A N R Development
- Based in
- Daly City
- On San Francisco permits
- Apr 2022 to May 2026
- Last 24 months
- 2 permits filed
13 permits since 2000: 10 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 211 Divisadero St | revision to pa# 202603167604: structural drawings to verify foundation and to install new post & beam.Details
revision to pa# 202603167604: structural drawings to verify foundation and to install new post & beam. | $20,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 211 Divisadero St | kitchen & bathroom remodel on 1/f.Details
kitchen & bathroom remodel on 1/f. | $80,000 |
| Dec 2, 2022 | Completed final sign-off May 2023 | 178 San Carlos St | bathroom remodel, no wall change. convert tub to walk-in shower. replace other lighting and fixtures.Details
bathroom remodel, no wall change. convert tub to walk-in shower. replace other lighting and fixtures. | $35,000 |
| Dec 2, 2022 | Completed final sign-off Jul 2023 | 754 18th Av | kitchen remodel, short wall removal, replace all appliances, cabinet with electrical and plumbing work.Details
kitchen remodel, short wall removal, replace all appliances, cabinet with electrical and plumbing work. | $40,000 |
| Dec 2, 2022 | Completed final sign-off Jul 2023 | 754 18th Av | 1) full bathroom remodel, no wall change. replace bathtub, fixtures including electrical and plumbing. 2) half bath remodel. no wall change. replace all fixtures.Details
1) full bathroom remodel, no wall change. replace bathtub, fixtures including electrical and plumbing. 2) half bath remodel. no wall change. replace all fixtures. | $30,000 |
| Oct 19, 2022 | Never finaled issued Oct 2022, no final | 211 Divisadero St | remodel of bathroom 1, 2, 3, and powder room with plumbing and electrical work. no wall change or removalDetails
remodel of bathroom 1, 2, 3, and powder room with plumbing and electrical work. no wall change or removal | $57,000 |
| Aug 23, 2022 | Completed final sign-off Oct 2022 | 919 Excelsior Av | bathroom remodel on the 2nd floor. no wall change. replace vanity, toilet and tub.Details
bathroom remodel on the 2nd floor. no wall change. replace vanity, toilet and tub. | $40,000 |
| Aug 8, 2022 | Completed final sign-off Oct 2022 | 195 Monticello St | (1) bathroom remodel, no wall changesDetails
(1) bathroom remodel, no wall changes | $40,000 |
| Jun 30, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | (1) 50 sq ft 3/4-bath on ground floor, in-kind. replace (e) with new curbless shower, toilet, vanity. all new fixtures and finishes. no structural, no changes to walls or openings.Details
(1) 50 sq ft 3/4-bath on ground floor, in-kind. replace (e) with new curbless shower, toilet, vanity. all new fixtures and finishes. no structural, no changes to walls or openings. | $14,500 |
| Jun 30, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | (1) 35 sq ft hall bath on 2nd floor. replace extg with new tub/shower, toilet/bidet, and replace extg with new fixtures and finishes. no structural no changes to walls or openings.Details
(1) 35 sq ft hall bath on 2nd floor. replace extg with new tub/shower, toilet/bidet, and replace extg with new fixtures and finishes. no structural no changes to walls or openings. | $14,500 |
| Jun 13, 2022 | Completed final sign-off Sep 2022 | 429 Spruce St | one 59 sq ft master bath remodel on 2nd floor. (n) tub/shower, toilet, and vanity. all (n) fixtures and finishes. no structural no changes to layout or openings. in kind remodel. (2 bathrooms in unit total)Details
one 59 sq ft master bath remodel on 2nd floor. (n) tub/shower, toilet, and vanity. all (n) fixtures and finishes. no structural no changes to layout or openings. in kind remodel. (2 bathrooms in unit total) | $14,500 |
| Jun 7, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | one 41 sqft master bathroom on 2nd fl in-kind remodel. replace (e) with (n) curbless shower toilet/ bidet, single vanity. all (e) fixtures + finishes. no structural. no change to walls or openings.Details
one 41 sqft master bathroom on 2nd fl in-kind remodel. replace (e) with (n) curbless shower toilet/ bidet, single vanity. all (e) fixtures + finishes. no structural. no change to walls or openings. | $14,500 |
| Apr 28, 2022 | Completed final sign-off Jul 2022 | 429 Spruce St | 1 guest bathroom remodels no structural, no changes to bath a) 47 sqft hall bath on 2n floor (n) tub/shower, toilet, vanity. all new fixtures and finishes.Details
1 guest bathroom remodels no structural, no changes to bath a) 47 sqft hall bath on 2n floor (n) tub/shower, toilet, vanity. all new fixtures and finishes. | $30,000 |