancelled
cancelled Feb 2014
2775 San Bruno Avvertical and horizontal extensions of the existing building. work includes raising the existing building vertically and adding a new ground level beneath. project will provide 3 condominiums (2 residential w/ 3 bdrm/2 ba, 1 commercial w/ 2 retail spaces)
Details
Permit
200808219735
Status
cancelled
Filed
Aug 21, 2008
Declared cost
$350,000
Address
2775 San Bruno Av

vertical and horizontal extensions of the existing building. work includes raising the existing building vertically and adding a new ground level beneath. project will provide 3 condominiums (2 residential w/ 3 bdrm/2 ba, 1 commercial w/ 2 retail spaces)

Open the permit page

$350,000
Jan 18, 2008Completed
final sign-off Nov 2008
2106 41st AvHa's Construction2 story horizontal addition in the rear of bldg. demolition of ex. walls and finishes, fixtures, windows and utilities and construct new walls, finishes, fixtures, doors and windows. remodel ex. bath on 2nd flr. extend and modify ex. plumbing, heating and electrical system.
Details
Permit
200801182817
Status
complete
Filed
Jan 18, 2008
Permit issued
Jun 23, 2008
Final sign-off
Nov 21, 2008
Declared cost
$80,000
Address
2106 41st Av

2 story horizontal addition in the rear of bldg. demolition of ex. walls and finishes, fixtures, windows and utilities and construct new walls, finishes, fixtures, doors and windows. remodel ex. bath on 2nd flr. extend and modify ex. plumbing, heating and electrical system.

Open the permit page

$80,000
Jul 21, 2006Expired or cancelled
cancelled Aug 2011
2919 Clement Stremoving existing fireplace, add a new penthouse to the existing 3 story building, add a front and rear deck on the penthouse floor
Details
Permit
200607217265
Status
cancelled
Filed
Jul 21, 2006
Declared cost
$70,000
Address
2919 Clement St

removing existing fireplace, add a new penthouse to the existing 3 story building, add a front and rear deck on the penthouse floor

Open the permit page

$70,000
May 5, 2006Completed
final sign-off Oct 2006
481 Princeton Stadd new bath & family room at ground level, scale back deck at 2/f to 7'. add new window in front & enlarge existing window in back..
Details
Permit
200605050808
Status
complete
Filed
May 5, 2006
Permit issued
May 5, 2006
Final sign-off
Oct 19, 2006
Declared cost
$10,000
Address
481 Princeton St

add new bath & family room at ground level, scale back deck at 2/f to 7'. add new window in front & enlarge existing window in back..

Open the permit page

$10,000
May 24, 2005Completed
final sign-off Jan 2006
1501 Funston Avadd family rm and 1/2 bath at ground fl behind garage
Details
Permit
200505243322
Status
complete
Filed
May 24, 2005
Permit issued
May 24, 2005
Final sign-off
Jan 3, 2006
Declared cost
$20,000
Address
1501 Funston Av

add family rm and 1/2 bath at ground fl behind garage

Open the permit page

$20,000
Dec 17, 2004Completed
final sign-off Dec 2006
2817 San Bruno Avhorizontal extension in the rear & side. add one residential uint with one parking space.
Details
Permit
200412171647
Status
complete
Filed
Dec 17, 2004
Permit issued
Jul 8, 2005
Final sign-off
Dec 1, 2006
Declared cost
$150,000
Address
2817 San Bruno Av

horizontal extension in the rear & side. add one residential uint with one parking space.

Open the permit page

$150,000
Jun 30, 2004Never finaled
issued Aug 2005, no final
2035 15th Avhorizontallly extend building envelopen in the rear of the building at the basement entry and **
Details
Permit
200406307735
Status
issued
Filed
Jun 30, 2004
Permit issued
Aug 5, 2005
Declared cost
$100,000
Address
2035 15th Av

horizontallly extend building envelopen in the rear of the building at the basement entry and **

Open the permit page

$100,000
Apr 20, 2004Completed
final sign-off Sep 2004
227 Lakeshore Drconvert (e)storage in garage to bath & (e)storage in back of garage to new bedroom,remove kitchennet
Details
Permit
200404201718
Status
complete
Filed
Apr 20, 2004
Permit issued
Apr 20, 2004
Final sign-off
Sep 13, 2004
Declared cost
$15,000
Address
227 Lakeshore Dr

convert (e)storage in garage to bath & (e)storage in back of garage to new bedroom,remove kitchennet

Open the permit page

$15,000