Whiteside Construction Corp.
- Based in
- Richmond
- On San Francisco permits
- Feb 2011 to May 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2021 | Completed final sign-off Dec 2021 | 2350 Green St | voluntary seismic improvements to address the soft storyDetails
voluntary seismic improvements to address the soft story | $25,000 |
| Sep 9, 2019 | Completed final sign-off Feb 2021 | 875 Stevenson St | replace existing sub basement waterproofing memebrane, asphalt pavement, artificial turf, topping slab, install new horizontal waterproofing, topping slab, artificial turf and asphalt pavement to match existingDetails
replace existing sub basement waterproofing memebrane, asphalt pavement, artificial turf, topping slab, install new horizontal waterproofing, topping slab, artificial turf and asphalt pavement to match existing | $128,000 |
| Aug 20, 2019 | Completed final sign-off Feb 2021 | 1355 Market St | repairs of exist waterproofing membrane, remove (e) sidewalk topping slab, curb, parking strip and (e) basement waterproofing membrane, replace membrane and topping slab (no structural)Details
repairs of exist waterproofing membrane, remove (e) sidewalk topping slab, curb, parking strip and (e) basement waterproofing membrane, replace membrane and topping slab (no structural) | $228,000 |
| Sep 6, 2011 | Completed final sign-off May 2018 | 840 Union St | remodel of an (e) 3-story, 2-unit residence, including: 1) conversion of a portion of the (e) basement from storage to habitable area; 2) interior remodel at all floors; 3) exterior elevations alterations; 4) replacement of (e) exterior stair; 5) (n) site stair & landscaping.Details
remodel of an (e) 3-story, 2-unit residence, including: 1) conversion of a portion of the (e) basement from storage to habitable area; 2) interior remodel at all floors; 3) exterior elevations alterations; 4) replacement of (e) exterior stair; 5) (n) site stair & landscaping. | $275,000 |
| Feb 22, 2011 | Never finaled issued Mar 2011, no final | 890 Valencia St | construction of new concrete shearwalls in basemnt for voluntary structural strengthening. new steel frames behind windows, no change to (e) facade/storefront. add ada bath to 1st level.Details
construction of new concrete shearwalls in basemnt for voluntary structural strengthening. new steel frames behind windows, no change to (e) facade/storefront. add ada bath to 1st level. | $80,000 |