Mark Thomas
- Listed as
- architect, authorized agent-others, engineer, lessee
- Firm
- Hood Thomas Architects
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Oct 2026
189 permits since 2000 (architect on 180 permits, authorized agent-others on 9 permits, engineer on 1 permit, lessee on 1 permit): 128 completed, 27 in progress, 15 never finaled, 19 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 189.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2298 Pacific Av | provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent.Details
provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent. | $98,000 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 1346 Alabama St | Pattani Construction Co Inc | revision to pa 202212017475 (1346 alabama b,b1) & 202212017472 (1346 alabama a,a1) revise retaining wall @ rear of buildingDetails
revision to pa 202212017475 (1346 alabama b,b1) & 202212017472 (1346 alabama a,a1) revise retaining wall @ rear of building | |
| Sep 18, 2026 | In progress issued Sep 2026 | 1030 Sanchez St | D3 Construction | revision to approved pa 202512051067 vault @ living/dining space; window revision @ living room not visible from streetDetails
revision to approved pa 202512051067 vault @ living/dining space; window revision @ living room not visible from street | |
| Aug 27, 2026 | In progress issued Sep 2026 | 37 Saturn St | D3 Construction | interior renovation to include: (n) closet in bedroom 3. (n) laundry room, (n) kitchen appliances, (n) shower finish. replace rear door and window due to dryrot.Details
interior renovation to include: (n) closet in bedroom 3. (n) laundry room, (n) kitchen appliances, (n) shower finish. replace rear door and window due to dryrot. | $25,000 |
| Jun 25, 2026 | In progress issued Aug 2026 | 595 03rd Av | Olive Construction Corp | a) remove (e) delaminating/sparkling brick facade @ floors 2 & 3 along the east & south facades. and make repairs to building substrate at those locations as required. b) provide new 3 coat cement plaster finishes @ floors 2 & 3 w/ waterproofing, flashing, building paper, wire mesh reinforcements.Details
a) remove (e) delaminating/sparkling brick facade @ floors 2 & 3 along the east & south facades. and make repairs to building substrate at those locations as required. b) provide new 3 coat cement plaster finishes @ floors 2 & 3 w/ waterproofing, flashing, building paper, wire mesh reinforcements. | $108,000 |
| Jun 22, 2026 | In progress filed Jun 2026, not yet issued | 4564 19th St | selective renovation @ all flrs: (n) kitchen cabinetry @ flr 2. enlarge (1) bedroom & replace (1) bathtub w/ (n) shower @ flr 1. (n) wine storage & cabs @ basement. all (n) interior finishes & associated electrical & plumbing all flrs.Details
selective renovation @ all flrs: (n) kitchen cabinetry @ flr 2. enlarge (1) bedroom & replace (1) bathtub w/ (n) shower @ flr 1. (n) wine storage & cabs @ basement. all (n) interior finishes & associated electrical & plumbing all flrs. | $68,000 | |
| Jun 6, 2026 | In progress filed Jun 2026, not yet issued | 79 Homestead St | proposed alteration scope includes permit revision to pa# 2021-0512-0274: exterior: 3 story horizontal additon at rear yard. changes to finishtration at rear elevation. interior: convert (e) first fl. crawl space to living, miscellaneous interior change to unit #1 & #2 with in bld scope.Details
proposed alteration scope includes permit revision to pa# 2021-0512-0274: exterior: 3 story horizontal additon at rear yard. changes to finishtration at rear elevation. interior: convert (e) first fl. crawl space to living, miscellaneous interior change to unit #1 & #2 with in bld scope. | $288,000 | |
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 2255 North Point St | new construction of detached adu in rear yard. 2-story, 1 residential unit, type v-b.Details
new construction of detached adu in rear yard. 2-story, 1 residential unit, type v-b. | $210,000 | |
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | revision to 202603187875 to include: reconfigured 2 hr wall layout on floor 1. structural steel posts for motorized door on floor 01. conference 318 to become shared office 318.Details
revision to 202603187875 to include: reconfigured 2 hr wall layout on floor 1. structural steel posts for motorized door on floor 01. conference 318 to become shared office 318. | |
| Apr 27, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | 3rd floor interior tenant improvement to include new barista bar serving coffee, tea and grab & go prepackaged food. new back of house catering area.Details
3rd floor interior tenant improvement to include new barista bar serving coffee, tea and grab & go prepackaged food. new back of house catering area. | $48,000 |
| Apr 10, 2026 | In progress issued Apr 2026 | 1100 Sacramento St | Nob Hill Construction | revision to pa# 202602115734 unit #504 5/f - upgrade interior finishes, new paint, moldings, door styles, refinish floors, kitchen countertops, led lighting, add of decorative partition walls.Details
revision to pa# 202602115734 unit #504 5/f - upgrade interior finishes, new paint, moldings, door styles, refinish floors, kitchen countertops, led lighting, add of decorative partition walls. | |
