Marc Penninger
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Studios Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Oct 2026
96 permits since 2000 (architect on 93 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 54 completed, 27 in progress, 11 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1089 03rd St | proj-26-0643: mou port - deferred submittal for atrium audio-visual diplay piers (reference pa# 202511079166 & b-2025-025Details
proj-26-0643: mou port - deferred submittal for atrium audio-visual diplay piers (reference pa# 202511079166 & b-2025-025 | ||
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 16th floor: dining and servery t.i. includes interior wall, ceiling, millwork and finishes.Details
16th floor: dining and servery t.i. includes interior wall, ceiling, millwork and finishes. | $6,048,657 | |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes.Details
14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes. | $9,172,090 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | Novo Construction Inc | 2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms.Details
2/f: tenant improvements: in existing office building. improvements to include, architectural, mechanical, electrical and plumbing to accommodate new tenant build out. mep scope to support kitchen build-out and updated restrooms. | $8,061,217 |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 15th floor: t.i. including new interior walls, ceilings, millwork & finishesDetails
15th floor: t.i. including new interior walls, ceilings, millwork & finishes | $8,361,087 | |
| Aug 28, 2026 | In progress issued Sep 2026 | 345 Spear St | B N Builders Inc | ground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep)Details
ground fl ste 118-120: addition of partition wall to divide (e) lounge space into (2) individual enclosed rooms. (arch/mep) | $100,000 |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 300 Howard St | 2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbingDetails
2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbing | $6,048,657 | |
| Aug 24, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 14th/f: structural upgrade to accommodate future t.i.Details
14th/f: structural upgrade to accommodate future t.i. | $165,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 15th f/l: structural upgrades to accomodate future tenant buildout.Details
15th f/l: structural upgrades to accomodate future tenant buildout. | $165,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 300 Howard St | Novo Construction Inc | 7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes.Details
7th & 8th floors: t.i. including new interior walls, ceiling, milkwork and finishes. | $15,451,442 |
| Jul 7, 2026 | In progress issued Jul 2026 | 300 Howard St | Novo Construction Inc | 9/f: structural upgrades to accommodate future tenant buildout.Details
9/f: structural upgrades to accommodate future tenant buildout. | $135,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 16th fl: structural upgrades to accommodate future tenant buildoutDetails
16th fl: structural upgrades to accommodate future tenant buildout | $165,000 |
| Jun 23, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 2 : structural upgrades to accommodate future tenant buildoutDetails
2 : structural upgrades to accommodate future tenant buildout | $200,000 |
| Jun 18, 2026 | In progress issued Jul 2026 | 555 Market St | Bcci Construction Company | deferred submittal for pa#: 202512121719 for review of climbing walls.Details
deferred submittal for pa#: 202512121719 for review of climbing walls. | |
| May 27, 2026 | In progress issued May 2026 | 1 Harrison St | Truebeck Construction | 6/fl- revisoin 202410173107 to include adding guardrail to 6th floor roof deck plan north parapet. in response to as built discovery that the parapet is less than 42" at roof deckDetails
6/fl- revisoin 202410173107 to include adding guardrail to 6th floor roof deck plan north parapet. in response to as built discovery that the parapet is less than 42" at roof deck | |
| Apr 7, 2026 | In progress issued Apr 2026 | 1 Harrison St | Truebeck Construction | revision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening.Details
revision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening. | |
| Mar 30, 2026 | In progress issued Apr 2026 | 199 Fremont St | Novo Construction Inc | floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017.Details
