Mehdi Karimi
- Listed as
- architect, engineer
- Firm
- Stg, Inc.
- Based in
- Albany
- On San Francisco permits
- Mar 2005 to May 2023
18 permits since 2000 (engineer on 16 permits, architect on 2 permits): 10 completed, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 31, 2023 | Never finaled issued Jun 2023, no final | 3526 Anza St | Structural Integrity | revision to pa# 202209011769. changes include removing entry door by garage. removing interior wall. moving some mechanical to roof, and other minor changes.Details
revision to pa# 202209011769. changes include removing entry door by garage. removing interior wall. moving some mechanical to roof, and other minor changes. | |
| Dec 2, 2022 | Completed final sign-off Jul 2023 | 754 18th Av | A N R Development | kitchen remodel, short wall removal, replace all appliances, cabinet with electrical and plumbing work.Details
kitchen remodel, short wall removal, replace all appliances, cabinet with electrical and plumbing work. | $40,000 |
| Sep 1, 2022 | Completed final sign-off Nov 2023 | 3526 Anza St | Structural Integrity | remodel of lower floor garage into an adu.per ordinance 95-17.Details
remodel of lower floor garage into an adu.per ordinance 95-17. | $100,000 |
| Jan 6, 2021 | Never finaled issued Feb 2021, no final | 4235 Folsom St | Green Group Remodeling Inc | revision to pa# 202012030177: removing interior post. replaceing (e) beam with new composite beam.Details
revision to pa# 202012030177: removing interior post. replaceing (e) beam with new composite beam. | |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 4235 Folsom St | Green Group Remodeling Inc | kitchen remodeling. like for like. upgrade mep up to code. remove support wall by plans and buliding island. replacing bearing wall with post & beam @ kitchen / living room.Details
kitchen remodeling. like for like. upgrade mep up to code. remove support wall by plans and buliding island. replacing bearing wall with post & beam @ kitchen / living room. | $20,000 |
| Nov 24, 2020 | Completed final sign-off Mar 2026 | 1333 Waller St | Axelson Builders Inc | to comply w/ nov #202174165 legalization of work completed to ground floor. partial renovation of top (3) floors. 21 sq ft addition within (e) footprint @ kitchen. (n) deck @ 2nd fl. ground floor work to include family room, bathroom & addition of 163 sq ft.Details
to comply w/ nov #202174165 legalization of work completed to ground floor. partial renovation of top (3) floors. 21 sq ft addition within (e) footprint @ kitchen. (n) deck @ 2nd fl. ground floor work to include family room, bathroom & addition of 163 sq ft. | $250,000 |
| Dec 6, 2017 | Completed final sign-off Jan 2020 | 1245 20th Av | M J Construction | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to compny with ces nov#201717851.Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to compny with ces nov#201717851. | $60,000 |
| Nov 21, 2017 | Expired or cancelled withdrawn Dec 2017 | 1234 20th Av | M J Construction | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $60,000 |
| Aug 18, 2017 | Completed final sign-off Jul 2018 | 1234 12th Av | M J Construction | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $50,000 |
| Aug 18, 2017 | Completed final sign-off Jun 2018 | 52 Sanchez St | M J Construction | revision to soft story pa #201610200828. additonal footing & changing handy frame panel to wood frame shearwall.Details
revision to soft story pa #201610200828. additonal footing & changing handy frame panel to wood frame shearwall. | $5,000 |
| Sep 28, 2016 | Never finaled issued Oct 2016, no final | 50 Thomas More Wy | Bach Construction, Inc. | revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam.Details
revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam. | |
| Sep 13, 2016 | Completed final sign-off Jan 2017 | 40 Parkridge Dr | Sft Construction Corp | soft story retrofitting of a hillside 9 unit apt bldg. 2012 iebc appendix a-4Details
soft story retrofitting of a hillside 9 unit apt bldg. 2012 iebc appendix a-4 | $105,000 |
| Mar 22, 2016 | Completed final sign-off Jan 2021 | 2390 48th Av | remove wall between living room & kitchen in both units, kitchen remodel in both units, add laundry machines in lower unit, exterior door, window, & skylight replacement & new roofing material on bldg.Details
remove wall between living room & kitchen in both units, kitchen remodel in both units, add laundry machines in lower unit, exterior door, window, & skylight replacement & new roofing material on bldg. | $180,000 | |
| Mar 16, 2016 | Never finaled issued Jun 2016, no final | 50 Thomas More Wy | Bach Construction, Inc. | build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit.Details
build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit. | $200,000 |
| Sep 3, 2008 | Completed final sign-off Mar 2009 | 1484 Noe St | remove extg jucuzzi. remove proposed clear story wndw above kitchen glass door & replac with smaller transom wndw. remove & replace retaining wall. rmove and replace three wndws at south exterior wall with extg opening .revision to app #200711148114Details
remove extg jucuzzi. remove proposed clear story wndw above kitchen glass door & replac with smaller transom wndw. remove & replace retaining wall. rmove and replace three wndws at south exterior wall with extg opening .revision to app #200711148114 | $10,000 | |
| Nov 14, 2007 | Completed final sign-off Mar 2009 | 1484 Noe St | S F Builders Inc | structurally reinforcing front elevation , changing windows, adding 2 dormers, remove deck, replace flat roof w/pitch roof over bathroom.Details
structurally reinforcing front elevation , changing windows, adding 2 dormers, remove deck, replace flat roof w/pitch roof over bathroom. | $50,000 |
| Sep 21, 2007 | Expired or cancelled expired Jun 2010 | 1666 Market St | to install a sign attached to the buildingDetails
to install a sign attached to the building | $2,500 | |
| Mar 14, 2005 | Expired or cancelled expired Apr 2006 | 101 Utah St | E B Gilmore & Sons Mech Svcs Inc | supply & install steel support frames to accomodate (e) hvac equipmentDetails
supply & install steel support frames to accomodate (e) hvac equipment | $20,000 |