| Apr 10, 2026 | In progress filed Apr 2026, not yet issued | 1039 Green St | rev. to approved roof deck permit bpa#2019 0311 4863. subtitute wood frame lass rail w/ a. metal frame glass rail(not visible from street)Details
rev. to approved roof deck permit bpa#2019 0311 4863. subtitute wood frame lass rail w/ a. metal frame glass rail(not visible from street) | $7,800 | |
| Apr 3, 2026 | In progress issued Apr 2026 | 180 Palo Alto Av | Force Development Company Inc | interior renovations to reconfigure interior stair, new kitchen island, new electric fireplace, new gas line at courtyard, and associated electrical. no plumbing fixtures at extended kitchen.Details
interior renovations to reconfigure interior stair, new kitchen island, new electric fireplace, new gas line at courtyard, and associated electrical. no plumbing fixtures at extended kitchen. | $28,000 |
| Mar 18, 2026 | In progress issued Jul 2026 | 240 Bosworth St | Brighter Legacy Builders Inc. | modifications to an (e) multi-unit building. convert the (e) 2 car garage into an adu-one bedroom, one bath of 516sf per state adu policyDetails
modifications to an (e) multi-unit building. convert the (e) 2 car garage into an adu-one bedroom, one bath of 516sf per state adu policy | $185,000 |
| Mar 18, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal.Details
all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal. | $940,000 |
| Mar 5, 2026 | Completed final sign-off Sep 2026 | 117 Collingwood St | Olive Construction Corp | interior non structural work: remove and relocate property line window along north wall at bath. remodel kitchen. remodel 2 bathrooms. new interior finishes to replace existing.Details
interior non structural work: remove and relocate property line window along north wall at bath. remodel kitchen. remodel 2 bathrooms. new interior finishes to replace existing. | $98,000 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 3120 Mission St | Rossi Builders Inc. | interior non structural ti ro resolve nov #202650676. barrier removal scope to remove and reinstall existing restrooms. addition of one new water closet. existing ceiling, lighting, electrical and mech to remain.Details
interior non structural ti ro resolve nov #202650676. barrier removal scope to remove and reinstall existing restrooms. addition of one new water closet. existing ceiling, lighting, electrical and mech to remain. | $85,000 |
| Jan 19, 2026 | In progress filed Jan 2026, not yet issued | 76 Liberty St | raise (e) building 18in. insert (n) garage below gradeDetails
raise (e) building 18in. insert (n) garage below grade | $350,000 | |
| Dec 23, 2025 | In progress issued Jun 2026 | 1030 Sanchez St | D3 Construction | 2-story rear horizontal addition and reconfigured rear deck and stairs full interior renovations at existing floors 01, 02. new interior stairs.xcavation of approximately 71 cu.yd.existing front street facade to remain, no work.Details
2-story rear horizontal addition and reconfigured rear deck and stairs full interior renovations at existing floors 01, 02. new interior stairs.xcavation of approximately 71 cu.yd.existing front street facade to remain, no work. | $488,000 |
| Dec 8, 2025 | In progress issued May 2026 | 9 14th Av | H I & D Construction | addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl.Details
addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl. | $380,000 |
| Nov 21, 2025 | In progress issued Dec 2025 | 150 San Buenaventura Wy | Mone Construction Co Inc | (n) skylight and interior non structural bedroom/bathroom renovations. facing street.Details
(n) skylight and interior non structural bedroom/bathroom renovations. facing street. | $85,000 |
| Oct 3, 2025 | Completed final sign-off Feb 2026 | 501 Beale St | Olive Construction Corp | deferred energy code compliance forms for lighting replacement in like kind. no change in quantity or location. permitted under 202407307604.Details
deferred energy code compliance forms for lighting replacement in like kind. no change in quantity or location. permitted under 202407307604. | |
| Sep 3, 2025 | In progress issued Oct 2025 | 350 Cumberland St | Olive Construction Corp | new garden retaining wall at rear yardDetails
new garden retaining wall at rear yard | $15,980 |
| Jun 26, 2025 | Completed final sign-off May 2026 | 1090 Chestnut St | Robison Nieri White Construction | 5th/fl: (unit#5) interior non structural remodel: a) remodel bedroom#3 and closet b) relocate bathroom#3 and laudry c) (n) finishes,fixtures, and fittings in bath #2 and #3. d) (n) led lighting in baths and home office.Details
5th/fl: (unit#5) interior non structural remodel: a) remodel bedroom#3 and closet b) relocate bathroom#3 and laudry c) (n) finishes,fixtures, and fittings in bath #2 and #3. d) (n) led lighting in baths and home office. | $98,000 |
| May 14, 2025 | In progress issued Sep 2025 | 150 San Buenaventura Wy | Mone Construction Co Inc | revision to pa 202312041846 to include revised basement floor plan and associated structural changesDetails
revision to pa 202312041846 to include revised basement floor plan and associated structural changes | |
| Apr 8, 2025 | Expired or cancelled expired Apr 2026 | 628 Shotwell St | Tip Managers Inc | revision to pa #201911197709 to include: 1) relocation of unit #1 entry door. 2) interior non-structural partition layout. 3)front yard layout.Details