floor 1,3, 8, 11, 12, 17, 18, 20, 21, 22. interior non-strucutural demo of (e) unoccupied floors include removal of walls, ceilings, millworks, finishes, doors, light fixture per ab-017. | $1,500,000 |
| Mar 11, 2026 | In progress issued Mar 2026 | 1 Harrison St | Truebeck Construction | defferred green living wall submission associated with approved pa #202410173107Details
defferred green living wall submission associated with approved pa #202410173107 | $10,000 |
| Dec 18, 2025 | Completed final sign-off Jan 2026 | 2 Harrison St | ref 202506108301- documentation only for path of travel compliance of (e) high rise office buidling from street access and basement parking to first floor. scope does not inlcude levels above 1st floor. no work to be done and drawings record as built conditions complaint with cbc accessiblityDetails
ref 202506108301- documentation only for path of travel compliance of (e) high rise office buidling from street access and basement parking to first floor. scope does not inlcude levels above 1st floor. no work to be done and drawings record as built conditions complaint with cbc accessiblity | ||
| Dec 12, 2025 | In progress issued Feb 2026 | 555 Market St | Bcci Construction Company | 1/fl- (n) amenity bar/restaurant space, basketball court, lounge area, includes (n) conference rooms, countertop bar and island, seating, restrooms, finishes, and lighting throughout. 2/fl (n) lighting, ceilings, and finishes throughout. (n) pickleball court, fitness area, fitness, classroom, newDetails
1/fl- (n) amenity bar/restaurant space, basketball court, lounge area, includes (n) conference rooms, countertop bar and island, seating, restrooms, finishes, and lighting throughout. 2/fl (n) lighting, ceilings, and finishes throughout. (n) pickleball court, fitness area, fitness, classroom, new | $8,361,781 |
| Oct 24, 2025 | In progress issued Oct 2025 | 500 Howard St | Novo Construction Inc | 1/f: change of occupancy from retail to office.Details
1/f: change of occupancy from retail to office. | |
| Oct 10, 2025 | In progress filed Oct 2025, not yet issued | 1089 03rd St | proj#25-0621-mou port: alteration to existing floor plates on level 6,7,& 8.demo existing slab & create floor openings as shown, for future tenant improvements.provide temporary code compliance with smoke control report.Details
proj#25-0621-mou port: alteration to existing floor plates on level 6,7,& 8.demo existing slab & create floor openings as shown, for future tenant improvements.provide temporary code compliance with smoke control report. | $1,750,000 | |
| Sep 24, 2025 | In progress issued Jan 2026 | 222 02nd St | Novo Construction Inc | 18th floor: installation of 3 phone booths.Details
18th floor: installation of 3 phone booths. | $15,000 |
| Jun 10, 2025 | Completed final sign-off Nov 2025 | 2 Harrison St | Skyline Construction | barrier removal improvements in high rise office bldg. bring basement floor parking accessibility up to current code. bring publicly accessible restrooms on 1st fl of 2 harrison & 345 spear up to current codeDetails
barrier removal improvements in high rise office bldg. bring basement floor parking accessibility up to current code. bring publicly accessible restrooms on 1st fl of 2 harrison & 345 spear up to current code | $150,000 |
| May 29, 2025 | In progress issued Jul 2025 | 1 Harrison St | Truebeck Construction | revision to pa# 202410082583: misc structural updates.Details
revision to pa# 202410082583: misc structural updates. | |
| May 28, 2025 | In progress issued Sep 2025 | 500 Howard St | Novo Construction Inc | ground floor:t.i. to existing retail space consisting of 2 new interior doors, curtains, privacy film and applied finish treatments, repairs to existing conditions. signage replacements where room names changed mech/electrical included.Details
ground floor:t.i. to existing retail space consisting of 2 new interior doors, curtains, privacy film and applied finish treatments, repairs to existing conditions. signage replacements where room names changed mech/electrical included. | $75,000 |
| Mar 31, 2025 | Completed final sign-off Jan 2026 | 500 Howard St | Novo Construction Inc | 5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical ,plumbing & structural includedDetails
5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical ,plumbing & structural included | $5,416,864 |
| Feb 26, 2025 | Completed final sign-off Feb 2026 | 500 Howard St | Novo Construction Inc | 3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep includedDetails
