Mark Robison
- Listed as
- engineer
- Firm
- Robison Engineer. Inc
- Based in
- Lynnwood
- On San Francisco permits
- Mar 2015 to Apr 2023
24 permits since 2000 (engineer on 24 permits): 17 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 6, 2023 | Completed final sign-off May 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | revision to permit 201912038490 for changes to emergency power to corridor exhaust fans.Details
revision to permit 201912038490 for changes to emergency power to corridor exhaust fans. | |
| Nov 10, 2022 | Expired or cancelled withdrawn Dec 2022 | 345 04th St | as-built for elevator pressuization fanDetails
as-built for elevator pressuization fan | $10,000 | |
| Sep 29, 2022 | Expired or cancelled withdrawn May 2023 | 851 California St | configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf.Details
configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf. | $7,500,000 | |
| Jul 15, 2022 | Completed final sign-off May 2023 | 1318 Stockton St | Eric F Anderson Incorporated | t.i. non-bearing partition demo and buil-out. upgrades to finishes, furniture, casework & reintallment of (e) bank equipment monor mep work. business entrance accessibility upgrade.Details
t.i. non-bearing partition demo and buil-out. upgrades to finishes, furniture, casework & reintallment of (e) bank equipment monor mep work. business entrance accessibility upgrade. | $220,000 |
| Jun 13, 2022 | Completed final sign-off Jul 2023 | 1501 Van Ness Av | Jones/Convey Group Incorportaed | rev to bpa#202106233062. minor changes.install heavy duty concrete pavement w/in property line. reonfig floor plan per sales, storage, cashier areas. new ceiling speaker throughout sales fl, new platforms on roof w/insulation cricket attached. paint ext/int. structural pad for tanks, new landscapingDetails
rev to bpa#202106233062. minor changes.install heavy duty concrete pavement w/in property line. reonfig floor plan per sales, storage, cashier areas. new ceiling speaker throughout sales fl, new platforms on roof w/insulation cricket attached. paint ext/int. structural pad for tanks, new landscaping | |
| Apr 20, 2022 | Completed final sign-off Nov 2023 | 1820 Alemany Bl | James E Roberts-Obayashi Corporation | prop h: tenant improvement. non-profit child care facility.Details
prop h: tenant improvement. non-profit child care facility. | $1,200,000 |
| Jan 14, 2022 | Completed final sign-off Jun 2022 | 550 Geary St | Continental Contractors Inc | select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work.Details
select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work. | $150,000 |
| Jun 14, 2021 | Completed final sign-off Jul 2022 | 609 Market St | Holt Construction Inc | main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt.Details
main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt. | $325,000 |
| Mar 24, 2021 | Completed final sign-off May 2022 | 8 Mission St | ti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes.Details
ti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes. | $475,000 | |
| Jul 8, 2020 | Never finaled issued Apr 2021, no final | 225 Powell St | Trainor Commercial Construction Inc. | the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit.Details
the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit. | $90,000 |
| Jul 7, 2020 | Completed final sign-off Jan 2021 | 165 Steuart St | M C S Construction Services | permit consist of cosmetic modifications to the 1st fl lobby, including new wall finishes, casework, lighting & electrical. no work to exterior. no demo or modification of historic elements. maher naDetails
permit consist of cosmetic modifications to the 1st fl lobby, including new wall finishes, casework, lighting & electrical. no work to exterior. no demo or modification of historic elements. maher na | $400,000 |
| Feb 19, 2019 | Completed final sign-off Jan 2021 | 450 Powell St | Centric Construction Inc | 21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes.Details
21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes. | $950,000 |
| Nov 14, 2018 | Completed final sign-off Feb 2019 | 655 08th St | Paradigm General Contractors | rev to pa# 201806141916 & 201809251302 minor changes to mechanical & electrical per sffdDetails
rev to pa# 201806141916 & 201809251302 minor changes to mechanical & electrical per sffd | |
| Oct 9, 2018 | Never finaled filed Oct 2018, never issued | 1055 Market St | to erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms.Details
to erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms. | $25,250,000 | |
| Oct 30, 2017 | Completed final sign-off Nov 2018 | 165 Steuart St | Award Construction And Restoration Inc | revision to pa #201706209811 - mechanical, plumbing & electrical revision to include: removal of heat pumps, removal of new waste & vent piping, existing to remain. removal of new receptacles & removal of new light fixtures, exisitng to remain. revision to switching.Details
revision to pa #201706209811 - mechanical, plumbing & electrical revision to include: removal of heat pumps, removal of new waste & vent piping, existing to remain. removal of new receptacles & removal of new light fixtures, exisitng to remain. revision to switching. | |
| Aug 7, 2017 | Expired or cancelled expired Sep 2022 | 405 Taylor St | Cw Horton General Contractor | accesible rooms ref bpa#201706300767. renovation of non-accessible guestrooms in a 16 story hotel. work on floors 2-17. includes select demolition and construction of walls, ceilings, fixtures and finishes. no change in egress.Details
accesible rooms ref bpa#201706300767. renovation of non-accessible guestrooms in a 16 story hotel. work on floors 2-17. includes select demolition and construction of walls, ceilings, fixtures and finishes. no change in egress. | $1,100,000 |
| Jul 25, 2017 | Completed final sign-off Jan 2019 | 165 Steuart St | Award Construction And Restoration Inc | lobby reception to provide accessible check-in, installation of an accessible single unisex restrm & 2 conference rooms within lobby/lounge area. general cosmetic upgrades & refurbishment throughout-the lobby/lounge area. conversion of e. reception counter to a combination grab & go check-in counterDetails
lobby reception to provide accessible check-in, installation of an accessible single unisex restrm & 2 conference rooms within lobby/lounge area. general cosmetic upgrades & refurbishment throughout-the lobby/lounge area. conversion of e. reception counter to a combination grab & go check-in counter | $300,000 |
| Jun 20, 2017 | Completed final sign-off Jan 2019 | 165 Steuart St | Award Construction And Restoration Inc | on levels 4-8 - upgrades to accessible guestrooms & conversion of tub to showers on all the hotel guestrooms. minor cosmetic upgrades throughoutDetails
on levels 4-8 - upgrades to accessible guestrooms & conversion of tub to showers on all the hotel guestrooms. minor cosmetic upgrades throughout | $340,000 |
| May 17, 2017 | Completed final sign-off Aug 2018 | 250 Beach St | Centric Construction Inc | demo of (e) hvac system. tenant space facade & updating utilities to future tenants consisting of hvac, plumbing & electrical. new employee restroom. maher naDetails
demo of (e) hvac system. tenant space facade & updating utilities to future tenants consisting of hvac, plumbing & electrical. new employee restroom. maher na | $2,800,000 |
| Mar 3, 2017 | Completed final sign-off Apr 2019 | 345 Bay Shore Bl | Ybj Construction Services | new exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher naDetails
new exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher na | $375,000 |
| Jan 26, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Trainor Commercial Construction Inc. | renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit.Details
renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit. | $350,000 |
| May 16, 2016 | Completed final sign-off Aug 2019 | 952 Sutter St | Trim Fit Constr. - O'reilly Engineering, Delta General Engineering Pc | non-structural interior remodel of existing dwelling unit 101 on level 1. addition of five (n) dwelling units in basement.Details
non-structural interior remodel of existing dwelling unit 101 on level 1. addition of five (n) dwelling units in basement. | $585,858 |
| Apr 6, 2015 | Never finaled issued Jul 2015, no final | 545 Post St | Centric Construction Inc | installation of (n) wheelchair lift and new (4) stop elevator serving the public space. fire alarm & sprinklers under seperate permitDetails
installation of (n) wheelchair lift and new (4) stop elevator serving the public space. fire alarm & sprinklers under seperate permit | $150,000 |
| Mar 26, 2015 | Never finaled issued Apr 2015, no final | 225 Powell St | Champion Industrial Contractors Inc | add bath ventilation (mech work) for 6 guestrooms from level 2 - 7. ref to appl #2014.1003.8007 & 2015.0203.7376.Details
add bath ventilation (mech work) for 6 guestrooms from level 2 - 7. ref to appl #2014.1003.8007 & 2015.0203.7376. | $10,000 |