revision to pa #201911197709 to include: 1) relocation of unit #1 entry door. 2) interior non-structural partition layout. 3)front yard layout. | |
| Mar 10, 2025 | Completed final sign-off Dec 2025 | 188 Minna St | Black Mountain Development | 22nd fl, 22d - interior non-structurl remodel: remove a portion of all for (n) 3'0" fire rated door to connect units 22d & 22e; all interior finishes, fixture to remainDetails
22nd fl, 22d - interior non-structurl remodel: remove a portion of all for (n) 3'0" fire rated door to connect units 22d & 22e; all interior finishes, fixture to remain | $15,000 |
| Mar 10, 2025 | Completed final sign-off Dec 2025 | 188 Minna St | Black Mountain Development | 22nd fl, 22e - interior non-structurl remodel: remove a portion of all for (n) 3'0" fire rated door to connect units 22d & 22e; all interior finishes, fixture to remain; (n) grab bars @ bath 2Details
22nd fl, 22e - interior non-structurl remodel: remove a portion of all for (n) 3'0" fire rated door to connect units 22d & 22e; all interior finishes, fixture to remain; (n) grab bars @ bath 2 | $19,000 |
| Dec 13, 2024 | Completed final sign-off Apr 2025 | 432 Funston Av | H I & D Construction | rev 202402055215- unit 432-first floor unit- add (n) window at north wall in powder room. relocate toilet and sink powder room. remove (n) lower cabinet at work room. (n) sink location. repair and replace wet rot at entire rear facade and popout. window and siding at same locationDetails
rev 202402055215- unit 432-first floor unit- add (n) window at north wall in powder room. relocate toilet and sink powder room. remove (n) lower cabinet at work room. (n) sink location. repair and replace wet rot at entire rear facade and popout. window and siding at same location | |
| Dec 12, 2024 | Completed final sign-off Jul 2025 | 343 Sansome St | Skyline Construction | 16th floor: tenant improvement interior renovation to include non-structural partitions, new ceilings , and new finishes thoughout area of work. mep deferredDetails
16th floor: tenant improvement interior renovation to include non-structural partitions, new ceilings , and new finishes thoughout area of work. mep deferred | $430,000 |
| Dec 6, 2024 | In progress issued Jul 2025 | 870 40th Av | 2 story rear horizontal addition and interior remodel. 6feet deep 2 story horizontal addition (matches height of (e) building) (n) 7 feet deep rear deck less than 10 feet above grade. stair to rear yard ( 3 feet away from property line- no fire wall) and infill south lightwell.Details
2 story rear horizontal addition and interior remodel. 6feet deep 2 story horizontal addition (matches height of (e) building) (n) 7 feet deep rear deck less than 10 feet above grade. stair to rear yard ( 3 feet away from property line- no fire wall) and infill south lightwell. | $288,000 | |
| Nov 12, 2024 | In progress issued Dec 2024 | 60 Mountain Spring Av | Olive Construction Corp | interior: remove section of wall btwn kitchen & dining room; remodel kithcen w/ new cabinets, counters, appliances & finishes. exterior: non street facing window & door replacement and reconfiguration sky light at front porchDetails
interior: remove section of wall btwn kitchen & dining room; remodel kithcen w/ new cabinets, counters, appliances & finishes. exterior: non street facing window & door replacement and reconfiguration sky light at front porch | $138,850 |
| Oct 21, 2024 | Completed final sign-off Jan 2025 | 65 Noe St | removal of unauthorized dwelling unit per conditional use authorization 2023-007971 cua per planning commission motion 21532 issued on 3/7/24 and planning code sections 303 and 307 to include removal of kitchen and return a portion of the gr fl area at rear of bld to storageDetails
removal of unauthorized dwelling unit per conditional use authorization 2023-007971 cua per planning commission motion 21532 issued on 3/7/24 and planning code sections 303 and 307 to include removal of kitchen and return a portion of the gr fl area at rear of bld to storage | $3,800 | |
| Sep 27, 2024 | Completed final sign-off Mar 2026 | 1090 Chestnut St | Robison Nieri White Construction | unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishesDetails
unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishes | $350,786 |
| Sep 13, 2024 | Expired or cancelled expired Sep 2026 | 350 Cumberland St | Olive Construction Corp | minor revision to approved pa#: 202009053629. basement: revised west retaining wall first floor: maintain (e) garage loaction (do not relocate) second flr: maintain (e) west elevation light (do not infill). minor flr plan charge. remove rear deck and install (n) balcony. roof: provide 2 additionalDetails
minor revision to approved pa#: 202009053629. basement: revised west retaining wall first floor: maintain (e) garage loaction (do not relocate) second flr: maintain (e) west elevation light (do not infill). minor flr plan charge. remove rear deck and install (n) balcony. roof: provide 2 additional | |
| Aug 20, 2024 | Completed final sign-off Jul 2025 | 188 Minna St | Robison Nieri White Construction | unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting.Details
unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting. | $220,000 |