3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep included | $4,721,444 |
| Feb 24, 2025 | Completed final sign-off Dec 2025 | 500 Howard St | Novo Construction Inc | 5th fl- removal of (e) walls, ceilings, millwork and finishes ab017Details
5th fl- removal of (e) walls, ceilings, millwork and finishes ab017 | $175,000 |
| Feb 21, 2025 | Completed final sign-off Feb 2026 | 500 Howard St | Novo Construction Inc | 3rd floor: non-structural demolition of office space. addition of prep kitchen to include walk -in cooler, cooking hood, dish clean, & misc. equipment. ancillary storage for mechanical equipment, grease interceptor & water heaters.Details
3rd floor: non-structural demolition of office space. addition of prep kitchen to include walk -in cooler, cooking hood, dish clean, & misc. equipment. ancillary storage for mechanical equipment, grease interceptor & water heaters. | $986,000 |
| Feb 21, 2025 | Completed final sign-off May 2025 | 500 Howard St | Novo Construction Inc | 8th fl- revision to pa #202412237306 to add selective new demo for new exhaust duct, new environmental exhuast louver added hand and prep sink, added power, new hot water pump. new exhaust fan, under floor terminal unit and equipment anchorageDetails
8th fl- revision to pa #202412237306 to add selective new demo for new exhaust duct, new environmental exhuast louver added hand and prep sink, added power, new hot water pump. new exhaust fan, under floor terminal unit and equipment anchorage | $75,000 |
| Jan 10, 2025 | Completed final sign-off Aug 2025 | 500 Howard St | Novo Construction Inc | 4th floor: selective demo of millwork, finshes and wall penetrations, mew carpet, paint and acoustic panels, new exterior window louver alteration of drinking fountain niche, mep includedDetails
4th floor: selective demo of millwork, finshes and wall penetrations, mew carpet, paint and acoustic panels, new exterior window louver alteration of drinking fountain niche, mep included | $325,000 |
| Dec 23, 2024 | Completed final sign-off May 2025 | 500 Howard St | Novo Construction Inc | 8/fl- ti to convert storage to pantry to include (n) refrigator, freezer, food storage and sinks. mep included.Details
8/fl- ti to convert storage to pantry to include (n) refrigator, freezer, food storage and sinks. mep included. | $250,000 |
| Nov 14, 2024 | In progress issued Jul 2025 | 1 Harrison St | Truebeck Construction | horizontal infill of (e) terraces at levels 2-5, (n) marquee. architectural and mep core and shell updates at all floors, and (n) interior & exterior assembly amenity spaces at level 6. soft demo, interior tenant improvements, and voluntary seismic upgrade to be done under separate permits.Details
horizontal infill of (e) terraces at levels 2-5, (n) marquee. architectural and mep core and shell updates at all floors, and (n) interior & exterior assembly amenity spaces at level 6. soft demo, interior tenant improvements, and voluntary seismic upgrade to be done under separate permits. | $13,300,000 |
| Oct 28, 2024 | Completed final sign-off May 2025 | 500 Howard St | Novo Construction Inc | select demo of built in seating and tables, addition of new mobile food service severy carts new shelving and wall mounted dish drying rack new stainless steel finishes around t/r/ dish drop are enlarge waste opening paint one wall in barista areaDetails
select demo of built in seating and tables, addition of new mobile food service severy carts new shelving and wall mounted dish drying rack new stainless steel finishes around t/r/ dish drop are enlarge waste opening paint one wall in barista area | $195,000 |
| Oct 8, 2024 | In progress issued May 2025 | 1 Harrison St | Truebeck Construction | phase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107.Details
phase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107. | $6,545,000 |
| Oct 4, 2024 | Completed final sign-off May 2025 | 500 Howard St | Novo Construction Inc | barrier removal path of travel compliance for parking level floors 1,2,3,5, and 8Details
barrier removal path of travel compliance for parking level floors 1,2,3,5, and 8 | $288,991 |
| Aug 1, 2024 | Completed final sign-off Sep 2024 | 2 Harrison St | Bcci Construction Company | 7/f: demo of partitions and ceilings. ref sprinkler 202407297491Details
7/f: demo of partitions and ceilings. ref sprinkler 202407297491 | $45,000 |
| May 7, 2024 | In progress issued May 2024 | 444 De Haro St | Skyline Construction | installation and relocation of 12 phone booths and relocate 4.Details
