Marco Scanu
- Listed as
- engineer, pmt consultant/expediter
- Firm
- Forell / Elsesser Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Aug 2021
7 permits since 2000 (engineer on 6 permits, pmt consultant/expediter on 1 permit): 3 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2021 | Never finaled filed Aug 2021, never issued | 1180 Evans Av | Clark Construction Group Ca Lp | erect a new 3 stories with no basement electrical switchgear/storage. type 2-aDetails
erect a new 3 stories with no basement electrical switchgear/storage. type 2-a | $16,000,000 |
| May 21, 2021 | Completed final sign-off Dec 2021 | 2350 Green St | Whiteside Construction Corp. | voluntary seismic improvements to address the soft storyDetails
voluntary seismic improvements to address the soft story | $25,000 |
| May 21, 2014 | Never finaled issued May 2014, no final | 25 Taylor St | P 3 Construction & Remodeling Inc | expansion of existing underground electrical vault, electric under seperate permit.Details
expansion of existing underground electrical vault, electric under seperate permit. | $60,000 |
| Sep 19, 2012 | Completed final sign-off Jun 2025 | 266 04th St | Tutor Perini Corporation | erect central transit subway station.Details
erect central transit subway station. | $38,314,494 |
| Apr 3, 2012 | Never finaled issued Jul 2013, no final | 933 Stockton St | Tutor Perini Corporation | erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton streetDetails
erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton street | $69,970,683 |
| Jun 14, 2010 | Completed final sign-off Jun 2011 | 660 Filbert St | Cahill Const Service Inc | strengthen (e) upper towers. work includes limited localized demo of (e) steel & concrete structure; in addition to new steel framing & concrete piers & walls. towers will be scaffolded to allow for non structural exterior crack repair & painting.Details
strengthen (e) upper towers. work includes limited localized demo of (e) steel & concrete structure; in addition to new steel framing & concrete piers & walls. towers will be scaffolded to allow for non structural exterior crack repair & painting. | $500,000 |
| Jul 12, 2005 | Expired or cancelled expired Mar 2007 | 2629 Diamond St | interior renovation including (n)family room,bathroom & closet in basement.(n)stairway between basemDetails
interior renovation including (n)family room,bathroom & closet in basement.(n)stairway between basem | $80,000 |