| Jul 30, 2024 | Completed final sign-off Feb 2026 | 501 Beale St | Olive Construction Corp | interior non-structural renovation to include new non-structural glass partition at (e) resident lounge, new reception desk, new lighting at (e) gyp. ceilings.Details
interior non-structural renovation to include new non-structural glass partition at (e) resident lounge, new reception desk, new lighting at (e) gyp. ceilings. | $120,000 |
| May 15, 2024 | Expired or cancelled expired Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | foundation revision to permit 202304266459.strengthen exist. fdn with new retaining wall in unit #8Details
foundation revision to permit 202304266459.strengthen exist. fdn with new retaining wall in unit #8 | $5,000 |
| May 3, 2024 | In progress issued Oct 2025 | 502 Jefferson St | Rossi Builders Inc. | install new exterior sauna room at existing deck (at grade)Details
install new exterior sauna room at existing deck (at grade) | $40,000 |
| May 1, 2024 | Completed final sign-off May 2024 | 433 Upper Tr | revision to bpa# 202011189147: revision to original plan set reflecting that we did not building 42 inch wall on upper roof deck.Details
revision to bpa# 202011189147: revision to original plan set reflecting that we did not building 42 inch wall on upper roof deck. | ||
| Apr 4, 2024 | Completed final sign-off Jun 2025 | 1333 Jones St | Nob Hill Construction | unit 1705: supply & install new insulated windows to replace like in kind. install new flooring, new exterior door in terrace. replace tile at deck. one bath remodel. no structural workDetails
unit 1705: supply & install new insulated windows to replace like in kind. install new flooring, new exterior door in terrace. replace tile at deck. one bath remodel. no structural work | $100,000 |
| Mar 21, 2024 | Completed final sign-off Sep 2024 | 301 Mission St | Garibaldi Plumbing Company Inc | relocate 11 fire sprinkler heads, add 4 pendent heads, remove 2 pendents in unit 48d. ref to 202303143620Details
relocate 11 fire sprinkler heads, add 4 pendent heads, remove 2 pendents in unit 48d. ref to 202303143620 | $3,000 |
| Mar 21, 2024 | In progress issued Mar 2024 | 301 Mission St | Garibaldi Plumbing Company Inc | #48e: relocate 2 fire sprinkler heads . ref pa#202303143623Details
#48e: relocate 2 fire sprinkler heads . ref pa#202303143623 | $3,000 |
| Mar 18, 2024 | Completed final sign-off Aug 2024 | 3949 26th St | Bashland Inc. Dba Bashland Builders | interior non-structural work. remodel/reconfigure bath #2 on the 2nd fl; all new interior finishes to replace existing finishes @ bed #2 & den; reconfigure bedroom #8 closetDetails
interior non-structural work. remodel/reconfigure bath #2 on the 2nd fl; all new interior finishes to replace existing finishes @ bed #2 & den; reconfigure bedroom #8 closet | $48,000 |
| Feb 5, 2024 | Completed final sign-off Oct 2024 | 239 Brannan St | Robison Nieri White Construction | interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes.Details
interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes. | $62,000 |
| Dec 4, 2023 | In progress issued Aug 2024 | 150 San Buenaventura Wy | Mone Construction Co Inc | proposed basement addition to include new bedroom,media room,exercise/work room,2 baths and storage rooms.Details
proposed basement addition to include new bedroom,media room,exercise/work room,2 baths and storage rooms. | $480,000 |
| Nov 22, 2023 | Completed final sign-off Aug 2024 | 1200 California St | Nob Hill Construction | interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes.Details
interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes. | $170,000 |
| Nov 14, 2023 | Completed final sign-off Dec 2024 | 163 West Portal Av | Mone Construction Co Inc | change of use from retail to restaurant. interior tenant improvement to include: new interior non structural build out for new restaurant and commercial kitchen. repair/replace (e) storefront glazing system in like kind. replace (e) alum/glass entry doors and transom w/ (n) double doors and (n) tranDetails
change of use from retail to restaurant. interior tenant improvement to include: new interior non structural build out for new restaurant and commercial kitchen. repair/replace (e) storefront glazing system in like kind. replace (e) alum/glass entry doors and transom w/ (n) double doors and (n) tran | $320,000 |
| Nov 13, 2023 | Completed final sign-off Jan 2026 | 1170 Sacramento St | Nob Hill Construction | unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes.Details
unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes. | $170,000 |
| Sep 7, 2023 | Completed final sign-off Dec 2024 | 163 West Portal Av | Mone Construction Co Inc | core and shell alterations to include: merge 2 (e) commercial spaces to become 1. voluntary seismic upgrades. new interior support areas and storage. new accessible restroom. replace (e) windows in like kind at rear facade and side facade.Details
core and shell alterations to include: merge 2 (e) commercial spaces to become 1. voluntary seismic upgrades. new interior support areas and storage. new accessible restroom. replace (e) windows in like kind at rear facade and side facade. | $108,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 131 Caselli Av | Olive Construction Corp | replace (e) rutted hood/tile/stucco stair @ front entry in like kind. replace misc rotted framing @ bldg wall adjacent to stair. replace (e) landing finish above garage w/ new landing finish in like kind. all work within property line not public rowDetails