installation and relocation of 12 phone booths and relocate 4. | $100,000 |
| Mar 23, 2021 | Completed final sign-off Dec 2021 | 2 Harrison St | Source Planning And Construction Inc | 4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maherDetails
4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maher | $100,000 |
| Jan 27, 2021 | Never finaled issued Apr 2021, no final | 303 02nd St | Skyline Construction | 7th fl tenant improvement to include new non-structural partitions, multi purpose room expansion, all gender restrooms, upgrades to mens & womens restrooms, interior finishes.Details
7th fl tenant improvement to include new non-structural partitions, multi purpose room expansion, all gender restrooms, upgrades to mens & womens restrooms, interior finishes. | $1,250,000 |
| Jan 21, 2021 | Never finaled issued Mar 2021, no final | 303 02nd St | Skyline Construction | 7/f: partial demolition of existing construction for future tenant improvement in compliance to ab-017. maher n/a. eniter 7th floor is vacantDetails
7/f: partial demolition of existing construction for future tenant improvement in compliance to ab-017. maher n/a. eniter 7th floor is vacant | $85,000 |
| Jan 19, 2021 | Completed final sign-off Mar 2023 | 303 02nd St | Skyline Construction | 6th fl partial demolition of existing construction for future tenant improvement. ab-017. entire 6th floor is vacant.Details
6th fl partial demolition of existing construction for future tenant improvement. ab-017. entire 6th floor is vacant. | $65,000 |
| Oct 18, 2019 | Completed final sign-off Oct 2020 | 2 Harrison St | Bcci Construction Company | 3rd fl - alterations include new non rated partitions. new conference rooms, new editing room & storage. ref pa 2019-0123-0979Details
3rd fl - alterations include new non rated partitions. new conference rooms, new editing room & storage. ref pa 2019-0123-0979 | $410,000 |
| Mar 11, 2019 | Never finaled issued Apr 2019, no final | 345 Spear St | Bcci Construction Company | 6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher.Details
6th floor - construction of a new catering kitchen and office space. new grease trap that runs from the 5th flooor through the 7th fl. 8th fl and roof equipment included in scope. structural deferred for grease interceptors & 8th floor rooftop anchorage. n/a for maher. | $2,800,000 |
| Jan 23, 2019 | Completed final sign-off Aug 2019 | 2 Harrison St | Bcci Construction Company | 4th floor: revision to previously approved architectural and m.e.p permits. change door and partition in coffee tasting room. adding new hand sink. ref: 201810193678.Details
4th floor: revision to previously approved architectural and m.e.p permits. change door and partition in coffee tasting room. adding new hand sink. ref: 201810193678. | $100,000 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 121 Spear St | Bcci Construction Company | roo: replace the existing roof gate with a new gate at east tower of building. maher n/a.Details
roo: replace the existing roof gate with a new gate at east tower of building. maher n/a. | $15,000 |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 121 Spear St | Bcci Construction Company | 2nd fl - fire only. permit for a-3 occupancy assembly. ref pa #201711093681. occupant load 91 and 94Details
2nd fl - fire only. permit for a-3 occupancy assembly. ref pa #201711093681. occupant load 91 and 94 | |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 121 Spear St | Bcci Construction Company | 5th fl - fire only. permit for a-2 assembly. ref pa #201711164136. barisita and deck occupant load 149Details
5th fl - fire only. permit for a-2 assembly. ref pa #201711164136. barisita and deck occupant load 149 | |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 121 Spear St | Bcci Construction Company | 6th floor- fire only permit for a3 occupancy assembly. ref: 2017-1212-6270 ol concentrated 276. ol unconcentrated 14 lb.Details
6th floor- fire only permit for a3 occupancy assembly. ref: 2017-1212-6270 ol concentrated 276. ol unconcentrated 14 lb. | |
| Oct 19, 2018 | Completed final sign-off Mar 2021 | 2 Harrison St | Bcci Construction Company | 3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls.Details
3th fl - office ti includes new partitions, kitchen & a-2 assembly area. room 300. mep deferred. structural drawings for walls. | $980,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2021 | 2 Harrison St | Bcci Construction Company | 4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area.Details