replace (e) rutted hood/tile/stucco stair @ front entry in like kind. replace misc rotted framing @ bldg wall adjacent to stair. replace (e) landing finish above garage w/ new landing finish in like kind. all work within property line not public row | $18,000 |
| Jul 18, 2023 | Completed final sign-off Mar 2024 | 131 Caselli Av | Olive Construction Corp | (n) rear deck within allowable buildable area to a single family residence. 1 hr property line wall @ new deck; 1 hr wall no more than 6' above gradeDetails
(n) rear deck within allowable buildable area to a single family residence. 1 hr property line wall @ new deck; 1 hr wall no more than 6' above grade | $10,000 |
| May 2, 2023 | Completed final sign-off Jun 2025 | 642 Moultrie St | patch and repair roof in kind, skylights, roof members due to fire damageDetails
patch and repair roof in kind, skylights, roof members due to fire damage | $50,000 | |
| May 1, 2023 | Completed final sign-off Jul 2023 | 1036 Gilman Av | corrective action for nov 202180951. to remove work done without the required approvals.Details
corrective action for nov 202180951. to remove work done without the required approvals. | $7,000 | |
| Apr 26, 2023 | Completed final sign-off Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | convert (e) undocumented ground floor unit to become studio 1 bath adu. reference soft story work under separate permit #202210144345Details
convert (e) undocumented ground floor unit to become studio 1 bath adu. reference soft story work under separate permit #202210144345 | $138,000 |
| Mar 31, 2023 | Completed final sign-off Jan 2024 | 1070 Green St | Bashland Inc. Dba Bashland Builders | kitchen: new cabinets, counters, fixtures and finishes to replace (e) in same location bath 1&2: new cabinets counters, fixtures and finishes to replace (e) in same location, replace (e) window in kind at side elevation (not visible from street) w/(n) window to match building standard.Details
kitchen: new cabinets, counters, fixtures and finishes to replace (e) in same location bath 1&2: new cabinets counters, fixtures and finishes to replace (e) in same location, replace (e) window in kind at side elevation (not visible from street) w/(n) window to match building standard. | $78,000 |
| Mar 27, 2023 | Completed final sign-off Jun 2024 | 339 Lombard St | Nob Hill Construction | new roof deck at (e) single family residence and associated metal access stairs, handrails and guardrails.Details
new roof deck at (e) single family residence and associated metal access stairs, handrails and guardrails. | $60,000 |
| Mar 14, 2023 | Completed final sign-off Sep 2024 | 301 Mission St | Black Mountain Development | modification from planning code sec 305.1 to provide temporary door / connection bet unit 48d & 48e w/o hearing under sec 317. temporary connecting door to be 45 min rated. non-structural remodel of kitchen, reconfigure 2 bedrooms, remove 1 bathroom & remodel 1 for cbc 11a accessDetails
modification from planning code sec 305.1 to provide temporary door / connection bet unit 48d & 48e w/o hearing under sec 317. temporary connecting door to be 45 min rated. non-structural remodel of kitchen, reconfigure 2 bedrooms, remove 1 bathroom & remodel 1 for cbc 11a access | $87,400 |
| Mar 14, 2023 | Completed final sign-off Sep 2024 | 301 Mission St | Black Mountain Development | modification from planning code sec 305.1 to provide temporary door / connection between unit 48e & 48d without hearing under sec 317. temporary door / connecting to be 45 minute rated. reconfigure (e) den / bedroom to become dining room. (non-structural interior remodel).Details
modification from planning code sec 305.1 to provide temporary door / connection between unit 48e & 48d without hearing under sec 317. temporary door / connecting to be 45 minute rated. reconfigure (e) den / bedroom to become dining room. (non-structural interior remodel). | $42,800 |
| Feb 23, 2023 | Completed final sign-off Sep 2023 | 328 Cumberland St | Forma Construction | revision to pa#'s 201708013585, 201811206369, & 202109239061, revised structural details, delete gas fireplace applicant @ living rm, delete window @ west facade, e perimeter wall to remain, n on grade concrete pad, relocated elec & gas meter, revised interior stairs railing, update t24 rpt.Details
revision to pa#'s 201708013585, 201811206369, & 202109239061, revised structural details, delete gas fireplace applicant @ living rm, delete window @ west facade, e perimeter wall to remain, n on grade concrete pad, relocated elec & gas meter, revised interior stairs railing, update t24 rpt. | |
| Feb 14, 2023 | Expired or cancelled expired Dec 2025 | 1756 Broadway | detached garage: per ab-094 voluntary seismic upgrade of soft story. ref permit 202210144345 for front bldg.Details
detached garage: per ab-094 voluntary seismic upgrade of soft story. ref permit 202210144345 for front bldg. | $10,000 | |
| Feb 7, 2023 | Expired or cancelled cancelled Jan 2026 | 660 Market St | voluntaring barrier removal work only. to provide new power assisted door operators at (e) entry doors.Details
voluntaring barrier removal work only. to provide new power assisted door operators at (e) entry doors. | $4,800 | |
| Feb 2, 2023 | Completed final sign-off Feb 2023 | 995 14th St | revision to pa# 2022-1212-8062; delete security fence inside lobbyDetails
revision to pa# 2022-1212-8062; delete security fence inside lobby | ||
| Jan 20, 2023 | Completed final sign-off Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | detached garage - convert (e) detached garage to become 1-bed, 1-bath adu within (e) structure.Details
detached garage - convert (e) detached garage to become 1-bed, 1-bath adu within (e) structure. | $138,000 |
| Dec 12, 2022 | Completed final sign-off Feb 2023 | 995 14th St | to comply w/bid nov#200704454 dated 5/18/2007 for code comppliant gate @ front of property, new in-swing gate @ 2(e) lower units, remove (e) gate @ 4(e) upper units, new security fence inside lobbyDetails
to comply w/bid nov#200704454 dated 5/18/2007 for code comppliant gate @ front of property, new in-swing gate @ 2(e) lower units, remove (e) gate @ 4(e) upper units, new security fence inside lobby | $3,500 | |
| Dec 1, 2022 | In progress issued Nov 2025 | 1346 Alabama St | Pattani Construction Co Inc | (n) unit b1: legalize unit at floor 04, two bedrooms, one bathroom at block # 4271 lot #46. per ord 43-14.Details
(n) unit b1: legalize unit at floor 04, two bedrooms, one bathroom at block # 4271 lot #46. per ord 43-14. | $81,400 |
| Dec 1, 2022 | In progress issued Nov 2025 | 1346 Alabama St | Pattani Construction Co Inc | (n) unit a1: adu at floors 01 & 02, one bedroom, one bath at block #4271 lot #045. per state ord.Details
(n) unit a1: adu at floors 01 & 02, one bedroom, one bath at block #4271 lot #045. per state ord. | $111,260 |
| Nov 15, 2022 | Never finaled issued Dec 2022, no final | 1333 Jones St | Nob Hill Construction | revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes.Details
revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes. | |
| Oct 11, 2022 | In progress issued Feb 2024 | 502 Jefferson St | Rossi Builders Inc. | exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupolaDetails
exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupola | $1,252,000 |
| Sep 14, 2022 | Completed final sign-off Feb 2023 | 660 Market St | Novo Construction Inc | 5th flr - interior tenant improvement. demolition of non-structural partitions & selective ceiling & lights. construct (5) new phone/meeting rooms, new break room.Details
5th flr - interior tenant improvement. demolition of non-structural partitions & selective ceiling & lights. construct (5) new phone/meeting rooms, new break room. | $208,000 |
| Aug 10, 2022 | Completed final sign-off Apr 2023 | 14 Santa Clara Av | Bashland Inc. Dba Bashland Builders | exterior work: replace sash selected windows in kind. interior: replace main bath fixtures in kind. relocate attic ceiling access.Details
exterior work: replace sash selected windows in kind. interior: replace main bath fixtures in kind. relocate attic ceiling access. | $38,000 |
| Aug 2, 2022 | Expired or cancelled expired Jun 2026 | 157 28th Av | Adamas Builders Inc | to comply with planning enf case no 2021-008117enf replace front windows, legalize dormer size, remove unpermitted deck.Details
to comply with planning enf case no 2021-008117enf replace front windows, legalize dormer size, remove unpermitted deck. | $78,000 |
| Jul 13, 2022 | Completed final sign-off Aug 2022 | 180 Palo Alto Av | Bashland Inc. Dba Bashland Builders | rev to pa202109309572 to eliminate new deck (on grade) at rear yard. maintain previously approved landing and stairs to (e) grade.Details
rev to pa202109309572 to eliminate new deck (on grade) at rear yard. maintain previously approved landing and stairs to (e) grade. | |
| Jul 7, 2022 | Completed final sign-off Mar 2024 | 1025 Hampshire St | Pattani Construction Co Inc | per ordinance 43-14, legalize (1) unit @ 1/f of an existing 2 unit bldg. legalized unit will have (1) bedroom w/kitchen, bath & open denDetails
per ordinance 43-14, legalize (1) unit @ 1/f of an existing 2 unit bldg. legalized unit will have (1) bedroom w/kitchen, bath & open den | $70,000 |
| May 27, 2022 | Expired or cancelled withdrawn May 2023 | 1036 Gilman Av | correct n.o.v 202180951 to document non-permitted construction of 2nd-story rear addition that contains new bedroom. remove (e) storage shed in rear yard.Details
correct n.o.v 202180951 to document non-permitted construction of 2nd-story rear addition that contains new bedroom. remove (e) storage shed in rear yard. | $137,800 | |
| Mar 30, 2022 | Completed final sign-off Mar 2023 | 398 Pennsylvania Av | Beam Construction Enterprises Inc | interior alteration & skylight addition; 1st fl - manufactured spa tub in rear; pedestal decking, repplace carpet; 2nd fl - replace closet sliding door; 3rd fl - (n) carpet, (n) hardwood in kitchen; 4th fl - add skylight & remodel (e) bath w/(n) fixtures finishes & cab.Details
interior alteration & skylight addition; 1st fl - manufactured spa tub in rear; pedestal decking, repplace carpet; 2nd fl - replace closet sliding door; 3rd fl - (n) carpet, (n) hardwood in kitchen; 4th fl - add skylight & remodel (e) bath w/(n) fixtures finishes & cab. | $90,000 |