4th fl - office ti includes new partitions, gender neutral restrooms. as assembly area, room 401. mep deferred. also includes kitchen & coffee tasting area. | $980,000 |
| Jun 26, 2018 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 6th fl revision to approved ti. relocate hand sink inpantry. clarify to utilize floor mop sink. update cove base finish in restroom. ref #201803163850. maher naDetails
6th fl revision to approved ti. relocate hand sink inpantry. clarify to utilize floor mop sink. update cove base finish in restroom. ref #201803163850. maher na | |
| Dec 12, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 2nd flr: office space including partition, event rooms & horizontal exit. maher n/aDetails
2nd flr: office space including partition, event rooms & horizontal exit. maher n/a | $2,000,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 6th flr office ti with mep. new partitions, horizontal exit & finishes. this permit is to be completed together with permit #9.Details
6th flr office ti with mep. new partitions, horizontal exit & finishes. this permit is to be completed together with permit #9. | $5,000,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 3rd flr office ti with mep. new partitions, horizontal exit & finishes.Details
3rd flr office ti with mep. new partitions, horizontal exit & finishes. | $4,500,000 |
| Nov 21, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | 5th fl - tenant improvement including build out of workstations, partitions a/meps. also work on 3rd floor mdf room. fire under separate permits. maher naDetails
5th fl - tenant improvement including build out of workstations, partitions a/meps. also work on 3rd floor mdf room. fire under separate permits. maher na | $6,000,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a **Details
on 2nd through 5th floors- new interconnecting stair & stair openings for ti project. ** maher: n/a ** | $1,100,000 |
| Nov 9, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. (n) 2 hrs shaft, fire assembly area- two way communication, ul 300, sprinklers and fire alarm separate permit.Details
amep. level 3, office - kitchen dishroom & servery, seating areas. grease trap on level 2 & shafts that run from level 3 to roof. mep included. (n) 2 hrs shaft, fire assembly area- two way communication, ul 300, sprinklers and fire alarm separate permit. | $6,000,000 |
| Jul 26, 2017 | Completed final sign-off Jun 2019 | 345 Spear St | Bcci Construction Company | 6th floor remodel, (e) tech talk room, conference rooms 9 fire doorsDetails
6th floor remodel, (e) tech talk room, conference rooms 9 fire doors | $1,215,000 |
| Jul 24, 2017 | Completed final sign-off Jun 2019 | 121 Spear St | Bcci Construction Company | demolition of floors 2,3,4,5 & 6 interior only selective areas on each floor to be demolished. n/a maherDetails
demolition of floors 2,3,4,5 & 6 interior only selective areas on each floor to be demolished. n/a maher | $100,000 |
| Jun 26, 2017 | Never finaled issued Jun 2017, no final | 2 Harrison St | Bcci Construction Company | 2nd floor - new partitions, ceilings and finishes. n/a for maher.Details
2nd floor - new partitions, ceilings and finishes. n/a for maher. | $300,000 |
| Feb 7, 2017 | Never finaled issued Feb 2017, no final | 1 Embarcadero Center | Principal Builders Inc. | 30th floor - revision to pa #201607132253 to show guardrail at 30th floor.Details
30th floor - revision to pa #201607132253 to show guardrail at 30th floor. | |
| Jan 18, 2017 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction | revision to 201606291145 ti permit to update da checklist. no new construction, administrative onlyDetails
revision to 201606291145 ti permit to update da checklist. no new construction, administrative only | |
| Sep 12, 2016 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction | 1st floor - administrative purposes to document a-3 assembly space 114 and 118 in office bldg. t.i. portion is under a separate permit #201606291145.Details
1st floor - administrative purposes to document a-3 assembly space 114 and 118 in office bldg. t.i. portion is under a separate permit #201606291145. | |
| Jun 29, 2016 | Completed final sign-off Feb 2017 | 188 The Embarcadero | Dpr Construction | interior alterations including walls, ceilings, flooring and casework. mech, elec, plumbing to support new interior space. demo under 201602119345 maher not reqDetails
interior alterations including walls, ceilings, flooring and casework. mech, elec, plumbing to support new interior space. demo under 201602119345 maher not req | $2,400,000 |
| Apr 22, 2016 | Completed final sign-off Jun 2017 | 345 Spear St | Bcci Construction Company | 4th floor -demolition of (17) existing offices to create open office space & a single occupancy unisex ada restroom to be built to provide full accessibility and associated mep; n/a maher ord. # 155-13Details
4th floor -demolition of (17) existing offices to create open office space & a single occupancy unisex ada restroom to be built to provide full accessibility and associated mep; n/a maher ord. # 155-13 | $494,160 |
| Mar 24, 2016 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Dpr Construction | revision to pa #201509116686 - revisions include additoinal t. i. by means of new conference rooms, open office & re-routing of mechanical duct work, to supply new open office area. n/a maher ordinanceDetails
revision to pa #201509116686 - revisions include additoinal t. i. by means of new conference rooms, open office & re-routing of mechanical duct work, to supply new open office area. n/a maher ordinance | $500,000 |
| Dec 28, 2015 | Completed final sign-off Oct 2017 | 345 Spear St | Bcci Construction Company | 5th flr: partial floor t.i. including minor demolition,new partitions,finishes & associated mep, fire ls under separate permit; maher n/aDetails
5th flr: partial floor t.i. including minor demolition,new partitions,finishes & associated mep, fire ls under separate permit; maher n/a | $795,000 |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | 12th flr: revision to 201509177337; added two new room, changed some lighting fixtures etc. meps under separate permit; maher n/aDetails
12th flr: revision to 201509177337; added two new room, changed some lighting fixtures etc. meps under separate permit; maher n/a | $25,000 |
| Nov 5, 2015 | Completed final sign-off Jul 2016 | 345 Spear St | Skyline Construction | demolition of existing concrete fountain related fountain equipment on level b1 to be removed. $20,000 to be deferred to construction permit application. compliance with maher ordinance no 155-13 not required.Details
demolition of existing concrete fountain related fountain equipment on level b1 to be removed. $20,000 to be deferred to construction permit application. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Nov 3, 2015 | Completed final sign-off Aug 2016 | 188 The Embarcadero | Dpr Construction Inc | interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals.Details
interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals. | $2,000,000 |
| Oct 21, 2015 | Completed final sign-off Oct 2016 | 188 The Embarcadero | Dpr Construction | modification of (e) cellular phone equipment and platform. raising of equipment on roof. compliance with maher ordinance not required.Details
modification of (e) cellular phone equipment and platform. raising of equipment on roof. compliance with maher ordinance not required. | $24,000 |
| Sep 22, 2015 | Expired or cancelled cancelled Jan 2026 | 22 04th St | floor 3, 6, 10 tenant improvement - upgrade lobbies access control door devices only, and toilet patition door at womens ada restroom door n/a maher ordinanceDetails
floor 3, 6, 10 tenant improvement - upgrade lobbies access control door devices only, and toilet patition door at womens ada restroom door n/a maher ordinance | $10,000 | |
| Sep 17, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Sc Builders, Inc | upgrade elevator lobby area, reception area, conference rooms & upgrade existing door access control, scope of work to include demolition of partitions at open office area, elevator lobby. n/a ordinance #155-13Details
upgrade elevator lobby area, reception area, conference rooms & upgrade existing door access control, scope of work to include demolition of partitions at open office area, elevator lobby. n/a ordinance #155-13 | $200,000 |
| Jul 30, 2015 | Never finaled filed Jul 2015, never issued | 188 The Embarcadero | Dpr Construction | 8th flr: deferred submittal to permit 201506048095; for decorative ceiling trellis on 8th flr; maher n/aDetails
8th flr: deferred submittal to permit 201506048095; for decorative ceiling trellis on 8th flr; maher n/a | |
| Jul 10, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | 2nd floor suite #200: interior t.i. including new partitions, ceiling, finishes and associated mechanical and electrical. fire life safety under separate permit. maher n/a.Details