| Feb 28, 2022 | In progress issued Sep 2024 | 1039 Green St | Bashland Inc. Dba Bashland Builders, Barton Builders | correct noe complaint 2021-010111enf: return bldg to become 2 unit in compliance with bpa 201901251242. legalize horizontal infill at 1/f bed #2 to enclose (e) rear deck approved under bpa 201901251242. legalize alterations to roofdeck approved under bpa 201903114863.Details
correct noe complaint 2021-010111enf: return bldg to become 2 unit in compliance with bpa 201901251242. legalize horizontal infill at 1/f bed #2 to enclose (e) rear deck approved under bpa 201901251242. legalize alterations to roofdeck approved under bpa 201903114863. | $250,000 |
| Feb 24, 2022 | Completed final sign-off Dec 2022 | 229 Brannan St | Robison Nieri White Construction | unit #14e: interior alteration. reduce pantry closet. remove closet in meddia room.Details
unit #14e: interior alteration. reduce pantry closet. remove closet in meddia room. | $8,000 |
| Nov 10, 2021 | Expired or cancelled cancelled Mar 2023 | 2820 Scott St | Dollard Construction Inc. | roof deck: renovate(e) 500 sf deck to 1375 sf.install(new)porcelain pavers on bison system.intall (n) guardrail at 42" maximum.Details
roof deck: renovate(e) 500 sf deck to 1375 sf.install(new)porcelain pavers on bison system.intall (n) guardrail at 42" maximum. | $58,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2025 | 1655 Revere Av | Threemile Construction, Vsa Construction | add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested.Details
add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested. | $150,000 |
| Sep 30, 2021 | Completed final sign-off Sep 2022 | 180 Palo Alto Av | Bashland Inc. Dba Bashland Builders | interior remodel new office/den, bathrooms, reconfigured main bedroom. new finishes & associated electrical/plumbing. new deck (on grade) @ rear yard. new skylights. mechanical deferred submittal.Details
interior remodel new office/den, bathrooms, reconfigured main bedroom. new finishes & associated electrical/plumbing. new deck (on grade) @ rear yard. new skylights. mechanical deferred submittal. | $318,000 |
| Sep 23, 2021 | Completed final sign-off Sep 2023 | 328 Cumberland St | Forma Construction | revision to pa 201708013585 and 201811206369 to include structural connections at open interior stairs, revised lightwell layout, revised rear yard layout, revised gas appliance locationsDetails
revision to pa 201708013585 and 201811206369 to include structural connections at open interior stairs, revised lightwell layout, revised rear yard layout, revised gas appliance locations | |
| Sep 2, 2021 | Completed final sign-off Oct 2022 | 2820 Scott St | Dollard Construction Inc. | driveway gate: repair (e) driveway gates @ front. reuse (e) gates. see structure drawing. replace 2 doors & 1 window @ 2nd fl rear exterior @ rearDetails
driveway gate: repair (e) driveway gates @ front. reuse (e) gates. see structure drawing. replace 2 doors & 1 window @ 2nd fl rear exterior @ rear | $20,000 |
| Aug 10, 2021 | Completed final sign-off Sep 2023 | 1200 California St | Nob Hill Construction | residential non structural int. remodel. enclose balcony: 151sf ext. terrace to become conditional living space, new glazing system to match exactly (e) approved bldg standards. remodel interior: remodel kitchen, remodel and reconfigure bedrooms, new laundry room, new lighting, and new int. finishesDetails
residential non structural int. remodel. enclose balcony: 151sf ext. terrace to become conditional living space, new glazing system to match exactly (e) approved bldg standards. remodel interior: remodel kitchen, remodel and reconfigure bedrooms, new laundry room, new lighting, and new int. finishes | $200,000 |
| Jul 14, 2021 | Never finaled issued Nov 2021, no final | 544 Clayton St | Ewen Utting Inc. | unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only.Details
unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only. | |
| Jun 10, 2021 | Completed final sign-off Nov 2023 | 1200 California St | Nob Hill Construction | non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit.Details
non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit. | $530,000 |
| May 27, 2021 | Completed final sign-off Oct 2022 | 1433 Jefferson St | Seismic Retrofitters Inc., Aura Fire Safety Inc | legalize adu on ground floor. voluntary soft story retrofit included.Details
legalize adu on ground floor. voluntary soft story retrofit included. | $20,000 |
| May 12, 2021 | Never finaled issued Feb 2023, no final | 79 Homestead St | Urban Builder General Contracting Inc | site. remodel (e) 2-story 2-fam residence. raise (e) building 15'-9 1/2". add garage at street lvl, curb cut/infill at front yard for (n) driveway. remodel/reconfig interior of both dwellings- stairs, kitch & bath rms. rear yard decks. reconfig (e) rear deck stairs. (n) rear deck & stairs at 3rd flrDetails
site. remodel (e) 2-story 2-fam residence. raise (e) building 15'-9 1/2". add garage at street lvl, curb cut/infill at front yard for (n) driveway. remodel/reconfig interior of both dwellings- stairs, kitch & bath rms. rear yard decks. reconfig (e) rear deck stairs. (n) rear deck & stairs at 3rd flr | $330,000 |
| Mar 22, 2021 | Never finaled issued May 2021, no final | 10 Presidio Av | Bashland Inc. Dba Bashland Builders | revision to pa# 202012110866. reduce opening size at (e) closet & den. (e) wall to remain. opening to be created at (e) kitchen & den.Details