2nd floor suite #200: interior t.i. including new partitions, ceiling, finishes and associated mechanical and electrical. fire life safety under separate permit. maher n/a. | $1,416,000 |
| Jul 2, 2015 | Completed final sign-off Jan 2016 | 22 04th St | Metropolitan Electrical Construction | 6th floor: tenant improvement for lighting upgrade. n/a for maher ordinance. ref #201504224272Details
6th floor: tenant improvement for lighting upgrade. n/a for maher ordinance. ref #201504224272 | $30,000 |
| May 18, 2015 | Completed final sign-off Jun 2016 | 345 Spear St | Bcci Construction Company | 2nd flr: interior non-structural pre construction demo. work done under sfab-017. floor to remain unoccupiedDetails
2nd flr: interior non-structural pre construction demo. work done under sfab-017. floor to remain unoccupied | $248,000 |
| Jan 27, 2015 | Completed final sign-off May 2016 | 2 Harrison St | Bcci Construction Company | 3rd floor suite 350 tenant improvement including minor demolition, new partitions, finishes & associated mechanical & electrical. n/a maher ordinance. life safety deferred. structural for tube steel support under separate permitDetails
3rd floor suite 350 tenant improvement including minor demolition, new partitions, finishes & associated mechanical & electrical. n/a maher ordinance. life safety deferred. structural for tube steel support under separate permit | $678,000 |
| Jan 23, 2015 | Completed final sign-off Nov 2016 | 345 Spear St | Bcci Construction Company | 7th floor: ti. include demo, refurbishing of (e) restrooms, new partitions & new ceilings. mep, fire alarm and sprinklers under separate permit. new occupant loads and pavers on roof. sffd assembly permit required.** maher: compliance with ordinance no# 155-13 not required **Details
7th floor: ti. include demo, refurbishing of (e) restrooms, new partitions & new ceilings. mep, fire alarm and sprinklers under separate permit. new occupant loads and pavers on roof. sffd assembly permit required.** maher: compliance with ordinance no# 155-13 not required ** | $3,100,000 |
| Nov 19, 2014 | Completed final sign-off Jun 2016 | 345 Spear St | Bcci Construction Company | 3rd floor - revision to appl #2014.0818.4059 to reconfigure work spaces & to eliminate the demolitoin of the interconnecting staircase. mechanical & electrical work under separate permit.Details
3rd floor - revision to appl #2014.0818.4059 to reconfigure work spaces & to eliminate the demolitoin of the interconnecting staircase. mechanical & electrical work under separate permit. | |
| Aug 18, 2014 | Expired or cancelled cancelled Jul 2016 | 345 Spear St | Bcci Construction Company | interior demolition of convenient stair connecting levels 2 to 3 floor & 3 to 4 floor. demolition of associated partitions. structural infill of openings on levels 3 to 4 floor. n/a ordinance #155-13Details
interior demolition of convenient stair connecting levels 2 to 3 floor & 3 to 4 floor. demolition of associated partitions. structural infill of openings on levels 3 to 4 floor. n/a ordinance #155-13 | $250,000 |
| Aug 18, 2014 | Completed final sign-off Jan 2015 | 345 Spear St | Bcci Construction Company | cafe 3rd floor - revision to appl #2014.0611.8144 establish occupancy load. sffd assembly permit required. to reflect changes in food service plan. n/a maher ordinanceDetails
cafe 3rd floor - revision to appl #2014.0611.8144 establish occupancy load. sffd assembly permit required. to reflect changes in food service plan. n/a maher ordinance | |
| Jul 16, 2014 | Expired or cancelled cancelled Sep 2015 | 345 Spear St | Bcci Construction Company | 7th floor: phase 1 of 2 interior t.i. including new partitions and finishes, mechanical and electrical and fire alarm and sprinkler under seperate permit. work includes new horizontal exit & reviseing smoke control report. ** maher: compliance with ordinance no# 155-13 not required **Details
7th floor: phase 1 of 2 interior t.i. including new partitions and finishes, mechanical and electrical and fire alarm and sprinkler under seperate permit. work includes new horizontal exit & reviseing smoke control report. ** maher: compliance with ordinance no# 155-13 not required ** | $1,900,000 |
| Jun 11, 2014 | Completed final sign-off Dec 2014 | 345 Spear St | Bcci Construction Company | cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load.Details
cafe 3rd floor: minor demolition, new wall, kitchen equipment and mechanical & electrical. installing new hortzontial exit. ls & sprinklers under seperate permit. n/a ordinance #155-13-per pre-application mtg 7-3-14- phase i- temp exiting corridor- sealing convience stair. occupant load. | $1,400,000 |
| May 13, 2014 | Never finaled issued May 2014, no final | 345 Spear St | Bcci Construction Company | tenant improvement on the 5th fl. new partitions, willwork, finishes. associated mep and sprinklers and life safety under separate permit.Details
tenant improvement on the 5th fl. new partitions, willwork, finishes. associated mep and sprinklers and life safety under separate permit. | $3,000,000 |
| Apr 1, 2014 | Completed final sign-off Sep 2014 | 345 Spear St | Bcci Construction Company | interior, non-structural pre construction demo under sfab 017 area to remain unoccupied. n/a to ordinance#155-13.Details
interior, non-structural pre construction demo under sfab 017 area to remain unoccupied. n/a to ordinance#155-13. | $215,460 |
| Oct 5, 2011 | Completed final sign-off Mar 2012 | 4 Embarcadero Center | Field Construction Inc. | 25th floor tenant improvement of existing space, consisting primarily of the installation of new gypsum board walls, floor covering, wall & ceiling finishes, suspended act & lighting. also misc work in bathrooms. mep, sprinkler and fire alarm under separate applicationsDetails
25th floor tenant improvement of existing space, consisting primarily of the installation of new gypsum board walls, floor covering, wall & ceiling finishes, suspended act & lighting. also misc work in bathrooms. mep, sprinkler and fire alarm under separate applications | $155,474 |
| Oct 5, 2011 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | Field Construction Inc. | 24th floor tenant improvement of existing space, consisting primarily of the installation of new gypsum board walls, floor covering, wall & ceiling finishes, suspended act & lighting. misc. restroom upgrades. mep, life safety separate.Details
24th floor tenant improvement of existing space, consisting primarily of the installation of new gypsum board walls, floor covering, wall & ceiling finishes, suspended act & lighting. misc. restroom upgrades. mep, life safety separate. | $129,685 |
| Jul 21, 2011 | Completed final sign-off Sep 2011 | 333 Bush St | Principal Builders Inc. | 30th floor - new partitions, new millwork, new doors, frames & hardward, new sink @ break room, re-wrap fabric panels, new electrical floor boxes, new lighting, rework mechanical zones, repaint all walls. life safety & sprinkler under separate permit.Details
30th floor - new partitions, new millwork, new doors, frames & hardward, new sink @ break room, re-wrap fabric panels, new electrical floor boxes, new lighting, rework mechanical zones, repaint all walls. life safety & sprinkler under separate permit. | $115,001 |
| Jun 27, 2011 | Completed final sign-off Sep 2011 | 333 Bush St | Principal Builders Inc. | 27th & 28th floor mechanical, electrical & plumbing modifications, arch pa #201106027295. life safety & sprinklers to be under separate permit.Details
27th & 28th floor mechanical, electrical & plumbing modifications, arch pa #201106027295. life safety & sprinklers to be under separate permit. | $230,000 |
| Jun 2, 2011 | Completed final sign-off Sep 2011 | 333 Bush St | Principal Builders Inc. | new ceiling and walls for 27th nad 28th floors. demo under 201105176217- mep, sp & ls separate permits-Details
new ceiling and walls for 27th nad 28th floors. demo under 201105176217- mep, sp & ls separate permits- | $534,066 |
| Mar 10, 2010 | Completed final sign-off May 2010 | 1 Market St | Hathaway Dinwiddie Co. | 5th floor tenant improvement involving removal of an existing glass partition & addition of (2) new partitions dividing existing conf. room into (2) new offices. fire sprinklers & life safety & mep under separate permit.Details
5th floor tenant improvement involving removal of an existing glass partition & addition of (2) new partitions dividing existing conf. room into (2) new offices. fire sprinklers & life safety & mep under separate permit. | $28,000 |
| Mar 1, 2007 | Completed final sign-off Jul 2007 | 1 Market St | Hathaway Dinwiddie Co. | sedgwick, deiert moran arnold- oti-2, 11th floor, el, me.Details
sedgwick, deiert moran arnold- oti-2, 11th floor, el, me. | $112,000 |
| Jul 22, 2003 | Completed final sign-off Nov 2003 | 219 King St | 1st time t.i. for ice cream store, work includes (n)partitions (n)casework (n)finishes (n)ductsDetails
1st time t.i. for ice cream store, work includes (n)partitions (n)casework (n)finishes (n)ducts | $90,000 |