revision to pa# 202012110866. reduce opening size at (e) closet & den. (e) wall to remain. opening to be created at (e) kitchen & den. | |
| Dec 11, 2020 | Never finaled issued Jan 2021, no final | 10 Presidio Av | Bashland Inc. Dba Bashland Builders | interior remodeling on the 2nd flr. remove interior wall between (e) kitchen & (e) den. remove interior wall between (e) closet & (e) den. remodel (e) kitchen.Details
interior remodeling on the 2nd flr. remove interior wall between (e) kitchen & (e) den. remove interior wall between (e) closet & (e) den. remodel (e) kitchen. | $38,000 |
| Nov 17, 2020 | Completed final sign-off Feb 2023 | 169 Commonwealth Av | Mark Scott Construction Inc | to comply with nov #201974861. fire damage repair (e) 2-story sfd over bsmt. interior: replace all int. finishes, cabinets, doors, trims/mouldings damaged. ext.: relpace ext. finishes damaged in kind, replace 9 windows damaged in kind. roof: replace roof areas damaged in kind.Details
to comply with nov #201974861. fire damage repair (e) 2-story sfd over bsmt. interior: replace all int. finishes, cabinets, doors, trims/mouldings damaged. ext.: relpace ext. finishes damaged in kind, replace 9 windows damaged in kind. roof: replace roof areas damaged in kind. | $388,000 |
| Sep 15, 2020 | Completed final sign-off Sep 2023 | 324 Cumberland St | Ace Drilling & Excavation, Forma Construction | temporary earth shoring system to accomodate foundation construction at 328 cumberland street. shoring consists of underpinning piers.Details
temporary earth shoring system to accomodate foundation construction at 328 cumberland street. shoring consists of underpinning piers. | $62,000 |
| Sep 1, 2020 | Completed final sign-off Sep 2023 | 328 Cumberland St | Ace Drilling & Excavation, Forma Construction | temporary earth shoring system to accomodate foundation construction. shoring consists of soldier beams, pressure treated lagging, and internal braces.Details
temporary earth shoring system to accomodate foundation construction. shoring consists of soldier beams, pressure treated lagging, and internal braces. | $73,000 |
| Feb 13, 2020 | Completed final sign-off Sep 2020 | 122 Sussex St | Pattani Construction Co Inc | work at garage bldg: revision to pa #201908098357. interior work: replace (e) toilet, provide (n) handwash sink & new workshop in garage. exterior work: (n) window at east garage wall (not visible from street) match existing windows.Details
work at garage bldg: revision to pa #201908098357. interior work: replace (e) toilet, provide (n) handwash sink & new workshop in garage. exterior work: (n) window at east garage wall (not visible from street) match existing windows. | $8,500 |
| Feb 6, 2020 | Completed final sign-off Sep 2020 | 122 Sussex St | Pattani Construction Co Inc | replace existing exterior wood entry stairs and handrails.Details
replace existing exterior wood entry stairs and handrails. | $21,000 |
| Jan 24, 2020 | Completed final sign-off Mar 2020 | 1545 Clement St | Olive Construction Corp | revision to pa #201512094574 to include reconfig.of non-structural interor partitions at residential units: unit 1: relocate washer/dryer closet, new closets at family rm. unit 2: relocate washer/dryer closet, revise kitchen layout. unit 3: revised bathroom layout, relocate kitchen, new coat closet.Details
revision to pa #201512094574 to include reconfig.of non-structural interor partitions at residential units: unit 1: relocate washer/dryer closet, new closets at family rm. unit 2: relocate washer/dryer closet, revise kitchen layout. unit 3: revised bathroom layout, relocate kitchen, new coat closet. | |
| Jan 17, 2020 | Completed final sign-off Jul 2020 | 1940 Broadway | Olive Construction Corp | interior non structural remodel of sub basement lobby. relocate entry door between e sub basement lobby and garage. eliminate door at e stair landing at basement level. associated elec and int finishesDetails
interior non structural remodel of sub basement lobby. relocate entry door between e sub basement lobby and garage. eliminate door at e stair landing at basement level. associated elec and int finishes | $42,500 |
| Jan 15, 2020 | Completed final sign-off May 2022 | 1090 Chestnut St | Robison Nieri White Construction | interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishesDetails
interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishes | $210,000 |
| Jan 7, 2020 | Completed final sign-off Dec 2020 | 2200 Sacramento St | Bashland Inc. Dba Bashland Builders | bathroom & powder room remodel; no structural.Details
bathroom & powder room remodel; no structural. | $175,000 |
| Nov 19, 2019 | Completed final sign-off Apr 2026 | 628 Shotwell St | Vsa Construction, Tip Managers Inc | interior alteration to remodel existing fire damaged sfd with 5 bedrooms and 2 bathrooms to become a 5 bedroom, 4.5 bathroom sfd. proposed scope includes new 2nd unit, new foundation and excavation (approx 310 cu yd) at floor 1 and seismic upgrade. (n) rear deck.Details
interior alteration to remodel existing fire damaged sfd with 5 bedrooms and 2 bathrooms to become a 5 bedroom, 4.5 bathroom sfd. proposed scope includes new 2nd unit, new foundation and excavation (approx 310 cu yd) at floor 1 and seismic upgrade. (n) rear deck. | $488,000 |